Compare versions of UN R100
Specific requirements for the electric power train
1.1.changed
Part I: Safety requirements with respect to the electric power train of road vehicles of categories M and N 1 , N1, with a maximum design speed exceeding 25 km/h, equipped with one or more traction motor(s) operated by electric power and not train, excluding vehicles permanently connected to the grid, as well as their high grid. Part I of this regulation does not cover; (a) Post-crash safety requirements of road vehicles. (b) High voltage components and systems which are not galvanically connected to the high voltage bus of the electric power train. Part I of this regulation does not cover post-crash safety requirements of road vehicles.
1.2.changed
Energy Storage System (REESS), of road vehicles of categories M and N equipped with one or more traction motors operated by electric power and not train, excluding vehicles permanently connected to the grid. Part II of this Regulation does not apply to REESS(s) a battery whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries systems. auxiliaries’ systems..
2.2.changed
2.3.changed
2.4.added
"Breakout harness" means connector wires that are connected for testing
purposes to the REESS on the traction side of the automatic disconnect
2.5.changed
2.6.deleted
2.7.changed
2.8.changed
2.9.changed
2.10.changed
2.11.changed
"Electric power train" energy conversion system" means the electrical circuit which includes the traction motor(s), a system (e.g. fuel cell) that generates and may include the REESS, the provides electric energy conversion system, the electronic converters, the associated wiring harness and connectors, and the coupling system for charging the REESS. electric propulsion.
2.12.changed
2.13.changed
2.14.changed
2.15.changed
2.16.changed
2.17.changed
2.18.changed
2.19.changed
2.20.changed
2.21.changed
2.22.changed
2.23.changed
2.24.changed
2.25.changed
2.26.changed
2.27.changed
2.28.changed
2.29.changed
2.30.changed
2.31.changed
2.32.changed
2.33.changed
2.34.changed
2.35.changed
2.36.changed
2.37.changed
2.38.changed
2.39.added
"Rupture" means opening(s) through the casing of any functional cell
assembly created or enlarged by an event, large enough for a 12 mm diameter
test finger (IPXXB) to penetrate and make contact with live parts (see
Annex 3).
2.40.added
"Service disconnect" means the device for deactivation of the electrical circuit
when conducting checks and services of the REESS, fuel cell stack, etc.
2.41.added
"Solid insulator" means the insulating coating of wiring harnesses provided
in order to cover and prevent the high voltage live parts from any direct
contact
2.42.added
"Specific voltage condition" means the condition that the maximum voltage
of a galvanically connected electrical circuit between a DC live part and any
other live part (DC or AC) is ≤ 30 V AC (rms) and ≤ 60 V DC.
Note: When a DC live part of such an electrical circuit is connected to chassis
and the specific voltage condition applies, the maximum voltage between any
live part and the electrical chassis is ≤ 30 V AC (rms) and ≤ 60 V DC
2.43.added
DeviceTested-Device expressed as a percentage of its rated capacity.
2.44.added
"Tested-Device" means either complete REESS or REESS subsystem that is
subjected to the tests prescribed by this Regulation.
2.45.added
"Thermal event" means the condition when the temperature within the
REESS is significantly higher (as defined by the manufacturer) than the
maximum operating temperature.
2.46.added
"Thermal runaway" means an uncontrolled increase of cell temperature
caused by exothermic reactions inside the cell.
2.47.added
"Thermal propagation" means the sequential occurrence of thermal runaway
within a REESS triggered by thermal runaway of a cell in that REESS.
2.48.added
"Type of REESS" means systems which do not differ significantly in such
essential aspects as:
(a) The manufacturer's trade name or mark;
(b) The chemistry, capacity and physical dimensions of its cells;
(c) The number of cells, the mode of connection of the cells and the
physical support of the cells;
(d) The construction, materials and physical dimensions of the casing and
(e) The necessary ancillary devices for physical support, thermal
management and electronic control.
2.49.added
"Vehicle connector" means the device which is inserted into the vehicle inlet
to supply electric energy to the vehicle from an external electric power
supply.
2.50.added
"Vehicle inlet" means the device on the externally chargeable vehicle into
which the vehicle connector is inserted for the purpose of transferring electric
energy from an external electric power supply.
2.51.added
"Vehicle type" means vehicles which do not differ in such essential aspects
as:
(a) Installation of the electric power train and the galvanically connected
high voltage bus;
(b) Nature and type of electric power train and the galvanically connected
high voltage components.
2.52.added
"Venting" means the release of excessive internal pressure from cell or
REESS subsystem or REESS in a manner intended by design to preclude
rupture or explosion."
2.53.added
"Working voltage" means the highest value of an electrical circuit voltage
root-mean-square (rms), specified by the manufacturer, which may occur
between any conductive parts in open circuit conditions or under normal
operating condition. If the electrical circuit is divided by galvanic isolation,
the working voltage is defined for each divided circuit, respectively.
3.1.changed
Part I: Approval of a vehicle type with regard to its electrical safety, including specific requirements for the High Voltage System electric power train.
4.4.1.deleted
3.1.2.1.changed
Detailed description of the vehicle type as with regards to the electric power train and the high voltage bus galvanically connected high voltage bus. to it.
4.4.2.deleted
4.4.3.deleted
3.2.added
Part II: Approval of a Rechargeable Electrical Energy Storage System
(REESS)
3.2.1.changed
The application for approval of a type of REESS or separate technical unit with regard to the safety requirements of the REESS shall be submitted by the REESS manufacturer or by his duly accredited representative.
4.6.1.deleted
4.6.2.deleted
3.2.2.1.changed
Detailed description of the type of REESS or separate technical unit as regards the safety of the REESS.
4.7.deleted
4.1.changed
4.2.changed
4.3.changed
4.3.1.added
A circle surrounding the letter "E" followed by the distinguishing number of
the country which has granted approval3.
5.1.1.4.deleted
4.3.2.added
The number of this Regulation, followed by the letter "R", a dash and the
approval number to the right of the circle described in paragraph 4.3.1.
4.3.3.added
In the case of an approval of a REESS the "R" shall be followed by the
symbol "ES".
5.1.1.5.1.deleted
4.4.changed
4.5.changed
5.1.1.5.2.deleted
4.5.1.added
In the case of a vehicle, the approval mark shall be placed on or close to the
vehicle data plate affixed by the manufacturer.
5.1.1.5.3.deleted
4.5.2.added
In the case of a REESS, the approval mark shall be affixed on the major
element of the REESS by the manufacturer.
5.1.2.deleted
4.6.changed
5.changed
Part I: Requirements of a vehicle with regard to its electrical safety specific requirements for the electric power train
5.1.changed
These electrical safety requirements apply to high voltage buses of electric power train and electrical components which are galvanically connected to the high voltage bus of electric power train under conditions where they are not connected to external high voltage power supplies.
5.1.1.changed
Figure 1changed
5.1.1.1.changed
For protection of high voltage live parts inside the passenger compartment or luggage compartment, the protection degree IPXXD shall be provided.
5.1.1.2.changed
For protection of high voltage live parts in areas other than the passenger compartment or luggage compartment, the protection degree IPXXB shall be satisfied. provided.
5.1.1.3.changed
5.1.1.4.1.added
The symbol shown in Figure 2 shall be present on or near the REESS having
high voltage capability. The symbol background shall be yellow, the
bordering and the arrow shall be black.
This requirement shall also apply to a REESS which is part of a galvanically
connected electrical circuit where the specific voltage condition is not
fulfilled, independent of the maximum voltage of the REESS.
5.1.1.4.2.added
The symbol shall also be visible on enclosures and electrical protection
barriers, which, when removed, expose live parts of high voltage circuits.
This provision is optional to any connector for high voltage buses. This
provision shall not apply to any of the following cases:
(a) Where electrical protection barriers or enclosures cannot be physically
accessed, opened, or removed; unless other vehicle components are
removed with the use of tools;
(b) Where electrical protection barriers or enclosures are located
underneath the vehicle floor.
(c) Electrical protection barriers or enclosures of conductive connection
device for vehicles of categories N2, N3, M2 and M3 which satisfies
the conditions prescribed in paragraph 5.1.1.
5.1.1.4.3.added
Cables for high voltage buses which are not located within enclosures shall
be identified by having an outer covering with the colour orange.
5.3.deleted
5.1.2.1.changed
For protection against electrical shock which could arise from indirect contact, the exposed conductive parts, such as the conductive electrical protection barrier and enclosure, shall be galvanically connected securely to the electrical chassis by connection with electrical wire or ground cable, or by welding, or by connection using bolts, etc. so that no dangerous potentials are produced.
5.1.2.2.changed
The resistance between all exposed conductive parts and the electrical chassis shall be lower than 0.1 ohm Ω when there is current flow of at least 0.2 amperes. The resistance between any two simultaneously reachable exposed conductive parts of the electrical protection barriers that are less than 2.5 m from each other shall not exceed 0.2 Ω. This resistance may be calculated using the separately measured resistances of the relevant parts of electric path. This requirement is satisfied if the galvanic connection has been established by welding. In case of doubt or if the connection is established by other means than welding, a measurement shall be made by using one of the test procedures described in Annex 4.
5.1.2.3.changed
In the case of motor vehicles which are intended to be connected to the grounded external electric power supply through the conductive connection, connection between vehicle inlet and vehicle connector, a device to enable the galvanical connection of the electrical chassis to the earth ground for the external electric power supply shall be provided. The device should enable connection to the earth ground before exterior voltage is applied to the vehicle and retain the connection until after the exterior voltage is removed from the vehicle. Compliance to this requirement may be demonstrated either by using the connector specified by the car vehicle manufacturer, by visual inspection or by analysis. drawings. The above requirements are only applicable for vehicles when charging from a stationary charging point, with a charging cable of finite length, through a vehicle coupler comprising a vehicle connector and a vehicle inlet.
5.1.3.added
This paragraph shall not apply to electrical circuits that are galvanically
connected to each other, where the DC part of these circuits is connected to
the electrical chassis and the specific voltage condition is fulfilled.
5.1.3.1.changed
Current-buses If AC high voltage buses and DC high voltage buses are galvanically isolated from each other, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/volt Ω/volt of the working voltage for DC buses, and a minimum value of 500 Ω/volt Ω/volt of the working voltage for AC buses. The measurement shall be conducted according to Annex 4A 5A "Isolation resistance measurement method for vehicle based tests".
5.1.3.2.changed
If AC high voltage buses and DC high voltage buses are galvanically connected connected, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 500 Ω/volt Ω/volt of the working voltage. However, if all AC high voltage buses are protected by one of the 2 two following measures, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V Ω/V of the working voltage: (a) Double At least two or more layers of solid insulators, electrical protection barriers or enclosures that meet the requirement in paragraph 5.1.1. independently, for example wiring harness; (b) Mechanically robust protections that have sufficient durability over vehicle service life such as motor housings, electronic converter cases or connectors; The isolation resistance between the high voltage bus and the electrical chassis may be demonstrated by calculation, measurement or a combination of both. The measurement shall be conducted according to Annex 4A 5A "Isolation resistance measurement method for vehicle based tests".
5.1.3.3.changed
5.1.3.4.changed
Isolation resistance requirement for the coupling system for charging the REESS For the vehicle inlet conductive connection device intended to be conductively connected to the grounded external AC power supply and the electrical circuit that is galvanically connected to the vehicle inlet conductive connection device during charging of the REESS, the isolation resistance between the high voltage bus and the electrical chassis shall be at least 1 MΩ comply with the requirements of paragraph 5.1.3.1. when the charger coupler conductive connection is disconnected. disconnected and the isolation resistance is measured at the high voltage live parts (contacts) of the vehicle conductive connection device. During the measurement, the traction battery REESS may be disconnected.
5.1.4.added
Protection against water effects.
The vehicles shall maintain isolation resistance after exposure to water (e.g.
washing, driving through standing water). This paragraph shall not apply to
electrical circuits that are galvanically connected to each other, where the DC
part of these circuits is connected to the electrical chassis and the specific
voltage condition is fulfilled.
5.1.4.1.added
The vehicle manufacturer can choose to comply with requirements specified
in paragraph 5.1.4.2., those specified in paragraph 5.1.4.3., or those specified
in paragraph 5.1.4.4.
5.1.4.2.added
The vehicle manufacturers shall provide evidence and/or documentation to
the type-approval authority or technical services as applicable on how the
electrical design or the components of the vehicle located outside the
passenger compartment or externally attached, after water exposure remain
safe and comply with the requirements described in Annex 7A. If the
evidence and/or documentation provided is not satisfactory the type-approval
authority or technical services or testing entity as applicable shall require the
manufacturer to perform a physical component test based on the same
specifications as those described in Annex 7A.
5.1.4.3.added
If the test procedures specified in Annex 7B are performed, just after each
exposure, and with the vehicle still wet, the vehicle shall then comply with
isolation resistance test given in Annex 5A, and the isolation resistance
requirements given in paragraph 5.1.3. shall be met. In addition, after a 24
hour pause, the isolation resistance test specified in Annex 5A shall again be
performed, and the isolation resistance requirements given in paragraph 5.1.3.
shall be met.
5.1.4.4.added
If an isolation resistance monitoring system is provided, and the isolation
resistance less than the requirements given in paragraph 5.1.3. is detected, a
warning shall be indicated to the driver. The function of the on-board
isolation resistance monitoring system shall be confirmed as described in
Annex 6.
5.2.1.1.changed
For a REESS which has been type approved in accordance with Part II of this series of Amendments to this Regulation, it shall be installed in accordance with the instructions provided by the manufacturer of the REESS, and in conformity with the description provided in Part Annex 1, Appendix 2 of Annex 6 to this Regulation.
5.2.1.2.changed
The REESS including related vehicle components, systems and structure as applicable, shall comply with the respective requirements of paragraph 6. of this Regulation.
5.2.3.added
The vehicle shall provide a warning to the driver when the vehicle is in active
driving possible mode in the event specified in paragraphs 6.13. to 6.15.
In case of optical warning, the tell-tale shall, when illuminated, be
sufficiently bright to be visible to the driver under both daylight and night-
time driving conditions, when the driver has adapted to the ambient roadway
light conditions.
This tell-tale shall be activated as a check of lamp function either when the
propulsion system is turned to the "On" position, or when the propulsion
system is in a position between "On" and "Start" that is designated by the
manufacturer as a check position. This requirement does not apply to the tell-
tale or text shown in a common space.
5.2.4.added
Warning in the event of low energy content of REESS.
For pure electric vehicles (vehicles equipped with a powertrain containing
exclusively electric machines as propulsion energy converters and
exclusively rechargeable electric energy storage systems as propulsion energy
storage systems), a warning to the driver in the event of low REESS state of
charge shall be provided. Based on engineering judgment, the manufacturer
shall determine the necessary level of REESS energy remaining, when the
driver warning is first provided.
In case of optical warning, the tell-tale shall, when illuminated, be
sufficiently bright to be visible to the driver under both daylight and night-
time driving conditions, when the driver has adapted to the ambient roadway
light conditions.
5.3.1.added
At least a momentary indication shall be given to the driver each time when
the vehicle is first placed in "active driving possible mode'' after manual
activation of the propulsion system.
However, this provision is optional under conditions where an internal
combustion engine provides directly or indirectly the vehicle´s propulsion
power upon start up.
5.3.2.added
When leaving the vehicle, the driver shall be informed by a signal (e.g.
optical or audible signal) if the vehicle is still in the active driving possible
mode. Moreover, in case of vehicles of category M 2 and M3 with a capacity
of more than 22 passengers in addition to the driver, this signal shall already
be given when the drivers leave their seat.
However, this provision is optional under conditions where an internal
combustion engine provides, directly or indirectly, the vehicle´s propulsion
power while leaving the vehicle or driver seat.
5.3.3.added
If the REESS can be externally charged, vehicle movement by its own
propulsion system shall be impossible as long as the vehicle connector is
physically connected to the vehicle inlet.
This requirement shall be demonstrated by using the vehicle connector
specified by the vehicle manufacturer.
The above requirements are only applicable for vehicles when charging from
a stationary charging point, with a charging cable of finite length, through a
vehicle coupler comprising a vehicle connector and a vehicle inlet.
5.3.4.added
The state of the drive direction control unit shall be identified to the driver.
5.4.2.changed
The test shall be conducted following the method described in Annex 7 8 to the present Regulation. The hydrogen sampling and analysis shall be the ones prescribed. Other analysis methods can be approved if it is proven that they give equivalent results.
5.4.3.changed
During a normal charge procedure in the conditions given in Annex 7, 8, hydrogen emissions shall be below 125 g during 5 h, or below 25 x t2 g during t2 (in h).
5.4.4.changed
During a charge carried out by a charger presenting a failure (conditions given in Annex 7), 8), hydrogen emissions shall be below 42 g. Furthermore the charger shall limit this possible failure to 30 minutes.
5.4.10.changed
The approval granted to a vehicle type relative to hydrogen emissions can be extended to different vehicle types belonging to the same family, in accordance with the definition of the family given in Annex 7, 8, Appendix 2.
6.changed
Energy Storage System (REESS) with regard to its safety
6.1.changed
The procedures prescribed in Annex 8 9 of this Regulation shall be applied.
6.2.1.changed
The test shall be conducted in accordance with Annex 8A 9A to this Regulation.
6.2.2.1.changed
During the test, there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS (s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.2.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
6.3.1.changed
6.3.2.1.changed
During the test, there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) REESS (s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.3.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B of 5B to this Regulation shall not be less than 100 Ω/Volt.
6.4.1.1.changed
Compliance with the requirements of the acceptance criteria of paragraph 6.4.1.3. below may be demonstrated by REESS(s) installed in vehicles that have been subjected to vehicle crash tests in accordance with UN Regulation No. 12, 94, Annex 3 or UN Regulation No. 94, 137, Annex 3 for frontal impact, and UN Regulation No. 95, Annex 4 for side impact. The ambient temperature and the SOC shall be in accordance with the said Regulations. This requirement is deemed to be met if the vehicle equipped with electric power train operating on high voltage is approved in accordance with UN Regulation No. 94 (04 series of amendments or later) or UN Regulation No. 137 (01 series of amendments or later) for frontal impact and UN Regulation No. 95 (05 series of amendments or later) for lateral impact. The approval of a REESS tested under this paragraph shall be limited to the specific vehicle type.
6.4.1.2.changed
The test shall be conducted in accordance with Annex 8C 9C to this Regulation.
6.4.1.3.changed
During the test there shall be no evidence of: (a) Fire; (b) Explosion; (c1) Electrolyte leakage if tested according to paragraph 6.4.1.1.: (i) In case of aqueous electrolyte REESS: For a period from the impact until 30 60 minutes after the impact impact, there shall be no electrolyte spillage leakage from the REESS into the passenger compartment; (ii) No compartment and no more than 7 per cent by volume of the REESS electrolyte capacity shall spill with a maximum of 5.0 l leaked from the REESS to the outside of the passenger compartment. The leaked amount of electrolyte can be measured by the usual techniques of determination of liquid volumes after its collection. For containers containing Stoddard, coloured coolant and electrolyte, the fluids shall be allowed to separate by specific gravity then measured; (ii) In case of non-aqueous electrolyte REESS: For a period from the impact until 60 minutes after the impact, there shall be no liquid electrolyte leakage from the REESS into the passenger compartment, luggage compartment (for open type traction batteries a limitation and no liquid electrolyte leakage to a maximum outside the vehicle. This requirement shall be verified by visual inspection without disassembling any part of 5 litres also applies); the vehicle. (c2) Electrolyte leakage if tested according to paragraph 6.4.1.2. After the vehicle based test (paragraph 6.4.1.1.), a REESS which is located inside the passenger compartment shall remain in attached to the installed location vehicle by at least one component anchorage, bracket, or any structure that transfers loads from REESS to the vehicle structure, and the REESS components shall remain inside REESS boundaries. No part of any REESS that is located outside the passenger compartment shall not enter the passenger compartment during or after the impact test procedures. compartment. After the component based test (paragraph 6.4.1.2.) the tested-device Tested-Device shall be retained by its mounting and its components shall remain inside its boundaries. For a high voltage REESS the isolation resistance of the tested-device Tested-Device shall ensure at least 100 Ω/Volt Ω/Volt for the whole REESS measured after the test in accordance with Annex 4A 5A or Annex 4B 5B to this Regulation, or the protection degree IPXXB shall be fulfilled for the tested-device. Tested-Device. For a REESS tested in accordance with paragraph 6.4.1.2., the evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. To confirm compliance to (c1) of paragraph 6.4.1.3. an appropriate coating shall, if necessary, be applied to the physical protection (casing) in order to confirm if there is any electrolyte leakage from the REESS resulting from the impact test. Unless the manufacturer provides a means to differentiate between the leakage of different liquids, all liquid leakage shall be considered as the electrolyte. Tested-Device.
6.4.2.1.1.changed
Compliance with the requirements of the acceptance criteria of paragraph 6.4.2.3. below may be demonstrated by REESS(s) installed in vehicles that have been subjected to a vehicle crash test in accordance with the Annex 3 to Regulations Nos. 12 or 94 for frontal impact, and Annex 4 to Regulation No. 95 for side impact. The ambient temperature and the SOC shall be in accordance with the said Regulations.
6.4.2.3.changed
6.4.2.1.2.changed
The test shall be conducted in accordance with Annex 8D 9D of this Regulation. The crush force replacing the prescribed force specified in paragraph 3.2.1. of Annex 8D shall 9D may be determined replaced with the value declared by the vehicle manufacturer using the data obtained from either actual crash tests or its simulation as specified in Annex 3 of UN Regulations No. 12 Nos. 94 or No. 94 137 in the direction of travel and according to Annex 4 to UN Regulation No. 95 in the direction horizontally perpendicular to the direction of travel. These forces shall be agreed by the Technical Service. The manufacturers may, in agreement with the Technical Services, use forces derived from the data obtained from alternative crash test procedures, but these forces shall be equal to or greater than the forces that would result from using data in accordance with the Regulations specified above. The manufacturer may define the relevant parts of the vehicle structure used for the mechanical protection of the REESS components. The test shall be conducted with the REESS mounted to this vehicle structure in a way which is representative of its mounting in the vehicle.
6.4.2.2.changed
The test shall be conducted in accordance with Annex 8D 9D to this Regulation. REESS approved according to this paragraph shall be mounted in a position which is between the two planes; (a) a vertical plane perpendicular to the centre line of the vehicle located 420 mm rearward from the front edge of the vehicle, and (b) a vertical plane perpendicular to the centre line of the vehicle located 300 mm forward from the rear edge of the vehicle. The mounting restrictions shall be documented in Annex 6 - Part 1 – Appendix 2. The crush force specified in paragraph 3.2.1. of Annex 8D 9D may be replaced with the value declared by the manufacturer, where the crush force shall be documented in Annex 6, Part 1, Appendix 2 as a mounting restriction. In this case, the vehicle manufacturer who uses such REESS shall demonstrate, during the process of approval for Part I of this Regulation, that the contact force to the REESS will not exceed the figure declared by the REESS manufacturer. Such force shall be determined by the vehicle manufacturer using the data obtained from either actual crash test or its simulation as specified in Annex 3 of to UN Regulations Nos. 12 94 or 94 137 in the direction of travel and according to Annex 4 to Regulation No. 95 in the direction horizontally perpendicular to the direction of travel. These forces shall be agreed by the manufacturer together with the Technical Service. The manufacturers may, in agreement with the Technical Services, use forces derived from the data obtained from alternative crash test procedures, but these forces shall be equal to or greater than the forces that would result from using data in accordance with the regulations specified above.
6.4.2.3.added
During the test there shall be no evidence of:
(a) Fire;
(b) Explosion;
(c1) Electrolyte leakage if tested according to paragraph 6.4.1.1.:
(i) In case of aqueous electrolyte REESS:
For a period from the impact until 60 minutes after the impact
there shall be no electrolyte leakage from the REESS into the
passenger compartment and
no more than 7 per cent by volume of the REESS electrolyte
with a maximum of 5.0 l leaked from the REESS to the outside
of the passenger compartment. The leaked amount of
electrolyte can be measured by the usual techniques of
determination of liquid volumes after its collection. For
containers containing stoddard, coloured coolant and
electrolyte, the fluids shall be allowed to separate by specific
gravity then measured.
(ii) In case of non-aqueous electrolyte REESS:
For a period from the impact until 60 minutes after the impact,
there shall be no liquid electrolyte leakage from the REESS
into the passenger compartment, luggage compartment and no
liquid electrolyte leakage to outside the vehicle. This
requirement shall be verified by visual inspection without
disassembling any part of the vehicle.
(c2) Electrolyte leakage if tested according to paragraph 6.4.2.2.
For a high voltage REESS, the isolation resistance of the Tested-Device shall
ensure at least 100 Ω/Volt for the whole REESS measured in accordance with
Annex 5A or Annex 5B of this Regulation or the protection degree IPXXB
shall be fulfilled for the Tested-…
6.5.1.changed
The test shall be conducted in accordance with Annex 8E 9E paragraph 3.2.1. of this Regulation. The approval of a REESS tested according to this paragraph shall be limited to approvals for a specific vehicle type.
6.10.2.deleted
6.5.2.changed
The test shall be conducted in accordance with Annex 8E 9E paragraph 3.2.2. of this Regulation.
6.5.3.1.changed
During the test, the tested-device Tested-Device shall exhibit no evidence of explosion.
6.6.1.changed
The test shall be conducted in accordance with Annex 8F 9F of this Regulation.
7.2.deleted
7.3.deleted
6.6.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.6.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4 5 B to this Regulation shall not be less than 100 Ω/Volt.
6.7.1.changed
The test shall be conducted in accordance with Annex 8G 9G to this Regulation.
8.3.deleted
8.3.1.deleted
6.7.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (de) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
8.3.2.deleted
6.7.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
8.3.3.deleted
8.3.4.deleted
6.8.1.changed
The test shall be conducted in accordance with Annex 8H 9H to this Regulation.
8.3.5.deleted
8.3.6.deleted
6.8.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
8.4.deleted
6.8.2.2.changed
For a high voltage REESS the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
8.4.1.deleted
8.4.2.deleted
6.9.1.changed
The test shall be conducted in accordance with Annex 8I 9I to this Regulation.
8.4.3.deleted
8.4.4.deleted
6.9.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
8.4.5.deleted
6.9.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
6.10.changed
6.10.1.changed
6.10.2.1.added
During the test there shall be no evidence of:
(a) Electrolyte leakage;
(b) Rupture (applicable to high voltage REESS(s) only);
(c) Venting (for REESS other than open-type traction battery);
(d) Fire;
(e) Explosion.
The evidence of electrolyte leakage shall be verified by visual inspection
without disassembling any part of the Tested-Device. An appropriate
technique shall, if necessary, be used in order to confirm if there is any
electrolyte leakage from the REESS resulting from the test. The evidence of
venting shall be verified by visual inspection without disassembling any part
of the Tested-Device.
6.10.2.2.added
The overcurrent protection control of the REESS shall terminate charging or
the temperature measured on the casing of the REESS shall be stabilized,
such that the temperature gradient varies by less than 4 °C through 2 hours
after the maximum overcurrent charging level is reached.
6.10.2.3.added
For a high voltage REESS, the isolation resistance measured after the test in
accordance with Annex 5B to this Regulation shall not be less than 100 Ω/V.
6.11.changed
6.12.1.added
Under vehicle operation including the operation with a failure, the vehicle
occupants shall not be exposed to any hazardous environment caused by
emissions from REESS.
6.12.2.added
Open-type traction batteries shall meet the requirements of paragraph 5.4. of
this Regulation with regard to hydrogen emissions.
6.12.3.added
For REESS other than open-type traction battery, the requirement of
paragraph 6.12.1. is deemed to be satisfied, if all applicable requirements of
the following tests are met: paragraph 6.2. (vibration), paragraph 6.3.
(thermal shock and cycling), paragraph 6.6. (external short circuit protection),
paragraph 6.7. (overcharge protection), paragraph 6.8. (over-discharge
protection), paragraph 6.9. (over-temperature protection) and paragraph 6.10.
(overcurrent protection).
6.13.added
REESS safe operation.
The REESS or vehicle system shall provide a signal to activate the warning
specified in paragraph 5.2.3. in the event of operational failure of the vehicle
controls (e.g. input and output signals to the management system of REESS,
sensors within REESS, etc.) that manage the safe operation of the REESS.
REESS or vehicle manufacturer shall make available, at the request of the
Technical Service with its necessity, the following documentation explaining
safety performance of the system level or subsystem level of the vehicle:
6.13.1.added
A system diagram that identifies all the vehicle controls that manage REESS
operations. The diagram must identify what components are used to generate
a warning due to operational failure of vehicle controls to conduct one or
more basic operations.
6.13.2.added
A written explanation describing the basic operation of the vehicle controls
that manage REESS operation. The explanation must identify the
components of the vehicle control system, provide description of their
functions and capability to manage the REESS, and provide a logic diagram
and description of conditions that would lead to triggering of the warning.
6.14.added
Warning in the case of a thermal event within the REESS.
The REESS or vehicle system shall provide a signal to activate the warning
specified in paragraph 5.2.3. in the case of a thermal event in the REESS (as
specified by the manufacturer). REESS or vehicle manufacturer shall make
available, at the request of the Technical Service with its necessity, the
following documentation explaining safety performance of the system level
or subsystem level of the vehicle:
6.14.1.added
The parameters and associated threshold levels that are used to indicate a
thermal event (e.g. temperature, temperature rise rate, SOC level, voltage
drop, electrical current, etc.) to trigger the warning.
6.14.2.added
A system diagram and written explanation describing the sensors and
operation of the vehicle controls to manage the REESS in the event of a
thermal event.
6.15.added
Thermal propagation.
For a REESS containing flammable electrolyte, the vehicle occupants shall
not be exposed to any hazardous environment caused by thermal propagation
which is triggered by an internal short circuit leading to a single cell thermal
runaway. To ensure this, the requirements of paragraphs 6.15.1. and 6.15.2.
shall be satisfied.4
4 The manufacturer will be accountable for the verity and integrity of documentation submitted, and
assume full responsibility for the safety of occupants against adverse effects arising from thermal
propagation caused by internal short circuit.
6.15.1.added
The REESS or vehicle system shall provide a signal to activate the advance
warning indication in the vehicle to allow egress or 5 minutes prior to the
presence of a hazardous situation inside the passenger compartment caused
by thermal propagation which is triggered by an internal short circuit leading
to a single cell thermal runaway such as fire, explosion or smoke. This
requirement is deemed to be satisfied if the thermal propagation does not lead
to a hazardous situation for the vehicle occupants. REESS or vehicle
manufacturer shall make available, at the request of the Technical Service
with its necessity, the following documentation explaining safety
performance of the system level or sub-system level of the vehicle:
6.15.1.1.added
The parameters (for example, temperature, voltage or electrical current)
which trigger the warning indication.
6.15.1.2.added
Description of the warning system.
6.15.2.added
The REESS or vehicle system shall have functions or characteristics in the
cell or REESS intended to protect vehicle occupants (as described in
paragraph 6.15.) in conditions caused by thermal propagation which is
triggered by an internal short circuit leading to a single cell thermal runaway.
REESS or vehicle manufacturers shall make available, at the request of the
Technical Service with its necessity, the following documentation explaining
safety performance of the system level or sub-system level of the vehicle:
Table 1deleted
6.15.2.1.added
A risk reduction analysis using appropriate industry standard methodology
(for example, IEC 61508, MIL-STD 882E, ISO 26262, AIAG DFMEA, fault
analysis as in SAE J2929, or similar), which documents the risk to vehicle
occupants caused by thermal propagation which is triggered by an internal
short circuit leading to a single cell thermal runaway and documents the
reduction of risk resulting from implementation of the identified risk
mitigation functions or characteristics.
6.15.2.2.added
A system diagram of all relevant physical systems and components. Relevant
systems and components are those which contribute to protection of vehicle
occupants from hazardous effects caused by thermal propagation triggered by
a single cell thermal runaway.
1.deleted
6.15.2.3.added
A diagram showing the functional operation of the relevant systems and
components, identifying all risk mitigation functions or characteristics.
2.deleted
6.15.2.4.added
For each identified risk mitigation function or characteristic:
6.15.2.4.1.added
A description of its operation strategy;
2.1.1.deleted
6.15.2.4.2.added
Identification of the physical system or component which implements the
function;
2.1.2.deleted
6.15.2.4.3.added
One or more of the following engineering documents relevant to the
manufacturers design which demonstrates the effectiveness of the risk
mitigation function:
(a) Tests performed including procedure used and conditions and
resulting data;
(b) Analysis or validated simulation methodology and resulting data.
2.2.deleted
2.2.1.deleted
7.1.changed
Every modification of the vehicle or REESS type with regard to this Regulation shall be notified to the Type Approval Authority which approved the vehicle or REESS type. The Authority may then either: (a) Decide, in consultation with the manufacturer, that a new type approval is to be granted; or (b) Apply the procedure contained in paragraph 7.1.1. (Revision) and, if applicable, the procedure contained in paragraph 7.1.2. (Extension).
2.2.2.deleted
7.1.1.changed
7.1.2.changed
2.2.3.1.deleted
8.added
The conformity of production procedure shall comply with the requirements
set out in Schedule 1 of the Agreement (E/ECE/TRANS/505/Rev.3).
2.2.3.2.deleted
2.2.3.3.deleted
2.2.3.4.deleted
Figure 2deleted
9.1.changed
The approval granted in respect of a vehicle/REESS type, pursuant to this Regulation may be withdrawn if the requirements laid down in paragraph 8. above are not complied with, or if the vehicle/REESS or its components fail to pass the tests provided for in paragraph 8.3.5. above. with.
Figure 3deleted
9.2.changed
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation, by means of a communication copy of the approval form conforming to bearing at the Model end, in Annex 1 (Part 1 or Part 2) to this Regulation. large letters, the signed and dated annotation "APPROVAL WITHDRAWN".
2.2.3.5.deleted
10.changed
If the holder of the approval completely ceases to manufacture a vehicle/REESS type approved in accordance with this Regulation, he shall so inform the Type Approval Authority which granted the approval. Upon receiving the relevant communication, that Type Approval Authority shall inform thereof the other Contracting Parties to the 1958 Agreement applying this Regulation by means of a communication copy of the approval form conforming to bearing at the model end, in Annex 1 (Part 1 or Part 2) to this Regulation. large letters, the signed and dated annotation "PRODUCTION DISCONTINUED".
1.deleted
1.1.1.deleted
12.1.changed
As from the official date of entry into force of the 02 03 series of amendments, no Contracting Party applying this Regulation shall refuse to grant approval or refuse to accept type approvals under this Regulation as amended by the 02 03 series of amendments.
1.1.2.deleted
12.2.changed
As from [36] months after the date of entry into force of the 02 series of amendments, 1 September 2023, Contracting Parties applying this Regulation shall grant not be obliged to accept type approvals only if to the vehicle type to be approved meets the requirements of this Regulation as amended by the 02 preceding series of amendments. amendments, first issued after 1 September 2023.
12.3.changed
Until 1 September 2025, Contracting Parties applying this Regulation shall continue to grant accept type approvals to those types of vehicles which comply with the requirements of this Regulation as amended by the preceding series of amendments during the [36] months' period which follows the date of entry into force of the 02 series of amendments. amendments, first issued before 1 September 2023.
1.2.1.deleted
12.4.changed
As from 1 September 2025, Contracting Parties applying this Regulation shall not refuse be obliged to grant extensions of approval accept type approvals issued to the preceding series of amendments to this Regulation.
1.2.2.deleted
12.5.changed
12.6.added
Notwithstanding the transitional provisions above, Contracting Parties who
start to apply this Regulation after the date of entry into force of the most
recent series of amendments are not obliged to accept type approvals which
were granted in accordance with any of the preceding series of amendments
to this Regulation.
Annex 1 – Part 1
Annex 1 - Part 1
Communication
(Maximum format: A4 (210 x 297 mm))
Issued by: Name of administration:
Concerning2: Approval granted,
Approval extended,
Approval refused,
Approval withdrawn,
Production definitively discontinued,
of a vehicle type with regard to its electrical safety pursuant to Regulation No. 100
1.2.3.1.deleted
6.1.1.changed
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 1 – Part 1
1.2.3.2.deleted
17.changed
The documents filed with the request for approval or extension may be obtained on request. Annex 1 – Part 2 Annex 1 – Part 2 Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning: 2 Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a REESS type as component/separate technical unit2 pursuant to Regulation No. 100
1.2.3.3.deleted
6.added
Installation restrictions applicable to the REESS as described in paragraphs 6.4 and
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval
(see approval provisions in the Regulation).
2 Strike out what does not apply.
Annex 1 – Part 2
1.2.3.4.deleted
1.2.3.5.deleted
Annex 5deleted
3.3.added
Description or drawing(s) or picture(s) of the REESS explaining:
Annex 1 – Appendix 1
3.3.deleted
3.6.added
Description or drawing(s) or picture(s) of the installation of the REESS in the
3.6.deleted
4.added
Fuel Cell (if any)
4.deleted
7.deleted
8.1.deleted
1.6.deleted
1.6.added
Description or drawing(s) or picture(s) of the installation of the REESS in the
Annex 2
Annex 7deleted
1.deleted
Figure 1changed
a = 8 mm min. The approval mark in Figure 1 affixed to a vehicle shows that the road vehicle type concerned has been approved in the Netherlands (E 4), pursuant to Regulation No. 100, and under the approval number 022492. 032492. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 100 as amended by 02 03 series of amendments.
2.deleted
Figure 2changed
a = 8 mm min. The approval mark in Figure 2 affixed to a REESS shows that the REESS type ("ES") concerned has been approved in the Netherlands (E 4), pursuant to Regulation No. 100, and under the approval number 022492. 032492. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 100 as amended by 02 03 series of amendments. Model B (See paragraph 4.5. of this Regulation) 100 03 2492 42 00 1628 a = 8 mm min. The above approval mark affixed to a vehicle shows that the road vehicle concerned has been approved in the Netherlands (E4) pursuant to Regulations Nos. 100 and 42 * . 42*. The approval number indicates that, at the dates when the respective approvals were granted, Regulation No. 100 was amended by the 02 03 series of amendments and Regulation No. 42 was still in its original form. * The latter number is given only as an example. Annex 3
3.1.1.deleted
3.1.2.deleted
3.changed
The access probe shall not touch live parts. If this requirement is verified by a signal circuit between the probe and live parts, the lamp shall not light. In the case of the test for IPXXB, the jointed test finger may penetrate to its 80 mm length, but the stop face (diameter 50 mm x 20 mm) shall not pass through the opening. Starting from the straight position, both joints of the test finger shall be successively bent through an angle of up to 90 degrees with respect to the axis of the adjoining section of the finger and shall be placed in every possible position. In case of the tests for IPXXD, the access probe may penetrate to its full length, but the stop face shall not fully penetrate through the opening. Annex 3
3.2.1.deleted
Figure 1changed
R2 ± 0.05 cylindrical R4 ± 0.05 spherical Material: metal, except where otherwise specified Linear dimensions in millimeters Tolerances on dimensions without specific tolerance: (a) Nn On angles: 0/-10°; 0/-10 seconds; (b) On linear dimensions: (i) up to 25 mm: 0/-0.05 mm mm: (ii) over 25 mm: ±0.2 mm mm. Both joints shall permit movement in the same plane and the same direction through an angle of 90° with a 0 to +10° tolerance. Annex 4A Annex 4A Isolation resistance measurement method for vehicle based tests 4
3.2.2.deleted
Figure 7deleted
1.added
Test method using a resistance tester.
The resistance tester is connected to the measuring points (typically,
electrical chassis and electro conductive enclosure/electrical protection
barrier) and the resistance is measured using a resistance tester that meets the
specification that follows:
(a) Resistance tester: Measurement current at least 0.2 A;
(b) Resolution: 0.01 Ω or less;
(c) The resistance R shall be less than 0.1 Ω.
2.added
Test method using DC power supply, voltmeter and ammeter.
Example of the test method using DC power supply, voltmeter and ammeter
is shown below.
4.1.deleted
Figure 1added
Connection to exposed Conductive Parts
Exposed Conductive
DC Parts
Power
U
Supply
Electrical Chassis
Connection to Electrical Chassis
4.2.deleted
2.1.added
Test Procedure.
The DC power supply, voltmeter and ammeter are connected to the
measuring points (Typically, electrical chassis and electro conductive
enclosure/electrical protection barrier).
The voltage of the DC power supply is adjusted so that the current flow
becomes at least 0.2 A.
The current "I" and the voltage "U" are measured.
The resistance "R" is calculated according to the following formula:
R=U/I
The resistance R shall be less than 0.1 Ω.
Note: If lead wires are used for voltage and current measurement, each lead wire shall be
independently connected to the electrical protection barrier/enclosure/electrical chassis.
Terminal can be common for voltage measurement and current measurement.
Annex 5A
Annex 5A
Isolation resistance measurement method for vehicle based
tests
1.added
The isolation resistance for each high voltage bus of the vehicle shall be
measured or shall be determined by calculation using measurement values
from each part or component unit of a high voltage bus (hereinafter referred
to as the "divided measurement").
2.added
The isolation resistance measurement shall be conducted by selecting an
appropriate measurement method from among those listed in paragraphs 2.1.
through 2.2. of this annex, depending on the electrical charge of the live parts
or the isolation resistance, etc.
Megohmmeter or oscilloscope measurements are appropriate alternatives to
the procedure described below for measuring isolation resistance. In this
case, it may be necessary to deactivate the on-board isolation resistance
monitoring system.
The range of the electrical circuit to be measured shall be clarified in
advance, using electrical circuit diagrams, etc. If the high voltage buses are
conductively isolated from each other, isolation resistance shall be measured
for each electrical circuit.
Moreover, modification necessary for measuring the isolation resistance may
be carried out, such as removal of the cover in order to reach the live parts,
drawing of measurement lines, change in software, etc.
In cases where the measured values are not stable due to the operation of the
on-board isolation resistance monitoring system, necessary modification for
conducting the measurement may be carried out by stopping of the operation
of the device concerned or removing it. Furthermore, when the device is
removed, a set of drawings will be used to prove that the isolation resistance
between the live parts and the electrical chassis remains unchanged.
These modifications shall not influence the test results.
Utmost care shall be e…
4.3.1.1.deleted
4.3.1.2.deleted
2.1.1.added
An isolation resistance test instrument capable of applying a DC voltage
higher than the working voltage of the high voltage bus shall be used.
4.3.1.3.deleted
2.1.2.added
An isolation resistance test instrument shall be connected between the live
parts and the electrical chassis. Then, the isolation resistance shall be
measured by applying a DC voltage at least half of the working voltage of the
high voltage bus.
If the system has several voltage ranges (e.g. because of boost converter) in
galvanically connected circuit and some of the components cannot withstand
the working voltage of the entire circuit, the isolation resistance between
those components and the electrical chassis can be measured separately by
Annex 5A
applying at least half of their own working voltage with those component
disconnected.
4.3.1.4.deleted
4.3.2.deleted
2.2.1.added
The high voltage-bus shall be energized by the vehicle’s own REESS and/or
energy conversion system and the voltage level of the REESS and/or energy
conversion system throughout the test shall be at least the nominal operating
voltage as specified by the vehicle manufacturer.
2.2.2.added
The voltmeter used in this test shall measure DC values and shall have an
internal resistance of at least 10 MΩ.
4.4.1.deleted
4.4.2.deleted
2.2.3.1.added
The voltage is measured as shown in Figure 1 and the high voltage bus
voltage (Ub) is recorded. Ub shall be equal to or greater than the nominal
operating voltage of the REESS and/or energy conversion system as specified
by the vehicle manufacturer.
Measurement of Ub, U1, U2
Electrical Chassis
Energy Conversion
System Assembly U2 REESS Assembly
High Voltage Bus
+ +
Energy
Traction System REESS
Conversion
Ub
System
- -
U1
Electrical Chassis
4.4.3.deleted
2.2.3.2.added
Measure and record the voltage (U1) between the negative side of the high
voltage bus and the electrical chassis (see Figure 1).
4.4.4.deleted
2.2.3.3.added
Measure and record the voltage (U2) between the positive side of the high
voltage bus and the electrical chassis (see Figure 1).
4.4.5.deleted
2.2.3.4.added
Annex 5A
If U1 is greater than or equal to U2, insert a standard known resistance (Ro)
between the negative side of the high voltage bus and the electrical chassis.
With Ro installed, measure the voltage (U1’) between the negative side of the
high voltage bus and the electrical chassis (see Figure 2).
Calculate the electrical isolation (Ri) according to the following formula:
Ri = Ro*Ub*(1/U1’ – 1/U1)
Figure 2added
Electrical Chassis
Energy Conversion
System Assembly REESS Assembly
High Voltage Bus
+ +
Energy
Traction System REESS
Conversion
Ub
System
- -
U1´ Ro
Electrical Chassis
If U2 is greater than U1, insert a standard known resistance (Ro) between the
positive side of the high voltage bus and the electrical chassis. With Ro installed, measure
the voltage (U2’) between the positive side of the high voltage bus and the electrical chassis
(see Figure 3). Calculate the electrical isolation (Ri) according to the formula shown.
Divide this electrical isolation value (in Ω) by the nominal operating voltage of the high
voltage bus (in volts).
Calculate the electrical isolation (Ri) according to the following formula:
Ri = Ro*Ub*(1/U2’ – 1/U2)
Annex 5A
4.5.1.deleted
Figure 3added
Electrical Chassis
Energy Conversion Ro
System Assembly REESS Assembly
U2'
High Voltage Bus
+ +
Energy
Conversion Traction System REESS
System
- -
Electrical Chassis
4.5.2.deleted
2.2.3.5.added
The electrical isolation value Ri (in Ω) divided by the working voltage of the
high voltage bus (in volts) results in the isolation resistance (in Ω/V).
Note: The standard known resistance Ro (in Ω) should be the value of the
minimum required isolation resistance (in Ω/V) multiplied by the working
voltage of the vehicle plus/minus 20 per cent (in volts). Ro is not required to
be precisely this value since the equations are valid for any Ro; however, a
Ro value in this range should provide good resolution for the voltage
measurements.
Annex 5B
Annex 5B
Isolation resistance measurement method for component
based tests of a REESS
4.5.3.deleted
1.added
The isolation resistance measurement shall be conducted by selecting an
appropriate measurement method from among those listed in paragraphs 1.1.
through 1.2. of this Annex, depending on the electrical charge of the live
parts or the isolation resistance, etc.
Megohmmeter or oscilloscope measurements are appropriate alternatives to
the procedure described below for measuring isolation resistance. In this
case, it may be necessary to deactivate the on-board isolation resistance
monitoring system.
The range of the electrical circuit to be measured shall be clarified in
advance, using electrical circuit diagrams, etc. If the high voltage buses are
galvanically isolated from each other, isolation resistance shall be measured
for each electrical circuit.
If the operating voltage of the Tested-Device (Ub, Figure 1) cannot be
measured (e.g. due to disconnection of the electric circuit caused by main
contactors or fuse operation) the test may be performed with a modified test
device to allow measurement of the internal voltages (upstream the main
contactors).
Moreover, modification necessary for measuring the isolation resistance may
be carried out, such as removal of the cover in order to reach the live parts,
drawing of measurement lines, change in software, etc.
In cases where the measured values are not stable due to the operation of the
isolation resistance monitoring system, necessary modification for
conducting the measurement may be carried out by stopping the operation of
t…
4.6.1.deleted
1.1.1.added
An isolation resistance test instrument capable of applying a DC voltage
higher than the nominal voltage of the Tested-Device shall be used.
4.6.2.deleted
1.1.2.added
An insulation resistance test instrument shall be connected between the live
parts and the ground connection. Then, the isolation resistance shall be
measured.
If the system has several voltage ranges (e.g. because of boost converter) in a
galvanically connected circuit and some of the components cannot withstand
the working voltage of the entire circuit, the isolation resistance between
Annex 5B
those components and the ground connection can be measured separately by
applying at least half of their own working voltage with those component
disconnected.
4.6.3.deleted
4.6.4.deleted
1.2.1.added
The voltage level of the Tested-Device throughout the test shall be at least the
nominal operating voltage of the Tested-Device.
4.7.deleted
1.2.2.added
The voltmeter used in this test shall measure DC values and shall have an
internal resistance of at least 10 MΩ.
4.8.1.deleted
1.2.3.1.added
The voltage is measured as shown in Figure 1 and the operating voltage of
the Tested-Device (Ub, Figure 1) is recorded. Ub shall be equal to or greater
than the nominal operating voltage of the Tested-Device.
+
Tested-
Ub device
-
U2 U1
Ground
connection
4.8.2.deleted
1.2.3.2.added
Measure and record the voltage (U1) between the negative pole of the
Tested-Device and the ground connection (Figure 1).
5.deleted
1.2.3.3.added
Measure and record the voltage (U2) between the positive pole of the Tested-
Device and the ground connection (Figure 1).
1.2.3.4.added
If U1 is greater than or equal to U2, insert a standard known resistance (Ro)
between the negative pole of the Tested-Device and the ground connection.
With Ro installed, measure the voltage (U1’) between the negative pole of the
Tested-Device and the ground connection (see Figure 2).
Calculate the electrical isolation (Ri) according to the following formula:
Ri = Ro*Ub*(1/U1’ – 1/U1)
Annex 5B
+
Tested-
Ub device
-
R0 U1’
Ground
connection
If U2 is greater than U1, insert a standard known resistance (Ro) between the
positive pole of the Tested-Device and the ground connection. With Ro
installed, measure the voltage (U2’) between the positive pole of the Tested-
Device and the ground connection (see Figure 3).
Calculate the electrical isolation (Ri) according to the following formula:
Ri = Ro*Ub*(1/U2’ – 1/U2)
+
Tested-
Ub Device
R0 -
U2’
Ground
connection
5.1.1.deleted
1.2.3.5.added
The electrical isolation value Ri (in Ω) divided by the nominal voltage of the
Tested-Device (in volts) results in the isolation resistance (in Ω/V).
Note : The standard known resistance Ro (in Ω) should be the value of the
minimum required isolation resistance (in Ω/V) multiplied by the nominal
voltage of the Tested-Device plus/minus 20 per cent (in V). Ro is not required to
be precisely this value since the equations are valid for any Ro; however, a Ro
value in this range should provide good resolution for the voltage measurements.
Annex 6
5.1.1.1.deleted
Annex 6added
isolation resistance monitoring system
The on-board isolation resistance monitoring system shall be tested using the
following procedure:
(a) Determine the isolation resistance, Ri, of the electric power train with
the electrical isolation monitoring system using the procedure outlined
Annex 5A.
(b) If the minimum isolation resistance value required in accordance with
paragraphs 5.1.3.1. or 5.1.3.2. is 100 Ω/V, insert a resistor with
resistance Ro between either side of the high voltage bus that exhibit
lower value in U1 or U2 measured in accordance with paragraph 2.2.3.
of Annex 5A and the electrical chassis. The magnitude of the resistor,
Ro, shall be such that:
1/(1/(95xU) – 1/Ri) ≤ Ro < 1/(1/(100xU) – 1/Ri)
where U is the working voltage of the electric power train.
(c) If the minimum isolation resistance value required in accordance with
paragraphs 5.1.3.1. or 5.1.3.2. is 500 Ω/V, insert a resistor with
resistance Ro between either side of the high voltage bus that exhibit
lower value in U1 or U2 measured in accordance with paragraph 2.2.3.
of Annex 5A and the electrical chassis. The magnitude of the resistor,
Ro, shall be such that:
1/(1/(475xU) – 1/Ri) ≤ Ro < 1/(1/(500xU) – 1/Ri)
where U is the working voltage of the electric power train.
Annex 7A
Annex 7A
Verification method for testing authorities confirming
document based isolation resistance compliance of electrical
design of the vehicle after water exposure
This annex describes the applicable requirement…
5.1.1.2.deleted
1.added
Documentation shall contain the following information:
(a) on how the manufacturer tested isolation resistance compliance of
electrical design of the vehicle by using fresh water;
(b) on how, after the test had been carried out, the high-voltage
component or system was inspected for ingress of water and how,
depending on its mounting location, each high voltage
component/system met the appropriate degree of protection against
water.
5.1.1.3.deleted
2.added
The testing authority will verify and confirm the authenticity of documented
conditions that have been observed, and should have been complied with,
during the process of certification by manufacturer:
5.1.2.deleted
2.1.added
It is permitted that, during the test, the moisture contained inside the
enclosure is partly condensed. The dew which may be deposited is not
considered as ingress of water. For the purpose of the tests, the surface area
of the tested high-voltage component or system is calculated with an
accuracy of 10 per cent. If possible, the tested high-voltage component or
system is run energized. If the tested high-voltage component or system is
energized, adequate safety precautions are taken.
5.1.3.deleted
2.2.added
For electrical components, externally attached (e.g. in engine compartment),
open underneath, both exposed or protected locations, the testing authority
shall verify, with a view to confirming the compliance, whether the test is
conducted by spraying the high-voltage component or system from all
practicable directions with a stream of water from a standard test nozzle as
shown in Figure 1. The following parameters are observed during the test in
particular:
(a) Nozzle internal diameter: 6.3 mm;
(b) Delivery rate: 11.9 – 13.2 l/min;
(c) Water pressure at the nozzle: approximately 30 kPa (0.3 bar);
(d) Test duration per m2 of surface area of the tested high-voltage
component or system: 1 min;
(e) Minimum test duration: 3 min;
(f) Distance from nozzle to tested high-voltage component or system
surface: approximately 3 m (this distance may be reduced, if necessary
to ensure proper wetting when spraying upwards).
Annex 7A
Figure 1added
Dimensions in millimetres
D is 6.3 mm as specified in (a) above.
5.1.4.1.deleted
2.3.added
For electrical components, externally attached (e.g. in engine compartment),
covered from underneath, the testing authority shall verify, with a view to
confirming the compliance, whether:
(a) The cover protects the component against direct spray water from
underneath and is not visible;
(b) The test is conducted by using splashing test nozzle as shown in Figure 2; (c) The moving shield is removed from the spray nozzle and the machine
is sprayed from all practicable directions;
(d) The water pressure is adjusted to give a delivery rate of (10 ± 0.5)
l/min (pressure approximately 80 kPa to 100 kPa (0.8 bar to 1.0 bar));
(e) The test duration is 1 min/m2 of calculated surface area of the machine
(excluding any mounting surface and cooling fin) with a minimum
duration of 5 min.
Splashing Test Nozzle
Viewed according to arrow A (with shield removed)
Dimensions in millimetres
IEC 927/01
Note:
5.1.4.2.deleted
5.1.4.3.deleted
1.added
Cock 7. Spray nozzle – brass with 121 holes 0,5:
5.1.4.4.deleted
5.1.4.5.deleted
5.1.4.6.deleted
5.1.4.7.deleted
5.1.4.8.deleted
6.added
Annex 7A
5.1.4.9.deleted
3.added
The entire high voltage system or each component is checked to comply with the
isolation resistance requirement in paragraph 5.1.3. with the following conditions:
(a) The electric chassis shall be simulated by an electric conductor, e.g. a metal
plate, and the components are attached with their standard mounting devices
to it;
(b) Cables, where provided, shall be connected to the component.
4.added
The parts designed not to be wet during operation are not allowed to be wet and no
accumulation of water which could have reached them is tolerated inside the high-
voltage component or system.
Annex 7B
Annex 7B
Vehicle-based test procedure for protection against water
effects
5.1.5.1.deleted
1.added
This test is intended to simulate the normal washing of vehicles, but not
specific cleaning using high water pressure or underbody washing.
The areas of the vehicle regarding this test are border lines, i.e. a seal of two
parts such as flaps, glass seals, outline of opening parts, outline of front grille
and seals of lamps.
All border lines shall be exposed and followed in all directions with the water
stream using a hose nozzle and conditions in accordance with IPX5 as
specified in Annex 7A.
5.1.5.2.deleted
2.added
The vehicle shall be driven in a wade pool, with 10 cm water depth, over a
distance of 500 m at a speed of 20 km/h, in a time of approximately 1.5 min.
If the wade pool used is less than 500 m in length, then the vehicle shall be
driven through it several times. The total time, including the periods outside
the wade pool, shall be less than 10 min.
5.1.5.3.deleted
Annex 8added
procedures of the REESS
5.1.5.4.deleted
1.added
This annex describes the procedure for the determination of hydrogen
emissions during the charge procedures of the REESS of all road vehicles,
according to paragraph 5.4. of this Regulation.
5.1.5.5.deleted
2.added
The hydrogen emission test (Figure 1 of Annex 8) is conducted in order to
determine hydrogen emissions during the charge procedures of the REESS
with the charger. The test consists in the following steps:
(a) Vehicle/REESS preparation;
(b) Discharge of the REESS;
(c) Determination of hydrogen emissions during a normal charge;
(d) Determination of hydrogen emissions during a charge carried out with
the charger failure.
5.1.5.6.deleted
5.1.5.7.deleted
5.1.5.8.deleted
3.1.1.added
The vehicle shall be in good mechanical condition and have been driven
at least 300 km during seven days before the test. The vehicle shall be
equipped with the REESS subject to the test of hydrogen emissions, over this
period.
5.1.5.9.deleted
3.1.2.added
If the REESS is used at a temperature above the ambient temperature, the
operator shall follow the manufacturer's procedure in order to keep the
REESS temperature in normal functioning range.
The manufacturer's representative shall be able to certify that the temperature
conditioning system of the REESS is neither damaged nor presenting a
capacity defect.
5.1.5.10.deleted
5.1.5.11.deleted
3.2.1.added
The REESS shall be in good mechanical condition and have been subject to
minimum of 5 standard cycles (as specified in Annex 9, Appendix 1).
3.2.2.added
If the REESS is used at a temperature above the ambient temperature, the
operator shall follow the manufacturer's procedure in order to keep the
REESS temperature in its normal functioning range.
The manufacturer's representative shall be able to certify that the temperature
conditioning system of the REESS is neither damaged nor presenting a
capacity defect
Annex 8
5.2.1.deleted
Figure 1added
START
Vehicle/REESS preparation
(if necessary)
Maximum 7 days
days days
Discharge of the REESS
Ambient temperature of 293 to 303 K
Maximum 15 min
12 to Soak
36 h
36 h
36 h Maximum 2 min after
connection to mains
Hydrogen emission test
to mains
during a normal charge
Maximum 7 days
Discharge of the REESS
Ambient temperature of 293 to 303 K
Maximum 15 min
12 to 1.1.1.1. Soak
36 h
Maximum 2 min after
Hydrogen emission test connection to mains
during a charger failure
Ambient temperature 293 K ± 2 K
END
5.2.2.deleted
5.2.3.deleted
4.1.added
The chassis dynamometer shall meet the requirements of the 06 series of
amendments to Regulation No. 83.
4.2.added
The hydrogen emission measurement enclosure shall be a gas-tight measuring
chamber able to contain the vehicle/REESS under test. The vehicle/REESS
shall be accessible from all sides and the enclosure when sealed shall be gas-
tight in accordance with Appendix 1 to this annex. The inner surface of the
enclosure shall be impermeable and non-reactive to hydrogen. The temperature
conditioning system shall be capable of controlling the internal enclosure air
temperature to follow the prescribed temperature throughout the test, with an
average tolerance of ±2 K over the duration of the test.
To accommodate the volume changes due to enclosure hydrogen emissions,
either a variable-volume or another test equipment may be used. The
variable-volume enclosure expands and contracts in response to the hydrogen
emissions in the enclosure. Two potential means of accommodating the
internal volume changes are movable panels, or a bellows design, in which
impermeable bags inside the enclosure expand and contract in response to
internal pressure changes by exchanging air from outside the enclosure. Any
design for volume accommodation shall maintain the integrity of the
enclosure as specified in Annex 8, Appendix 1.
Any method of volume accommodation shall limit the differential between
the enclosure internal pressure and the barometric pressure to a maximum
value of ±5hPa.
The enclosure shall be capable of latching to a fixed volume. A variable
volume enclosure shall be capable of accommodating…
5.2.4.1.deleted
5.2.4.2.deleted
5.2.4.3.deleted
4.3.1.1.added
The atmosphere within the chamber is monitored using a hydrogen analyser
(electrochemical detector type) or a chromatograph with thermal conductivity
detection. Sample gas shall be drawn from the mid-point of one side-wall or
roof of the chamber and any bypass flow shall be returned to the enclosure,
preferably to a point immediately downstream of the mixing fan.
5.2.4.4.deleted
4.3.1.2.added
The hydrogen analyser shall have a response time to 90 per cent of final
reading of less than 10 seconds. Its stability shall be better than 2 per cent of
full scale at zero and at 80 per cent ± 20 per cent of full scale, over
a 15-minute period for all operational ranges.
5.2.4.5.deleted
4.3.1.3.added
The repeatability of the analyser expressed as one standard deviation shall be
better than 1 per cent of full scale, at zero and at 80 per cent ± 20 per cent of
full scale on all ranges used.
5.2.4.6.deleted
4.3.1.4.added
The operational ranges of the analyser shall be chosen to give best resolution
over the measurement, calibration and leak checking procedures.
Annex 8
5.2.4.7.deleted
4.3.2.added
The hydrogen analyser shall be fitted with a device to record electrical signal
output, at a frequency of at least once per minute. The recording system shall
have operating characteristics at least equivalent to the signal being recorded and
shall provide a permanent record of results. The recording shall show a clear
indication of the beginning and end of the normal charge test and charging failure
operation.
5.2.4.8.deleted
5.2.4.9.deleted
4.4.1.added
The temperature in the chamber is recorded at two points by temperature
sensors, which are connected so as to show a mean value. The measuring
points are extended approximately 0.1 m into the enclosure from the vertical
centre line of each side-wall at a height of 0.9 ± 0.2 m.
4.4.2.added
The temperatures in the proximity of the cells are recorded by means of the
sensors.
5.2.5.1.deleted
4.4.3.added
Temperatures shall, throughout the hydrogen emission measurements, be
recorded at a frequency of at least once per minute.
5.2.5.2.deleted
4.4.4.added
The accuracy of the temperature recording system shall be within ±1.0 K and
the temperature shall be capable of being resolved to ±0.1 K.
5.2.5.3.deleted
4.4.5.added
The recording or data processing system shall be capable of resolving time
to ± 15 seconds.
5.2.5.4.deleted
5.2.5.5.deleted
4.5.1.added
The difference p between barometric pressure within the test area and the
enclosure internal pressure shall, throughout the hydrogen emission
measurements, be recorded at a frequency of at least once per minute.
5.2.5.6.deleted
4.5.2.added
The accuracy of the pressure recording system shall be within ±2 hPa and the
pressure shall be capable of being resolved to ±0.2 hPa.
5.2.5.7.deleted
4.5.3.added
The recording or data processing system shall be capable of resolving time
to ±15 seconds.
5.2.5.8.deleted
5.2.5.9.deleted
4.6.1.added
The charger voltage and current intensity (battery) shall, throughout the
hydrogen emission measurements, be recorded at a frequency of at least once
per minute.
5.2.5.10.deleted
4.6.2.added
The accuracy of the voltage recording system shall be within ±1 V and the
voltage shall be capable of being resolved to ±0.1 V.
5.2.5.11.deleted
4.6.3.added
The accuracy of the current intensity recording system shall be within ±0.5 A
and the current intensity shall be capable of being resolved to ±0.05 A.
6.deleted
4.6.4.added
The recording or data processing system shall be capable of resolving time to
±15 seconds.
6.1.deleted
4.7.added
The chamber shall be equipped with one or more fans or blowers with a
possible flow of 0.1 to 0.5 m3/second in order to thoroughly mix the
atmosphere in the enclosure. It shall be possible to reach a homogeneous
temperature and hydrogen concentration in the chamber during
measurements. The vehicle in the enclosure shall not be subjected to a direct
stream of air from the fans or blowers.
1.deleted
4.8.1.added
The following pure gases shall be available for calibration and operation:
(a) Purified synthetic air (purity < 1 ppm C1 equivalent; < 1 ppm CO;
< 400 ppm CO2; < 0.1 ppm NO ); oxygen content between 18 and
21 per cent by volume,
(b) Hydrogen ( H2 ), 99.5 per cent minimum purity.
4.8.2.added
Calibration and span gases shall contain mixtures of hydrogen (H 2) and
purified synthetic air. The real concentrations of a calibration gas shall be
within ±2 per cent of the nominal values. The accuracy of the diluted gases
obtained when using a gas divider shall be within ±2 per cent of the nominal
value. The concentrations specified in Annex 8, Appendix 1 may also be
obtained by a gas divider using synthetic air as the dilution gas.
5.added
The test consists in the five following steps:
(a) Vehicle/REESS preparation;
(b) Discharge of the REESS;
(c) Determination of hydrogen emissions during a normal charge;
(d) Discharge of the traction battery;
(e) Determination of hydrogen emissions during a charge carried out with
the charger failure.
If the vehicle/REESS has to be moved between two steps, it shall be pushed
to the following test area.
2.1.1.deleted
2.1.2.deleted
5.1.1.added
The ageing of REESS shall be checked, proving that the vehicle has
performed at least 300 km during seven days before the test. During this
period, the vehicle shall be equipped with the traction battery submitted to
the hydrogen emission test. If this cannot be demonstrated then the following
procedure will be applied.
2.1.3.deleted
5.1.1.1.added
The procedure starts with the discharge of the REESS of the vehicle while
driving on the test track or on a chassis dynamometer at a steady speed of 70
per cent ± 5 per cent of the maximum speed of the vehicle during 30 minutes.
Discharging is stopped:
(a) When the vehicle is not able to run at 65 per cent of the maximum
thirty minutes speed, or
(b) When an indication to stop the vehicle is given to the driver by the
standard on-board instrumentation, or
(c) After having covered the distance of 100 km.
2.2.deleted
5.1.1.2.added
The charge is carried out:
(a) With the charger;
(b) In an ambient temperature between 293 K and 303 K.
The procedure excludes all types of external chargers.
The end of REESS charge criteria corresponds to an automatic stop given by
the charger.
Annex 8
This procedure includes all types of special charges that could be
automatically or manually initiated like, for instance, the equalisation charges
or the servicing charges.
2.2.1.deleted
5.1.1.3.added
Procedure from paragraphs 5.1.1.1. and 5.1.1.2. shall be repeated two times.
2.2.2.deleted
5.1.2.added
The REESS is discharged while driving on the test track or on a chassis
dynamometer at a steady speed of 70 per cent ± 5 per cent from the
maximum thirty minutes speed of the vehicle.
Stopping the discharge occurs:
(a) When an indication to stop the vehicle is given to the driver by the
standard on-board instrumentation, or
(b) When the maximum speed of the vehicle is lower than 20 km/h.
2.2.3.deleted
5.1.3.added
Within fifteen minutes of completing the battery discharge operation
specified in paragraph 5.1.2., the vehicle is parked in the soak area. The
vehicle is parked for a minimum of 12 hours and a maximum of 36 hours,
between the end of the traction battery discharge and the start of the hydrogen
emission test during a normal charge. For this period, the vehicle shall be
soaked at 293 K ± 2 K.
2.2.4.deleted
2.2.5.deleted
5.1.4.1.added
Before the completion of the soak period, the measuring chamber shall be
purged for several minutes until a stable hydrogen background is obtained.
The enclosure mixing fan(s) shall also be turned on at this time.
2.2.6.deleted
5.1.4.2.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the
test.
2.2.7.deleted
5.1.4.3.added
At the end of the soak, the test vehicle, with the engine shut off and the test
vehicle windows and luggage compartment opened shall be moved into the
measuring chamber.
2.2.8.deleted
5.1.4.4.added
The vehicle shall be connected to the mains. The REESS is charged
according to normal charge procedure as specified in paragraph 5.1.4.7.
below.
2.3.deleted
5.1.4.5.added
The enclosure doors are closed and sealed gas-tight within two minutes from
electrical interlock of the normal charge step.
2.3.1.deleted
5.1.4.6.added
The start of a normal charge for hydrogen emission test period begins when
the chamber is sealed. The hydrogen concentration, temperature and
barometric pressure are measured to give the initial readings C H2i, Ti and Pi
for the normal charge test.
These figures are used in the hydrogen emission calculation (paragraph 6. of
this annex). The ambient enclosure temperature T shall not be less than
291 K and no more than 295 K during the normal charge period.
2.3.2.deleted
5.1.4.7.added
The normal charge is carried out with the charger and consists of the
following steps:
(a) Charging at constant power during t1;
(b) Over-charging at constant current during t2. Over-charging intensity is
specified by manufacturer and corresponds to the one used during
equalisation charging.
The end of REESS charge criteria corresponds to an automatic stop given by
the charger to a charging time of t1 + t2. This charging time will be limited to
t1 + 5 h, even if a clear indication is given to the driver by the standard
instrumentation that the battery is not yet fully charged.
2.3.3.deleted
5.1.4.8.added
The hydrogen analyser shall be zeroed and spanned immediately before the
end of the test.
2.3.4.deleted
5.1.4.9.added
The end of the emission sampling period occurs t 1 + t2 or t1 + 5 hours after
the beginning of the initial sampling, as specified in Annex 8 paragraph
2.3.5.deleted
5.1.4.6.added
of this annex. The different times elapsed are recorded. The hydrogen
concentration, temperature and barometric pressure are measured to give the
final readings CH2f, Tf and Pf for the normal charge test, used for the
calculation in Annex 8, paragraph 6.
2.3.6.deleted
2.3.7.deleted
5.1.5.1.added
Within seven days maximum after having completed the prior test, the
procedure starts with the discharge of the REESS of the vehicle according to
Annex 8, paragraph 5.1.2.
2.3.8.deleted
5.1.5.2.added
The steps of the procedure in Annex 8, paragraph 5.1.3. of this annex shall be
repeated.
2.3.9.deleted
5.1.5.3.added
Before the completion of the soak period, the measuring chamber shall be
purged for several minutes until a stable hydrogen background is obtained.
The enclosure mixing fan(s) shall also be turned on at this time.
2.3.10.deleted
5.1.5.4.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the
test.
2.4.deleted
5.1.5.5.added
At the end of the soak, the test vehicle, with the engine shut off and the test
vehicle windows and luggage compartment opened shall be moved into the
measuring chamber.
3.deleted
5.1.5.6.added
The vehicle shall be connected to the mains. The REESS is charged
according to failure charge procedure as specified in paragraph 5.1.5.9.
below.
3.1.deleted
5.1.5.7.added
The enclosure doors are closed and sealed gas-tight within two minutes from
electrical interlock of the failure charge step.
3.2.deleted
5.1.5.8.added
The start of a failure charge for hydrogen emission test period begins when
the chamber is sealed. The hydrogen concentration, temperature and
barometric pressure are measured to give the initial readings C H2i, Ti and Pi
for the failure charge test.
These figures are used in the hydrogen emission calculation (Annex 8,
paragraph 6). The ambient enclosure temperature T shall not be less than
291 K and no more than 295 K during the charging failure period.
3.3.deleted
5.1.5.9.added
The charging failure is carried out with the suitable charger and consists of
the following steps:
(a) Charging at constant power during t'1;
(b) Charging at maximum current as recommended by the manufacturer
during 30 minutes. During this phase, the charger shall supply
maximum current as recommended by the manufacturer.
3.4.deleted
5.1.5.10.added
The hydrogen analyser shall be zeroed and spanned immediately before the
end of the test.
Annex 8
3.5.deleted
5.1.5.11.added
The end of test period occurs t'1 + 30 minutes after the beginning of the initial
sampling, as specified in paragraph 5.1.5.8. above. The times elapsed are
recorded. The hydrogen concentration, temperature and barometric pressure
are measured to give the final readings CH2f, Tf and Pf for the charging failure
test, used for the calculation in Annex 8, paragraph 6.
1.deleted
5.2.1.added
The ageing of REESS shall be checked, to confirm that the REESS has
performed at least 5 standard cycles (as specified in Annex 8, Appendix 1).
2.deleted
5.2.2.added
The REESS is discharged at 70 per cent ± 5 per cent of the nominal power of
the system.
Stopping the discharge occurs when minimum SOC as specified by the
manufacturer is reached.
5.2.3.added
Within 15 minutes of the end of the REESS discharge operation specified in
paragraph 5.2.2. above, and before the start of the hydrogen emission test, the
REESS shall be soaked at 293 K ± 2 K for a minimum period of 12 hours and
a maximum of period of 36 hours.
Annex 8 - Appendix 1deleted
5.2.4.1.added
Before the completion of the REESS's soak period, the measuring chamber
shall be purged for several minutes until a stable hydrogen background is
obtained. The enclosure mixing fan(s) shall also be turned on at this time.
5.2.4.2.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the
test.
2.1.deleted
5.2.4.3.added
At the end of the soak period, the REESS shall be moved into the measuring
chamber.
5.2.4.4.added
The REESS shall be charged in accordance with the normal charge procedure
as specified in paragraph 5.2.4.7. below.
5.2.4.5.added
The chamber shall be closed and sealed gas-tight within two minutes of the
electrical interlock of the normal charge step.
5.2.4.6.added
The start of a normal charge for hydrogen emission test period shall begin
when the chamber is sealed. The hydrogen concentration, temperature and
barometric pressure are measured to give the initial readings C H2i, Ti and Pi
for the normal charge test.
These figures are used in the hydrogen emission calculation (Annex 8,
paragraph 6). The ambient enclosure temperature T shall not be less than
291 K and no more than 295 K during the normal charge period.
5.2.4.7.added
The normal charge is carried out with a suitable charger and consists of the
following steps:
(a) Charging at constant power during t1;
(a) Over-charging at constant current during t2. Over-charging intensity is
specified by manufacturer and corresponding to that used during
equalisation charging.
The end of REESS charge criteria corresponds to an automatic stop given by
the charger to a charging time of t1 + t2. This charging time will be limited to
t1 + 5 h, even if a clear indication is given by a suitable instrumentation that
the REESS is not yet fully charged.
Table 1deleted
5.2.4.8.added
The hydrogen analyser shall be zeroed and spanned immediately before the
end of the test.
1.deleted
5.2.4.9.added
The end of the emission sampling period occurs t 1 + t2 or t1 + 5 h after the
beginning of the initial sampling, as specified in paragraph 5.2.4.6. above.
The different times elapsed are recorded. The hydrogen concentration,
temperature and barometric pressure are measured to give the final readings
CH2f, Tf and Pf for the normal charge test, used for the calculation in in Annex
8, paragraph 6.
5.2.5.1.added
The test procedure shall start within a maximum of seven days after having
completed the test in paragraph 5.2.4. above, the procedure shall start with
the discharge of the REESS of the vehicle in accordance with
paragraph 5.2.2. above.
3.1.deleted
5.2.5.2.added
The steps of the procedure in paragraph 5.2.3. above shall be repeated.
3.2.deleted
5.2.5.3.added
Before the completion of the soak period, the measuring chamber shall be
purged for several minutes until a stable hydrogen background is obtained.
The enclosure mixing fan(s) shall also be turned on at this time.
1.deleted
5.2.5.4.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the
test.
5.2.5.5.added
At the end of the soak the REESS shall be moved into the measuring
chamber.
5.2.5.6.added
The REESS shall be charged according to the failure charge procedure as
specified in paragraph 5.2.5.9. below.
5.2.5.7.added
The chamber shall be closed and sealed gas-tight within two minutes from
electrical interlock of the failure charge step.
5.2.5.8.added
The start of a failure charge for hydrogen emission test period begins when
the chamber is sealed. The hydrogen concentration, temperature and
barometric pressure are measured to give the initial readings C H2i, Ti and Pi
for the failure charge test.
These figures are used in the hydrogen emission calculation (Annex 8,
paragraph 6.). The ambient enclosure temperature T shall not be less than
291 K and no more than 295 K during the charging failure period.
3.1.deleted
5.2.5.9.added
The charging failure is carried out with a suitable charger and consists of the
following steps:
(a) Charging at constant power during t'1,
(b) Charging at maximum current as recommended by the manufacturer
during 30 minutes. During this phase, the charger shall supply
maximum current as recommended by the manufacturer.
3.2.deleted
5.2.5.10.added
The hydrogen analyser shall be zeroed and spanned immediately before the
end of the test.
Figure 1deleted
5.2.5.11.added
The end of test period occurs t'1 + 30 minutes after the beginning of the initial
sampling, as specified in paragraph 5.2.5.8. above. The times elapsed are
recorded. The hydrogen concentration, temperature and barometric pressure
are measured to give the final readings CH2f, Tf and Pf for the charging failure
test, used for the calculation in paragraph 6. below.
Annex 8
Table 2deleted
6.added
The hydrogen emission tests described in paragraph 5. above allow the
calculation of the hydrogen emissions from the normal charge and charging
failure phases. Hydrogen emissions from each of these phases are calculated
using the initial and final hydrogen concentrations, temperatures and
pressures in the enclosure, together with the net enclosure volume.
The formula below is used:
V
(1 + out ) C H 2f Pf C P
M H 2 = k V 10
−4 V − H 2 i i
Tf Ti
Where:
MH2 = hydrogen mass, in grams
CH2 = measured hydrogen concentration in the enclosure, in ppm
volume
V = net enclosure volume in cubic metres (m3) corrected for the
volume of the vehicle, with the windows and the luggage
compartment open. If the volume of the vehicle is not
determined a volume of 1.42 m³ is subtracted.
Vout = compensation volume in m³, at the test temperature and
pressure
T = ambient chamber temperature, in K
P = absolute enclosure pressure, in kPa
k = 2.42
Where: i is the initial reading
f is the final reading
Table 3deleted
6.1.added
The hydrogen mass emissions for the REESS are:
MN = hydrogen mass emission for normal charge test, in grams
MD = hydrogen mass emission for charging failure test, in grams
1.deleted
1.changed
All equipment shall be calibrated before its initial use and then calibrated as often as necessary and in any case in the month before type approval testing. The purpose of calibration methods to be used are described in this test is to verify the safety performance of the REESS under a vibration environment which the REESS will likely experience during the normal operation of the vehicle. appendix.
2.1.1.added
Before its initial use, the internal volume of the chamber shall be determined
as follows. The internal dimensions of the chamber are carefully measured,
taking into account any irregularities such as bracing struts. The internal
volume of the chamber is determined from these measurements.
The enclosure shall be latched to a fixed volume when the enclosure is held
at an ambient temperature of 293 K. This nominal volume shall be repeatable
within ±0.5 per cent of the reported value.
3.1.deleted
2.1.2.changed
2.1.3.changed
3.2.1.deleted
2.2.changed
This operation determines that the chamber does not contain any materials that emit significant amounts of hydrogen. The tested-device check shall be firmly secured carried out at the enclosure's introduction to service, after any operations in the platform enclosure which may affect background emissions and at a frequency of the vibration machine in such a manner as to ensure that the vibrations are directly transmitted to the tested-device. at least once per year.
1.deleted
2.2.1.added
Variable-volume enclosure may be operated in either latched or unlatched
volume configuration, as described in paragraph 2.1.1. above. Ambient
temperature shall be maintained at 293 K ± 2 K, throughout the four-hour
period mentioned below.
2.2.2.changed
The tested-device shall enclosure may be connected sealed and the mixing fan operated for a period of up to 12 hours before the test fixture only by the intended mountings provided for the purpose of attaching the REESS or REESS subsystem to the vehicle. four-hour background-sampling period begins.
2.1.deleted
2.2.3.changed
The tested-device analyser (if required) shall be connected to the test fixture as recommended by the manufacturer. calibrated, then zeroed and spanned.
2.2.4.changed
3.1.deleted
2.2.5.added
The chamber is then sealed and the background hydrogen concentration,
temperature and barometric pressure are measured. These are the initial
readings CH2i, Ti and Pi used in the enclosure background calculation.
3.2.deleted
2.2.6.added
The enclosure is allowed to stand undisturbed with the mixing fan on for a
period of four hours.
3.2.1.deleted
2.2.7.added
At the end of this time the same analyser is used to measure the hydrogen
concentration in the chamber. The temperature and the barometric pressure
are also measured. These are the final readings CH2f, Tf and Pf.
Annex 8 – Appendix 1
3.2.2.deleted
2.2.8.added
The change in mass of hydrogen in the enclosure shall be calculated over the
time of the test in accordance with Annex 8, paragraph 2.4. and shall not
exceed 0.5 g.
3.3.deleted
2.3.changed
3.4.deleted
2.3.1.added
The enclosure shall be purged until a stable hydrogen concentration is
reached. The mixing fan is turned on, if not already switched on. The
hydrogen analyser is zeroed, calibrated if required, and spanned.
3.5.deleted
2.3.2.changed
The temperature of the tested-device enclosure shall be continuously measured inside latched to the casing in the proximity of the cells during the test in order to monitor the changes of the temperature. The onboard sensor if existing may be used. The manufacturer and Technical Service shall agree on the location of the temperature sensor(s) used. nominal volume position.
2.3.3.added
The ambient temperature control system is then turned on (if not already on)
and adjusted for an initial temperature of 293 K.
3.1.changed
Establish the calibration curve by at least five calibration points spaced as evenly as possible over the operating range. The following conditions shall apply to the tested-device: (a) The test shall be conducted at an ambient temperature of 20 ± 10 °C; (b) At the beginning nominal concentration of the test, calibration gas with the SOC shall highest concentrations to be adjusted to a value in the upper 50 at least 80 per cent of the normal operating SOC range of the tested- device; (c) At the beginning of the test, all protection devices which affect the function(s) of the tested-device that are relevant to the outcome of the test shall be operational. full scale.
3.2.changed