Specific requirements for the electric power train

128 changed · 313 added · 231 deleted
1.1.changed
Part I: Safety requirements with respect to the electric power train of road vehicles of categories M and N 1 , N1, with a maximum design speed exceeding 25 km/h, equipped with one or more traction motor(s) operated by electric power and not train, excluding vehicles permanently connected to the grid, as well as their high grid. Part I of this regulation does not cover; (a) Post-crash safety requirements of road vehicles. (b) High voltage components and systems which are not galvanically connected to the high voltage bus of the electric power train. Part I of this regulation does not cover post-crash safety requirements of road vehicles.
1.2.changed
Energy Storage System (REESS), of road vehicles of categories M and N equipped with one or more traction motors operated by electric power and not train, excluding vehicles permanently connected to the grid. Part II of this Regulation does not apply to REESS(s) a battery whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries systems. auxiliaries’ systems..
2.2.changed
"Barrier" "Aqueous electrolyte" means an electrolyte based on water solvent for the part compounds (e.g. acids, bases) providing protection against direct contact to the live parts from any direction of access. conducting ions after its dissociation.
2.3.changed
"Cell" "Automatic disconnect" means a single encased electrochemical unit containing one positive and one negative electrode which exhibits a device that when triggered, conductively separates the electric energy sources from the rest of the high voltage differential across its two terminals. 2.4 "Conductive connection" means circuit of the connection using connectors to an external electric power supply when the rechargeable energy storage system (REESS) is charged. train.
2.4.added
"Breakout harness" means connector wires that are connected for testing purposes to the REESS on the traction side of the automatic disconnect
2.5.changed
"Coupling system for charging "Cell" means a single encased electrochemical unit containing one positive and one negative terminals, which exhibits a voltage differential across its two terminals and used as rechargeable electrical energy storage device. 2.6 "Conductive connection" means the connection using connectors to an external power supply when the Rechargeable Electrical Energy Storage System (REESS)" means the electrical circuit used for charging the REESS from an external electric power supply including the vehicle inlet. (REESS) is charged.
2.6.deleted
"C Rate" of "n C" is defined as the constant current of the tested-device, which takes 1/n hours to charge or discharge the tested-device between 0 per cent of the state of charge and 100 per cent of the state of charge.
2.7.changed
"Direct contact" "Connector" means the contact device that provides mechanical connection and disconnection of persons with live parts. As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.2, para. 2. high voltage electrical conductors to a suitable mating component including its housing
2.8.changed
"Electrical chassis" System (REESS)" means a set made the electrical circuit used for charging the REESS from an external electric power supply including the vehicle inlet. 1 As defined in the Consolidated Resolution on the Construction of conductive parts electrically linked together, whose potential is taken as reference. Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.6, para. 2 https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
2.9.changed
"Electrical circuit" means an assembly DeviceTested-Device, which takes 1/n hours to charge or discharge the Tested-DeviceTested-Device between 0 per cent of connected live parts which is designed to be electrically energized in normal operation. the state of charge and 100 per cent of the state of charge.
2.10.changed
"Electric energy conversion system" "Direct contact" means a system that generates and provides electric energy for electric propulsion. the contact of persons with high voltage live parts.
2.11.changed
"Electric power train" energy conversion system" means the electrical circuit which includes the traction motor(s), a system (e.g. fuel cell) that generates and may include the REESS, the provides electric energy conversion system, the electronic converters, the associated wiring harness and connectors, and the coupling system for charging the REESS. electric propulsion.
2.12.changed
"Electronic converter" "Electric power train" means a device capable of controlling and/or converting the electrical circuit which includes the traction motor(s), and may include the REESS, the electric power energy conversion system, the electronic converters, the associated wiring harness and connectors, and the coupling system for electric propulsion. charging the REESS.
2.13.changed
"Enclosure" "Electrical chassis" means the part enclosing the internal units and providing protection against direct contact from any direction a set made of access. conductive parts electrically linked together, whose potential is taken as reference.
2.14.changed
"Exposed conductive part" "Electrical circuit" means the conductive part an assembly of connected live parts which can is designed to be touched under the provisions of the protection IPXXB, and which becomes electrically energized under isolation failure conditions. This includes parts under a cover that can be removed without using tools. in normal operation.
2.15.changed
"Explosion" "Electrical protection barrier" means the sudden release of energy sufficient to cause pressure waves and/or projectiles part that may cause structural and/or physical damage to provides protection against direct contact with the surrounding of the tested-device. high voltage live parts.
2.16.changed
"External electric power supply" "Electrolyte leakage" means an alternating current (AC) or direct current (DC) electric power supply outside the escape of electrolyte from the vehicle. REESS in the form of liquid
2.17.changed
"High Voltage" "Electronic converter" means the classification a device capable of an controlling and/or converting electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms). power for electric propulsion.
2.18.changed
"Fire" "Enclosure" means the emission of flames from a tested-device. Sparks part enclosing the internal units and arcing shall not be considered as flames. providing protection against any direct contact.
2.19.changed
"Flammable electrolyte" "Explosion" means an electrolyte the sudden release of energy sufficient to cause pressure waves and/or projectiles that contains substances classified as Class 3 "flammable liquid" under "UN Recommendations on may cause structural and/or physical damage to the Transport surrounding of Dangerous Goods – Model Regulations (Revision 17 from June 2011), Volume I, Chapter 2.3" 2 the Tested-DeviceTested-Device.
2.20.changed
"High voltage bus" "Exposed conductive part" means the electrical circuit, including conductive part which can be touched under the coupling system for charging provisions of the REESS protection degree IPXXB, and which is not normally energized, but which can become electrically energized under isolation failure conditions. This includes parts under a cover that operates on high voltage. can be removed without using tools.
2.21.changed
"Indirect contact" "External electric power supply" means an alternating current (AC) or direct current (DC) electric power supply outside of the contact of persons with exposed conductive parts. vehicle.
2.22.changed
"Live parts" "Fire" means the conductive part(s) intended to emission of flames from a Tested-Device. Sparks and arcing shall not be electrically energized in normal use. www.unece.org/trans/danger/publi/unrec/rev17/17files_e.html considered as flames.
2.23.changed
"Luggage compartment" "Flammable electrolyte" means an electrolyte that contains substances classified as Class 3 "flammable liquid" under "UN Recommendations on the space in the vehicle for luggage accommodation, bounded by the roof, hood, floor, side walls, as well as by the barrier and enclosure provided for protecting the occupants Transport of Dangerous Goods – Model Regulations (Revision 17 from direct contact with live parts, being separated from the passenger compartment by the front bulkhead or the rear bulk head. June 2011), Volume I, Chapter 2.3"2
2.24.changed
"Manufacturer" "High Voltage" means the person classification of an electric component or body who circuit, if its working voltage is responsible to the approval authority for all aspects of the type approval process > 60 V and for ensuring conformity of production. It is not essential that the person ≤ 1500 V DC or body be directly involved in all stages of the construction of the vehicle, system or component which is the subject of the approval process. > 30 V and ≤ 1000 V AC root mean square (rms).
2.25.changed
"On-board isolation resistance monitoring system" "High voltage bus" means the device which monitors electrical circuit, including the isolation resistance between coupling system for charging the REESS that operates on high voltage. In case of electrical circuits, that are galvanically connected to each other and fulfilling the voltage condition specified in paragraph 2.42., only the components or parts of the electric circuit that operate on high voltage buses and the electrical chassis. are classified as a high voltage bus. 2 www.unece.org/trans/danger/publi/unrec/rev17/17files_e.html
2.26.changed
"Open type traction battery" "Indirect contact" means a liquid type battery requiring refilling the contact of persons with water and generating hydrogen gas released to the atmosphere. exposed conductive parts.
2.27.changed
"Passenger compartment" "Live parts" means the space for occupant accommodation, bounded by the roof, floor, side walls, doors, window glass, front bulkhead and rear bulkhead, or rear gate, as well as by the barriers and enclosures provided for protecting the occupants from direct contact with live parts. conductive part(s) intended to be electrically energized under normal operating conditions.
2.28.changed
"Protection degree" "Luggage compartment" means the protection space in the vehicle for luggage accommodation, bounded by the roof, hood, floor, side walls, as well as by the barrier and enclosure provided by a barrier/enclosure related to for protecting the occupants from direct contact with high voltage live parts parts, being separated from the passenger compartment by a test probe, such as a test finger (IPXXB) the front bulkhead or a test wire (IPXXD), as defined in Annex 3. the rear bulk head.
2.29.changed
"Rechargeable Energy Storage System (REESS)" "Manufacturer" means the rechargeable energy storage system person or body who is responsible to the approval authority for all aspects of the approval process and for ensuring conformity of production. It is not essential that provides electric energy for electric propulsion. The REESS may include subsystem(s) together with the necessary ancillary systems for physical support, thermal management, electronic control and enclosures. person or body is directly involved in all stages of the construction of the vehicle or component which is the subject of the approval process
2.30.changed
"Rupture" "Non-aqueous electrolyte" means opening(s) through an electrolyte not based on water as the casing of any functional cell assembly created or enlarged by an event, large enough for a 12 mm diameter test finger (IPXXB) to penetrate and make contact with live parts (see Annex 3). solvent.
2.31.changed
"Service disconnect" means the device for deactivation "Normal operating conditions" includes operating modes and conditions that can reasonably be encountered during typical operation of the electrical circuit when conducting checks vehicle including driving at legally posted speeds, parking and services of standing in traffic, as well as, charging using chargers that are compatible with the REESS, fuel cell stack, etc. specific charging ports installed on the vehicle. It does not include conditions where the vehicle is damaged, either by a crash, road debris or vandalization, subjected to fire or water submersion, or in a state where service and or maintenance is needed or being performed.
2.32.changed
"State of Charge (SOC)" "On-board isolation resistance monitoring system" means the available device which monitors the isolation resistance between the high voltage buses and the electrical charge in a tested- device expressed as a percentage of its rated capacity. chassis.
2.33.changed
"Solid insulator" "Open type traction battery" means a liquid type battery requiring refilling with water and generating hydrogen gas released to the insulating coating of wiring harnesses provided in order to cover and protect the live parts against direct contact from any direction of access; covers for insulating the live parts of connectors, and varnish or paint for the purpose of insulation. atmosphere.
2.34.changed
"Subsystem" "Passenger compartment" means any functional assembly of REESS components. the space for occupant accommodation, bounded by the roof, floor, side walls, doors, window glass, front bulkhead and rear bulkhead, or rear gate, as well as by the barriers and enclosures provided for protecting the occupants from direct contact with live parts.
2.35.changed
"Tested-device" "Protection degree IPXXB" means protection from contact with high voltage live parts provided by either the complete REESS an electrical protection barrier or the subsystem of an enclosure and tested using a REESS that is subjected to the tests prescribed by this Regulation. Jointed Test Finger (IPXXB) as described in Annex 3.
2.36.changed
"Type of REESS" "Protection degree IPXXD" means systems which do not differ significantly protection from contact with high voltage live parts provided by either an electrical protection barrier or an enclosure and tested using a Test Wire (IPXXD) as described in such essential aspects as: (a) The manufacturer's trade name or mark; (b) The chemistry, capacity and physical dimensions of its cells; (c) The number of cells, the mode of connection of the cells and the physical support of the cells; (d) The construction, materials and physical dimensions of the casing and (e) The necessary ancillary devices for physical support, thermal management and electronic control. Annex 3.
2.37.changed
"Vehicle type" "Rechargeable Electrical Energy Storage System (REESS)" means vehicles which do the rechargeable energy storage system that provides electric energy for electrical propulsion. A battery whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries’ systems is not differ in such essential aspects as: (a) Installation of considered as a REESS. The REESS may include the electric power train necessary systems for physical support, thermal management, electronic controls and the galvanically connected high voltage bus; (b) Nature and type of electric power train and the galvanically connected high voltage components. casing
2.38.changed
"Working voltage" "REESS subsystem" means any assembly of REESS components which stores energy. A REESS subsystem may or may not include the highest value entire management system of an electrical circuit voltage root-mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating condition. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively. REESS.
2.39.added
"Rupture" means opening(s) through the casing of any functional cell assembly created or enlarged by an event, large enough for a 12 mm diameter test finger (IPXXB) to penetrate and make contact with live parts (see Annex 3).
2.40.added
"Service disconnect" means the device for deactivation of the electrical circuit when conducting checks and services of the REESS, fuel cell stack, etc.
2.41.added
"Solid insulator" means the insulating coating of wiring harnesses provided in order to cover and prevent the high voltage live parts from any direct contact
2.42.added
"Specific voltage condition" means the condition that the maximum voltage of a galvanically connected electrical circuit between a DC live part and any other live part (DC or AC) is ≤ 30 V AC (rms) and ≤ 60 V DC. Note: When a DC live part of such an electrical circuit is connected to chassis and the specific voltage condition applies, the maximum voltage between any live part and the electrical chassis is ≤ 30 V AC (rms) and ≤ 60 V DC
2.43.added
DeviceTested-Device expressed as a percentage of its rated capacity.
2.44.added
"Tested-Device" means either complete REESS or REESS subsystem that is subjected to the tests prescribed by this Regulation.
2.45.added
"Thermal event" means the condition when the temperature within the REESS is significantly higher (as defined by the manufacturer) than the maximum operating temperature.
2.46.added
"Thermal runaway" means an uncontrolled increase of cell temperature caused by exothermic reactions inside the cell.
2.47.added
"Thermal propagation" means the sequential occurrence of thermal runaway within a REESS triggered by thermal runaway of a cell in that REESS.
2.48.added
"Type of REESS" means systems which do not differ significantly in such essential aspects as: (a) The manufacturer's trade name or mark; (b) The chemistry, capacity and physical dimensions of its cells; (c) The number of cells, the mode of connection of the cells and the physical support of the cells; (d) The construction, materials and physical dimensions of the casing and (e) The necessary ancillary devices for physical support, thermal management and electronic control.
2.49.added
"Vehicle connector" means the device which is inserted into the vehicle inlet to supply electric energy to the vehicle from an external electric power supply.
2.50.added
"Vehicle inlet" means the device on the externally chargeable vehicle into which the vehicle connector is inserted for the purpose of transferring electric energy from an external electric power supply.
2.51.added
"Vehicle type" means vehicles which do not differ in such essential aspects as: (a) Installation of the electric power train and the galvanically connected high voltage bus; (b) Nature and type of electric power train and the galvanically connected high voltage components.
2.52.added
"Venting" means the release of excessive internal pressure from cell or REESS subsystem or REESS in a manner intended by design to preclude rupture or explosion."
2.53.added
"Working voltage" means the highest value of an electrical circuit voltage root-mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating condition. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.
3.1.changed
Part I: Approval of a vehicle type with regard to its electrical safety, including specific requirements for the High Voltage System electric power train.
4.4.1.deleted
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval 3 .
3.1.2.1.changed
Detailed description of the vehicle type as with regards to the electric power train and the high voltage bus galvanically connected high voltage bus. to it.
4.4.2.deleted
The number of this Regulation, followed by the letter "R", a dash and the approval number to the right of the circle described in paragraph 4.4.1.
4.4.3.deleted
In the case of an approval of a REESS or a separate technical unit of the REESS the "R" shall be followed by the symbol "ES".
3.2.added
Part II: Approval of a Rechargeable Electrical Energy Storage System (REESS)
3.2.1.changed
The application for approval of a type of REESS or separate technical unit with regard to the safety requirements of the REESS shall be submitted by the REESS manufacturer or by his duly accredited representative.
4.6.1.deleted
In the case of a vehicle, the approval mark shall be placed on or close to the vehicle data plate affixed by the manufacturer.
4.6.2.deleted
In the case of a REESS or separate technical unit approved as a REESS, the approval mark shall be affixed on the major element of the REESS by the manufacturer.
3.2.2.1.changed
Detailed description of the type of REESS or separate technical unit as regards the safety of the REESS.
4.7.deleted
Annex 2 to this Regulation gives examples of the arrangements of the approval mark.
4.1.changed
If the An approval number shall be assigned to each approved type submitted for approval pursuant to this Regulation meets the requirements in accordance with Schedule 4 of the relevant parts of this Regulation, approval of that type shall be granted. Agreement (E/ECE/TRANS/505/Rev.3).
4.2.changed
An Notice of approval number or of refusal or of extension or withdrawal of approval or production definitively discontinued of a vehicle type pursuant to this Regulation shall be assigned to each type approved. Its first two digits (at present 02 for the Regulation in its form) shall indicate the series of amendments incorporating the most recent major technical amendments made communicated to the Regulation at Parties to the time Agreement applying this Regulation, by means of issue of a form conforming to the approval. The same Contracting Party shall not assign the same number model in Annex 1, Part 1 or 2 as appropriate to another vehicle type. this Regulation.
4.3.changed
Notice of There shall be affixed, conspicuously and in a readily accessible place specified on the approval form, to every vehicle or of refusal or of extension or withdrawal of approval or production definitively discontinued of REESS conforming to a vehicle type pursuant to approved under this Regulation shall be communicated to the Parties to the Agreement applying this Regulation, by means of a form conforming to the model in Annex 1, Part 1 or 2 as appropriate to this Regulation. an international approval mark consisting of:
4.3.1.added
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval3.
5.1.1.4.deleted
For a service disconnect which can be opened, disassembled or removed without tools, it is acceptable if protection degree IPXXB is satisfied under a condition where it is opened, disassembled or removed without tools.
4.3.2.added
The number of this Regulation, followed by the letter "R", a dash and the approval number to the right of the circle described in paragraph 4.3.1.
4.3.3.added
In the case of an approval of a REESS the "R" shall be followed by the symbol "ES".
5.1.1.5.1.deleted
In the case of a REESS having high voltage capability the symbol shown in
4.4.changed
There shall Regulations annexed to the Agreement in the country which has granted approval under this Regulation, the symbol prescribed in paragraph 4.3.1. need not be affixed, conspicuously repeated; in this case the Regulation and approval numbers and the additional symbols of all the Regulations under which approval has been granted in a readily accessible place specified on the country which has granted approval form, to every vehicle or REESS or separate technical unit conforming to a type approved under this Regulation an international approval mark consisting of: shall be placed in vertical columns to the right of the symbol prescribed in paragraph 4.3.1.
4.5.changed
Regulations annexed to the Agreement in the country which has granted The approval under this Regulation, the symbol prescribed in paragraph 4.4.1. need not be repeated; in this case the Regulation and approval numbers and the additional symbols of all the Regulations under which approval has been granted in the country which has granted approval under this Regulation mark shall be placed in vertical columns to the right of the symbol prescribed in paragraph 4.4.1. The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.2/Amend.3 clearly legible and shall be indelible.
5.1.1.5.2.deleted
The symbol shall also be visible on enclosures and barriers, which, when removed expose live parts of high voltage circuits. This provision is optional to any connector for high voltage buses. This provision shall not apply to any of the following cases: (a) Where barriers or enclosures cannot be physically accessed, opened, or removed; unless other vehicle components are removed with the use of tools; (b) Where barriers or enclosures are located underneath the vehicle floor.
4.5.1.added
In the case of a vehicle, the approval mark shall be placed on or close to the vehicle data plate affixed by the manufacturer.
5.1.1.5.3.deleted
Cables for high voltage buses which are not located within enclosures shall be identified by having an outer covering with the colour orange.
4.5.2.added
In the case of a REESS, the approval mark shall be affixed on the major element of the REESS by the manufacturer.
5.1.2.deleted
Protection against indirect contact is also required for vehicles equipped with any REESS type approved under Part II of this Regulation.
4.6.changed
The Annex 2 to this Regulation gives examples of the arrangements of the approval mark shall be clearly legible and shall be indelible. mark.
5.changed
Part I: Requirements of a vehicle with regard to its electrical safety specific requirements for the electric power train
5.1.changed
These electrical safety requirements apply to high voltage buses of electric power train and electrical components which are galvanically connected to the high voltage bus of electric power train under conditions where they are not connected to external high voltage power supplies.
5.1.1.changed
Protection against direct contact with live Live parts is also required for vehicles equipped with any REESS type approved under Part II of this Regulation. The protection against direct contact with the live parts, shall comply with paragraphs 5.1.1.1. and 5.1.1.2. These protections (solid insulator, barrier, enclosure, etc.) for protection against direct contact. Electrical protection barriers, enclosures, solid insulators and connectors shall not be able to be opened, separated, disassembled or removed without the use of tools. tools or, for vehicles of categories N2, N3, M2 and M3, an operator controlled activation/deactivation device or equivalent. 3 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.2/Amend.3 However, connectors (including the vehicle inlet) are allowed to be separated without the use of tools, if they meet one or more of the following requirements: (a) They comply with paragraphs 5.1.1.1. and 5.1.1.2. when separated, or (b) They are provided with a locking mechanism (at least two distinct actions are needed to separate the connector from its mating component). Additionally, other components, not being part of the connector, shall be removable only with the use of tools or, for vehicles of categories N2, N3, M2 and M3, an operator controlled activation/deactivation device or equivalent in order to be able to separate the connector, or (c) The voltage of the live parts becomes equal or below 60 V DC or equal or below 30 V AC (rms) within 1 s after the connector is separated. For vehicles of categories N2, N3, M2 and M3, conductive connection devices not energized except during charging of the REESS are exempted from this requirement if located on the roof of the vehicle out of reach for a person standing outside of the vehicle and, for vehicles of category M2 and M3, the minimum wrap around distance from the instep of the vehicle to the roof mounted charging devices is 3 m. In case of multiple steps due to an elevated floor inside the vehicle, the wrap around distance is measured from the bottom most step at entry, as illustrated in Figure 1.
Figure 1changed
be yellow, the bordering and the arrow shall be black. Marking of high voltage equipment 3.0 m
5.1.1.1.changed
For protection of high voltage live parts inside the passenger compartment or luggage compartment, the protection degree IPXXD shall be provided.
5.1.1.2.changed
For protection of high voltage live parts in areas other than the passenger compartment or luggage compartment, the protection degree IPXXB shall be satisfied. provided.
5.1.1.3.changed
Connectors (including vehicle inlet) are deemed to meet this requirement if: (a) They comply with 5.1.1.1. and 5.1.1.2. when separated For a high voltage service disconnect which can be opened, disassembled or removed without the use of tools, or (b) They are located underneath the floor for vehicles of categories N2, N3, M2 and are provided with a locking mechanism, M3, an operator controlled activation/deactivation device or (c) They are provided with a locking mechanism and other components equivalent, protection degree IPXXB shall be removed with the use of tools in order to separate the connector, satisfied when it is opened, disassembled or (d) The voltage of the live parts becomes equal or below DC 60V or equal or below AC 30V (rms) within one second after the connector is separated. removed.
5.1.1.4.1.added
The symbol shown in Figure 2 shall be present on or near the REESS having high voltage capability. The symbol background shall be yellow, the bordering and the arrow shall be black. This requirement shall also apply to a REESS which is part of a galvanically connected electrical circuit where the specific voltage condition is not fulfilled, independent of the maximum voltage of the REESS.
5.1.1.4.2.added
The symbol shall also be visible on enclosures and electrical protection barriers, which, when removed, expose live parts of high voltage circuits. This provision is optional to any connector for high voltage buses. This provision shall not apply to any of the following cases: (a) Where electrical protection barriers or enclosures cannot be physically accessed, opened, or removed; unless other vehicle components are removed with the use of tools; (b) Where electrical protection barriers or enclosures are located underneath the vehicle floor. (c) Electrical protection barriers or enclosures of conductive connection device for vehicles of categories N2, N3, M2 and M3 which satisfies the conditions prescribed in paragraph 5.1.1.
5.1.1.4.3.added
Cables for high voltage buses which are not located within enclosures shall be identified by having an outer covering with the colour orange.
5.3.deleted
At least a momentary indication shall be given to the driver when the vehicle is in "active driving possible mode''. However, this provision does not apply under conditions where an internal combustion engine provides directly or indirectly the vehicle´s propulsion power. When leaving the vehicle, the driver shall be informed by a signal (e.g. optical or audible signal) if the vehicle is still in the active driving possible mode. If the on-board REESS can be externally charged by the user, vehicle movement by its own propulsion system shall be impossible as long as the connector of the external electric power supply is physically connected to the vehicle inlet. This requirement shall be demonstrated by using the connector specified by the car manufacturer. The state of the drive direction control unit shall be identified to the driver.
5.1.2.1.changed
For protection against electrical shock which could arise from indirect contact, the exposed conductive parts, such as the conductive electrical protection barrier and enclosure, shall be galvanically connected securely to the electrical chassis by connection with electrical wire or ground cable, or by welding, or by connection using bolts, etc. so that no dangerous potentials are produced.
5.1.2.2.changed
The resistance between all exposed conductive parts and the electrical chassis shall be lower than 0.1 ohm Ω when there is current flow of at least 0.2 amperes. The resistance between any two simultaneously reachable exposed conductive parts of the electrical protection barriers that are less than 2.5 m from each other shall not exceed 0.2 Ω. This resistance may be calculated using the separately measured resistances of the relevant parts of electric path. This requirement is satisfied if the galvanic connection has been established by welding. In case of doubt or if the connection is established by other means than welding, a measurement shall be made by using one of the test procedures described in Annex 4.
5.1.2.3.changed
In the case of motor vehicles which are intended to be connected to the grounded external electric power supply through the conductive connection, connection between vehicle inlet and vehicle connector, a device to enable the galvanical connection of the electrical chassis to the earth ground for the external electric power supply shall be provided. The device should enable connection to the earth ground before exterior voltage is applied to the vehicle and retain the connection until after the exterior voltage is removed from the vehicle. Compliance to this requirement may be demonstrated either by using the connector specified by the car vehicle manufacturer, by visual inspection or by analysis. drawings. The above requirements are only applicable for vehicles when charging from a stationary charging point, with a charging cable of finite length, through a vehicle coupler comprising a vehicle connector and a vehicle inlet.
5.1.3.added
This paragraph shall not apply to electrical circuits that are galvanically connected to each other, where the DC part of these circuits is connected to the electrical chassis and the specific voltage condition is fulfilled.
5.1.3.1.changed
Current-buses If AC high voltage buses and DC high voltage buses are galvanically isolated from each other, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/volt Ω/volt of the working voltage for DC buses, and a minimum value of 500 Ω/volt Ω/volt of the working voltage for AC buses. The measurement shall be conducted according to Annex 4A 5A "Isolation resistance measurement method for vehicle based tests".
5.1.3.2.changed
If AC high voltage buses and DC high voltage buses are galvanically connected connected, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 500 Ω/volt Ω/volt of the working voltage. However, if all AC high voltage buses are protected by one of the 2 two following measures, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V Ω/V of the working voltage: (a) Double At least two or more layers of solid insulators, electrical protection barriers or enclosures that meet the requirement in paragraph 5.1.1. independently, for example wiring harness; (b) Mechanically robust protections that have sufficient durability over vehicle service life such as motor housings, electronic converter cases or connectors; The isolation resistance between the high voltage bus and the electrical chassis may be demonstrated by calculation, measurement or a combination of both. The measurement shall be conducted according to Annex 4A 5A "Isolation resistance measurement method for vehicle based tests".
5.1.3.3.changed
If the minimum isolation resistance requirement cannot be maintained over time, then protection In fuel cell vehicles, DC high voltage buses shall be achieved by any of the following: (a) Double or more layers of solid insulators, barriers or enclosures that meet the requirement in paragraph 5.1.1. independently; (b) On-board have an on-board isolation resistance monitoring system together with a warning to the driver if the isolation resistance drops below the minimum required value. value of 100 Ω/V. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 6. The isolation resistance between the high voltage bus of the coupling system for charging the REESS, which is not energized besides in conditions other than that during the charging of the REESS, and the electrical chassis need not to be monitored. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 5.
5.1.3.4.changed
Isolation resistance requirement for the coupling system for charging the REESS For the vehicle inlet conductive connection device intended to be conductively connected to the grounded external AC power supply and the electrical circuit that is galvanically connected to the vehicle inlet conductive connection device during charging of the REESS, the isolation resistance between the high voltage bus and the electrical chassis shall be at least 1 MΩ comply with the requirements of paragraph 5.1.3.1. when the charger coupler conductive connection is disconnected. disconnected and the isolation resistance is measured at the high voltage live parts (contacts) of the vehicle conductive connection device. During the measurement, the traction battery REESS may be disconnected.
5.1.4.added
Protection against water effects. The vehicles shall maintain isolation resistance after exposure to water (e.g. washing, driving through standing water). This paragraph shall not apply to electrical circuits that are galvanically connected to each other, where the DC part of these circuits is connected to the electrical chassis and the specific voltage condition is fulfilled.
5.1.4.1.added
The vehicle manufacturer can choose to comply with requirements specified in paragraph 5.1.4.2., those specified in paragraph 5.1.4.3., or those specified in paragraph 5.1.4.4.
5.1.4.2.added
The vehicle manufacturers shall provide evidence and/or documentation to the type-approval authority or technical services as applicable on how the electrical design or the components of the vehicle located outside the passenger compartment or externally attached, after water exposure remain safe and comply with the requirements described in Annex 7A. If the evidence and/or documentation provided is not satisfactory the type-approval authority or technical services or testing entity as applicable shall require the manufacturer to perform a physical component test based on the same specifications as those described in Annex 7A.
5.1.4.3.added
If the test procedures specified in Annex 7B are performed, just after each exposure, and with the vehicle still wet, the vehicle shall then comply with isolation resistance test given in Annex 5A, and the isolation resistance requirements given in paragraph 5.1.3. shall be met. In addition, after a 24 hour pause, the isolation resistance test specified in Annex 5A shall again be performed, and the isolation resistance requirements given in paragraph 5.1.3. shall be met.
5.1.4.4.added
If an isolation resistance monitoring system is provided, and the isolation resistance less than the requirements given in paragraph 5.1.3. is detected, a warning shall be indicated to the driver. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 6.
5.2.1.1.changed
For a REESS which has been type approved in accordance with Part II of this series of Amendments to this Regulation, it shall be installed in accordance with the instructions provided by the manufacturer of the REESS, and in conformity with the description provided in Part Annex 1, Appendix 2 of Annex 6 to this Regulation.
5.2.1.2.changed
The REESS including related vehicle components, systems and structure as applicable, shall comply with the respective requirements of paragraph 6. of this Regulation.
5.2.3.added
The vehicle shall provide a warning to the driver when the vehicle is in active driving possible mode in the event specified in paragraphs 6.13. to 6.15. In case of optical warning, the tell-tale shall, when illuminated, be sufficiently bright to be visible to the driver under both daylight and night- time driving conditions, when the driver has adapted to the ambient roadway light conditions. This tell-tale shall be activated as a check of lamp function either when the propulsion system is turned to the "On" position, or when the propulsion system is in a position between "On" and "Start" that is designated by the manufacturer as a check position. This requirement does not apply to the tell- tale or text shown in a common space.
5.2.4.added
Warning in the event of low energy content of REESS. For pure electric vehicles (vehicles equipped with a powertrain containing exclusively electric machines as propulsion energy converters and exclusively rechargeable electric energy storage systems as propulsion energy storage systems), a warning to the driver in the event of low REESS state of charge shall be provided. Based on engineering judgment, the manufacturer shall determine the necessary level of REESS energy remaining, when the driver warning is first provided. In case of optical warning, the tell-tale shall, when illuminated, be sufficiently bright to be visible to the driver under both daylight and night- time driving conditions, when the driver has adapted to the ambient roadway light conditions.
5.3.1.added
At least a momentary indication shall be given to the driver each time when the vehicle is first placed in "active driving possible mode'' after manual activation of the propulsion system. However, this provision is optional under conditions where an internal combustion engine provides directly or indirectly the vehicle´s propulsion power upon start up.
5.3.2.added
When leaving the vehicle, the driver shall be informed by a signal (e.g. optical or audible signal) if the vehicle is still in the active driving possible mode. Moreover, in case of vehicles of category M 2 and M3 with a capacity of more than 22 passengers in addition to the driver, this signal shall already be given when the drivers leave their seat. However, this provision is optional under conditions where an internal combustion engine provides, directly or indirectly, the vehicle´s propulsion power while leaving the vehicle or driver seat.
5.3.3.added
If the REESS can be externally charged, vehicle movement by its own propulsion system shall be impossible as long as the vehicle connector is physically connected to the vehicle inlet. This requirement shall be demonstrated by using the vehicle connector specified by the vehicle manufacturer. The above requirements are only applicable for vehicles when charging from a stationary charging point, with a charging cable of finite length, through a vehicle coupler comprising a vehicle connector and a vehicle inlet.
5.3.4.added
The state of the drive direction control unit shall be identified to the driver.
5.4.2.changed
The test shall be conducted following the method described in Annex 7 8 to the present Regulation. The hydrogen sampling and analysis shall be the ones prescribed. Other analysis methods can be approved if it is proven that they give equivalent results.
5.4.3.changed
During a normal charge procedure in the conditions given in Annex 7, 8, hydrogen emissions shall be below 125 g during 5 h, or below 25 x t2 g during t2 (in h).
5.4.4.changed
During a charge carried out by a charger presenting a failure (conditions given in Annex 7), 8), hydrogen emissions shall be below 42 g. Furthermore the charger shall limit this possible failure to 30 minutes.
5.4.10.changed
The approval granted to a vehicle type relative to hydrogen emissions can be extended to different vehicle types belonging to the same family, in accordance with the definition of the family given in Annex 7, 8, Appendix 2.
6.changed
Energy Storage System (REESS) with regard to its safety
6.1.changed
The procedures prescribed in Annex 8 9 of this Regulation shall be applied.
6.2.1.changed
The test shall be conducted in accordance with Annex 8A 9A to this Regulation.
6.2.2.1.changed
During the test, there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS (s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.2.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
6.3.1.changed
The This test shall be conducted in accordance with Annex 8B 9B to this Regulation.
6.3.2.1.changed
During the test, there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) REESS (s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.3.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B of 5B to this Regulation shall not be less than 100 Ω/Volt.
6.4.1.1.changed
Compliance with the requirements of the acceptance criteria of paragraph 6.4.1.3. below may be demonstrated by REESS(s) installed in vehicles that have been subjected to vehicle crash tests in accordance with UN Regulation No. 12, 94, Annex 3 or UN Regulation No. 94, 137, Annex 3 for frontal impact, and UN Regulation No. 95, Annex 4 for side impact. The ambient temperature and the SOC shall be in accordance with the said Regulations. This requirement is deemed to be met if the vehicle equipped with electric power train operating on high voltage is approved in accordance with UN Regulation No. 94 (04 series of amendments or later) or UN Regulation No. 137 (01 series of amendments or later) for frontal impact and UN Regulation No. 95 (05 series of amendments or later) for lateral impact. The approval of a REESS tested under this paragraph shall be limited to the specific vehicle type.
6.4.1.2.changed
The test shall be conducted in accordance with Annex 8C 9C to this Regulation.
6.4.1.3.changed
During the test there shall be no evidence of: (a) Fire; (b) Explosion; (c1) Electrolyte leakage if tested according to paragraph 6.4.1.1.: (i) In case of aqueous electrolyte REESS: For a period from the impact until 30 60 minutes after the impact impact, there shall be no electrolyte spillage leakage from the REESS into the passenger compartment; (ii) No compartment and no more than 7 per cent by volume of the REESS electrolyte capacity shall spill with a maximum of 5.0 l leaked from the REESS to the outside of the passenger compartment. The leaked amount of electrolyte can be measured by the usual techniques of determination of liquid volumes after its collection. For containers containing Stoddard, coloured coolant and electrolyte, the fluids shall be allowed to separate by specific gravity then measured; (ii) In case of non-aqueous electrolyte REESS: For a period from the impact until 60 minutes after the impact, there shall be no liquid electrolyte leakage from the REESS into the passenger compartment, luggage compartment (for open type traction batteries a limitation and no liquid electrolyte leakage to a maximum outside the vehicle. This requirement shall be verified by visual inspection without disassembling any part of 5 litres also applies); the vehicle. (c2) Electrolyte leakage if tested according to paragraph 6.4.1.2. After the vehicle based test (paragraph 6.4.1.1.), a REESS which is located inside the passenger compartment shall remain in attached to the installed location vehicle by at least one component anchorage, bracket, or any structure that transfers loads from REESS to the vehicle structure, and the REESS components shall remain inside REESS boundaries. No part of any REESS that is located outside the passenger compartment shall not enter the passenger compartment during or after the impact test procedures. compartment. After the component based test (paragraph 6.4.1.2.) the tested-device Tested-Device shall be retained by its mounting and its components shall remain inside its boundaries. For a high voltage REESS the isolation resistance of the tested-device Tested-Device shall ensure at least 100 Ω/Volt Ω/Volt for the whole REESS measured after the test in accordance with Annex 4A 5A or Annex 4B 5B to this Regulation, or the protection degree IPXXB shall be fulfilled for the tested-device. Tested-Device. For a REESS tested in accordance with paragraph 6.4.1.2., the evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. To confirm compliance to (c1) of paragraph 6.4.1.3. an appropriate coating shall, if necessary, be applied to the physical protection (casing) in order to confirm if there is any electrolyte leakage from the REESS resulting from the impact test. Unless the manufacturer provides a means to differentiate between the leakage of different liquids, all liquid leakage shall be considered as the electrolyte. Tested-Device.
6.4.2.1.1.changed
Compliance with the requirements of the acceptance criteria of paragraph 6.4.2.3. below may be demonstrated by REESS(s) installed in vehicles that have been subjected to a vehicle crash test in accordance with the Annex 3 to Regulations Nos. 12 or 94 for frontal impact, and Annex 4 to Regulation No. 95 for side impact. The ambient temperature and the SOC shall be in accordance with the said Regulations.
6.4.2.3.changed
During the test there shall below may be no evidence of: (a) Fire; (b) Explosion; (c1) Electrolyte leakage if tested according to paragraph 6.4.1.1.: (i) For a period from the impact until 30 minutes after the impact there shall be no electrolyte spillage from the REESS into the passenger compartment. (ii) No more than 7 per cent demonstrated by volume of the REESS electrolyte capacity shall spill from the REESS to the outside of the passenger compartment (for open type traction batteries a limitation REESS(s) installed in vehicles that have been subjected to a maximum of 5 litres also applies). (c2) Electrolyte leakage if tested according to paragraph 6.4.2.2. For a high voltage REESS, the isolation resistance of the tested-device shall ensure at least 100 Ω/Volt for the whole REESS measured vehicle crash test in accordance with the Annex 4A 3 to UN Regulations Nos. 94 or 137 for frontal impact, and Annex 4B of this 4 to Regulation or No. 95 for side impact. The ambient temperature and the protection degree IPXXB SOC shall be fulfilled in accordance with the said Regulations. This requirement is deemed to be met if the vehicle equipped with the electric power train operating on high voltage is approved in accordance with UN Regulation No. 94 (04 series of amendments or later) or UN Regulation No. 137 (01 series of amendments or later) for the Tested-Device. If tested according to paragraph 6.4.2.2., the evidence frontal impact and UN Regulation No. 95 (05 series of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. To confirm compliance to (c1) of paragraph 6.4.2.3. an appropriate coating shall, if necessary, be applied to the physical protection (casing) in order to confirm if there is any electrolyte leakage from the REESS resulting from the impact test. Unless the manufacturer provides a means to differentiate between the leakage of different liquids, all liquid leakage shall be considered as the electrolyte. amendments or later) for lateral impact.
6.4.2.1.2.changed
The test shall be conducted in accordance with Annex 8D 9D of this Regulation. The crush force replacing the prescribed force specified in paragraph 3.2.1. of Annex 8D shall 9D may be determined replaced with the value declared by the vehicle manufacturer using the data obtained from either actual crash tests or its simulation as specified in Annex 3 of UN Regulations No. 12 Nos. 94 or No. 94 137 in the direction of travel and according to Annex 4 to UN Regulation No. 95 in the direction horizontally perpendicular to the direction of travel. These forces shall be agreed by the Technical Service. The manufacturers may, in agreement with the Technical Services, use forces derived from the data obtained from alternative crash test procedures, but these forces shall be equal to or greater than the forces that would result from using data in accordance with the Regulations specified above. The manufacturer may define the relevant parts of the vehicle structure used for the mechanical protection of the REESS components. The test shall be conducted with the REESS mounted to this vehicle structure in a way which is representative of its mounting in the vehicle.
6.4.2.2.changed
The test shall be conducted in accordance with Annex 8D 9D to this Regulation. REESS approved according to this paragraph shall be mounted in a position which is between the two planes; (a) a vertical plane perpendicular to the centre line of the vehicle located 420 mm rearward from the front edge of the vehicle, and (b) a vertical plane perpendicular to the centre line of the vehicle located 300 mm forward from the rear edge of the vehicle. The mounting restrictions shall be documented in Annex 6 - Part 1 – Appendix 2. The crush force specified in paragraph 3.2.1. of Annex 8D 9D may be replaced with the value declared by the manufacturer, where the crush force shall be documented in Annex 6, Part 1, Appendix 2 as a mounting restriction. In this case, the vehicle manufacturer who uses such REESS shall demonstrate, during the process of approval for Part I of this Regulation, that the contact force to the REESS will not exceed the figure declared by the REESS manufacturer. Such force shall be determined by the vehicle manufacturer using the data obtained from either actual crash test or its simulation as specified in Annex 3 of to UN Regulations Nos. 12 94 or 94 137 in the direction of travel and according to Annex 4 to Regulation No. 95 in the direction horizontally perpendicular to the direction of travel. These forces shall be agreed by the manufacturer together with the Technical Service. The manufacturers may, in agreement with the Technical Services, use forces derived from the data obtained from alternative crash test procedures, but these forces shall be equal to or greater than the forces that would result from using data in accordance with the regulations specified above.
6.4.2.3.added
During the test there shall be no evidence of: (a) Fire; (b) Explosion; (c1) Electrolyte leakage if tested according to paragraph 6.4.1.1.: (i) In case of aqueous electrolyte REESS: For a period from the impact until 60 minutes after the impact there shall be no electrolyte leakage from the REESS into the passenger compartment and no more than 7 per cent by volume of the REESS electrolyte with a maximum of 5.0 l leaked from the REESS to the outside of the passenger compartment. The leaked amount of electrolyte can be measured by the usual techniques of determination of liquid volumes after its collection. For containers containing stoddard, coloured coolant and electrolyte, the fluids shall be allowed to separate by specific gravity then measured. (ii) In case of non-aqueous electrolyte REESS: For a period from the impact until 60 minutes after the impact, there shall be no liquid electrolyte leakage from the REESS into the passenger compartment, luggage compartment and no liquid electrolyte leakage to outside the vehicle. This requirement shall be verified by visual inspection without disassembling any part of the vehicle. (c2) Electrolyte leakage if tested according to paragraph 6.4.2.2. For a high voltage REESS, the isolation resistance of the Tested-Device shall ensure at least 100 Ω/Volt for the whole REESS measured in accordance with Annex 5A or Annex 5B of this Regulation or the protection degree IPXXB shall be fulfilled for the Tested-…
6.5.1.changed
The test shall be conducted in accordance with Annex 8E 9E paragraph 3.2.1. of this Regulation. The approval of a REESS tested according to this paragraph shall be limited to approvals for a specific vehicle type.
6.10.2.deleted
For hydrogen emissions see paragraph 5.4. of this Regulation. For emission free systems with closed chemical process no verification is necessary.
6.5.2.changed
The test shall be conducted in accordance with Annex 8E 9E paragraph 3.2.2. of this Regulation.
6.5.3.1.changed
During the test, the tested-device Tested-Device shall exhibit no evidence of explosion.
6.6.1.changed
The test shall be conducted in accordance with Annex 8F 9F of this Regulation.
7.2.deleted
Confirmation or refusal of approval, specifying the alteration, shall be communicated by the procedure specified in paragraph 4.3. above to the Parties to the Agreement applying this Regulation.
7.3.deleted
The Type Approval Authority issuing the extension of approval shall assign a series number to each communication form drawn up for such an extension and inform thereof the other Parties to the 1958 Agreement applying the Regulation by means of a communication form conforming to the model in Annex 1 (Part 1 or Part 2) to this Regulation.
6.6.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.6.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4 5 B to this Regulation shall not be less than 100 Ω/Volt.
6.7.1.changed
The test shall be conducted in accordance with Annex 8G 9G to this Regulation.
8.3.deleted
The holder of the approval shall, in particular:
8.3.1.deleted
Ensure the existence of procedures for the effective quality control of vehicles or REESS;
6.7.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (de) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
8.3.2.deleted
Have access to the testing equipment necessary for checking the conformity of each approved type;
6.7.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
8.3.3.deleted
Ensure that test result data are recorded and that the annexed documents remain available for a period to be determined in agreement with the Type Approval Authority;
8.3.4.deleted
Analyse the results of each type of test, in order to verify and ensure the consistency of characteristics of the vehicle or REESS, making allowance for permissible variations in industrial production;
6.8.1.changed
The test shall be conducted in accordance with Annex 8H 9H to this Regulation.
8.3.5.deleted
Ensure that for each type of vehicle or component type at least the tests prescribed in the relevant part(s) of this Regulation are carried out;
8.3.6.deleted
Ensure that any set of samples or test pieces giving evidence of non- conformity with the type of test in question shall give rise to a further sampling and test. All necessary steps shall be taken to re-establish conformity of the corresponding production.
6.8.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
8.4.deleted
The Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production unit.
6.8.2.2.changed
For a high voltage REESS the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
8.4.1.deleted
At every inspection, the test records and production records shall be presented to the visiting inspector.
8.4.2.deleted
The inspector may take samples at random to be tested in the manufacturer's laboratory. The minimum number of samples may be determined according to the results of the manufacturer's own checks.
6.9.1.changed
The test shall be conducted in accordance with Annex 8I 9I to this Regulation.
8.4.3.deleted
When the quality level appears unsatisfactory or when it seems necessary to verify the validity of the tests carried out in application of paragraph 8.4.2., the inspector shall select samples to be sent to the technical service which has conducted the type approval tests.
8.4.4.deleted
The competent Authority may carry out any test prescribed in this Regulation.
6.9.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (d) (e) Explosion. Evidence The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the tested-device. Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
8.4.5.deleted
The normal frequency of inspections by the Type Approval Authority shall be one per year. If unsatisfactory results are recorded during one of these visits, the Type Approval Authority shall ensure that all necessary steps are taken to re-establish the conformity of production as rapidly as possible.
6.9.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 4B 5B to this Regulation shall not be less than 100 Ω/Volt.
6.10.changed
Possible emission This test is required for REESS intended for use on vehicles of gases caused categories M1 and N1 that have the capability of charging by the energy conversion process during normal use shall be considered. DC external electricity supply.
6.10.1.changed
Open type traction batteries shall meet the requirements of paragraph 5.4. of this Regulation with regard to hydrogen emissions. Systems with a closed chemical process The test shall be considered as emission-free under normal operation (e.g. lithium-ion battery). The closed chemical process shall be described and documented by the battery manufacturer conducted in accordance with Annex 6 - Part 2. Other technologies shall be evaluated by the manufacturer and the Technical Service regarding any possible emissions under normal operation. 9J to this Regulation.
6.10.2.1.added
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (e) Explosion. The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
6.10.2.2.added
The overcurrent protection control of the REESS shall terminate charging or the temperature measured on the casing of the REESS shall be stabilized, such that the temperature gradient varies by less than 4 °C through 2 hours after the maximum overcurrent charging level is reached.
6.10.2.3.added
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B to this Regulation shall not be less than 100 Ω/V.
6.11.changed
Distinguishing number Low-temperature protection. REESS manufacturer must make available, at the request of the country which has granted/extended/refused/withdrawn approval (see approval provisions in Technical Service with its necessity, the Regulation). Strike out what does not apply. Annex 1 – Part 2 following documentations explaining safety performance of the system level or subsystem level of the vehicle to demonstrate that the REESS monitors and appropriately controls REESS operations at low temperatures at the safety boundary limits of the REESS: (a) A system diagram; (b) Written explanation on the lower boundary temperature for safe operation of REESS; (c) Method of detecting REESS temperature; (d) Action taken when the REESS temperature is at or lower than the lower boundary for safe operation of the REESS.
6.12.1.added
Under vehicle operation including the operation with a failure, the vehicle occupants shall not be exposed to any hazardous environment caused by emissions from REESS.
6.12.2.added
Open-type traction batteries shall meet the requirements of paragraph 5.4. of this Regulation with regard to hydrogen emissions.
6.12.3.added
For REESS other than open-type traction battery, the requirement of paragraph 6.12.1. is deemed to be satisfied, if all applicable requirements of the following tests are met: paragraph 6.2. (vibration), paragraph 6.3. (thermal shock and cycling), paragraph 6.6. (external short circuit protection), paragraph 6.7. (overcharge protection), paragraph 6.8. (over-discharge protection), paragraph 6.9. (over-temperature protection) and paragraph 6.10. (overcurrent protection).
6.13.added
REESS safe operation. The REESS or vehicle system shall provide a signal to activate the warning specified in paragraph 5.2.3. in the event of operational failure of the vehicle controls (e.g. input and output signals to the management system of REESS, sensors within REESS, etc.) that manage the safe operation of the REESS. REESS or vehicle manufacturer shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or subsystem level of the vehicle:
6.13.1.added
A system diagram that identifies all the vehicle controls that manage REESS operations. The diagram must identify what components are used to generate a warning due to operational failure of vehicle controls to conduct one or more basic operations.
6.13.2.added
A written explanation describing the basic operation of the vehicle controls that manage REESS operation. The explanation must identify the components of the vehicle control system, provide description of their functions and capability to manage the REESS, and provide a logic diagram and description of conditions that would lead to triggering of the warning.
6.14.added
Warning in the case of a thermal event within the REESS. The REESS or vehicle system shall provide a signal to activate the warning specified in paragraph 5.2.3. in the case of a thermal event in the REESS (as specified by the manufacturer). REESS or vehicle manufacturer shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or subsystem level of the vehicle:
6.14.1.added
The parameters and associated threshold levels that are used to indicate a thermal event (e.g. temperature, temperature rise rate, SOC level, voltage drop, electrical current, etc.) to trigger the warning.
6.14.2.added
A system diagram and written explanation describing the sensors and operation of the vehicle controls to manage the REESS in the event of a thermal event.
6.15.added
Thermal propagation. For a REESS containing flammable electrolyte, the vehicle occupants shall not be exposed to any hazardous environment caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway. To ensure this, the requirements of paragraphs 6.15.1. and 6.15.2. shall be satisfied.4 4 The manufacturer will be accountable for the verity and integrity of documentation submitted, and assume full responsibility for the safety of occupants against adverse effects arising from thermal propagation caused by internal short circuit.
6.15.1.added
The REESS or vehicle system shall provide a signal to activate the advance warning indication in the vehicle to allow egress or 5 minutes prior to the presence of a hazardous situation inside the passenger compartment caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway such as fire, explosion or smoke. This requirement is deemed to be satisfied if the thermal propagation does not lead to a hazardous situation for the vehicle occupants. REESS or vehicle manufacturer shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or sub-system level of the vehicle:
6.15.1.1.added
The parameters (for example, temperature, voltage or electrical current) which trigger the warning indication.
6.15.1.2.added
Description of the warning system.
6.15.2.added
The REESS or vehicle system shall have functions or characteristics in the cell or REESS intended to protect vehicle occupants (as described in paragraph 6.15.) in conditions caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway. REESS or vehicle manufacturers shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or sub-system level of the vehicle:
Table 1deleted
Annex 3
6.15.2.1.added
A risk reduction analysis using appropriate industry standard methodology (for example, IEC 61508, MIL-STD 882E, ISO 26262, AIAG DFMEA, fault analysis as in SAE J2929, or similar), which documents the risk to vehicle occupants caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway and documents the reduction of risk resulting from implementation of the identified risk mitigation functions or characteristics.
6.15.2.2.added
A system diagram of all relevant physical systems and components. Relevant systems and components are those which contribute to protection of vehicle occupants from hazardous effects caused by thermal propagation triggered by a single cell thermal runaway.
1.deleted
The isolation resistance for each high voltage bus of the vehicle shall be measured or shall be determined by calculation using measurement values from each part or component unit of a high voltage bus (hereinafter referred to as the "divided measurement").
6.15.2.3.added
A diagram showing the functional operation of the relevant systems and components, identifying all risk mitigation functions or characteristics.
2.deleted
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 2.1. through 2.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the on-board isolation resistance monitoring system, etc., necessary modification for conducting the measurement may be carried out, such as stopping of the operation of the device concerned or removing it. Furthermore, when the device is removed, it shall be proven, using drawings, etc., that it will not change the isolation resistance between the live parts and the electrical chassis. Utmost care shall be exercised as to short circuit, electric shock, etc., for this confirmation might require direct operations of the high-voltage circuit.
6.15.2.4.added
For each identified risk mitigation function or characteristic:
6.15.2.4.1.added
A description of its operation strategy;
2.1.1.deleted
An isolation resistance test instrument capable of applying a DC voltage higher than the working voltage of the high voltage bus shall be used.
6.15.2.4.2.added
Identification of the physical system or component which implements the function;
2.1.2.deleted
An insulator resistance test instrument shall be connected between the live parts and the electrical chassis. Then, the isolation resistance shall be measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those component disconnected. Annex 4A
6.15.2.4.3.added
One or more of the following engineering documents relevant to the manufacturers design which demonstrates the effectiveness of the risk mitigation function: (a) Tests performed including procedure used and conditions and resulting data; (b) Analysis or validated simulation methodology and resulting data.
2.2.deleted
Measurement method using the vehicle’s own REESS as DC voltage source
2.2.1.deleted
The high voltage-bus shall be energized by the vehicle’s own REESS and/or energy conversion system and the voltage level of the REESS and/or energy conversion system throughout the test shall be at least the nominal operating voltage as specified by the vehicle manufacturer.
7.1.changed
Every modification of the vehicle or REESS type with regard to this Regulation shall be notified to the Type Approval Authority which approved the vehicle or REESS type. The Authority may then either: (a) Decide, in consultation with the manufacturer, that a new type approval is to be granted; or (b) Apply the procedure contained in paragraph 7.1.1. (Revision) and, if applicable, the procedure contained in paragraph 7.1.2. (Extension).
2.2.2.deleted
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
7.1.1.changed
Consider When details recorded in the information documents of Annex 1 - Appendix 1 or Annex 1 - Appendix 2 have changed and the Type Approval Authority considers that the modifications made are unlikely to have an appreciable adverse effect effect, and that in any case the vehicle or the REESS still complies with meets the requirements, the modification shall be designated a "revision". In such a case, the Type Approval Authority shall issue the revised pages of the information documents of Annex 1 – Appendix 1 or Annex 1 – Appendix 2 as necessary, marking each revised page to show clearly the nature of the modification and the date of reissue. A consolidated, updated version of the information documents of Annex 1 – Appendix 1 or Annex 1 – Appendix 2, accompanied by a detailed description of the modification, shall be deemed to meet this requirement.
7.1.2.changed
Require The modification shall be designated an "extension" if, in addition to the change of the particulars recorded in the information folder: (a) Further inspections or tests are required; or (b) Any information on the communication document (with the exception of its attachments) has changed; or (c) Approval to a further test report from the Technical Service responsible for conducting the tests. later series of amendments is requested after its entry into force.
2.2.3.1.deleted
The voltage is measured as shown in Figure 1 and the high voltage bus voltage (Vb) is recorded. Vb shall be equal to or greater than the nominal operating voltage of the REESS and/or energy conversion system as specified by the vehicle manufacturer. Measurement of Vb, V1, V2 Electrical Chassis Energy Conversion System Assembly V2 REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Vb System - - V1 Electrical Chassis
8.added
The conformity of production procedure shall comply with the requirements set out in Schedule 1 of the Agreement (E/ECE/TRANS/505/Rev.3).
2.2.3.2.deleted
Measure and record the voltage (V1) between the negative side of the high voltage bus and the electrical chassis (see Figure 1).
2.2.3.3.deleted
Measure and record the voltage (V2) between the positive side of the high voltage bus and the electrical chassis (see Figure 1). Annex4A
2.2.3.4.deleted
If V1 is greater than or equal to V2, insert a standard known resistance (Ro) between the negative side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (V1’) between the negative side of the high voltage bus and the electrical chassis (see
Figure 2deleted
Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V1’ – Vb/V1) or Ri = Ro*Vb*(1/V1’ – 1/V1) Measurement of V1’ Electrical Chassis Energy Conversion System Assembly REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Vb System - - V1´ Ro Electrical Chassis If V2 is greater than V1, insert a standard known resistance (Ro) between the positive side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (V2’) between the positive side of the high voltage bus and the electrical chassis (see Figure 3). Calculate the electrical isolation (Ri) according to the formula shown. Divide this electrical isolation value (in Ω) by the nominal operating voltage of the high voltage bus (in volts). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V2’ – Vb/V2) or Ri = Ro*Vb*(1/V2’ – 1/V2) Annex 4A
9.1.changed
The approval granted in respect of a vehicle/REESS type, pursuant to this Regulation may be withdrawn if the requirements laid down in paragraph 8. above are not complied with, or if the vehicle/REESS or its components fail to pass the tests provided for in paragraph 8.3.5. above. with.
Figure 3deleted
Electrical Chassis Energy Conversion Ro System Assembly REESS Assembly V2' High Voltage Bus + + Energy Conversion Traction System REESS System - - Electrical Chassis
9.2.changed
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation, by means of a communication copy of the approval form conforming to bearing at the Model end, in Annex 1 (Part 1 or Part 2) to this Regulation. large letters, the signed and dated annotation "APPROVAL WITHDRAWN".
2.2.3.5.deleted
The electrical isolation value Ri (in Ω) divided by the working voltage of the high voltage bus (in volts) results in the isolation resistance (in Ω/V). Note: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the working voltage of the vehicle plus/minus 20 per cent (in volts). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements. Annex 4B Annex 4B Isolation resistance measurement method for component based tests of a REESS
10.changed
If the holder of the approval completely ceases to manufacture a vehicle/REESS type approved in accordance with this Regulation, he shall so inform the Type Approval Authority which granted the approval. Upon receiving the relevant communication, that Type Approval Authority shall inform thereof the other Contracting Parties to the 1958 Agreement applying this Regulation by means of a communication copy of the approval form conforming to bearing at the model end, in Annex 1 (Part 1 or Part 2) to this Regulation. large letters, the signed and dated annotation "PRODUCTION DISCONTINUED".
1.deleted
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 1.1. through 1.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. If the operating voltage of the tested-device (Vb, Figure 1) cannot be measured (e.g. due to disconnection of the electric circuit caused by main contactors or fuse operation) the test may be performed with a modified test device to allow measurement of the internal voltages (upstream the main contactors). These modifications shall not influence the test results. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. If the high voltage buses are galvanically isolated from each other, isolation resistance shall be measured for each electrical circuit. Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the isolation resistance monitoring system, etc., necessary modification for conducting the measurement may be carried out, such as stopping the operation of the device concerned or removing it. Furthermore, when the device is removed, it shall be proven, using drawings, etc., that it will not change the isolation resistance be…
1.1.1.deleted
An isolation resistance test instrument capable of applying a DC voltage higher than the nominal voltage of the tested-device shall be used.
12.1.changed
As from the official date of entry into force of the 02 03 series of amendments, no Contracting Party applying this Regulation shall refuse to grant approval or refuse to accept type approvals under this Regulation as amended by the 02 03 series of amendments.
1.1.2.deleted
An insulation resistance test instrument shall be connected between the live parts and the ground connection. Then, the isolation resistance shall be measured. If the system has several voltage ranges (e.g. because of boost converter) in a galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance Annex 4B between those components and the ground connection can be measured separately by applying at least half of their own working voltage with those component disconnected.
12.2.changed
As from [36] months after the date of entry into force of the 02 series of amendments, 1 September 2023, Contracting Parties applying this Regulation shall grant not be obliged to accept type approvals only if to the vehicle type to be approved meets the requirements of this Regulation as amended by the 02 preceding series of amendments. amendments, first issued after 1 September 2023.
12.3.changed
Until 1 September 2025, Contracting Parties applying this Regulation shall continue to grant accept type approvals to those types of vehicles which comply with the requirements of this Regulation as amended by the preceding series of amendments during the [36] months' period which follows the date of entry into force of the 02 series of amendments. amendments, first issued before 1 September 2023.
1.2.1.deleted
The voltage level of the tested-device throughout the test shall be at least the nominal operating voltage of the tested-device.
12.4.changed
As from 1 September 2025, Contracting Parties applying this Regulation shall not refuse be obliged to grant extensions of approval accept type approvals issued to the preceding series of amendments to this Regulation.
1.2.2.deleted
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
12.5.changed
Notwithstanding the transitional provisions above, Contracting Parties whose application of applying this Regulation comes into force after the date of entry into force of the most recent series of amendments are shall not obliged refuse to accept grant type approvals which were granted in accordance with according to any of the preceding series of amendments to this Regulation. Annex 1 – Part 1 Annex 1 - Part 1 Communication (Maximum format: A4 (210 x 297 mm)) Issued by: Name of administration: Concerning 2 : Approval granted, Approval extended, Approval refused, Approval withdrawn, Production definitively discontinued, of a vehicle type with regard to its electrical safety pursuant to Regulation No. 100 or extensions thereof.
12.6.added
Notwithstanding the transitional provisions above, Contracting Parties who start to apply this Regulation after the date of entry into force of the most recent series of amendments are not obliged to accept type approvals which were granted in accordance with any of the preceding series of amendments to this Regulation. Annex 1 – Part 1 Annex 1 - Part 1 Communication (Maximum format: A4 (210 x 297 mm)) Issued by: Name of administration: Concerning2: Approval granted, Approval extended, Approval refused, Approval withdrawn, Production definitively discontinued, of a vehicle type with regard to its electrical safety pursuant to Regulation No. 100
1.2.3.1.deleted
The voltage is measured as shown in Figure 1 and the operating voltage of the tested-device (Vb, Figure 1) is recorded. Vb shall be equal to or greater than the nominal operating voltage of the tested-device. + Tested- Vb device - V2 V1 Ground connection
6.1.1.changed
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 1 – Part 1
1.2.3.2.deleted
Measure and record the voltage (V1) between the negative pole of the tested-device and the ground connection (Figure 1).
17.changed
The documents filed with the request for approval or extension may be obtained on request. Annex 1 – Part 2 Annex 1 – Part 2 Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning: 2 Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a REESS type as component/separate technical unit2 pursuant to Regulation No. 100
1.2.3.3.deleted
Measure and record the voltage (V2) between the positive pole of the tested-device and the ground connection (Figure 1).
6.added
Installation restrictions applicable to the REESS as described in paragraphs 6.4 and 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 1 – Part 2
1.2.3.4.deleted
If V1 is greater than or equal to V2, insert a standard known resistance (Ro) between the negative pole of the tested-device and the ground connection. With Ro installed, measure the voltage (V1’) between the negative pole of the tested-device and the ground connection (see Annex 4B Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V1’ – Vb/V1) or Ri = Ro*Vb*(1/V1’ – 1/V1) + Tested- Vb device - R0 V1’ Ground connection If V2 is greater than V1, insert a standard known resistance (Ro) between the positive pole of the tested-device and the ground connection. With Ro installed, measure the voltage (V2’) between the positive pole of the tested-device and the ground connection (see Figure 3). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V2’ – Vb/V2) or Ri = Ro*Vb*(1/V2’ – 1/V2) + Tested- Vb device R0 - V2’ Ground connection Annex 4B
1.2.3.5.deleted
The electrical isolation value Ri (in Ω) divided by the nominal voltage of the tested-device (in volts) results in the isolation resistance (in Ω/V). Note 1: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the nominal voltage of the tested-device plus/minus 20 per cent (in volts). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements.
Annex 5deleted
resistance monitoring system The function of the on-board isolation resistance monitoring system shall be confirmed by the following method: Insert a resistor that does not cause the isolation resistance between the terminal being monitored and the electrical chassis to drop below the minimum required isolation resistance value. The warning shall be activated. Annex 6 – Part 1 Annex 6 - Part 1 Essential characteristics of road vehicles or systems
3.3.added
Description or drawing(s) or picture(s) of the REESS explaining: Annex 1 – Appendix 1
3.3.deleted
Description or drawing(s) or picture(s) of the REESS explaining: Annex 6 – Part 1
3.6.added
Description or drawing(s) or picture(s) of the installation of the REESS in the
3.6.deleted
Description or drawing(s) or picture(s) of the installation of the REESS in the
4.added
Fuel Cell (if any)
4.deleted
Fuel Cell (if any)
7.deleted
Annex 6 – Part 1
8.1.deleted
Annex 6 – Part 2 Annex 6 - Part 2 Essential characteristics of REESS
1.6.deleted
Description or drawing(s) or picture(s) of the installation of the REESS in the Annex 7
1.6.added
Description or drawing(s) or picture(s) of the installation of the REESS in the Annex 2
Annex 7deleted
procedures of the REESS
1.deleted
This annex describes the procedure for the determination of hydrogen emissions during the charge procedures of the REESS of all road vehicles, according to paragraph 5.4. of this Regulation.
Figure 1changed
a = 8 mm min. The approval mark in Figure 1 affixed to a vehicle shows that the road vehicle type concerned has been approved in the Netherlands (E 4), pursuant to Regulation No. 100, and under the approval number 022492. 032492. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 100 as amended by 02 03 series of amendments.
2.deleted
The hydrogen emission test (Figure 7.1 of the present annex) is conducted in order to determine hydrogen emissions during the charge procedures of the REESS with the charger. The test consists in the following steps: (a) Vehicle/REESS preparation; (b) Discharge of theREESS; (c) Determination of hydrogen emissions during a normal charge; (d) Determination of hydrogen emissions during a charge carried out with the charger failure.
Figure 2changed
a = 8 mm min. The approval mark in Figure 2 affixed to a REESS shows that the REESS type ("ES") concerned has been approved in the Netherlands (E 4), pursuant to Regulation No. 100, and under the approval number 022492. 032492. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 100 as amended by 02 03 series of amendments. Model B (See paragraph 4.5. of this Regulation) 100 03 2492 42 00 1628 a = 8 mm min. The above approval mark affixed to a vehicle shows that the road vehicle concerned has been approved in the Netherlands (E4) pursuant to Regulations Nos. 100 and 42 * . 42*. The approval number indicates that, at the dates when the respective approvals were granted, Regulation No. 100 was amended by the 02 03 series of amendments and Regulation No. 42 was still in its original form. * The latter number is given only as an example. Annex 3
3.1.1.deleted
The vehicle shall be in good mechanical condition and have been driven at least 300 km during seven days before the test. The vehicle shall be equipped with the REESS subject to the test of hydrogen emissions, over this period.
3.1.2.deleted
If the REESS is used at a temperature above the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system of the REESS is neither damaged nor presenting a capacity defect.
3.changed
The access probe shall not touch live parts. If this requirement is verified by a signal circuit between the probe and live parts, the lamp shall not light. In the case of the test for IPXXB, the jointed test finger may penetrate to its 80 mm length, but the stop face (diameter 50 mm x 20 mm) shall not pass through the opening. Starting from the straight position, both joints of the test finger shall be successively bent through an angle of up to 90 degrees with respect to the axis of the adjoining section of the finger and shall be placed in every possible position. In case of the tests for IPXXD, the access probe may penetrate to its full length, but the stop face shall not fully penetrate through the opening. Annex 3
3.2.1.deleted
The REESS shall be in good mechanical condition and have been subject to minimum of 5 standard cycles (as specified in Annex 8, Appendix 1).
Figure 1changed
R2 ± 0.05 cylindrical R4 ± 0.05 spherical Material: metal, except where otherwise specified Linear dimensions in millimeters Tolerances on dimensions without specific tolerance: (a) Nn On angles: 0/-10°; 0/-10 seconds; (b) On linear dimensions: (i) up to 25 mm: 0/-0.05 mm mm: (ii) over 25 mm: ±0.2 mm mm. Both joints shall permit movement in the same plane and the same direction through an angle of 90° with a 0 to +10° tolerance. Annex 4A Annex 4A Isolation resistance measurement method for vehicle based tests 4
3.2.2.deleted
If the REESS is used at a temperature above the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in its normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system of the REESS is neither damaged nor presenting a capacity defect
Figure 7deleted
Determination of hydrogen emissions during the charge procedures of the REESS START Vehicle/REESS preparation (if necessary) Maximum 7 days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to Soak 36 h Maximum 2 min after connection to mains Hydrogen emission test during a normal charge Maximum 7 days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to 1.1.1.1. Soak 36 h Maximum 2 min after Hydrogen emission test connection to mains during a charger failure Ambient temperature 293 K ± 2 K END Annex 7
1.added
Test method using a resistance tester. The resistance tester is connected to the measuring points (typically, electrical chassis and electro conductive enclosure/electrical protection barrier) and the resistance is measured using a resistance tester that meets the specification that follows: (a) Resistance tester: Measurement current at least 0.2 A; (b) Resolution: 0.01 Ω or less; (c) The resistance R shall be less than 0.1 Ω.
2.added
Test method using DC power supply, voltmeter and ammeter. Example of the test method using DC power supply, voltmeter and ammeter is shown below.
4.1.deleted
The chassis dynamometer shall meet the requirements of the 06 series of amendments to Regulation No. 83.
Figure 1added
Connection to exposed Conductive Parts Exposed Conductive DC Parts Power U Supply Electrical Chassis Connection to Electrical Chassis
4.2.deleted
The hydrogen emission measurement enclosure shall be a gas-tight measuring chamber able to contain the vehicle/REESS under test. The vehicle/REESS shall be accessible from all sides and the enclosure when sealed shall be gas- tight in accordance with Appendix 1 to this annex. The inner surface of the enclosure shall be impermeable and non-reactive to hydrogen. The temperature conditioning system shall be capable of controlling the internal enclosure air temperature to follow the prescribed temperature throughout the test, with an average tolerance of ±2 K over the duration of the test. To accommodate the volume changes due to enclosure hydrogen emissions, either a variable-volume or another test equipment may be used. The variable-volume enclosure expands and contracts in response to the hydrogen emissions in the enclosure. Two potential means of accommodating the internal volume changes are movable panels, or a bellows design, in which impermeable bags inside the enclosure expand and contract in response to internal pressure changes by exchanging air from outside the enclosure. Any design for volume accommodation shall maintain the integrity of the enclosure as specified in Appendix 1 to this annex. Any method of volume accommodation shall limit the differential between the enclosure internal pressure and the barometric pressure to a maximum value of ±5hPa. The enclosure shall be capable of latching to a fixed volume. A variable volume enclosure shall be capabl…
2.1.added
Test Procedure. The DC power supply, voltmeter and ammeter are connected to the measuring points (Typically, electrical chassis and electro conductive enclosure/electrical protection barrier). The voltage of the DC power supply is adjusted so that the current flow becomes at least 0.2 A. The current "I" and the voltage "U" are measured. The resistance "R" is calculated according to the following formula: R=U/I The resistance R shall be less than 0.1 Ω. Note: If lead wires are used for voltage and current measurement, each lead wire shall be independently connected to the electrical protection barrier/enclosure/electrical chassis. Terminal can be common for voltage measurement and current measurement. Annex 5A Annex 5A Isolation resistance measurement method for vehicle based tests
1.added
The isolation resistance for each high voltage bus of the vehicle shall be measured or shall be determined by calculation using measurement values from each part or component unit of a high voltage bus (hereinafter referred to as the "divided measurement").
2.added
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 2.1. through 2.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. Megohmmeter or oscilloscope measurements are appropriate alternatives to the procedure described below for measuring isolation resistance. In this case, it may be necessary to deactivate the on-board isolation resistance monitoring system. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. If the high voltage buses are conductively isolated from each other, isolation resistance shall be measured for each electrical circuit. Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the on-board isolation resistance monitoring system, necessary modification for conducting the measurement may be carried out by stopping of the operation of the device concerned or removing it. Furthermore, when the device is removed, a set of drawings will be used to prove that the isolation resistance between the live parts and the electrical chassis remains unchanged. These modifications shall not influence the test results. Utmost care shall be e…
4.3.1.1.deleted
The atmosphere within the chamber is monitored using a hydrogen analyser (electrochemical detector type) or a chromatograph with thermal conductivity detection. Sample gas shall be drawn from the mid-point of one side-wall or roof of the chamber and any bypass flow shall be returned to the enclosure, preferably to a point immediately downstream of the mixing fan.
4.3.1.2.deleted
The hydrogen analyser shall have a response time to 90 per cent of final reading of less than 10 seconds. Its stability shall be better than 2 per cent of full scale at zero and at 80 per cent ± 20 per cent of full scale, over a 15-minute period for all operational ranges.
2.1.1.added
An isolation resistance test instrument capable of applying a DC voltage higher than the working voltage of the high voltage bus shall be used.
4.3.1.3.deleted
The repeatability of the analyser expressed as one standard deviation shall be better than 1 per cent of full scale, at zero and at 80 per cent ± 20 per cent of full scale on all ranges used.
2.1.2.added
An isolation resistance test instrument shall be connected between the live parts and the electrical chassis. Then, the isolation resistance shall be measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by Annex 5A applying at least half of their own working voltage with those component disconnected.
4.3.1.4.deleted
The operational ranges of the analyser shall be chosen to give best resolution over the measurement, calibration and leak checking procedures.
4.3.2.deleted
The hydrogen analyser shall be fitted with a device to record electrical signal output, at a frequency of at least once per minute. The recording system shall have operating characteristics at least equivalent to the signal being recorded and shall provide a permanent record of results. The recording shall show a clear indication of the beginning and end of the normal charge test and charging failure operation.
2.2.1.added
The high voltage-bus shall be energized by the vehicle’s own REESS and/or energy conversion system and the voltage level of the REESS and/or energy conversion system throughout the test shall be at least the nominal operating voltage as specified by the vehicle manufacturer.
2.2.2.added
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
4.4.1.deleted
The temperature in the chamber is recorded at two points by temperature sensors, which are connected so as to show a mean value. The measuring points are extended approximately 0.1 m into the enclosure from the vertical centre line of each side-wall at a height of 0.9 ± 0.2 m.
4.4.2.deleted
The temperatures in the proximity of the cells are recorded by means of the sensors.
2.2.3.1.added
The voltage is measured as shown in Figure 1 and the high voltage bus voltage (Ub) is recorded. Ub shall be equal to or greater than the nominal operating voltage of the REESS and/or energy conversion system as specified by the vehicle manufacturer. Measurement of Ub, U1, U2 Electrical Chassis Energy Conversion System Assembly U2 REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Ub System - - U1 Electrical Chassis
4.4.3.deleted
Temperatures shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
2.2.3.2.added
Measure and record the voltage (U1) between the negative side of the high voltage bus and the electrical chassis (see Figure 1).
4.4.4.deleted
The accuracy of the temperature recording system shall be within ±1.0 K and the temperature shall be capable of being resolved to ±0.1 K.
2.2.3.3.added
Measure and record the voltage (U2) between the positive side of the high voltage bus and the electrical chassis (see Figure 1).
4.4.5.deleted
The recording or data processing system shall be capable of resolving time to ± 15 seconds.
2.2.3.4.added
Annex 5A If U1 is greater than or equal to U2, insert a standard known resistance (Ro) between the negative side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (U1’) between the negative side of the high voltage bus and the electrical chassis (see Figure 2). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U1’ – 1/U1)
Figure 2added
Electrical Chassis Energy Conversion System Assembly REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Ub System - - U1´ Ro Electrical Chassis If U2 is greater than U1, insert a standard known resistance (Ro) between the positive side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (U2’) between the positive side of the high voltage bus and the electrical chassis (see Figure 3). Calculate the electrical isolation (Ri) according to the formula shown. Divide this electrical isolation value (in Ω) by the nominal operating voltage of the high voltage bus (in volts). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U2’ – 1/U2) Annex 5A
4.5.1.deleted
The difference Δp between barometric pressure within the test area and the enclosure internal pressure shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
Figure 3added
Electrical Chassis Energy Conversion Ro System Assembly REESS Assembly U2' High Voltage Bus + + Energy Conversion Traction System REESS System - - Electrical Chassis
4.5.2.deleted
The accuracy of the pressure recording system shall be within ±2 hPa and the pressure shall be capable of being resolved to ±0.2 hPa.
2.2.3.5.added
The electrical isolation value Ri (in Ω) divided by the working voltage of the high voltage bus (in volts) results in the isolation resistance (in Ω/V). Note: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the working voltage of the vehicle plus/minus 20 per cent (in volts). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements. Annex 5B Annex 5B Isolation resistance measurement method for component based tests of a REESS
4.5.3.deleted
The recording or data processing system shall be capable of resolving time to ±15 seconds.
1.added
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 1.1. through 1.2. of this Annex, depending on the electrical charge of the live parts or the isolation resistance, etc. Megohmmeter or oscilloscope measurements are appropriate alternatives to the procedure described below for measuring isolation resistance. In this case, it may be necessary to deactivate the on-board isolation resistance monitoring system. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. If the high voltage buses are galvanically isolated from each other, isolation resistance shall be measured for each electrical circuit. If the operating voltage of the Tested-Device (Ub, Figure 1) cannot be measured (e.g. due to disconnection of the electric circuit caused by main contactors or fuse operation) the test may be performed with a modified test device to allow measurement of the internal voltages (upstream the main contactors). Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the isolation resistance monitoring system, necessary modification for conducting the measurement may be carried out by stopping the operation of t…
4.6.1.deleted
The charger voltage and current intensity (battery) shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
1.1.1.added
An isolation resistance test instrument capable of applying a DC voltage higher than the nominal voltage of the Tested-Device shall be used.
4.6.2.deleted
The accuracy of the voltage recording system shall be within ±1 V and the voltage shall be capable of being resolved to ±0.1 V.
1.1.2.added
An insulation resistance test instrument shall be connected between the live parts and the ground connection. Then, the isolation resistance shall be measured. If the system has several voltage ranges (e.g. because of boost converter) in a galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between Annex 5B those components and the ground connection can be measured separately by applying at least half of their own working voltage with those component disconnected.
4.6.3.deleted
The accuracy of the current intensity recording system shall be within ±0.5 A and the current intensity shall be capable of being resolved to ±0.05 A.
4.6.4.deleted
The recording or data processing system shall be capable of resolving time to ±15 seconds.
1.2.1.added
The voltage level of the Tested-Device throughout the test shall be at least the nominal operating voltage of the Tested-Device.
4.7.deleted
The chamber shall be equipped with one or more fans or blowers with a possible flow of 0.1 to 0.5 m3/second in order to thoroughly mix the atmosphere in the enclosure. It shall be possible to reach a homogeneous temperature and hydrogen concentration in the chamber during Annex 7 measurements. The vehicle in the enclosure shall not be subjected to a direct stream of air from the fans or blowers.
1.2.2.added
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
4.8.1.deleted
The following pure gases shall be available for calibration and operation: (a) Purified synthetic air (purity < 1 ppm C1 equivalent; < 1 ppm CO; < 400 ppm CO2; < 0.1 ppm NO ); oxygen content between 18 and 21 per cent by volume, (b) Hydrogen ( H2 ), 99.5 per cent minimum purity.
1.2.3.1.added
The voltage is measured as shown in Figure 1 and the operating voltage of the Tested-Device (Ub, Figure 1) is recorded. Ub shall be equal to or greater than the nominal operating voltage of the Tested-Device. + Tested- Ub device - U2 U1 Ground connection
4.8.2.deleted
Calibration and span gases shall contain mixtures of hydrogen (H2) and purified synthetic air. The real concentrations of a calibration gas shall be within ±2 per cent of the nominal values. The accuracy of the diluted gases obtained when using a gas divider shall be within ±2 per cent of the nominal value. The concentrations specified in Appendix 1 may also be obtained by a gas divider using synthetic air as the dilution gas.
1.2.3.2.added
Measure and record the voltage (U1) between the negative pole of the Tested-Device and the ground connection (Figure 1).
5.deleted
The test consists in the five following steps: (a) Vehicle/REESS preparation; (b) Discharge of theREESS; (c) Determination of hydrogen emissions during a normal charge; (d) Discharge of the traction battery; (e) Determination of hydrogen emissions during a charge carried out with the charger failure. If the vehicle/REESS has to be moved between two steps, it shall be pushed to the following test area.
1.2.3.3.added
Measure and record the voltage (U2) between the positive pole of the Tested- Device and the ground connection (Figure 1).
1.2.3.4.added
If U1 is greater than or equal to U2, insert a standard known resistance (Ro) between the negative pole of the Tested-Device and the ground connection. With Ro installed, measure the voltage (U1’) between the negative pole of the Tested-Device and the ground connection (see Figure 2). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U1’ – 1/U1) Annex 5B + Tested- Ub device - R0 U1’ Ground connection If U2 is greater than U1, insert a standard known resistance (Ro) between the positive pole of the Tested-Device and the ground connection. With Ro installed, measure the voltage (U2’) between the positive pole of the Tested- Device and the ground connection (see Figure 3). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U2’ – 1/U2) + Tested- Ub Device R0 - U2’ Ground connection
5.1.1.deleted
The ageing of REESS shall be checked, proving that the vehicle has performed at least 300 km during seven days before the test. During this period, the vehicle shall be equipped with the traction battery submitted to the hydrogen emission test. If this cannot be demonstrated then the following procedure will be applied.
1.2.3.5.added
The electrical isolation value Ri (in Ω) divided by the nominal voltage of the Tested-Device (in volts) results in the isolation resistance (in Ω/V). Note : The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the nominal voltage of the Tested-Device plus/minus 20 per cent (in V). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements. Annex 6
5.1.1.1.deleted
The procedure starts with the discharge of the REESS of the vehicle while driving on the test track or on a chassis dynamometer at a steady speed of 70 per cent ± 5 per cent of the maximum speed of the vehicle during 30 minutes. Discharging is stopped: (a) When the vehicle is not able to run at 65 per cent of the maximum thirty minutes speed, or (b) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (c) After having covered the distance of 100 km.
Annex 6added
isolation resistance monitoring system The on-board isolation resistance monitoring system shall be tested using the following procedure: (a) Determine the isolation resistance, Ri, of the electric power train with the electrical isolation monitoring system using the procedure outlined Annex 5A. (b) If the minimum isolation resistance value required in accordance with paragraphs 5.1.3.1. or 5.1.3.2. is 100 Ω/V, insert a resistor with resistance Ro between either side of the high voltage bus that exhibit lower value in U1 or U2 measured in accordance with paragraph 2.2.3. of Annex 5A and the electrical chassis. The magnitude of the resistor, Ro, shall be such that: 1/(1/(95xU) – 1/Ri) ≤ Ro < 1/(1/(100xU) – 1/Ri) where U is the working voltage of the electric power train. (c) If the minimum isolation resistance value required in accordance with paragraphs 5.1.3.1. or 5.1.3.2. is 500 Ω/V, insert a resistor with resistance Ro between either side of the high voltage bus that exhibit lower value in U1 or U2 measured in accordance with paragraph 2.2.3. of Annex 5A and the electrical chassis. The magnitude of the resistor, Ro, shall be such that: 1/(1/(475xU) – 1/Ri) ≤ Ro < 1/(1/(500xU) – 1/Ri) where U is the working voltage of the electric power train. Annex 7A Annex 7A Verification method for testing authorities confirming document based isolation resistance compliance of electrical design of the vehicle after water exposure This annex describes the applicable requirement…
5.1.1.2.deleted
The charge is carried out: (a) With the charger; (b) In an ambient temperature between 293 K and 303 K. The procedure excludes all types of external chargers. The end of REESS charge criteria corresponds to an automatic stop given by the charger. This procedure includes all types of special charges that could be automatically or manually initiated like, for instance, the equalisation charges or the servicing charges.
1.added
Documentation shall contain the following information: (a) on how the manufacturer tested isolation resistance compliance of electrical design of the vehicle by using fresh water; (b) on how, after the test had been carried out, the high-voltage component or system was inspected for ingress of water and how, depending on its mounting location, each high voltage component/system met the appropriate degree of protection against water.
5.1.1.3.deleted
Procedure from paragraphs 5.1.1.1. and 5.1.1.2. shall be repeated two times.
2.added
The testing authority will verify and confirm the authenticity of documented conditions that have been observed, and should have been complied with, during the process of certification by manufacturer:
5.1.2.deleted
The REESS is discharged while driving on the test track or on a chassis dynamometer at a steady speed of 70 per cent ± 5 per cent from the maximum thirty minutes speed of the vehicle. Stopping the discharge occurs: (a) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (b) When the maximum speed of the vehicle is lower than 20 km/h.
2.1.added
It is permitted that, during the test, the moisture contained inside the enclosure is partly condensed. The dew which may be deposited is not considered as ingress of water. For the purpose of the tests, the surface area of the tested high-voltage component or system is calculated with an accuracy of 10 per cent. If possible, the tested high-voltage component or system is run energized. If the tested high-voltage component or system is energized, adequate safety precautions are taken.
5.1.3.deleted
Within fifteen minutes of completing the battery discharge operation specified in paragraph 5.2., the vehicle is parked in the soak area. The vehicle is parked for a minimum of 12 hours and a maximum of 36 hours, between the end of the traction battery discharge and the start of the hydrogen emission test during a normal charge. For this period, the vehicle shall be soaked at 293 K ± 2 K.
2.2.added
For electrical components, externally attached (e.g. in engine compartment), open underneath, both exposed or protected locations, the testing authority shall verify, with a view to confirming the compliance, whether the test is conducted by spraying the high-voltage component or system from all practicable directions with a stream of water from a standard test nozzle as shown in Figure 1. The following parameters are observed during the test in particular: (a) Nozzle internal diameter: 6.3 mm; (b) Delivery rate: 11.9 – 13.2 l/min; (c) Water pressure at the nozzle: approximately 30 kPa (0.3 bar); (d) Test duration per m2 of surface area of the tested high-voltage component or system: 1 min; (e) Minimum test duration: 3 min; (f) Distance from nozzle to tested high-voltage component or system surface: approximately 3 m (this distance may be reduced, if necessary to ensure proper wetting when spraying upwards). Annex 7A
Figure 1added
Dimensions in millimetres D is 6.3 mm as specified in (a) above.
5.1.4.1.deleted
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
2.3.added
For electrical components, externally attached (e.g. in engine compartment), covered from underneath, the testing authority shall verify, with a view to confirming the compliance, whether: (a) The cover protects the component against direct spray water from underneath and is not visible; (b) The test is conducted by using splashing test nozzle as shown in Figure 2; (c) The moving shield is removed from the spray nozzle and the machine is sprayed from all practicable directions; (d) The water pressure is adjusted to give a delivery rate of (10 ± 0.5) l/min (pressure approximately 80 kPa to 100 kPa (0.8 bar to 1.0 bar)); (e) The test duration is 1 min/m2 of calculated surface area of the machine (excluding any mounting surface and cooling fin) with a minimum duration of 5 min. Splashing Test Nozzle Viewed according to arrow A (with shield removed) Dimensions in millimetres IEC 927/01 Note:
5.1.4.2.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.1.4.3.deleted
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
1.added
Cock 7. Spray nozzle – brass with 121 holes  0,5:
5.1.4.4.deleted
The vehicle shall be connected to the mains. The REESS is charged according to normal charge procedure as specified in paragraph 5.1.4.7. below.
5.1.4.5.deleted
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the normal charge step.
5.1.4.6.deleted
The start of a normal charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and Annex 7 barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
5.1.4.7.deleted
The normal charge is carried out with the charger and consists of the following steps: (a) Charging at constant power during t1; (b) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponds to the one used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given to the driver by the standard instrumentation that the battery is not yet fully charged.
5.1.4.8.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
6.added
Annex 7A
5.1.4.9.deleted
The end of the emission sampling period occurs t1 + t2 or t1 + 5 hours after the beginning of the initial sampling, as specified in paragraph 5.1.4.6. of this annex. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in paragraph 6. of this annex.
3.added
The entire high voltage system or each component is checked to comply with the isolation resistance requirement in paragraph 5.1.3. with the following conditions: (a) The electric chassis shall be simulated by an electric conductor, e.g. a metal plate, and the components are attached with their standard mounting devices to it; (b) Cables, where provided, shall be connected to the component.
4.added
The parts designed not to be wet during operation are not allowed to be wet and no accumulation of water which could have reached them is tolerated inside the high- voltage component or system. Annex 7B Annex 7B Vehicle-based test procedure for protection against water effects
5.1.5.1.deleted
Within seven days maximum after having completed the prior test, the procedure starts with the discharge of the REESS of the vehicle according to paragraph 5.1.2. of this annex.
1.added
This test is intended to simulate the normal washing of vehicles, but not specific cleaning using high water pressure or underbody washing. The areas of the vehicle regarding this test are border lines, i.e. a seal of two parts such as flaps, glass seals, outline of opening parts, outline of front grille and seals of lamps. All border lines shall be exposed and followed in all directions with the water stream using a hose nozzle and conditions in accordance with IPX5 as specified in Annex 7A.
5.1.5.2.deleted
The steps of the procedure in paragraph 5.1.3. of this annex shall be repeated.
2.added
The vehicle shall be driven in a wade pool, with 10 cm water depth, over a distance of 500 m at a speed of 20 km/h, in a time of approximately 1.5 min. If the wade pool used is less than 500 m in length, then the vehicle shall be driven through it several times. The total time, including the periods outside the wade pool, shall be less than 10 min.
5.1.5.3.deleted
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
Annex 8added
procedures of the REESS
5.1.5.4.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
1.added
This annex describes the procedure for the determination of hydrogen emissions during the charge procedures of the REESS of all road vehicles, according to paragraph 5.4. of this Regulation.
5.1.5.5.deleted
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
2.added
The hydrogen emission test (Figure 1 of Annex 8) is conducted in order to determine hydrogen emissions during the charge procedures of the REESS with the charger. The test consists in the following steps: (a) Vehicle/REESS preparation; (b) Discharge of the REESS; (c) Determination of hydrogen emissions during a normal charge; (d) Determination of hydrogen emissions during a charge carried out with the charger failure.
5.1.5.6.deleted
The vehicle shall be connected to the mains. The REESS is charged according to failure charge procedure as specified in paragraph 5.1.5.9. below.
5.1.5.7.deleted
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
5.1.5.8.deleted
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
3.1.1.added
The vehicle shall be in good mechanical condition and have been driven at least 300 km during seven days before the test. The vehicle shall be equipped with the REESS subject to the test of hydrogen emissions, over this period.
5.1.5.9.deleted
The charging failure is carried out with the suitable charger and consists of the following steps: (a) Charging at constant power during t'1; (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
3.1.2.added
If the REESS is used at a temperature above the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system of the REESS is neither damaged nor presenting a capacity defect.
5.1.5.10.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
5.1.5.11.deleted
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.1.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in paragraph 6. of this annex.
3.2.1.added
The REESS shall be in good mechanical condition and have been subject to minimum of 5 standard cycles (as specified in Annex 9, Appendix 1).
3.2.2.added
If the REESS is used at a temperature above the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in its normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system of the REESS is neither damaged nor presenting a capacity defect Annex 8
5.2.1.deleted
The ageing of REESS shall be checked, to confirm that the REESS has performed at least 5 standard cycles (as specified in Annex 8, Appendix 1).
Figure 1added
START Vehicle/REESS preparation (if necessary) Maximum 7 days days days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to Soak 36 h 36 h 36 h Maximum 2 min after connection to mains Hydrogen emission test to mains during a normal charge Maximum 7 days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to 1.1.1.1. Soak 36 h Maximum 2 min after Hydrogen emission test connection to mains during a charger failure Ambient temperature 293 K ± 2 K END
5.2.2.deleted
The REESS is discharged at 70 per cent ± 5 per cent of the nominal power of the system. Stopping the discharge occurs when minimum SOC as specified by the manufacturer is reached.
5.2.3.deleted
Within 15 minutes of the end of the REESS discharge operation specified in paragraph 5.2.2. above, and before the start of the hydrogen emission test, the REESS shall be soaked at 293 K ± 2 K for a minimum period of 12 hours and a maximum of period of 36 hours.
4.1.added
The chassis dynamometer shall meet the requirements of the 06 series of amendments to Regulation No. 83.
4.2.added
The hydrogen emission measurement enclosure shall be a gas-tight measuring chamber able to contain the vehicle/REESS under test. The vehicle/REESS shall be accessible from all sides and the enclosure when sealed shall be gas- tight in accordance with Appendix 1 to this annex. The inner surface of the enclosure shall be impermeable and non-reactive to hydrogen. The temperature conditioning system shall be capable of controlling the internal enclosure air temperature to follow the prescribed temperature throughout the test, with an average tolerance of ±2 K over the duration of the test. To accommodate the volume changes due to enclosure hydrogen emissions, either a variable-volume or another test equipment may be used. The variable-volume enclosure expands and contracts in response to the hydrogen emissions in the enclosure. Two potential means of accommodating the internal volume changes are movable panels, or a bellows design, in which impermeable bags inside the enclosure expand and contract in response to internal pressure changes by exchanging air from outside the enclosure. Any design for volume accommodation shall maintain the integrity of the enclosure as specified in Annex 8, Appendix 1. Any method of volume accommodation shall limit the differential between the enclosure internal pressure and the barometric pressure to a maximum value of ±5hPa. The enclosure shall be capable of latching to a fixed volume. A variable volume enclosure shall be capable of accommodating…
5.2.4.1.deleted
Before the completion of the REESS's soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
5.2.4.2.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.2.4.3.deleted
At the end of the soak period, the REESS shall be moved into the measuring chamber.
4.3.1.1.added
The atmosphere within the chamber is monitored using a hydrogen analyser (electrochemical detector type) or a chromatograph with thermal conductivity detection. Sample gas shall be drawn from the mid-point of one side-wall or roof of the chamber and any bypass flow shall be returned to the enclosure, preferably to a point immediately downstream of the mixing fan.
5.2.4.4.deleted
The REESS shall be charged in accordance with the normal charge procedure as specified in paragraph 5.2.4.7. below. Annex 7
4.3.1.2.added
The hydrogen analyser shall have a response time to 90 per cent of final reading of less than 10 seconds. Its stability shall be better than 2 per cent of full scale at zero and at 80 per cent ± 20 per cent of full scale, over a 15-minute period for all operational ranges.
5.2.4.5.deleted
The chamber shall be closed and sealed gas-tight within two minutes of the electrical interlock of the normal charge step.
4.3.1.3.added
The repeatability of the analyser expressed as one standard deviation shall be better than 1 per cent of full scale, at zero and at 80 per cent ± 20 per cent of full scale on all ranges used.
5.2.4.6.deleted
The start of a normal charge for hydrogen emission test period shall begin when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
4.3.1.4.added
The operational ranges of the analyser shall be chosen to give best resolution over the measurement, calibration and leak checking procedures. Annex 8
5.2.4.7.deleted
The normal charge is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t1; (a) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponding to that used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given by a suitable instrumentation that the REESS is not yet fully charged.
4.3.2.added
The hydrogen analyser shall be fitted with a device to record electrical signal output, at a frequency of at least once per minute. The recording system shall have operating characteristics at least equivalent to the signal being recorded and shall provide a permanent record of results. The recording shall show a clear indication of the beginning and end of the normal charge test and charging failure operation.
5.2.4.8.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
5.2.4.9.deleted
The end of the emission sampling period occurs t1 + t2 or t1 + 5 h after the beginning of the initial sampling, as specified in paragraph 5.2.4.6. above. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in paragraph 6. of this annex
4.4.1.added
The temperature in the chamber is recorded at two points by temperature sensors, which are connected so as to show a mean value. The measuring points are extended approximately 0.1 m into the enclosure from the vertical centre line of each side-wall at a height of 0.9 ± 0.2 m.
4.4.2.added
The temperatures in the proximity of the cells are recorded by means of the sensors.
5.2.5.1.deleted
The test procedure shall start within a maximum of seven days after having completed the test in paragraph 5.2.4. above, the procedure shall start with the discharge of the REESS of the vehicle in accordance with paragraph 5.2.2. above.
4.4.3.added
Temperatures shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
5.2.5.2.deleted
The steps of the procedure in paragraph 5.2.3. above shall be repeated.
4.4.4.added
The accuracy of the temperature recording system shall be within ±1.0 K and the temperature shall be capable of being resolved to ±0.1 K.
5.2.5.3.deleted
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
4.4.5.added
The recording or data processing system shall be capable of resolving time to ± 15 seconds.
5.2.5.4.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.2.5.5.deleted
At the end of the soak the REESS shall be moved into the measuring chamber.
4.5.1.added
The difference p between barometric pressure within the test area and the enclosure internal pressure shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
5.2.5.6.deleted
The REESS shall be charged according to the failure charge procedure as specified in paragraph 5.2.5.9. below.
4.5.2.added
The accuracy of the pressure recording system shall be within ±2 hPa and the pressure shall be capable of being resolved to ±0.2 hPa.
5.2.5.7.deleted
The chamber shall be closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
4.5.3.added
The recording or data processing system shall be capable of resolving time to ±15 seconds.
5.2.5.8.deleted
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
5.2.5.9.deleted
The charging failure is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t'1, (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
4.6.1.added
The charger voltage and current intensity (battery) shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
5.2.5.10.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
4.6.2.added
The accuracy of the voltage recording system shall be within ±1 V and the voltage shall be capable of being resolved to ±0.1 V.
5.2.5.11.deleted
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.2.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in paragraph 6. below.
4.6.3.added
The accuracy of the current intensity recording system shall be within ±0.5 A and the current intensity shall be capable of being resolved to ±0.05 A.
6.deleted
The hydrogen emission tests described in paragraph 5. above allow the calculation of the hydrogen emissions from the normal charge and charging failure phases. Hydrogen emissions from each of these phases are calculated using the initial and final hydrogen concentrations, temperatures and pressures in the enclosure, together with the net enclosure volume. The formula below is used: ⎛ V ⎞ ⎜ (1 + out ) × C H 2f × Pf C × P ⎟ M H 2 = k × V × 10 − 4 × ⎜ V − H 2i i ⎟ ⎜ Tf Ti ⎟ ⎜ ⎟ ⎝ ⎠ Where: MH2 = hydrogen mass, in grams CH2 = measured hydrogen concentration in the enclosure, in ppm volume V = net enclosure volume in cubic metres (m3) corrected for the volume of the vehicle, with the windows and the luggage compartment open. If the volume of the vehicle is not determined a volume of 1.42 m³ is subtracted. Annex 7 Vout = compensation volume in m³, at the test temperature and pressure T = ambient chamber temperature, in K P = absolute enclosure pressure, in kPa k = 2.42 Where: i is the initial reading f is the final reading
4.6.4.added
The recording or data processing system shall be capable of resolving time to ±15 seconds.
6.1.deleted
The hydrogen mass emissions for the REESS are: MN = hydrogen mass emission for normal charge test, in grams MD = hydrogen mass emission for charging failure test, in grams
4.7.added
The chamber shall be equipped with one or more fans or blowers with a possible flow of 0.1 to 0.5 m3/second in order to thoroughly mix the atmosphere in the enclosure. It shall be possible to reach a homogeneous temperature and hydrogen concentration in the chamber during measurements. The vehicle in the enclosure shall not be subjected to a direct stream of air from the fans or blowers.
1.deleted
All equipment shall be calibrated before its initial use and then calibrated as often as necessary and in any case in the month before type approval testing. The calibration methods to be used are described in this appendix.
4.8.1.added
The following pure gases shall be available for calibration and operation: (a) Purified synthetic air (purity < 1 ppm C1 equivalent; < 1 ppm CO; < 400 ppm CO2; < 0.1 ppm NO ); oxygen content between 18 and 21 per cent by volume, (b) Hydrogen ( H2 ), 99.5 per cent minimum purity.
4.8.2.added
Calibration and span gases shall contain mixtures of hydrogen (H 2) and purified synthetic air. The real concentrations of a calibration gas shall be within ±2 per cent of the nominal values. The accuracy of the diluted gases obtained when using a gas divider shall be within ±2 per cent of the nominal value. The concentrations specified in Annex 8, Appendix 1 may also be obtained by a gas divider using synthetic air as the dilution gas.
5.added
The test consists in the five following steps: (a) Vehicle/REESS preparation; (b) Discharge of the REESS; (c) Determination of hydrogen emissions during a normal charge; (d) Discharge of the traction battery; (e) Determination of hydrogen emissions during a charge carried out with the charger failure. If the vehicle/REESS has to be moved between two steps, it shall be pushed to the following test area.
2.1.1.deleted
Before its initial use, the internal volume of the chamber shall be determined as follows. The internal dimensions of the chamber are carefully measured, taking into account any irregularities such as bracing struts. The internal volume of the chamber is determined from these measurements. The enclosure shall be latched to a fixed volume when the enclosure is held at an ambient temperature of 293 K. This nominal volume shall be repeatable within ±0.5 per cent of the reported value.
2.1.2.deleted
The net internal volume is determined by subtracting 1.42 m3 from the internal volume of the chamber. Alternatively the volume of the test vehicle with the luggage compartment and windows open or REESS may be used instead of the 1.42 m3.
5.1.1.added
The ageing of REESS shall be checked, proving that the vehicle has performed at least 300 km during seven days before the test. During this period, the vehicle shall be equipped with the traction battery submitted to the hydrogen emission test. If this cannot be demonstrated then the following procedure will be applied.
2.1.3.deleted
The chamber shall be checked as in paragraph 2.3. of this annex. If the hydrogen mass does not agree with the injected mass to within ±2 per cent then corrective action is required.
5.1.1.1.added
The procedure starts with the discharge of the REESS of the vehicle while driving on the test track or on a chassis dynamometer at a steady speed of 70 per cent ± 5 per cent of the maximum speed of the vehicle during 30 minutes. Discharging is stopped: (a) When the vehicle is not able to run at 65 per cent of the maximum thirty minutes speed, or (b) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (c) After having covered the distance of 100 km.
2.2.deleted
This operation determines that the chamber does not contain any materials that emit significant amounts of hydrogen. The check shall be carried out at the enclosure's introduction to service, after any operations in the enclosure which may affect background emissions and at a frequency of at least once per year.
5.1.1.2.added
The charge is carried out: (a) With the charger; (b) In an ambient temperature between 293 K and 303 K. The procedure excludes all types of external chargers. The end of REESS charge criteria corresponds to an automatic stop given by the charger. Annex 8 This procedure includes all types of special charges that could be automatically or manually initiated like, for instance, the equalisation charges or the servicing charges.
2.2.1.deleted
Variable-volume enclosure may be operated in either latched or unlatched volume configuration, as described in paragraph 2.1.1. above. Ambient temperature shall be maintained at 293 K ± 2 K, throughout the four-hour period mentioned below.
5.1.1.3.added
Procedure from paragraphs 5.1.1.1. and 5.1.1.2. shall be repeated two times.
2.2.2.deleted
The enclosure may be sealed and the mixing fan operated for a period of up to 12 hours before the four-hour background-sampling period begins.
5.1.2.added
The REESS is discharged while driving on the test track or on a chassis dynamometer at a steady speed of 70 per cent ± 5 per cent from the maximum thirty minutes speed of the vehicle. Stopping the discharge occurs: (a) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (b) When the maximum speed of the vehicle is lower than 20 km/h.
2.2.3.deleted
The analyser (if required) shall be calibrated, then zeroed and spanned.
5.1.3.added
Within fifteen minutes of completing the battery discharge operation specified in paragraph 5.1.2., the vehicle is parked in the soak area. The vehicle is parked for a minimum of 12 hours and a maximum of 36 hours, between the end of the traction battery discharge and the start of the hydrogen emission test during a normal charge. For this period, the vehicle shall be soaked at 293 K ± 2 K.
2.2.4.deleted
The enclosure shall be purged until a stable hydrogen reading is obtained, and the mixing fan turned on if not already on.
2.2.5.deleted
The chamber is then sealed and the background hydrogen concentration, temperature and barometric pressure are measured. These are the initial readings CH2i, Ti and Pi used in the enclosure background calculation. Annex 7 – Appendix 1
5.1.4.1.added
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
2.2.6.deleted
The enclosure is allowed to stand undisturbed with the mixing fan on for a period of four hours.
5.1.4.2.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
2.2.7.deleted
At the end of this time the same analyser is used to measure the hydrogen concentration in the chamber. The temperature and the barometric pressure are also measured. These are the final readings CH2f, Tf and Pf.
5.1.4.3.added
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
2.2.8.deleted
The change in mass of hydrogen in the enclosure shall be calculated over the time of the test in accordance with paragraph 2.4. of this annex and shall not exceed 0.5 g.
5.1.4.4.added
The vehicle shall be connected to the mains. The REESS is charged according to normal charge procedure as specified in paragraph 5.1.4.7. below.
2.3.deleted
The calibration and hydrogen retention test in the chamber provides a check on the calculated volume (paragraph 2.1. above) and also measures any leak rate. The enclosure leak rate shall be determined at the enclosure's introduction to service, after any operations in the enclosure which may affect the integrity of the enclosure, and at least monthly thereafter. If six consecutive monthly retention checks are successfully completed without corrective action, the enclosure leak rate may be determined quarterly thereafter as long as no corrective action is required.
5.1.4.5.added
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the normal charge step.
2.3.1.deleted
The enclosure shall be purged until a stable hydrogen concentration is reached. The mixing fan is turned on, if not already switched on. The hydrogen analyser is zeroed, calibrated if required, and spanned.
5.1.4.6.added
The start of a normal charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
2.3.2.deleted
The enclosure shall be latched to the nominal volume position.
5.1.4.7.added
The normal charge is carried out with the charger and consists of the following steps: (a) Charging at constant power during t1; (b) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponds to the one used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given to the driver by the standard instrumentation that the battery is not yet fully charged.
2.3.3.deleted
The ambient temperature control system is then turned on (if not already on) and adjusted for an initial temperature of 293 K.
5.1.4.8.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
2.3.4.deleted
When the enclosure temperature stabilizes at 293 K ± 2 K, the enclosure is sealed and the background concentration, temperature and barometric pressure measured. These are the initial readings CH2i, Ti and Pi used in the enclosure calibration.
5.1.4.9.added
The end of the emission sampling period occurs t 1 + t2 or t1 + 5 hours after the beginning of the initial sampling, as specified in Annex 8 paragraph
2.3.5.deleted
The enclosure shall be unlatched from the nominal volume.
5.1.4.6.added
of this annex. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in Annex 8, paragraph 6.
2.3.6.deleted
A quantity of approximately 100 g of hydrogen is injected into the enclosure. This mass of hydrogen shall be measured to an accuracy of ±2 per cent of the measured value.
2.3.7.deleted
The contents of the chamber shall be allowed to mix for five minutes and then the hydrogen concentration, temperature and barometric pressure are measured. These are the final readings CH2f, Tf and Pf for the calibration of the enclosure as well as the initial readings CH2i, Ti and Pi for the retention check.
5.1.5.1.added
Within seven days maximum after having completed the prior test, the procedure starts with the discharge of the REESS of the vehicle according to Annex 8, paragraph 5.1.2.
2.3.8.deleted
On the basis of the readings taken in paragraphs 2.3.4 and 2.3.7 above and the formula in paragraph 2.4. below, the mass of hydrogen in the enclosure is calculated. This shall be within ±2 per cent of the mass of hydrogen measured in paragraph 2.3.6. above.
5.1.5.2.added
The steps of the procedure in Annex 8, paragraph 5.1.3. of this annex shall be repeated.
2.3.9.deleted
The contents of the chamber shall be allowed to mix for a minimum of 10 hours. At the completion of the period, the final hydrogen concentration, temperature and barometric pressure are measured and recorded. These are the final readings CH2f, Tf and Pf for the hydrogen retention check.
5.1.5.3.added
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
2.3.10.deleted
Using the formula in paragraph 2.4. below, the hydrogen mass is then calculated from the readings taken in paragraphs 2.3.7 and 2.3.9. above. This mass may not differ by more than 5 per cent from the hydrogen mass given by paragraph 2.3.8. above.
5.1.5.4.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
2.4.deleted
The calculation of net hydrogen mass change within the enclosure is used to determine the chamber's hydrocarbon background and leak rate. Initial and final readings of hydrogen concentration, temperature and barometric pressure are used in the following formula to calculate the mass change. ⎛ V ⎞ ⎜ (1 + out ) × C H 2f × Pf C × P ⎟ M H 2 = k × V × 10 −4 × ⎜ V − H 2i i ⎟ ⎜ Tf Ti ⎟ ⎜ ⎟ ⎝ ⎠ Where: MH2 = hydrogen mass, in grams CH2 = measured hydrogen concentration into the enclosure, in ppm volume V = enclosure volume in cubic metres (m3) as measured in paragraph 2.1.1. above. Vout = compensation volume in m³, at the test temperature and pressure T = ambient chamber temperature, in K P = absolute enclosure pressure, in kPa k = 2.42 Where: i is the initial reading f is the final reading
5.1.5.5.added
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
3.deleted
The analyser should be calibrated using hydrogen in air and purified synthetic air. See paragraph 4.8.2. of Annex 7. Each of the normally used operating ranges are calibrated by the following procedure:
5.1.5.6.added
The vehicle shall be connected to the mains. The REESS is charged according to failure charge procedure as specified in paragraph 5.1.5.9. below.
3.1.deleted
Establish the calibration curve by at least five calibration points spaced as evenly as possible over the operating range. The nominal concentration of the calibration gas with the highest concentrations to be at least 80 per cent of the full scale.
5.1.5.7.added
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
3.2.deleted
Calculate the calibration curve by the method of least squares. If the resulting polynomial degree is greater than three, then the number of calibration points shall be at least the number of the polynomial degree plus two.
5.1.5.8.added
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
3.3.deleted
The calibration curve shall not differ by more than two per cent from the nominal value of each calibration gas.
5.1.5.9.added
The charging failure is carried out with the suitable charger and consists of the following steps: (a) Charging at constant power during t'1; (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
3.4.deleted
Using the coefficients of the polynomial derived from paragraph 3.2. above, a table of analyser readings against true concentrations shall be drawn by steps Annex 7 – Appendix 1 no greater than 1 per cent of full scale. This is to be carried out for each analyser range calibrated. This table shall also contain other relevant data such as: (a) Date of calibration; (b) Span and zero potentiometer readings (where applicable); (c) Nominal scale; (d) Reference data of each calibration gas used; (e) Real and indicated value of each calibration gas used together with the percentage differences; (f) Calibration pressure of analyser.
5.1.5.10.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test. Annex 8
3.5.deleted
Alternative methods (e.g. computer, electronically controlled range switch) can be used if it is proven to the technical service that these methods give equivalent accuracy.
5.1.5.11.added
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.1.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in Annex 8, paragraph 6.
1.deleted
The family may be defined by basic design parameters which shall be common to vehicles within the family. In some cases there may be interaction of parameters. These effects shall also be taken into consideration to ensure that only vehicles with similar hydrogen emission characteristics are included within the family.
5.2.1.added
The ageing of REESS shall be checked, to confirm that the REESS has performed at least 5 standard cycles (as specified in Annex 8, Appendix 1).
2.deleted
To this end, those vehicle types whose parameters described below are identical are considered to belong to the same hydrogen emissions. REESS: (a) Trade name or mark of theREESS; (b) Indication of all types of electrochemical couples used; (c) Number of REESS cells; (d) Number of REESS subsystems; (e) Nominal voltage of the REESS (V); (f) REESS energy (kWh); (g) Gas combination rate (in per cent); (h) Type(s) of ventilation for REESS subsystem(s); (i) Type of cooling system (if any). On-board charger: (a) Make and type of different charger parts; (b) Output nominal power (kW); (c) Maximum voltage of charge (V); (d) Maximum intensity of charge (A); (e) Make and type of control unit (if any); (f) Diagram of operating, controls and safety; (g) Characteristics of charge periods. Annex 8
5.2.2.added
The REESS is discharged at 70 per cent ± 5 per cent of the nominal power of the system. Stopping the discharge occurs when minimum SOC as specified by the manufacturer is reached.
5.2.3.added
Within 15 minutes of the end of the REESS discharge operation specified in paragraph 5.2.2. above, and before the start of the hydrogen emission test, the REESS shall be soaked at 293 K ± 2 K for a minimum period of 12 hours and a maximum of period of 36 hours.
Annex 8 - Appendix 1deleted
A standard cycle will start with a standard discharge followed by a standard charge. Standard discharge: Discharge rate: The discharge procedure including termination criteria shall be defined by the manufacturer. If not specified, then it shall be a discharge with 1C current. Discharge limit (end voltage): Specified by the manufacturer Rest period after discharge: Minimum 30 min Standard charge: The charge procedure including termination criteria shall be defined by the manufacturer. If not specified, then it shall be a charge with C/3 current. Annex 8A Annex 8A Vibration test
5.2.4.1.added
Before the completion of the REESS's soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
5.2.4.2.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
2.1.deleted
REESS subsystem(s) including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested-device if so requested by the manufacturer.
5.2.4.3.added
At the end of the soak period, the REESS shall be moved into the measuring chamber.
5.2.4.4.added
The REESS shall be charged in accordance with the normal charge procedure as specified in paragraph 5.2.4.7. below.
5.2.4.5.added
The chamber shall be closed and sealed gas-tight within two minutes of the electrical interlock of the normal charge step.
5.2.4.6.added
The start of a normal charge for hydrogen emission test period shall begin when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
5.2.4.7.added
The normal charge is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t1; (a) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponding to that used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given by a suitable instrumentation that the REESS is not yet fully charged.
Table 1deleted
Annex 8A Frequency and acceleration Frequency (Hz) Acceleration (m/s2) 7 - 18 10 18 - 30 gradually reduced from 10 to 2 30 - 50 2 At the request of the manufacturer, a higher acceleration level as well as a higher maximum frequency may be used. At the request of the manufacturer a vibration test profile determined by the vehicle-manufacturer, verified for the vehicle application and agreed with the Technical Service may be used as a substitute for the frequency - acceleration correlation of Table 1. The approval of a REESS tested according to this condition shall be limited to approvals for a specific vehicle type. After the vibration, a standard cycle as described in Annex 8, Appendix 1 shall be conducted, if not inhibited by the tested-device. The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8B Annex 8B Thermal shock and cycling test
5.2.4.8.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
1.deleted
The purpose of this test is to verify the resistance of the REESS to sudden changes in temperature. The REESS shall undergo a specified number of temperature cycles, which start at ambient temperature followed by high and low temperature cycling. It simulates a rapid environmental temperature change which a REESS would likely experience during its life.
5.2.4.9.added
The end of the emission sampling period occurs t 1 + t2 or t1 + 5 h after the beginning of the initial sampling, as specified in paragraph 5.2.4.6. above. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in in Annex 8, paragraph 6.
5.2.5.1.added
The test procedure shall start within a maximum of seven days after having completed the test in paragraph 5.2.4. above, the procedure shall start with the discharge of the REESS of the vehicle in accordance with paragraph 5.2.2. above.
3.1.deleted
The following conditions shall apply to the tested-device at the start of the test: (a) The SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range; (b) All protection devices, which would affect the function of the tested- device and which are relevant to the outcome of the test shall be operational.
5.2.5.2.added
The steps of the procedure in paragraph 5.2.3. above shall be repeated.
3.2.deleted
The tested-device shall be stored for at least six hours at a test temperature equal to 60 ± 2 °C or higher if requested by the manufacturer, followed by storage for at least six hours at a test temperature equal to -40 ± 2 °C or lower if requested by the manufacturer. The maximum time interval between test temperature extremes shall be 30 minutes. This procedure shall be repeated until a minimum of 5 total cycles are completed, after which the tested-device shall be stored for 24 hours at an ambient temperature of 20 ± 10 °C. After the storage for 24 hours, a standard cycle as described in Annex 8, Appendix 1 shall be conducted, if not inhibited by the tested-device. The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8C Annex 8C Mechanical shock
5.2.5.3.added
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
1.deleted
The purpose of this test is to verify the safety performance of the REESS under inertial loads which may occur during a vehicle crash.
5.2.5.4.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.2.5.5.added
At the end of the soak the REESS shall be moved into the measuring chamber.
5.2.5.6.added
The REESS shall be charged according to the failure charge procedure as specified in paragraph 5.2.5.9. below.
5.2.5.7.added
The chamber shall be closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
5.2.5.8.added
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6.). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
3.1.deleted
The following condition shall apply to the test: (a) The test shall be conducted at an ambient temperature of 20 ± 10 °C, (b) At the beginning of the test, the SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range; (c) At the beginning of the test, all protection devices which effect the function of the tested-device and which are relevant to the outcome of the test, shall be operational.
5.2.5.9.added
The charging failure is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t'1, (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
3.2.deleted
The tested-device shall be decelerated or, at the choice of the applicant, accelerated in compliance with the acceleration corridors which are specified in Tables 1 to 3. The Technical Service in consultation with the manufacturer shall decide whether the tests shall be conducted in either the positive or negative direction or both. For each of the test pulses specified, a separate tested-device may be used. The test pulse shall be within the minimum and maximum value as specified in Tables 1 to 3. A higher shock level and /or longer duration as described in the maximum value in Tables 1 to 3 can be applied to the tested-device if recommended by the manufacturer. Annex 8C
5.2.5.10.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
Figure 1deleted
Maximum curve Acceleration Minimum curve F G B C E A D H Time Point Time (ms) Acceleration (g) Longitudinal Transverse A 20 0 0 B 50 20 8 C 65 20 8 D 100 0 0 E 0 10 4.5 F 50 28 15 G 80 28 15 H 120 0 0
5.2.5.11.added
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.2.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in paragraph 6. below. Annex 8
Table 2deleted
Point Time (ms) Acceleration (g) Longitudinal Transverse A 20 0 0 B 50 10 5 Annex 8C C 65 10 5 D 100 0 0 E 0 5 2.5 F 50 17 10 G 80 17 10 H 120 0 0
6.added
The hydrogen emission tests described in paragraph 5. above allow the calculation of the hydrogen emissions from the normal charge and charging failure phases. Hydrogen emissions from each of these phases are calculated using the initial and final hydrogen concentrations, temperatures and pressures in the enclosure, together with the net enclosure volume. The formula below is used:  V   (1 + out )  C H 2f  Pf C  P  M H 2 = k  V  10   −4 V − H 2 i i   Tf Ti      Where: MH2 = hydrogen mass, in grams CH2 = measured hydrogen concentration in the enclosure, in ppm volume V = net enclosure volume in cubic metres (m3) corrected for the volume of the vehicle, with the windows and the luggage compartment open. If the volume of the vehicle is not determined a volume of 1.42 m³ is subtracted. Vout = compensation volume in m³, at the test temperature and pressure T = ambient chamber temperature, in K P = absolute enclosure pressure, in kPa k = 2.42 Where: i is the initial reading f is the final reading
Table 3deleted
Point Time (ms) Acceleration (g) Longitudinal Transverse A 20 0 0 B 50 6,6 5 C 65 6,6 5 D 100 0 0 E 0 4 2.5 F 50 12 10 G 80 12 10 H 120 0 0 The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8D Annex 8D Mechanical integrity
6.1.added
The hydrogen mass emissions for the REESS are: MN = hydrogen mass emission for normal charge test, in grams MD = hydrogen mass emission for charging failure test, in grams
1.deleted
The purpose of this test is to verify the safety performance of the REESS under contact loads which may occur during vehicle crash situation.
1.changed
All equipment shall be calibrated before its initial use and then calibrated as often as necessary and in any case in the month before type approval testing. The purpose of calibration methods to be used are described in this test is to verify the safety performance of the REESS under a vibration environment which the REESS will likely experience during the normal operation of the vehicle. appendix.
2.1.1.added
Before its initial use, the internal volume of the chamber shall be determined as follows. The internal dimensions of the chamber are carefully measured, taking into account any irregularities such as bracing struts. The internal volume of the chamber is determined from these measurements. The enclosure shall be latched to a fixed volume when the enclosure is held at an ambient temperature of 293 K. This nominal volume shall be repeatable within ±0.5 per cent of the reported value.
3.1.deleted
The following condition and requirements shall apply to the test: (a) The test shall be conducted at an ambient temperature of 20 ± 10 °C; (b) At the beginning of the test, the SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range; (c) At the beginning of the test, all internal and external protection devices which would affect the function of the tested-device and which are relevant to the outcome of the test shall be operational.
2.1.2.changed
REESS subsystem(s) including The net internal volume is determined by subtracting 1.42 m 3 from the cells and their electrical connections. If internal volume of the manufacturer chooses to test with related subsystem(s), chamber. Alternatively the manufacturer shall demonstrate that volume of the test result can reasonably represent vehicle with the performance luggage compartment and windows open or REESS may be used instead of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested-device if so requested by the manufacturer 1.42 m3.
2.1.3.changed
REESS subsystem(s) including the cells and their electrical connections. The chamber shall be checked as in Annex 8, paragraph 2.3. If the manufacturer chooses hydrogen mass does not agree with the injected mass to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS within ±2 per cent then corrective action is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested-device if so requested by the manufacturer. required.
3.2.1.deleted
The tested-device shall be crushed between a resistance and a crush plate as described in Figure 1 with a force of at least 100 kN, but not exceeding 105 kN, unless otherwise specified in accordance with paragraph 6.4.2. of this Regulation, with an onset time less than 3 minutes and a hold time of at least 100 ms but not exceeding 10 s. Annex 8D Dimension of the crush plate: 600 mm x 600 mm or smaller A higher crush force, a longer onset time, a longer hold time, or a combination of these, may be applied at the request of the manufacturer. The application of the force shall be decided by the manufacturer together with the Technical Service having consideration to the direction of travel of the REESS relative to its installation in the vehicle. The application force being applied horizontally and perpendicular to the direction of travel of the REESS. The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8E Annex 8E Fire resistance
2.2.changed
This operation determines that the chamber does not contain any materials that emit significant amounts of hydrogen. The tested-device check shall be firmly secured carried out at the enclosure's introduction to service, after any operations in the platform enclosure which may affect background emissions and at a frequency of the vibration machine in such a manner as to ensure that the vibrations are directly transmitted to the tested-device. at least once per year.
1.deleted
The purpose of this test is to verify the resistance of the REESS, against exposure to fire from outside of the vehicle due to e.g. a fuel spill from a vehicle (either the vehicle itself or a nearby vehicle). This situation should leave the driver and passengers with enough time to evacuate.
2.2.1.added
Variable-volume enclosure may be operated in either latched or unlatched volume configuration, as described in paragraph 2.1.1. above. Ambient temperature shall be maintained at 293 K ± 2 K, throughout the four-hour period mentioned below.
2.2.2.changed
The tested-device shall enclosure may be connected sealed and the mixing fan operated for a period of up to 12 hours before the test fixture only by the intended mountings provided for the purpose of attaching the REESS or REESS subsystem to the vehicle. four-hour background-sampling period begins.
2.1.deleted
REESS subsystem(s) including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested-device if so requested by the manufacturer. Where the relevant REESS subsystems are distributed throughout the vehicle, the test may be conducted on each relevant of the REESS subsystem.
2.2.3.changed
The tested-device analyser (if required) shall be connected to the test fixture as recommended by the manufacturer. calibrated, then zeroed and spanned.
2.2.4.changed
Where a REESS is fitted with a cooling function and where the REESS will remain functional without a cooling function system being operational, the cooling system The enclosure shall be deactivated for purged until a stable hydrogen reading is obtained, and the test. mixing fan turned on if not already on.
3.1.deleted
The following requirements and conditions shall apply to the test: (a) The test shall be conducted at a temperature of at least 0 °C; (b) At the beginning of the test, the SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range; (c) At the beginning of the test, all protection devices which effect the function of the tested-device and are relevant for the outcome of the test shall be operational.
2.2.5.added
The chamber is then sealed and the background hydrogen concentration, temperature and barometric pressure are measured. These are the initial readings CH2i, Ti and Pi used in the enclosure background calculation.
3.2.deleted
A vehicle based test or a component based test shall be performed at the discretion of the manufacturer:
2.2.6.added
The enclosure is allowed to stand undisturbed with the mixing fan on for a period of four hours.
3.2.1.deleted
The tested-device shall be mounted in a testing fixture simulating actual mounting conditions as far as possible; no combustible material should be used for this with the exception of material that is part of the REESS. The method whereby the tested-device is fixed in the fixture shall correspond to the relevant specifications for its installation in a vehicle. In the case of a REESS designed for a specific vehicle use, vehicle parts which affect the course of the fire in any way shall be taken into consideration. Annex 8E
2.2.7.added
At the end of this time the same analyser is used to measure the hydrogen concentration in the chamber. The temperature and the barometric pressure are also measured. These are the final readings CH2f, Tf and Pf. Annex 8 – Appendix 1
3.2.2.deleted
The tested-device shall be placed on a grating table positioned above the pan, in an orientation according to the manufacturer’s design intent. The grating table shall be constructed by steel rods, diameter 6-10 mm, with 4-6 cm in between. If needed the steel rods could be supported by flat steel parts.
2.2.8.added
The change in mass of hydrogen in the enclosure shall be calculated over the time of the test in accordance with Annex 8, paragraph 2.4. and shall not exceed 0.5 g.
3.3.deleted
The flame to which the tested-device is exposed shall be obtained by burning commercial fuel for positive-ignition engines (hereafter called "fuel") in a pan. The quantity of fuel shall be sufficient to permit the flame, under free- burning conditions, to burn for the whole test procedure. The fire shall cover the whole area of the pan during whole fire exposure. The pan dimensions shall be chosen so as to ensure that the sides of the tested-device are exposed to the flame. The pan shall therefore exceed the horizontal projection of the tested-device by at least 20 cm, but not more than 50 cm. The sidewalls of the pan shall not project more than 8 cm above the level of the fuel at the start of the test.
2.3.changed
This The calibration and hydrogen retention test in the chamber provides a check on the calculated volume (paragraph 2.1. above) and also measures any leak rate. The enclosure leak rate shall be conducted either with determined at the complete REESS or with related REESS subsystem(s) enclosure's introduction to service, after any operations in the enclosure which may affect the integrity of the REESS including enclosure, and at least monthly thereafter. If six consecutive monthly retention checks are successfully completed without corrective action, the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit enclosure leak rate may be omitted from installation on the tested- device if so requested by the manufacturer. determined quarterly thereafter as long as no corrective action is required.
3.4.deleted
The pan filled with fuel shall be placed under the tested-device in such a way that the distance between the level of the fuel in the pan and the bottom of the tested-device corresponds to the design height of the tested-device above the road surface at the unladen mass if paragraph 3.2.1. above is applied or approximately 50 cm if paragraph 3.2.2. above is applied. Either the pan, or the testing fixture, or both, shall be freely movable.
2.3.1.added
The enclosure shall be purged until a stable hydrogen concentration is reached. The mixing fan is turned on, if not already switched on. The hydrogen analyser is zeroed, calibrated if required, and spanned.
3.5.deleted
During phase C of the test, the pan shall be covered by a screen. The screen shall be placed 3 cm +/- 1 cm above the fuel level measured prior to the ignition of the fuel. The screen shall be made of a refractory material, as prescribed in Annex 8E - Appendix 1. There shall be no gap between the bricks and they shall be supported over the fuel pan in such a manner that the holes in the bricks are not obstructed. The length and width of the frame shall be 2 cm to 4 cm smaller than the interior dimensions of the pan so that a gap of 1 cm to 2 cm exists between the frame and the wall of the pan to allow ventilation. Before the test the screen shall be at least at the ambient temperature. The firebricks may be wetted in order to guarantee repeatable test conditions.
2.3.2.changed
The temperature of the tested-device enclosure shall be continuously measured inside latched to the casing in the proximity of the cells during the test in order to monitor the changes of the temperature. The onboard sensor if existing may be used. The manufacturer and Technical Service shall agree on the location of the temperature sensor(s) used. nominal volume position.
2.3.3.added
The ambient temperature control system is then turned on (if not already on) and adjusted for an initial temperature of 293 K.
3.1.changed
Establish the calibration curve by at least five calibration points spaced as evenly as possible over the operating range. The following conditions shall apply to the tested-device: (a) The test shall be conducted at an ambient temperature of 20 ± 10 °C; (b) At the beginning nominal concentration of the test, calibration gas with the SOC shall highest concentrations to be adjusted to a value in the upper 50 at least 80 per cent of the normal operating SOC range of the tested- device; (c) At the beginning of the test, all protection devices which affect the function(s) of the tested-device that are relevant to the outcome of the test shall be operational. full scale.
3.2.changed
The tested-devices Calculate the calibration curve by the method of least squares. If the resulting polynomial degree is greater than three, then the number of calibration points shall be subjected to a vibration having a sinusoidal waveform with a logarithmic sweep between 7 Hz and 50 Hz and back to 7 Hz traversed in 15 minutes. This cycle shall be repeated 12 times for a total of 3 hours in at least the vertical direction number of the mounting orientation of the REESS as specified by the manufacturer. The correlation between frequency and acceleration shall be as shown in polynomial degree plus two.