I. Specific components of motor vehicles using compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system II. Vehicles with regard to the installation of specific components of an approved type for the use of compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system

211 changed · 82 added · 23 deleted
2.changed
The following standards contain provisions that, through reference in this text, constitute provisions of this Regulation. ASTM Standards2 ASTM B117-90 Test method of Salt Spray (Fog) Testing ASTM B154-92 Mercurous Nitrate Test for Copper and Copper Alloys ASTM D522-92 Mandrel Bend Test of attached Organic Coatings ASTM D1308-87 Effect of Household Chemicals on Clear and Pigmented Organic Finishes ASTM D2344-84 Test Method for Apparent interlaminar Shear Strength of Parallel Fibre Composites by Short Beam Method ASTM D2794-92 Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact) ASTM D3170-87 Chipping Resistance of Coatings ASTM D3418-83 Test Method for Transition Temperatures Polymers by Thermal Analysis ASTM D4814-17 Standard Specification for Automotive Spark- Ignition Engine Fuel ASTM E647-93 Standard Test, Method for Measurement of Fatigue Crack Growth Rates ASTM E813-89 Test Method for JIC, a Measure of Fracture Toughness ASTM G53-93 G154-16 Standard Practice for Operating Fluorescent Light and Water – Exposure Apparatus (Fluorescent UV- Condensation Type) for UV Exposure of non- metallic materials Nonmetallic Materials BSI Standards3 BS 5045 Part 1 (1982) Transportable Gas Containers – Specification for Seamless Steel Gas Containers Above 0.5 litre Water Capacity 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. – www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions 2 American Society for Testing and Materials. 3 British Standards Institution. BS 7448-91 Fracture Mechanics Toughness Tests Part I – Method for Determination of KIC, Critical COD and Critical J Values of BS PD 6493-1991. Guidance an Methods for Assessing the A Acceptability of Flaws in Fusion Welded Structures; Metallic Materials EN Standards4 EN1251-2 2000 Cryogenic vessels. Vacuum insulated vessels of not more than 1,000 litres volume EN 895:1995 Destructive tests on welds in metallic materials. Transverse tensile test EN 910:1996 Destructive test methods on welds in metallic materials. Bend tests EN 1435:1997 Non-destructive examination of welds. Radiographic examination of welded joints EN 6892-1:2009 6892-1:2016 Metallic materials. Tensile test EN 10045-1:1990 Charpy impact test on metallic materials. Test method (V- and U-notches) ISO Standards5 ISO 37 37:2011 Rubber, vulcanized or thermoplastic – Determination of tensile stress-strain properties. ISO 148-1983 Steel – Charpy Impact Test (v-notch) ISO 188 188:2011 Rubber, volcanized or thermoplastic – Accelerated ageing and heat resistance tests ISO 306-1987 306:2004 Plastics - Thermoplastic Materials – Determination of Vicat Softening Temperature ISO 527 Pt 1-93 527-2:2012 Plastics - – Determination of Tensile Properties tensile properties – Part I: General principles 2: Test conditions for moulding and extrusion plastics ISO 642-79 642:1999 Steel-Hardenability Test by End Quenching (Jominy Test) ISO 12991 Liquefied natural gas (LNG) – transportable tanks for use on-board vehicles ISO1307 ISO1307:2006 Rubber and plastics hoses – Hose sizes, minimum and maximum inside diameters, and tolerances on cut-to-length hoses ISO 1402 1402:2009 Rubber and plastics hoses and hose assemblies – Hydrostatic testing ISO 1431 1431:2009 Rubber, vulcanized or thermoplastic – Resistance to ozone cracking 4 European Norm. 5 International Organization for Standardization. ISO 1436 1436:2009 Rubber hoses and hose assemblies – Wire-braid- reinforced hydraulic types for oil-based or water- based fluids – Specification ISO 1817 1817:2015 Rubber, vulcanized or thermoplastic – Determination of the effect of liquids ISO 2808-91 2808:2007 Paints and Varnishes – Determination of film Thickness 4 European Norm. 5 International Organization for Standardization. ISO 3628-78 Glass Reinforced Materials – Determination of Tensile Properties ISO 4080 4080:2009 Rubber and plastics hoses and hose assemblies – Determination of permeability to gas ISO 4624-78 4624:2016 Plastics and Varnishes – Pull-off Test for adhesion ISO 4672 10619:2011 Rubber and plastics – Sub-ambient temperature hoses and tubing - Measurement of flexibility and stiffness - Part 2: Bending tests at sub-ambient temperatures ISO 6982-84 6892:2016 Metallic Materials – Tensile Testing ISO 6506-1981 6506-1:2014 Metallic Materials – Hardness Brinell hardness test – Brinell Part 1: Test method ISO 6508-1986 6508-1:2015 Metallic Materials – Hardness Tests Rockwell hardness Test – Rockwell Part 1: Test (Scales, ABCDEFGHK) method ISO 7225 7225:2005 Precautionary Labels for Gas Cylinders ISO/DIS 7866-1992 ISO 7866-2012 Refillable Transportable Seamless Aluminium Alloy Cylinders for Worldwide Usage seamless aluminium alloy cylinders – Design, Manufacture construction and Acceptance testing ISO 9001:1994 9001:2015 Quality Assurance in Design/Development. Production, Installation and Servicing ISO/TS 9002:2016 Quality management systems - Guidelines for the application of ISO 9002:1994 Quality Assurance in Production and Installation ISO/DIS 12737 Metallic Materials – Determination of the Plane- Strain Fracture Toughness ISO12991 9001:2015 ISO12991:2012 Liquefied natural gas (LNG) – transportable tanks for use on board of vehicles ISO14469-1:2004 ISO14469:2017 Road Vehicles: compressed natural gas CNG refuelling connector: Part I: 20 MPa (200 bar) connector ISO14469-2:2007 Road Vehicles: compressed natural gas CNG refuelling connector: Part II: 20 MPa (200 bar) connector ISO15500 ISO15500-2:2016 Road vehicles – Compressed natural gas (CNG) fuel system components Part 2: Performance and general test methods ISO 21028-1:2004 15500-17:2012 Road vehicles - Compressed natural gas (CNG) fuel system components - Part 17: Flexible fuel line ISO 21028-1:2016 Cryogenic vessels – Toughness requirements for materials at cryogenic temperature – Part I: Temperatures below -80 °C ISO 21029-1:2004 21029-1:2015 Cryogenic vessels – Transportable vacuum insulated vessels of not more than 1,000 litres volume – Part I: Design, fabrication, inspection and tests ISO/IEC Guide 25-1990 17025:2005 General requirements for the Technical Competence competence of Testing Laboratories ISO/IEC Guide 48-1986 Guidelines for Third Party Assessment testing and Registration of Supplies Quality System ISO/DIS 9809 Transportable Seamless Steel calibration laboratories ISO 9809-1:2010 Gas Cylinders cylinders — Refillable seamless steel gas cylinders — Design, Construction construction and Testing – testing — Part I: 1: Quenched and Tempered Steel Cylinders tempered steel cylinders with Tensile Strength < tensile strength less than 1,100 MPa ISO 11439 11439:2013 Gas cylinders — High pressure cylinders for the on-board storage of natural gas as a fuel for automotive vehicles NACE Standard6 NACE TM0177-90 Laboratory Testing of Metals for Resistance to Sulphide Stress Cracking in H2S Environments 6 National Association of Corrosion Engineers. UN Regulations7 UN Regulation No. 10 Uniform provisions concerning the approval of vehicles with regard to electromagnetic compatibility USA Federal Regulations8 49 CFR 393.67 Liquid fuel tanks (as amended in 78 FR 58484 on 24 September 2013) SAE Standards9 SAE J2343-2008 Recommended Practice for LNG Medium and Heavy-Duty Powered Vehicles
3.changed
Class 0 High pressure parts including tubes and fittings containing CNG at a pressure higher than 3 MPa and up to 26 MPa. Class 1 Medium pressure parts including tubes and fittings containing CNG at a pressure higher than 450 kPa and up to 3,000 kPa (3 MPa). Class 2 Low pressure parts including tubes and fittings containing CNG at a pressure higher than 20 kPa and up to 450 kPa. Class 3 Medium pressure parts as safety valves or protected by safety valve including tubes and fittings containing CNG at a pressure higher than 450 kPa and up to 3,000 kPa (3 MPa). Class 4 Parts in contact with gas subject to the pressure lower than 20 kPa. 6 National Association of Corrosion Engineers. 7 United Nations Economic Commission for Europe; UN Regulations. 8 United States of America Federal Regulations 9 Society of Automotive Engineers Class 5 Parts in contact with temperature range extending below -40 °C. Class 6 High pressure parts including tubes and fittings containing CNG, excluding CNG containers, at a pressure higher than 26 MPa.A MPa. A component can consist of several parts, each part classified in its own class with regard to maximum working pressure and function. CNG and/or LNG components for use in vehicles shall be classified with regard to the working pressure, temperature and function, according to Figure 1-1. 7 United Nations Economic Commission for Europe; Regulations. 8 United States of America Federal Regulations. 9 Society of Automotive Engineers.
Figure 1changed
Flow scheme for CNG and/or LNG components classification START In contact with No gas Yes Yes Temperature Class 5 ˂ -40 °C No Yes No po>3,000 kPa po ˂26,000 kPa Storage cylinder No Class 6 Yes No Class 0 Yes No Safety valve Class 1 450˂po˂3,000 kPa No Yes Class 3 Yes 20˂po˂450 kPa Class 2 No Class 4 Not subject to this Regulation Tests Test applicable to specific classes of components (excluding CNG cylinders and LNG tank) Test Class 0 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Annex Overpressure or strength X X X X O X X 5A External leakage X X X X O X X 5B Internal leakage A A A A O A A 5C Durability tests A A A A O A A 5L CNG/LNG compatibility A A A A A A A 5D Corrosion resistance X X X X X A X 5E Resistance to dry heat A A A A A A A 5F Ozone ageing A A A A A A A 5G Burst/destructive tests X O O O O A X 5M Temperature cycle A A A A O A A 5H Pressure cycle X O O O O A X 5I Vibration resistance A A A A O A A 5N Operating temperatures X X X X X X X 5O LNG low temperature O O O O O X O 5P LNG low temperature O O O O O X O 5P Compatibility with heat exchange fluids of non- metallic parts A A A A A A A 5Q Note: X = Applicable O = Not applicable A = As applicable
4.16.1.changed
"Manual valve" means valve which valve": as defined in paragraph 4.22. that is operated manually. rigidly fixed to the cylinder or tank.
4.16.3.changed
"Excess flow valve" means valve which automatically shuts off or limits, the gas flow when the flow exceeds a set design value. valve": as defined in paragraph 4.21.
4.21.1.added
"Pressure-equalization type excess flow valve" means an excess flow valve which automatically resets when the excess flow condition is no longer present.
4.21.2.added
"Shut-off type excess flow valve" means an excess flow valve that stops flow when in the closed position, which has to be reset by manual operation.
4.22.changed
"Manual valve" means a manual valve rigidly fixed to the cylinder or tank. which is operated manually.
4.32.changed
"Gas injector" means a device for introducing gaseous fuel into the engine or associated intake system. A gas injector shall be considered as a gas flow adjuster.
4.33.changed
"Gas flow adjuster" means a gas flow restricting device, installed downstream of a pressure regulator, controlling gas flow to the engine. The function of a gas flow adjuster can be performed by another component (e.g. gas injector).
4.48.changed
"Auto-frettage pressure" means the pressure within the over-wrapped cylinder at which the required distribution of stresses between the liner and the over-wrap over- wrap is established.
4.56.changed
"Finished cylinders" means completed cylinders that are ready for use, typical of normal production, complete with identification marks and external coating including integral insulation and/or protection specified by the manufacturer, but free from non-integral insulation or protection. manufacturer on the design drawing for the cylinder.
4.75.changed
"Commanded stop phase" defines the period of time during which the combustion engine is switched off automatically for fuel saving and is allowed to start again automatically. Part I Approval of specific components of motor vehicles using compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system
4.76.added
"Certified cylinder" means a finished cylinder that complies with the tests described in this Regulation for finished cylinders and is approved.
4.77.added
"CNG compressor" means a device to establish the supply of CNG to the engine by increasing the pressure of the vapour.
4.78.added
"CNG accumulator" means a device which is used to store CNG downstream of the LNG vaporizer and/or CNG storage system (cylinder(s)). Part I Approval of specific components of motor vehicles using compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system
6.1.1.changed
In addition to provisions of paragraph 6.1., one of the following additional marks shall be used for automatic cylinder valve which comply with paragraph 2.2.4. of Annex 4A: (a) "H1" 10 [n] stands for the sample size and shall be determined by the Type Approval Authority. (b) "H2" (c) "H3"
2.2.4.added
of Annex 4A: (a) "H1" (b) "H2" (c) "H3"
6.3.changed
Every container shall also bear a marking plate with the following data clearly legible and indelible: 10 [n] stands for the sample size and shall be determined by the Type Approval Authority . (a) A serial number; (b) The capacity in litres; (c) The marking "CNG"; (d) Operating pressure/test pressure/working pressure [MPa]; (e) Mass (kg); (f) Year and month of approval (e.g. 96/01); (g) Approval mark according to paragraph 7.4.
7.4.deleted
There shall be affixed, conspicuously and in the space referred to in paragraph 6.2. above, to all components conforming to a type approved under this Regulation, in addition to the mark prescribed in paragraphs 6.1. and 6.3. (CNG) and 6.4. (LNG), an international approval mark consisting of:
7.2.changed
An approval number shall be assigned to each type of component or multifunctional component approved. Its first two digits (at present 02 corresponding to the 02 series of amendments) shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue approved in accordance with Schedule 4 of the approval. The same Contracting Party shall not assign the same alphanumeric code to another type of component. Agreement (E/ECE/TRANS/505/Rev.3).
6.2.added
above, to all components conforming to a type approved under this Regulation, in addition to the mark prescribed in paragraphs 6.1. and 6.3. (CNG) and 6.4. (LNG), an international approval mark consisting of:
8.1.1.changed
The specific components of vehicles using CNG and/or LNG in their propulsion system shall function in a correct and safe way as specified in this Regulation. 11 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3, Annex 3 - www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html The materials of the components that are in contact with CNG/LNG shall be compatible with them (see Annex 5D). Those parts of components whose correct and safe functioning is liable to be influenced by CNG/LNG, high pressure or vibrations has to be submitted to relevant test procedures described in the annexes to this Regulation. In particular the provisions of paragraphs 8.2. to 8.11. are to be fulfilled for CNG components. For LNG components, the provisions of paragraphs 8.12. to 8.21. shall be fulfilled. The specific components of vehicles using CNG/LNG in their propulsion system shall comply with relevant electromagnetic compatibility (EMC) requirements according to UN Regulation No. 10, 03 series of amendments, or equivalent.
8.2.2.changed
CNG-1, CNG-2 and CNG-3 containers of welded construction are not permitted. permitted.8.3. Provisions on components fitted to the CNG container
8.2.3.added
The CNG accumulator shall be type approved pursuant to the provisions laid down in Annex 3A to this Regulation, taking into consideration: (a) The CNG accumulator with a volume ≤ 0.75 liter shall be tested as Class 6; 11 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.6, Annex 3 - https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions (b) The CNG accumulator with a volume > 0.75 liter is considered as a CNG container(cylinder) with a maximum pressure of 26 MPa; (c) The CNG accumulator shall be equipped with at least the following safety components: (i) Automatic cylinder valve according to paragraph 18.5.1.; (ii) TPRD according to paragraph 18.5.2.; (iii) Excess flow limiting according to paragraph 18.5.3.; (iv) Manual valve according to paragraph 18.5.4.; (v) Gas tight housing according to paragraph 18.5.5.; (vi) PRD (pressure triggered) according to paragraph 18.5.6."
8.7.added
CNG Compressor
17.2.changed
An approval number shall be assigned to each type of vehicle approved. Its first two digits shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue approved in accordance with Schedule 4 of the approval. Agreement (E/ECE/TRANS/505/Rev.3).
17.4.1.changed
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval; 12 12 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3, Annex 3 - www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html.
17.5.changed
Regulations annexed to the Agreement, in the country that has granted approval under this Regulation, the symbol prescribed in paragraph 17.4.1. need not be repeated; in such case, the Regulation and approval numbers and the additional symbols of all the Regulations under which approval has been granted in the country which has granted approval under this Regulation shall 12 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3, Annex 3 - https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions. be placed in vertical columns to the right of the symbol prescribed in paragraph 17.4.1. above.
17.4.1.added
above.
18.1.2.1.changed
Notwithstanding the provisions of paragraph 18.1.2. above, no separate type approval of the CNG/LNG electronic control unit is required if the CNG/LNG electronic control unit is integrated into the engine electronic control unit and is covered with a vehicle installation type approval according to Part II of this Regulation and to UN Regulation No. 10. The vehicle type approval shall also be pursuant to the applicable provisions laid down in Annex 4H of this Regulation.
18.1.6.1.added
Notwithstanding the provisions of paragraph 18.1.6., it shall be possible to make an external inspection (e.g. for periodic technical inspection) of the CNG cylinder or LNG tank and their accessories according to the specifications of the manufacturer, without the use of tools to dismantle, but with visual aids, e.g. lamps, mirrors or endoscopes.
18.1.7.1.changed
Notwithstanding the provisions of paragraph 18.1.7., vehicles may be fitted with a an extra engine for use on the vehicle (e.g. for cooling, heating system to heat the passenger compartment and/or the load area etc.) which is connected to the CNG and/or LNG system.
18.1.7.2.changed
The heating system secondary engine referred to in paragraph 18.1.7.1. shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the heating system secondary engine is adequately protected and the required operation of the normal CNG and/or LNG system is not affected.
18.1.8.1.changed
Vehicles of categories M2 M2/N2 and M3 M3/N3 equipped with a CNG system shall be labelled as specified in Annex 6.
18.1.8.2.changed
Vehicles of categories M2 M2/N2 and M3 M3/N3 equipped with a LNG system shall be labelled as specified in Annex 7.
18.1.8.3.changed
The label These labels shall be installed placed on the front and rear of the vehicle and on the left side as well as on the right side of the vehicle; for the side if available in vicinity of a front door. If there is no front door available, the label has to be placed on the first third of the vehicle length. In addition, for vehicles of category M 2 or M3 and on M3, a label shall be fixed to the outside rear of the doors on the right-hand side (left hand drive vehicles), left-hand side (right hand drive vehicles). vehicle.
18.5.1.1.changed
An automatic cylinder valve shall be installed directly on each CNG container. container and to each CNG accumulator.
18.5.1.3.changed
Notwithstanding the provisions of paragraph 18.5.1.2. (a) The automatic cylinder valve may stay in an open position during commanded stop phases; and (b) In the case where a fire alarm system is installed in the compartment autonomous CNG and/or LNG heater compartment, the automatic valve(s) may be opened by a CNG/LNG electronic control unit to permit the warming of the engine. Any defect or failure of the system shall cause the automatic valve of the cylinder supplying the heating system to close; and (c) In the case where a CNG combustion heater fire alarm system is located, installed in the refrigeration system compartment of the cargo compartment, the automatic valve(s) may be opened by a CNG/LNG electronic control unit to permit the cooling of the cargo compartment. Any defect or failure of the system shall cause the automatic valve of the cylinder supplying the refrigeration system to close; and (d) In the case where a fire alarm system is installed in the secondary engine compartment, the automatic valve(s) may be opened by an electronic control unit for to permit the purpose provision of permitting its operation electrical power. Any defect or failure of the system shall cause the automatic valve of the cylinder supplying the refrigeration system to warm the engine coolant. close.
18.5.2.1.changed
The pressure relief device (temperature triggered) shall be fitted to the CNG fuel container(s) and to each CNG accumulator in such a manner that can discharge into the gas-tight housing if that gas-tight housing fulfils the requirements of paragraph 18.5.5. below. below.. However, in case of vehicles of categories M and N where the container(s) is (are) fitted outside the vehicle and on the roof or top of the bodywork of the vehicle, the pressure relief device (temperature triggered) shall be fitted to the fuel container(s) in such a manner that it can discharge the CNG only in a vertical upward direction.
18.5.3.1.changed
The excess flow limiting device shall be fitted in the CNG fuel container(s) on/in the neck and on the automatic cylinder each CNG accumulator valve.
18.5.3.2.added
If the excess flow valve installed in the container is of a shut-off type per paragraph 18.5.1.1., any cover preventing access to the device to reset the excess flow valve (e.g. the manual valve) shall be removable without the use of tools or other equipment so that the device is accessible and operable
18.5.4.2.added
For accumulators a manual shut-off valve or a mechanism to empty the accumulator prior to maintenance works shall be added
18.5.5.1.changed
A gas-tight housing over the CNG container(s) container(s)/CNG accumulator fittings, which fulfils the requirements of paragraphs 18.5.5.2. to 18.5.5.5. shall be fitted to the CNG fuel container, container/CNG accumulator, unless the CNG container(s) container(s)/CNG accumulator is installed outside the vehicle. vehicle, outside enclosed spaces such as passenger compartment or cargo area or engine compartment.
18.5.6.2.changed
The PRD (pressure triggered) shall be fitted to the fuel container(s) and to the CNG accumulator in such a manner that it can discharge into the gas-tight housing if that gas-tight housing fulfils the requirements of paragraph 18.5.5. above. However, in case of vehicles of category M and N where the container(s) and/or CNG accumulator is (are) fitted outside the vehicle and on the roof or on the top of the bodywork of the vehicle, the pressure relief device (pressure triggered) shall be fitted to the fuel container(s) and/or to the CNG accumulator in such a manner that it can discharge the CNG only in a vertical upward direction.
18.5.6.3.added
CNG accumulators shall not be mounted inside the engine compartment or be mounted in the crash zone of the vehicle, only inside the frame of the vehicle.
18.7.2.1.deleted
The LNG rigid fuel line may be replaced by a flexible fuel line if used in Class 5.
18.7.2.changed
The CNG rigid fuel line may be replaced by a flexible fuel line if used in Class 0, 1, 2, 2 or 6.
18.7.3.changed
CNG and LNG flexible fuel line shall fulfil the relevant requirement of Annex 4B to this Regulation.
18.8.4.changed
Rigid fuel lines shall be connected by appropriate joints, for example, two- part two-part compression joints in steel tubes and joints with olives tapered on both sides.
18.10.4.changed
For vehicles of categories M2, M3, N2 and N3, the CNG filling unit (receptacle) shall comply with the drawing specifications detailed in Figure 1 or Figure 2 of Annex 4F or with the drawing specifications detailed in Figure 1 of Annex 4F for CNG only.
19.1.changed
The conformity of production procedures shall comply with those set out in the Agreement, Schedule 1 (E/ECE/TRANS/505/Rev.3). Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2).
1.2.4.5.8.2.deleted
Annex 1A
24.14.changed
Notwithstanding the transitional provisions above, Contracting Parties whose application of this Regulation comes into force after the date of entry into force of the most recent series of amendments are only obliged to accept type approval granted in accordance with the 02 series of amendments. Annex 1A Annex 1A Essential characteristics of the CNG/LNG components
24.15.added
As from the official date of entry into force of the 03 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept UN type-approvals under this Regulation as amended by the 03 series of amendments.
24.16.added
As from 1 September 2019, Contracting Parties applying this Regulation shall not be obliged to accept UN type-approvals of components approved to the requirements of Part I of this Regulation to the 02 series of amendments, first issued after 1 September
1.2.4.5.9.deleted
Annex 1A
24.17.added
As from 1 September 2021, Contracting Parties applying this Regulation shall not be obliged to accept UN type-approvals of vehicles approved to the requirements of Part II of this Regulation to the 02 series of amendments, first issued after 1 September 2021.
24.18.added
Contracting Parties applying this Regulation shall continue to accept UN type-approvals issued according to the 02 series of amendments to this Regulation first issued before 1 September 2019 in the case of components approved to the requirements of Part I of this Regulation, and before 1 September 2021 in the case of vehicles approved to the requirements of Part II of this Regulation.
24.19.added
Contracting Parties applying this Regulation shall not refuse to grant UN type-approvals according to any preceding series of amendments to this Regulation or extensions thereof.
24.20.added
Contracting Parties applying this Regulation shall continue to accept UN type-approvals of, and to grant extensions of approvals to the equipment and part to the preceding series of amendments to this Regulation which are not affected by the changes introduced by the 03 series of amendments.
24.21.added
Contracting Parties applying this Regulation shall continue to accept UN type-approvals to the 02 series of amendments to this Regulation, first issued before 1 September 2021.
1.2.4.5.14.deleted
Annex 1A
24.22.added
As from the official date of entry into force of the 04 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 04 series of amendments.
24.23.added
As from 1 September 2022, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2022.
24.24.added
Until 1 September 2024, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2022.
24.25.added
As from 1 September 2024, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation
24.26.added
As from the official date of entry into force of the 05 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 05 series of amendments.
1.2.4.5.20.deleted
Annex 1A
24.27.added
As from 1 September 2023, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2023.
24.28.added
Until 1 September 2025, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2023.
24.29.added
As from 1 September 2025, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation.
24.30.added
Regulation shall continue to accept UN type-approvals issued according to the preceding series of amendments to the UN Regulation, for the vehicles / vehicle systems / vehicle components which are not affected by the changes introduced by the 05 series of amendments. Annex 1A Essential characteristics of the CNG/LNG components
1.2.4.5.26.deleted
Annex 1A
1.2.4.5.2.added
CNG Compressor: yes/no1
1.2.4.5.4.changed
1 Strike out what does not apply. 2 Specify the tolerance. Annex 1A
1.2.4.5.7.changed
LNG tank(s) or vessel(s): yes/no1 CNG accumulator(s): yes/no1
1.2.4.5.8.2.deleted
Annex 1B
1.2.4.5.10.deleted
Annex 1B
1.2.4.5.17.deleted
Annex 1B
1.2.5.changed
Annex 1B Annex 1B Essential characteristics of the vehicle, engine and CNG/LNG-related system
1.2.4.5.22.deleted
Annex 1B
1.2.4.5.2.changed
CNG Pressure regulator(s): CNG Compressor:
1.2.4.5.28.deleted
Annex 1B
1.2.4.5.4.changed
1 Specify the tolerance. 2 Strike out what does not apply. Annex 1B
1.2.4.5.7.changed
LNG tank(s) or vessel(s): yes/no2 CNG accumulator(s): yes/no2
1.21.deleted
Annex 2B - Addendum
1.2.5.changed
Annex 2A Annex 2A Arrangement of the CNG/LNG component type approval mark (See paragraph 7.2. of this Regulation) 110 R-022439 R-042439 "L" (or "M" or "C") a  8 mm The above approval mark affixed to the CNG and or LNG component shows that this component has been approved in Italy (E 3), pursuant to UN Regulation No. 110 under approval number 022439. 042439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of UN Regulation No. 110 as amended by the 02 04 series of amendments. The letter "L" indicates that the product is suitable for use with LNG. The letter "M" indicates that the product is suitable in moderate temperatures. The letter "C" indicates that the product is suitable in cold temperatures. Annex 2B Annex 2B Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a type of CNG/LNG component pursuant to UN Regulation No. 110
1.changed
CNG/LNG component considered: Container(s) or cylinder(s)2 Tank(s) or vessel(s)2 CNG accumulator(s)2 Pressure indicator2 Pressure relief valve2 Automatic valve(s)2 Excess flow valve2 Gas-tight housing2 Pressure regulator(s)2 Non-return valve(s) or check valve(s)2 Pressure relief device (PRD) (temperature triggered)2 Manual valve2 Flexible fuel lines2 Filling unit or receptacle2 Gas injector(s)2 CNG Compressor2 Gas flow adjuster2 Gas/air mixer2 Electronic control unit2 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 2B Gas flow adjuster2 Gas/air mixer2 Electronic control unit2 Pressure and temperature sensor(s)2 CNG filter(s)2 PRD (pressure triggered)2 Fuel rail2 Heat exchanger(s) / vaporizer(s)2 Natural gas detector(s)2 LNG filling receptacle(s)2 LNG pressure control regulator(s)2 LNG pressure and/or temperature sensor(s)2 LNG manual valve(s)2 LNG automatic valve(s)2 LNG non-return valve(s)2 LNG pressure relief valve(s)2 LNG excess flow valve(s)2 LNG fuel pump(s)2
14.changed
The documents filed with the application or extension of approval can be obtained upon request. Annex 2B - Addendum Annex 2B - Addendum
1.changed
Additional information concerning the type approval of a type of CNG/LNG components pursuant to UN Regulation No. 110
1.31.deleted
Annex 2C Annex 2C Arrangement of approval marks Model A (See paragraph 17.2. of this Regulation) 110 R-022439 "L" (or "M" or "C") a  8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of CNG/LNG system for the use of natural gas for propulsion, been approved in Italy (E 3), pursuant to UN Regulation No. 110 under approval number 022439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of UN Regulation No. 110 as amended by the 02 series of amendments. The letter "L" indicates that the product is suitable for use with LNG. The letter "M" indicates that the product is suitable in moderate temperatures. The letter "C" indicates that the product is suitable in cold temperatures. Model B (See paragraph 17.2. of this Regulation) 110 022439 "L" 83 051628 (or "M" or "C") a  8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of CNG/LNG system for the use of natural gas for propulsion, been approved in Italy (E 3), pursuant to UN Regulation No. 110 under approval number
022439.deleted
The first two digits of the approval number indicate that at the date the approval was granted in accordance with the requirements of UN Regulation No. 110 as amended by the 02 series of amendments and that UN Regulation No. 83 included the 05 series of amendments. The letter "L" indicates that the product is suitable for use with LNG. The letter "M" indicates that the product is suitable in moderate temperatures. The letter "C" indicates that the product is suitable in cold temperatures. Annex 2D Annex 2D Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a vehicle type with regard to the installation of CNG/LNG system pursuant to UN Regulation No. 110
1.1.3.3.added
Capacity:……………………………………………………………………..
1.9.changed
1 Specify the tolerance. Annex 2B - Addendum
4.1.4.deleted
Recommendations for periodic requalification by visual inspection or testing during the service life shall be provided by the cylinder manufacturer on the basis of use under service conditions specified herein. Each cylinder shall be visually inspected at least every 48 months after the date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration, including under the support straps. The visual inspection shall be performed by a competent agency approved or recognized by the Regulatory Authority, in accordance with the manufacturer's specifications: Cylinders without label containing mandatory information or with labels containing mandatory information that are illegible in any way shall be removed from service. If the cylinder can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the cylinder to remain in service.
1.32.added
Annex 2C Arrangement of approval marks Model A (See paragraph 17.2. of this Regulation) 110 R-052439 "L" (or "M" or "C") a  8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of CNG/LNG system for the use of natural gas for propulsion, been approved in Italy (E 3), pursuant to Regulation No. 110 under approval number 052439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 110 as amended by the 05 series of amendments. The letter "L" indicates that the product is suitable for use with LNG. The letter "M" indicates that the product is suitable in moderate temperatures. The letter "C" indicates that the product is suitable in cold temperatures. Model B (See paragraph 17.2. of this Regulation) 110 052439 "L" 83 051628 (or "M" or "C") a  8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of CNG/LNG system for the use of natural gas for propulsion, been approved in Italy (E 3), pursuant to Regulation No. 110 under approval number 052439. The first two digits of the approval number indicate that at the date the approval was granted in accordance with the requirements of Regulation No. 110 as amended by the 05 series of amendments and that Regulation No. 83 included the 05 series of amendments. The letter "L" indicates that the product is suitable for use with LNG. The lett…
11.changed
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 2D
1.1.changed
Annex 3A sets out minimum requirements for light-weight refillable gas cylinders. The cylinders are intended only for the on-board storage of high pressure compressed natural gas as a fuel for automotive vehicles to which the cylinders are to be fixed. Cylinders may be of any steel, aluminium aluminum or non-metallic material, design or method of manufacture suitable for the specified service conditions. This annex also covers stainless steel metal liners of seamless or welded construction.
1.2.changed
Annex 3B sets out minimum requirements for refillable fuel tanks for liquefied natural gas (LNG) used in vehicles as well as the testing methods required. Annex 3A Annex 3A Gas cylinders - — High pressure cylinder for the on-board storage of CNG compressed natural gas as a fuel for automotive vehicles
4.1.1.changed
The standard service conditions specified in this section are provided as a basis for the design, manufacture, inspection, testing, and approval of cylinders that are to be mounted permanently on vehicles and used to store natural gas at ambient temperatures for use as a fuel on vehicles. Annex 3A
4.1.2.changed
The service conditions specified are also intended to provide information on how cylinders made to this Regulation may safely be used to: (a) Manufacturers of cylinders; (b) Owners of certified cylinders; (c) Designers or contractors responsible for the installation of cylinders; (d) Designers or owners of equipment used to refuel vehicle cylinders; (e) Suppliers of natural gas; and (f) Regulatory authorities who have jurisdiction over cylinder use.
4.1.3.changed
The service life for which certified cylinders are safe shall be specified by the cylinder designer on the basis of use under service conditions specified herein. The maximum service life shall be 20 years.
4.1.4.1.changed
Cylinders which have been involved in a vehicle collision Periodic technical inspection means the inspection of vehicles performed at specified intervals according to national regulations. Guidelines for the visual inspection of each cylinder during its service life shall be reinspected by an agency authorized provided by the manufacturer, unless otherwise directed by cylinder manufacturer on the Authority having jurisdiction. A cylinder that has not experienced any impact damage from the collision may be returned to service, otherwise the basis of use under service conditions specified herein. Each cylinder shall be returned to visually inspected at least every 48 months after the manufacturer date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for evaluation. 4.1.4.2 Cylinders involved in fires Cylinders which have been subject to the action of fire external damage and deterioration. The visual inspection shall be reinspected by an agency authorized by performed in accordance with the manufacturer, manufacturer's specifications: Cylinders without a label containing mandatory information or condemned and with labels containing mandatory information that are illegible in any way shall be removed from service. If the cylinder can be positively identified by the manufacturer and serial number, a replacement label may be applied, allowing the cylinder to remain in service.
4.1.4.2.added
Periodic requalification means an inspection or testing of cylinders at specified intervals according to national regulations whereby cylinders are re-qualified for a further period of service. For those countries that require a periodic requalification, the procedure shall be performed in accordance with the relevant regulations of the country(ies) where the cylinders are used and also in consideration of the manufacturer’s specifications. Periodic requalification shall be done at least every 48 months after the date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration. The requalification shall be performed in accordance with the manufacturer's specifications: Cylinders without a label containing mandatory information or with labels containing mandatory information that are illegible in any way shall be removed from service. If the cylinder can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the cylinder to remain in service.
4.1.4.3.added
Cylinders which have been involved in a vehicle collision shall be reinspected by an agency authorized by the manufacturer, unless otherwise directed by the Authority having jurisdiction. A certified cylinder that has not experienced any impact damage from the collision may be returned to service, otherwise the certified cylinder shall be returned to the manufacturer for evaluation.
4.1.4.4.added
Certified cylinders that have been subject to the action of fire shall be reinspected by an agency authorized by the manufacturer, or condemned and removed from service.
4.2.changed
The cylinder pressure shall be limited to the following: (a) A pressure that would settle to 20 MPa at a settled temperature of 15 °C; (b) 26 MPa, immediately after filling, regardless of temperature; Annex 3A
4.5.changed
Methanol and/or glycol shall not be deliberately added to the natural gas. Cylinder should be designed to tolerate being filled with natural gas meeting either of the following three conditions: (a) SAE J1616 (b) Dry gas Water vapour would normally be limited to less than 32 mg/m3 mg/m 3 at a pressure dew point of -9 °C at 20 MPa. There would be no constituent limits for dry gas, except for: Hydrogen sulphide and other soluble sulphides: 23 mg/m3 Oxygen: 1 per cent by volume Hydrogen shall be limited to 2 per cent by volume when cylinders are manufactured from steel with an ultimate tensile strength exceeding 950 MPa; (c) Wet gas Gas that contains water content higher than b) normally meets the following constituent limits; Hydrogen sulphide and other soluble sulphides: 23 mg/m3 Oxygen: 1 per cent by volume Carbon dioxide: 4 per cent by volume Hydrogen: 0.1 per cent by volume Under wet gas conditions, a minimum of 1 mg of compressor oil per kg of gas is necessary to protect metallic cylinders and liners. Annex 3A
5.2.changed
The purpose of this statement of service is to guide users and installers of cylinders as well as to inform the approving Type Approval Authority, or their designated representative. The statement of service shall include: (a) A statement that the cylinder design is suitable for use in the service conditions defined in paragraph 4. for the service life of the cylinder; (b) The service life; (c) The minimum in-service test and/or inspection requirements; Annex 3A (d) The pressure relief devices and/or insulation required; (e) Support methods, protective coatings, etc., required but not provided; (f) A description of the cylinder design; (g) Any other information necessary to ensure the safe use and inspection of the cylinder.
5.3.5.changed
The arrangement of pressure relief devices that will protect the cylinder from sudden rupture when exposed to the fire conditions in paragraph A.15 of Appendix A to this annex shall be specified. Test data shall substantiate the effectiveness of the specified fire protection system. Annex 3A
5.7.changed
A summary of the documents providing the information required in paragraph 5.1. above shall be listed on a specification sheet for each cylinder design. The title, reference number, revision numbers and dates of original issue and version issues of each document shall be given. All documents shall be signed or initialled by the issuer. The specification sheet shall be given a number, and revision numbers if applicable, that can be used to designate the cylinder design and shall carry the signature of the engineer responsible for the design. Space shall be provided on the specification sheet for a stamp indicating registration of the design.
5.1.changed
On each tank, the manufacturer shall provide clear permanent markings not less than 6 mm high. Marking above shall be made either by labels attached by adhesive or plates attached by welds. Adhesive labels listed on a specification sheet for each cylinder design. The title, reference number, revision numbers and their application dates of original issue and version issues of each document shall be in accordance with ISO 7225, or an equivalent standard. Multiple labels or plates are allowed and should be located such that they are not obscured by mounting brackets. Each tank complying with this annex given. All documents shall be marked as follows: (a) Mandatory information: (i) "LNG ONLY"; (ii) Manufacturer's identification; (iii) Tank identification (applicable part number signed or initialled by the issuer. The specification sheet shall be given a number, and a serial number unique for every cylinder); (iv) Working pressure revision numbers if applicable, that can be used to designate the cylinder design and temperature; (v) Regulation number, along with tank type and certification registration number; (vi) The pressure relief devices and/or valves that are qualified for use with shall carry the tank or the means for obtaining information on qualified fire protection systems; (vii) When labels are used, all tanks shall have a unique identification number stamped on an exposed metal surface to permit tracing in the event that the label is destroyed. Annex 3B (b) Non-mandatory information: On a separate label(s) the following non-mandatory information may be provided: (i) Gas temperature range, e.g. -195 °C to 65 °C; (ii) Nominal water capacity signature of the tank to two significant numbers. e.g. 120 litres; (iii) Date of original pressure test (month and year). The markings engineer responsible for the design. Space shall be placed in provided on the listed sequence but specification sheet for a stamp indicating registration of the specific arrangement may be varied to match the space available. An acceptable example of mandatory information is: LNG ONLY Manufacturer/Part Number/Serial Number 1.6 MPa (16 bar)/-160 °C ECE R 110 LNG (registration No. …) "Use Only Manufacturer-Approved Pressure Relief Device" design.
5.9.1.changed
Evaluation of conformity is required to be performed in accordance with the provisions of paragraph 9. of this Regulation. In order to ensure that the cylinders are in compliance with this international Regulation, they shall be subject to inspection in accordance with paragraphs 6.13. and 6.14. below performed by the Type Approval Authority. Annex 3A
6.3.1.changed
Materials used shall be suitable for the service conditions specified in paragraph 4. of this annex. The design shall not have incompatible materials in contact. The design qualification tests for materials are summarized in Table
6.3.2.1.changed
Steels shall be aluminium and/or silicon killed and produced to predominantly fine grain practice. The chemical composition of all steels shall be declared and defined at least by: (a) Carbon, manganese, aluminium and silicon contents in all cases; (b) Nickel, chromium, molybdenum, boron and vanadium contents, and any other alloying elements intentionally added. The following limits shall not be exceeded in the cast analysis: Tensile strength < 950 MPa  950 MPa Sulphur 0.020 per cent 0.010 per cent Phosphorus 0.020 per cent 0.020 per cent Sulphur and phosphorus 0.030 per cent 0.025 per cent Annex 3A When carbon-boron steel is used, a hardenability test in accordance with ISO 642, shall be performed on the first and last ingot or slab of each heat of steel. The hardness as measured in a distance of 7.9 mm from the quenched end, shall be within the range 33-53 HRC, or 327-560 HV, and shall be certified by the material manufacturer;
6.3.2.4.changed
The ultimate tensile strength of the steel from a finished cylinder shall not exceed 1,200 MPa. If the upper limit of the specified tensile strength for the steel exceeds 950 MPa, the steel from a finished cylinder shall be subjected to a sulphide stress cracking resistance test in accordance with Appendix A to this annex, paragraph A.3. and meet the requirements listed therein.6.3.3. Aluminium therein.
6.3.4.1.changed
The material for impregnation may be thermosetting or thermoplastic resins. Examples of suitable matrix materials are epoxy, modified epoxy, polyester and vinyl ester thermosetting plastics, and polyethylene and polyamide thermoplastic material; Annex 3A
6.3.5.changed
Structural reinforcing filament material types shall be glass fibre, aramid fibre or carbon fibre. If carbon fibre reinforcement is used the design shall incorporate means to prevent galvanic corrosion of metallic components of the cylinder. The manufacturer shall keep on file the published specifications for composite materials, the material manufacturer's recommendations for storage, conditions and shelf life and the material manufacturer's certification that each shipment conforms to the said specification requirements. The fibre manufacturer shall certify that the fibre material properties conform to the manufacturer's specifications for the product. 6.3.6 Plastic liners The tensile yield strength and ultimate elongation shall be determined in accordance with paragraph A.22. (Appendix A to this annex). Tests shall demonstrate the ductile properties of the plastic liner material at temperatures of -50 °C or lower by meeting the values specified by the manufacturer; the polymeric material shall be compatible with the service conditions specified in paragraph 4. of this annex. In accordance with the method described in paragraph A.23. (Appendix A to this annex), the softening temperature shall be at least 90 °C, and the melting temperature at least 100 °C. °C."
6.5.changed
For all types of cylinder the minimum actual burst pressure shall not be less than the values given in Table 6.3 of this annex. For type CNG-2, CNG-3 and CNG-4 designs the composite over-wrap shall be designed for high reliability under sustained loading and cyclic loading. This reliability shall be achieved by meeting or exceeding the composite reinforcement stress ratio values given in Table 6.3 of this annex. Stress ratio is defined as the stress in the fibre at the specified minimum burst pressure divided by the stress in the fibre at working pressure. The burst ratio is defined as the actual burst pressure of the cylinder divided by the working pressure. For type CNG-4 designs, the stress ratio is equal to the burst ratio. For type CNG-2 and CNG-3 designs (metal-lined, composite over-wrapped) stress ratio calculations shall include: (a) An analysis method with capability for non-linear materials (special purpose computer program or finite element analysis program); (b) Elastic-plastic stress-strain curve for liner material shall be known and correctly modelled; (c) Mechanical properties of composite materials shall be correctly modelled; Annex 3A (d) Calculations shall be made at: auto-frettage, zero after auto-frettage, working and minimum burst pressures; (e) Pre-stresses from winding tension shall be accounted for in the analysis; (f) Minimum burst pressure shall be chosen such that the calculated stress at minimum burst pressure divided by the calculated stress at working pressure meets the stress ratio requirements for the fibre used; (g) When analysing cylinders with hybrid reinforcement (two or more different fibre types), the load share between the different fibres shall be considered based on the different elastic moduli of the fibres. The stress ratio requirements for each individual fibre type shall be in accordance with the values given in Table 6.3. of this annex. Verification of the stress ratios may also be performed using strain gauges. An acceptable method is outlined in the informative Appendix E to this annex.
6.9.changed
All cylinders shall be protected from fire with pressure relief devices. The cylinder, its materials, pressure relief devices and any added insulation or protective material shall be designed collectively to ensure adequate safety during fire conditions in the test specified in paragraph A.15. (Appendix A to this annex). Pressure relief devices shall be tested in accordance with paragraph A.24. (Appendix A to this annex). Annex 3A
6.12.changed
The exterior of cylinders shall meet the requirements of the environmental test conditions of paragraph A.14. (Appendix A to this annex). Exterior protection shall be provided by using any of the following: (a) A surface finish giving adequate protection (e.g. metal sprayed on aluminium, anodizing); or (b) The use of a suitable fibre and matrix material (e.g. carbon fibre in resin); or (c) A protective coating (e.g. organic coating, paint) that shall meet the requirements of paragraph A.9. (Appendix A to this annex). Any coatings or protections applied to cylinders shall be such that the application process does not adversely affect the mechanical properties of the cylinder. The coating or protection shall be designed to facilitate subsequent in service inspection and the manufacturer shall provide guidance on coating or protection treatment during such inspection to ensure the continued integrity of the cylinder. Manufacturers are advised that an environmental performance test that evaluates the suitability of coating systems is provided in the informative Appendix H to this annex.
6.13.changed
For the approval of each cylinder type the material, design, manufacture and examination shall be proved to be adequate for their intended service by meeting the appropriate requirements of the material qualification tests summarized in Table 6.1 of this annex and the cylinder qualification tests summarized in Table 6.4 of this annex, with all tests in accordance with the Annex 3A relevant methods of test as described in Appendix A to this annex. The test cylinders or liners shall be selected and the tests witnessed by the Competent Authority. If more cylinders or liners are subjected to the tests than are required by this annex, all results shall be documented.
6.15.2.changed
For type CNG-1, CNG-2 and CNG-3 designs, the maximum defect size at any location in the metal cylinder or metal liner that will not grow to a critical size within the specified service life shall be determined. The critical defect size is defined as the limiting through-wall (cylinder or liner) thickness defect that would allow stored gas to be discharged without rupturing the cylinder. Defect sizes for the rejection criteria for ultrasonic scanning, or equivalent shall be smaller than the maximum allowable defect sizes. For type CNG-2 and CNG-3 CNG- 3 designs assume that there shall be no damage to composite due to any time-dependent time- dependent mechanisms; the allowable defect size for NDE shall be determined by an appropriate method. Two such methods are outlined in the informative Appendix F to this annex. Annex 3A
6.16.changed
In the event of failure to meet test requirements retesting or reheat treatment and retesting shall be carried out as follows: (a) If there is evidence of a fault in carrying out a test, or an error of measurement, a further test shall be performed. If the result of this test is satisfactory, the first test shall be ignored; (b) If the test has been carried out in a satisfactory manner, the cause of test failure shall be identified. If the failure is considered to be due to the heat treatment applied, the manufacturer may subject all the cylinders of the batch to a further heat treatment. If the failure is not due to the heat treatment applied, all the identified defective cylinders shall be rejected or repaired by an approved method. The non-rejected non- rejected cylinders are then considered as a new batch. In both cases the new batch shall be retested. All the relevant prototype or batch tests needed to prove the acceptability of the new batch shall be performed again. If one or more tests prove even partially unsatisfactory, all cylinders of the batch shall be rejected.
6.17.changed
A design change is any change in the selection of structural materials or dimensional change not attributable to normal manufacturing tolerances. Minor design changes shall be permitted to be qualified through a reduced test program. Changes of design specified in Table 6.7 below shall require design qualification testing as specified in the table. Material design qualification test Relevant paragraph of this annex Steel Aluminium Resins Fibres Plastic liners Tensile properties 6.3.2.2. 6.3.3.4. 6.3.5. 6.3.6. Impact properties 6.3.2.3. Sulphide stress cracking resistance 6.3.2.4. Sustained load crack resistance 6.3.3.3. Stress corrosion cracking 6.3.3.2. Shear strength 6.3.4.2. Glass transition temperature 6.3.4.3. Softening/Melting temperature 6.3.6. Fracture mechanics* 6.7. 6.7. * Not required if flawed cylinder test approach in paragraph A.7. of Appendix A to this annex is used. Annex 3A Impact test acceptable values Cylinder diameter D [mm] > 140  140 Direction of testing transverse longitudinal Width of test piece [mm] 3-5 > 5 - 7.5 > 7.5 - 10 3 to 5 Test temperature [C] -50 -50 Impact strength [J/cm²] Mean of 3 specimens 30 35 40 60 Individual specimen 24 28 32 48 Minimum actual burst values and stress ratios CNG-1 CNG-2 CNG-3 CNG-4 All-metal Hoop-wrapped Fully-wrapped All-composite Burst Stress Burst Stress Burst Stress Burst pressure ratio pressure ratio pressure ratio pressure [MPa] [MPa] [MPa] [MPa] [MPa] [MPa] [MPa] All metal 45 Glass 2.75 50 1) 3.65 70 1) 3.65 73 Aramid 2.35 47 3.10 60 1) 3.1 62 Carbon 2.35 47 2.35 47 2.35 47 2) 2) 2) Hybrid Note 1) - Minimum actual burst pressure. In addition, calculations shall be performed in accordance with paragraph 6.5. of this annex to confirm that the minimum stress ratio requirements are also met. Note 2) - Stress ratios and burst pressures shall be calculated in accordance with paragraph 6.5. of this annex. Cylinder design qualification tests Cylinder type Test and annex reference CNG-1 CNG-2 CNG-3 CNG-4 A.12. Burst X* X X X A.13. Ambient temperature/cycle X* X X X A.14. Acid environment test X X X A.15. Bonfire X X X X A.16. Penetration X X X X A.17. Flaw tolerance X X X X A.18. High temperature creep X X X A.19. Stress rupture X X X A.20. Drop test X X A.21. Permeation X A.24. PRD performance X X X A.25. Boss torque test X X A.27. Natural gas cycling X A.6. LBB assessment X X A.7. Extreme temperature/cycle X X X X Notes: X = required * = Not required for cylinders designed to ISO 9809 (ISO 9809 already provides for these tests). Annex 3A Batch tests Cylinder type Test and annex reference CNG-1 CNG-2 CNG-3 CNG-4 A.12. Burst X X X X A.13. Ambient temperature/cycle X X X X A.1. Tensile X X† X† A.2. Impact (steel) X X† X† A.9.2. Coating* X X X X X = required * = Except where no protective coating is used † = Tests on liner material Critical production inspection requirements Type Cylinder type Inspection requirements CNG-1 CNG-2 CNG-3 CNG-4 Critical dimensions X X X X Surface finish X X X X Flaws (ultrasonic or equivalent) X X X Hardness of metal cylinders and metal X X X liners Hydrostatic proof test X X X X Leak test X Markings X X X X X = required Annex 3A Change of design Type of test High temp: Permeation Creep A.18 A.21 CNG Stress Boss Cycling rupture torque A.19 A.25 PRD Burst ambient Flaw Hydrostatic temp: Environm. Bonfire Penetration tolerance Drop test Cycling performance Design change A.12 A.13 A.14 A.15 A.16 A.17 A.20 A.27 A.24 Fibre X X X* X† manufacturer Metallic cylinder or X X X* X X* X X* liner material Plastic liner X X X† material Fibre material X X X X X X X X† Resin material X X X X Diameter change X X  20 per cent Diameter change X X X X* X > 20 per cent Length change X X‡  50 per cent Length change X X X‡ > 50 per cent Working pressure X X change  20 per cent@ Dome shape X X X† Opening size X X Coating change X End boss X† design Change in X X manuf. process Pressure relief X X device X = required * Test not required on metal (CNG-1) designs: † Test only required on all-composite (CNG-4) designs ‡ Test only required when length increases @ Only when thickness changes proportional to diameter and/or pressure change. Annex 3A
Table 6added
Material design qualification test Relevant paragraph of this annex Steel Aluminium Resins Fibres Plastic liners Tensile properties 6.3.2.2. 6.3.3.4. 6.3.5. 6.3.6. Impact properties 6.3.2.3. Sulphide stress cracking resistance 6.3.2.4. Sustained load crack resistance 6.3.3.3. Stress corrosion cracking 6.3.3.2. Shear strength 6.3.4.2. Glass transition temperature 6.3.4.3. Softening/Melting temperature 6.3.6. Fracture mechanics* 6.7. 6.7. * Not required if flawed cylinder test approach in paragraph A.7. of Appendix A to this annex is used. Impact test acceptable values Cylinder diameter D [mm] > 140  140 Direction of testing transverse longitudinal Width of test piece [mm] 3-5 > 5 - 7.5 > 7.5 - 10 3 to 5 Test temperature [C] …
7.3.3.changed
Each finished cylinder shall be hydrostatically pressure tested in accordance with paragraph A.11. (Appendix A to this annex). Annex 3A
7.4.changed
Batch testing shall be conducted on finished cylinders which are representative of normal production and are complete with identification marks. Two cylinders shall be randomly selected from each batch. If more cylinders are subjected to the tests than are required by this annex, all results shall be documented. The following tests shall as a minimum be carried out on these. (a) Batch materials tests. One cylinder, or a heat treat witness sample representative of a finished cylinder, shall be subjected to the following tests: (i) Critical dimensions checked against the design; (ii) One tensile test in accordance with paragraph A.1. (Appendix A to this annex) and meet the requirements of the design; (iii) For steel cylinders, three impact tests in accordance with paragraph A.2. (Appendix A to this annex) and meet the requirements of paragraph 6.3.2.3. above; (iv) When a protective coating is a part of the design, the coating shall be tested in accordance with paragraph A.9.2. (Appendix A to this annex); All cylinders represented by a batch test which fail to meet the specified requirements shall follow the procedures specified in paragraph 6.16. above. Where the coating fails to meet the requirements of paragraph A.9.2. (Appendix A to this annex), the batch shall be 100 per cent inspected to remove similarly defective cylinders. The coating on all defective cylinders may be stripped and recoated. The coating batch test shall then be repeated; (b) Batch burst test. One cylinder shall be hydrostatically pressurized to burst in accordance with paragraph A.12. (Appendix A to this annex). If the burst pressure is less than the minimum calculated burst pressure the procedures specified in paragraph 6.16. above shall be followed. (c) Periodic pressure cycling test. Finished cylinders shall be pressure cycled in accordance with paragraph A.13. (Appendix A to this annex) at a test frequency defined as follows: (i) One cylinder from each batch shall be pressure cycled for a total of 1,000 times the specified service life in years, with a minimum 15,000 cycles; (ii) On 10 sequential production batches of a design family (i.e. similar materials and processes), should none of the pressure cycled cylinders in (i) above leak or rupture in less than 1,500 cycles times the specified life in years (minimum 22,500 cycles) then the pressure cycle test can be reduced to one cylinder from every 5 batches of production; Annex 3A (iii) On 10 sequential production batches of a design family, should none of the pressure cycled cylinders in (i) above leak or rapture in less than 2,000 cycles times the specified service life in years (minimum 30,000 cycles) then the pressure cycle test can be reduced to one cylinder from every 10 batches of production; (iv) Should more than 6 months have expired since the last batch of production. Then a cylinder from the next batch of production shall be pressure cycle tested in order to maintain the reduced frequency of batch testing in (ii) or (iii) above. (v) Should any reduced frequency pressure cycle test cylinder in (ii) or (iii) above fail to meet the required number of pressure cycles (minimum 22,500 or 30,000 pressure cycles, respectively,) then it shall be necessary to repeat the batch pressure cycle test frequency in (i) for a minimum 10 production batches in order to re-establish the reduced frequency of batch pressure cycle testing in (ii) or (iii) above. (vi) Should any cylinder in (i), (ii), or (iii) above fail to meet the minimum cycle life requirement of 1,000 cycles times the specified service life in years (minimum 15,000 cycles), then the cause of failure shall be determined and corrected following the procedures in paragraph 6.16. of this annex. The pressure cycle test shall then be repeated on an additional three cylinders from that batch. Should any of the three additional cylinders fail to meet the minimum pressure cycling requirement of 1,000 cycles times the specified service life in years, then the batch shall be rejected.
7.5.3.changed
Ambient temperature pressure cycling test. Two finished cylinders shall be pressure cycled at ambient temperature in accordance with paragraph A.13. (Appendix A to this annex) to failure, or to a minimum of 45,000 cycles. The cylinders shall not fail before reaching the specified service life in years times 1,000 cycles. Cylinders exceeding 1,000 cycles times the specified service life in years shall fail by leakage and not by rupture. Cylinders which do not fail within 45,000 cycles shall be destroyed either by continuing the cycling until failure occurs, or by hydrostatically pressurising to burst. The number of cycles to failure and the location of the failure initiation shall be recorded. Annex 3A
7.5.6.changed
For cylinder designs not exceeding 45,000 cycles when tested as per paragraph 7.5.3. above, LBB performance tests shall be conducted in accordance with paragraph A.6. of Appendix 1 to this annex and meet the requirements therein.
7.5.3.added
above, LBB performance tests shall be conducted in accordance with paragraph A.6. of Appendix 1 to this annex and meet the requirements therein.
8.2.3.changed
The stresses in the composite and in the liner after prestress shall be calculated. The pressures used for these calculations shall be zero, 2 MPa, 20 MPa test pressure and design burst pressure. The calculations shall use suitable analysis techniques using thin-shell theory taking account of non- linear non-linear material behaviour of the liner to establish stress distributions at the neck, transition regions and the cylindrical part of the liner. For designs using auto-frettage to provide prestress, the limits within which the auto-frettage pressure shall fall shall be calculated. For designs using controlled tension winding to provide prestress, the temperature at which it is performed, the tension required in each layer of composite and the consequent prestress in the liner shall be calculated.
8.3.1.changed
The composite cylinder shall be fabricated from a liner over-wrapped with continuous filament windings. Filament winding operations shall be Annex 3A computer or mechanically controlled. The filaments shall be applied under controlled tension during winding. After winding is complete, thermosetting resins shall be cured by heating, using a predetermined and controlled time- temperature time-temperature profile.
8.4.1.changed
Non-destructive examinations shall be carried out in accordance with a recognized ISO or an equivalent standard. The following tests shall be carried out on each metallic liner: (a) Hardness test in accordance with paragraph A.8. (Appendix A to this annex); Annex 3A (b) Ultrasonic examination, in accordance with BS 5045, Part 1, Annex 1B, or demonstrated equivalent NDT method, to ensure that the maximum defect size does not exceed the size specified in the design.
8.5.1.changed
Batch testing shall be conducted on finished cylinders which are representative of normal production and are complete with identification marks. Two cylinders, or a cylinder and a liner as appropriate, shall be randomly selected from each batch. If more cylinders are subjected to the tests than are required by this annex, all results shall be documented. The following tests shall as a minimum be carried out on these. Where defects are detected in over-wrapping before any auto-frettage or hydrostatic pressure testing, the over-wrapping may be completely removed and replaced; (a) Batch materials tests. One cylinder, or liner, or heat treat witness sample that is representative of a finished cylinder, shall be subjected to the following tests: (i) Dimensions checked against the design; (ii) One tensile test in accordance with paragraph A.1. (Appendix A to this annex) and meet the requirements of the design; (iii) For steel liners, three impact tests in accordance with paragraph A.2. (Appendix A to this annex) and meet the requirements of the design; (iv) When a protective coating is a part of the design, the coating shall be tested in accordance with paragraph A.9.2. (Appendix A to this annex) and meet the requirements therein. All cylinders or liners represented by a batch test which fails to meet the requirements specified shall follow the procedures specified in paragraph 6.16. above. Where the coating fails to meet the requirements of paragraph A.9.2. (Appendix A to this annex), the batch shall be 100 per cent inspected to remove similarly defective cylinders. The coating on all defective cylinders may be stripped using a method that does not affect the integrity of the composite wrapping, and recoated. The coating batch test shall then be repeated. (b) Batch burst test. One cylinder shall be tested in accordance with the requirements of paragraph 7.4.(b) above; Annex 3A (c) Periodic pressure cycling test. In accordance with the requirements of paragraph 7.4.(c) above.
8.6.4.changed
One cylinder shall be tested in accordance with paragraph A.14. (Appendix A to this annex) and meet the requirements therein. An optional environmental test is included in the informative Appendix H to this annex. therein."
Table 1deleted
Number of pressure Test steps Exposure environments Temperature cycles 1 Other fluids - Ambient 2 Immersion 1,875 Ambient 3 Air 1,875 High 4 Other fluids - Ambient 5 Immersion 1,875 Ambient 6 Air 3,750 Low 7 Other fluids - Ambient 8 Immersion 1,875 Ambient 9 Air 1,875 High 10 Other fluids - Ambient 11 Immersion 1,875 Ambient Annex 3B Annex 3B Liquid tanks - Vacuum insulated vessels for the on-board storage of natural gas as a fuel for automotive vehicles
8.6.7.changed
One finished cylinder shall be tested in accordance with paragraph A.17. (Appendix A to this annex) and meet the requirements therein. Annex 3A
8.6.10.changed
For cylinder designs not exceeding 45,000 cycles when tested as per paragraph 8.6.3. above, LBB performance tests shall be conducted in accordance with paragraph A.6. of Appendix A to this annex and meet the requirements therein.
8.6.3.added
above, LBB performance tests shall be conducted in accordance with paragraph A.6. of Appendix A to this annex and meet the requirements therein.
2.1.3.deleted
Recommendations for periodic requalification by visual inspection or testing during the service life shall be provided by the tank manufacturer on the basis of use under service conditions specified herein. Each tank shall be visually inspected at least every 120 months after the date of its entry into service on Annex 3B the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration, including under the support straps. The visual inspection shall be performed by a Technical Service designated or recognized by the Type Approval Authority, in accordance with the manufacturer's specifications: tanks without label containing mandatory information, or with labels containing mandatory information that are illegible in any way shall be removed from service. If the tank can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the tank to remain in service.
9.2.3.changed
The stresses in the tangential and longitudinal direction of the cylinder in the composite and in the liner after pressure shall be calculated. The pressure used for these calculations shall be zero, working pressure, 10 per cent of working pressure, test pressure and design burst pressure. The limits, within which auto-frettaging auto- frettaging pressure shall fall, shall be calculated. The calculations shall use suitable analysis techniques using thin-shell theory taking account of non-linear non- linear material behaviour of the liner to establish stress distributions at the neck, transition regions and the cylindrical part of the liner.
9.3.changed
Manufacturing requirements shall be in accordance with paragraph 8.3. above except that the over-wrap shall also include helically wound filaments. Annex 3A
10.2.changed
Design calculations shall be used to provide justification of design adequacy. The tensile stresses in the fibres shall meet the requirements of paragraph 6.5. above. Tapered and straight threads in accordance with paragraph 6.10.2. or 6.10.3. above shall be used on the metal end bosses. Metal end bosses with threaded openings shall be able to withstand a torque force of 500 Nm, without damaging the integrity of the connection to the non-metallic non- metallic liner. The metal end bosses connected to the non-metallic liner shall be of a material compatible with the service conditions specified in paragraph 4. of this annex.
4.changed
Method 1 (applies to cylinders that do not use high tension winding) (a) Prior to auto-frettage, apply strain gauges and calibrate; (b) Measure strains at auto-frettage, zero after auto-frettage, working, and minimum burst pressure have been met; (c) Confirm that the strain at burst pressure divided by strain at working pressure meets the stress ratio requirements. For hybrid construction, the strain at working pressure is compared with the rupture strain of cylinders reinforced with a single fibre type. this annex.
10.5.1.changed
Each finished cylinder shall be hydrostatically pressure tested in accordance with paragraph A.11. (Appendix A to this annex). The manufacturer shall define the appropriate limit of elastic expansion for the test pressure used, but Annex 3A in no case shall the elastic expansion of any cylinder exceed the average batch value by more than 10 per cent. Any cylinders not meeting the defined rejection limit shall be rejected and either destroyed or used for batch test purposes.
10.6.1.changed
Batch testing shall be conducted on finished cylinders which are representative of normal production and are complete with identification marks. One cylinder shall be randomly selected from each batch. If more cylinders are subjected to the tests that are required by this annex, all results shall be documented. The following tests shall as a minimum be carried out on these cylinders. (a) Batch materials test One cylinder, or liner, or liner witness sample that is representative of a finished cylinder, shall be subjected to the following tests: (i) Dimensions checked against the design; (ii) One tensile test of the plastic liner in accordance with paragraph A.22. (Appendix A to this annex) and meet the requirements of the design; (iii) The melt temperature of the plastic liner shall be tested in accordance with paragraph A.23. (Appendix A to this annex), and meet the requirements of the design; (iv) When a protective coating is a part of the design, the coating shall be tested in accordance with paragraph A.9.2. (Appendix A to this annex). Where the coating fails to meet the requirements of paragraph A.9.2. (Appendix A to this annex), the batch shall be 100 per cent inspected to remove similarly defective cylinders. The coating on all defective cylinders may be stripped using a method that does not affect the integrity of the composite wrapping, and recoated. The coating batch test shall then be repeated. (b) Batch burst test One cylinder shall be tested in accordance with the requirements of paragraph 7.4.(b) above; (c) Periodic pressure cycling test On one cylinder the end boss shall be torque tested to 500 Nm in accordance with the test method in paragraph A.25. (Appendix A to this annex). The cylinder shall then be pressure cycle tested in accordance with the procedures provided in paragraph 7.4.(c) above. Annex 3A Following the required pressure cycling, the cylinder shall be leak tested in accordance with the method described in paragraph A.10. (Appendix A to this annex) and meet the requirements therein.
10.7.1.changed
Cylinder design qualification tests shall be in accordance with the requirements of paragraphs 8.6., 10.7.2., 10.7.3. 10.7.3., 10.7.4. and 10.7.4. 10.7.5. of this annex, except that the LBB performance in paragraph 8.6.10. above is not required.
10.7.5.added
One or more finished cylinders shall be subjected to an impact damage test according to Appendix A, paragraph A.20.
11.1.changed
On each cylinder the manufacturer shall provide clear permanent markings not less than 6 mm high. Marking shall be made either by labels incorporated into resin coatings, labels attached by adhesive, low stress stamps used on the thickened ends of type CNG-1 and CNG-2 designs, or any combination of the above. Adhesive labels and their application shall be in accordance with ISO 7225, or an equivalent standard. Multiple labels are allowed and should be located such that they are not obscured by mounting brackets. Each cylinder complying with this annex shall be marked as follows: (a) Mandatory information: (i) "CNG ONLY"; (ii) "DO NOT USE AFTER XX/XXXX", where "XX/XXX" identifies the month and year of expiry;1 (iii) Manufacturer's identification; (iv) Cylinder identification (applicable part number and a serial number unique for every cylinder); (v) Working pressure and temperature; (vi) ECE Regulation number, along with cylinder type and certification registration number; 1 The expiry date shall not exceed the specified service life. The expiry date may be applied to the cylinder at the time of dispatch, provided that the cylinders have been stored in a dry location without internal pressure. Annex 3A (vii) The pressure relief devices and/or valves which are qualified for use with the cylinder, or the means for obtaining information on qualified fire protection systems; (viii) When labels are used, all cylinders shall have a unique identification number stamped on an exposed metal surface to permit tracing in the event that the label is destroyed. (b) Non-mandatory information: On a separate label(s) the following non-mandatory information may be provided: (i) Gas temperature range, e.g. -40 °C to 65 °C; (ii) Nominal water capacity of the cylinder to two significant numbers. e.g. 120 litres; (iii) Date of original pressure test (month and year). The markings shall be placed in the listed sequence but the specific arrangement may be varied to match the space available. An acceptable example of mandatory information is: CNG ONLY Manufacturer/Part Number/Serial Number 20 MPa/15 C ECE R 110 CNG-2 (registration No. …) "Use Only Manufacturer-Approved Pressure Relief Device"
12.changed
Prior to dispatch from the manufacturers shop, every cylinder shall be internally clean and dried. Cylinders not immediately closed by the fitting of a valve, and safety devices if applicable, shall have plugs, which prevent entry of moisture and protect threads, fitted to all openings. A corrosion inhibitor (e.g. oil-containing) shall be sprayed into all steel cylinders and liners prior to dispatch. 1 The expiry date shall not exceed the specified service life. The expiry date may be applied to the cylinder at the time of dispatch, provided that the cylinders have been stored in a dry location without internal pressure. The manufacturer's statement of service and all necessary information to ensure the proper handling, use and in-service inspection of the cylinder shall be supplied to the purchaser. The statement shall be in accordance with Appendix D to this annex. Annex 3A – Appendix A Annex 3A - Appendix A Test methods A.1. Tensile tests, steel and aluminium aluminum A tensile test shall be carried out on the material taken from the cylindrical part of the finished cylinder using a rectangular test piece shaped in accordance with the method described in ISO 9809 for steel and ISO 7866 for aluminium. aluminum. The two faces of the test pieces representing the inside and outside surface of the cylinder shall not be machined. The tensile test shall be carried out in accordance with ISO 6892. Note - Attention is drawn to the method of measurement of elongation described in ISO 6892, particularly in cases where the tensile test piece is tapered, resulting in a point of fracture away from the middle of the gauge length. A.2. Impact test, steel cylinders and steel liners The impact test shall be carried out on the material taken from the cylindrical part of the finished cylinder on three test pieces in accordance with ISO 148. The impact test pieces shall be taken in the direction as required in Table 6.2 of Annex 3A from the wall of the cylinder. The notch shall be perpendicular to the face of the cylinder wall. For longitudinal tests the test piece shall be machined all over (on six faces), if the wall thickness does not permit a final test piece width of 10 mm, the width shall be as near as practicable to the nominal thickness of the cylinder wall. The test pieces taken in transverse direction shall be machined on four faces only, the inner and outer face of the cylinder wall unmachined. A.3. Sulphide stress cracking test for steel Except as identified in the following, testing shall be conducted in accordance with Method A-NACE Standard Tensile Test procedures, as described in NACE Standard TM0177-96. Tests shall be conducted on a minimum of three tensile specimens with a gauge diameter of 3.81 mm (0.150 inches) machined from the wall of a finished cylinder or liner. The specimens shall be placed under a constant tensile load equal to 60 per cent of the specified minimum yield strength of the steel, immersed in a solution of distilled water buffered with 0.5 per cent (mass fraction) sodium acetate trihydrate and adjusted to an initial pH of 4.0, using acetic acid. The solution shall be continuously saturated at room temperature and pressure with 0.414 kPa (0.06 psia) hydrogen sulphide (balance nitrogen). The tested specimens shall not fail within a test duration of 144 hours. A.4. Corrosion tests, aluminium Corrosion tests for aluminium alloys shall be carried out in accordance with Annex A of ISO/DIS 7866 and meet the requirements therein. A.5. Sustained load cracking tests, aluminium The resistance to SLC shall be carried out in accordance with Annex D of ISO/DIS 7866 and shall meet the requirements therein; A.6. Leak-Before-Break (LBB) performance test Annex 3A – Appendix A Three finished cylinders shall be pressure cycled between not more than 2 MPa and nor less than 30 MPa at a rate not to exceed 10 cycles per minute. All cylinders shall fail by leakage. A.7. Extreme temperature pressure cycling Finished cylinders, with the composite wrapping free of any protective coating, shall be cycle tested, without showing evidence of rupture, leakage, or fibre unravelling, as follows: (a) Condition for 48 hours at zero pressure, 65 °C or higher, and 95 per cent or greater relative humidity. The intent of this requirement shall be deemed met by spraying with a fine spray or mist of water in a chamber held at 65 °C; (b) Hydrostatically pressurized for 500 cycles times the specified service life in years between not more than 2 MPa and not less than 26 MPa at 65 °C or higher and 95 per cent humidity; (c) Stabilize at zero pressure and ambient temperature; (d) Then pressurize from not more than 2 MPa to not less than 20 MPa for 500 cycles times the specified service life in years at -40 °C or lower; The pressure cycling rate of (b) shall not exceed 10 cycles per minute. The pressure cycling rate of (d) shall not exceed 3 cycles per minute unless a pressure transducer is installed directly within the cylinder. Adequate recording instrumentation shall be provided to ensure the minimum temperature of the fluid is maintained during the low temperature cycling. Following pressure cycling at extreme temperatures, cylinders shall be hydrostatically pressured to failure in accordance with the hydrostatic burst test requirements, and achieve a minimum burst pressure of 85 per cent of the minimum design burst pressure. For type CNG-4 designs, prior to the hydrostatic burst test the cylinder shall be leak tested in accordance with paragraph A.10. below. A.8. Brinell hardness test Hardness tests shall be carried out on the parallel wall at the centre and a domed end of each cylinder or liner in accordance with ISO 6506. The test shall be carried out after the final heat treatment and the hardness values thus determined shall be in the range specified for the design. A.9. Coating tests (mandatory if paragraph 6.12.(c)) of Annex 3A is used) A.9.1. Coating performance tests Coatings shall be evaluated using the following test methods, or using equivalent national standards. (a) Adhesion testing in accordance with ISO 4624 using Method A or B as applicable. The coating shall exhibit an adhesion rating of either 4A or 4B, as applicable; (b) Flexibility in accordance with ASTM D522 Mandrel Bend Test of Attached Organic Coatings, using Test Method B with a 12.7 mm (0.5 inch) mandrel at the specified thickness at -20 °C. Samples for the flexibility test shall be prepared in accordance with the ASTM D522 standard. There shall not be any visually apparent cracks; Annex 3A – Appendix A (c) Impact resistance in accordance with ASTM D2794 Test method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact). The coating at room temperature shall pass a forward impact test of 18 J (160 in-lbs); (d) Chemical resistance when tested in general accordance with ASTM D1308 Effect of Household Chemicals on Clear and Pigmented Organic Finishes. The tests shall be conducted using the Open Spot Test Method and 100 hour exposure to a 30 per cent sulfuric acid solution (battery acid with a specific gravity of 1.219) and 24 hours exposure to a polyalkalene glycol (e.g. brake fluid). There shall be no evidence of lifting, blistering or softening of the coating. The adhesion shall meet a rating of 3 when tested in accordance with ASTM D3359; (e) Minimum 1,000 hours exposure in accordance with ASTM G53 Practice for Operating Light- and Water-Exposure Apparatus (Fluorescent W-Condensation Type) for Exposure of non-metallic Materials. There shall be no evidence of blistering, and adhesion shall meet a rating of 3 when tested in accordance with ISO 4624. The maximum gloss loss allowed is 20 per cent; (f) Minimum 500 hours exposure in accordance with ASTM B117 Test Method of Salt Spray (Fog) Testing. Undercutting shall not exceed 3 mm at the scribe mark, there shall be no evidence of blistering, and adhesion shall meet a rating of 3 when tested in accordance with ASTM D3359; (g) Resistance to chipping at room temperature using the ASTM D3170 Chipping Resistance of Coatings. The coating shall have a rating of 7A or better and there shall not be any exposure of the substrate. A.9.2. Coating batch tests (a) Coating thickness The thickness of the coating shall meet the requirements of the design when tested in accordance with ISO 2808; (b) Coating adhesion The coating adhesion strength shall be measured in accordance with ISO 4624, and shall have a minimum rating of 4 when measured using either Test Method A or B, as appropriate. A.10. Leak test Type CNG-4 designs shall be leak tested using the following procedure (or an acceptable alternative); (a) Cylinders shall be thoroughly dried and pressurized to working pressure with dry air or nitrogen, and containing a detectable gas such as helium; (b) Any leakage measured at any point that exceeds 0.004 standard cm3/h cm 3/h shall be cause for rejection. A.11. Hydraulic test One of the following two options shall be used: Option 1: Water jacket test Annex 3A – Appendix A (a) The cylinder shall be hydrostatically tested to at least 1.5 times working pressure. In no case may the test pressure exceed the auto-frettage pressure; (b) Pressure shall be maintained for a sufficiently long period (at least 30 seconds) to ensure complete expansion. Any internal pressure applied after auto-frettage and previous to the hydrostatic test shall not exceed 90 per cent of the hydrostatic test pressure. If the test pressure cannot be maintained due to failure of the test apparatus, it is permissible to repeat the test at a pressure increased by 700 kPa. Not more than 2 such repeat rests are permitted; (c) The manufacturer shall define the appropriate limit of permanent volumetric expansion for the test pressure used, but in no case shall the permanent expansion exceed 5 per cent of the total volumetric expansion measured under the test pressure. For type CNG-4 designs, the elastic expansion shall be established by the manufacturer. Any cylinders not meeting the defined rejection limit shall be rejected and either destroyed or used for batch test purposes. Option 2: Proof pressure test The hydrostatic pressure in the cylinder shall be increased gradually and regularly until the test pressure, at least 1.5 times the working pressure, is reached. The cylinder test pressure shall be held for a sufficiently long period (at least 30 seconds) to ascertain that there is no tendency for the pressure to decrease and that tightness is guaranteed. A.12. Hydrostatic pressure burst test (a) The rate of pressurisation shall not exceed 1.4 MPa per second (200 psi/second) at pressures in excess of 80 per cent of the design burst pressure. If the rate of pressurisation at pressures in excess of 80 per cent of the design burst pressure exceeds 350 kPa/second (50 psi/second), then either the cylinder shall be placed schematically between the pressure source and the pressure measurement device, or there shall be a 5 second hold at the minimum design burst pressure; (b) The minimum required (calculated) burst pressure shall be at least 45 MPa, and in no case less than the value necessary to meet the stress ratio requirements. Actual burst pressure shall be recorded. Rupture may occur in either the cylindrical region or the dome region of the cylinder. A.13. Ambient temperature pressure cycling Pressure cycling shall be performed in accordance with the following procedure: (a) Fill the cylinder to be tested with a non-corrosive fluid such as oil, inhibited water or glycol; (b) Cycle the pressure in the cylinder between not more than 2 MPa and not less than 26 MPa at a rate not to exceed 10 cycles per minute. The number of cycles to failure shall be reported, along with the location and description of the failure initiation. A.14. Acid environment Environmental test Annex 3A – Appendix A On a finished A.14.1. Scope This test is applicable to type CNG-2, CNG-3 and CNG-4 designs only. A.14.2. Cylinder set-up and preparation The upper section of the cylinder the following test procedure should will be applied: (a) Exposing a 150 divided into 5 distinct areas and marked for preconditioning and fluid exposure (see Figure A.1). The areas will be nominally 100 mm diameter area in diameter. The areas shall not overlap on the cylinder surface surface. While convenient for 100 hours testing, the areas need not be oriented along a single line, but shall not overlap the immersed section of the cylinder. Although preconditioning and fluid exposure is performed on the cylindrical section of the cylinder, all of the cylinder, including the domed sections, should be as resistant to the exposure environments as are the exposed areas. Figure A.1 Cylinder orientation and layout of exposure areas A.14.3. Pendulum impact preconditioning The impact body shall be of steel and have the shape of a pyramid with equilateral triangle faces and a square base, the summit and the edges being rounded to a 30 per cent sulfuric acid solution (battery acid radius of 3 mm. The centre of percussion of the pendulum shall coincide with a specific the centre of gravity of 1.219) while the pyramid; its distance from the axis of rotation of the pendulum shall be 1 m. The total mass of the pendulum referred to its centre of percussion shall be 15 kg. The energy of the pendulum at the moment of impact shall be not less than 30 Nm and as close to that value as possible. During pendulum impact, the cylinder is shall be held at 26 MPa; (b) in position by the end bosses or by the intended mounting brackets. The cylinder shall then be burst un- pressurized during preconditioning. A.14.4. Environmental fluids for exposure Each marked area is to be exposed to one of five solutions for 30 minutes. The same environment shall be used for each location throughout the test. The solutions are: Sulphuric acid: 19 per cent solution by volume in water; Sodium hydroxide: 25 per cent solution by weight in water; 5% Methanol/95% gasoline: gasoline concentration of M5 fuel meeting the requirements of ASTM D4814; Ammonium nitrate: 28 per cent by weight in water; Windshield washer fluid 50 per cent by volume solution of methyl alcohol and water. When exposed, the test sample will be oriented with the exposure area uppermost. A pad of glass wool (approximately 0.5 mm thick and between 90 and 100 mm in diameter) shall be placed on the exposure area. Apply an amount of the test fluid to the glass wool sufficient to ensure that the pad is wetted evenly across its surface and through its thickness for the duration of the test, and that the concentration of the fluid is not changed significantly during the duration of the test. A.14.5. Pressure cycle and hold The cylinder shall be hydraulically pressure cycled between not more than 2 MPa and not less than 26 MPa for a total of 3,000 cycles. The maximum pressurization rate shall be 2.75 MPa per second. After pressure cycling, the cylinder shall be pressurized to 26 MPa and held at that pressure a minimum of 24 hours and until the elapsed exposure time (pressure cycling and pressure hold) to the environmental fluids equals 48 hours. A.14.6. Acceptable results The cylinder shall be hydraulically tested to destruction in accordance with the procedure defined in paragraph A.12. above and provide a The burst pressure that exceeds of the cylinder shall be not less than 85 per cent of the minimum design burst pressure. pressure." A.15. Bonfire test A.15.1. General The bonfire tests are designed to demonstrate that finished cylinders complete with the fire protection system (cylinder valve, pressure relief devices and/or integral thermal insulation) specified in the design will not burst when tested under the specified fire conditions. Extreme caution shall be exercised during fire testing in the event that cylinder rupture occurs; A.15.2. Cylinder set-up Cylinders shall be placed horizontally with the cylinder bottom approximately 100 mm above the fire source; Metallic shielding shall be used to prevent direct flame impingement on cylinder valves, fittings, and/or pressure relief devices. The metallic shielding shall not be in direct contact with the specified fire protection system (pressure relief devices or cylinder valve). Any failure during the test of a valve, fitting or tubing that is not part of the intended protection system for the design shall invalidate the result. A.15.3. Fire source A uniform fire source of 1.65 m length shall provide direct flame impingement on the cylinder surface across its entire diameter. Any fuel may be used for the fire source provided it supplies uniform heat sufficient to maintain the specified test temperatures until the cylinder is vented. The selection of fuel should take into consideration air pollution concerns. The arrangement of the fire shall be recorded in sufficient detail to ensure the rate of heat input to the cylinder is reproducible. Any failure or inconsistency of the fire source during a test invalidates the result. A.15.4. Temperature and pressure measurements Surface temperatures shall be monitored by at least three thermocouples located along the bottom of the cylinder and spaced not more than 0.75 m apart. Metallic shielding shall be used to prevent direct flame impingement on the thermocouples. Alternatively, thermocouples may be inserted into blocks of metal measuring less than 25 square mm. The pressure inside the cylinder shall be measured by a pressure sensor without modify the configuration of the system under test. Thermocouple temperatures and the cylinder pressure shall be recorded at intervals of every 30 seconds or less during the test. A.15.5. General test requirements Cylinders shall be pressurized with natural gas and tested in the horizontal position at both: Annex 3A – Appendix A (a) Working pressure; (b) 25 per cent of the working pressure. Immediately following ignition, the fire shall produce flame impingement on the surface of the cylinder along the 1.65 m length of the fire source and across the cylinder diameter. Within 5 minutes of ignition, at least one thermocouple shall indicate a temperature of at least 590 °C. This minimum temperature shall be maintained for the remaining duration of the test. A.15.6. Cylinders 1.65 m length or less The centre of the cylinder shall be positioned over the centre of the fire source; A.15.7. Cylinders greater than 1.65 m length If the cylinder is fitted with a pressure relief device at one end, the fire source shall commence at the opposite end of the cylinder. If the cylinder is fitted with pressure relief devices at both ends, or at more than one location along the length of the cylinder, the centre of the fire source shall be centred midway between the pressure relief devices that are separated by the greatest horizontal distance. If the cylinder is additionally protected using thermal insulation, then two fire tests at service pressure shall be performed, one with the fire centred midway along the cylinder length, and the other with the fire commencing at one of the cylinder ends. A.15.8. Acceptable results The cylinder shall vent through a pressure relief device. A.16. Penetration tests A cylinder pressurised to 20 MPa ± 1 MPa with compressed gas shall be penetrated by an armour piercing bullet with a diameter of 7.62 mm or greater. The bullet shall completely penetrate at least one side wall of the cylinder. For type CNG-1 designs, the projectile shall impact the side wall at 90°. For type CNG-2, CNG-3 and CNG-4 designs, the projectile shall impact the side wall at an approximate angle of 45°. The cylinder shall reveal no evidence of fragmentation failure. Loss of small pieces of material, each not weighing more than 45 grams, shall not constitute failure of the test. The approximate size of entrance and exit openings and their locations shall be recorded. A.17. Composite flaw tolerance tests For type CNG-2, CNG-3 and CNG-4 designs only, one finished cylinder, complete with protective coating, a flaw tolerance test shall have be performed on the cylindrical wall as well as on the minimum composite wall thickness of the weakest part(s) of the container as identified by an appropriate stress analysis as determined in Annex 3A, Appendix F, paragraph F.1. or full scale tests on finished cylinders. The flaws shall be cut in the longitudinal direction cut into the composite. The flaws shall be greater than the visual inspection limits as specified by the manufacturer. The flawed cylinder shall then be pressure cycled from not more than 2 MPa to not less than 26 MPa for 3,000 cycles, followed by an additional 12,000 cycles at ambient temperature; The cylinder shall not leak or rupture within the first 3,000 cycles, but may fail by leakage during the last 12,000 cycles. All cylinders which complete this test shall be destroyed. A.18. High temperature creep test This test is required for all type CNG-4 designs, and all type CNG-2 and CNG-3 CNG- 3 designs in which the glass transition temperature of the resin matrix Annex 3A – Appendix A does not exceed the maximum design material temperature given in paragraph 4.4.2. of Annex 3A by at least 20 °C. One finished cylinder shall be tested as follows: (a) The cylinder shall be pressurised to 26 MPa and held at a temperature of 100 °C for not less than 200 hours; (b) Following the test, the cylinder shall meet the requirements of the hydrostatic expansion test A.11., the leak test A.10., and the burst test A.12. above. A.19. Accelerated stress rupture test For type CNG-2, CNG-3, and CNG-4 designs only, one cylinder free of protective coating shall be hydrostatically pressurised to 26 MPa while immersed in water at 65 °C. The cylinder shall be held at this pressure and temperature for 1,000 hours. The cylinder shall then be pressured to burst in accordance with the procedure defined in paragraph A.12. above except that the burst pressure shall exceed 85 per cent of the minimum design burst pressure. A.20. Impact damage test One or more finished cylinders shall be drop tested at ambient temperature without internal pressurisation or attached valves. The surface onto which the cylinders are dropped shall be a smooth, horizontal concrete pad or flooring. One cylinder shall be dropped in a horizontal position with the bottom 1.8 m above the surface onto which it is dropped. One cylinder shall be dropped vertically on each end at a sufficient height above the floor or pad so that the potential energy is 488 J, but in no case shall the height of the lower end be greater than 1.8 m. One cylinder shall be dropped at a 45° angle onto a dome from a height such that the centre of gravity is at 1.8 m; however, if the lower end is closer to the ground than 0.6 m, the drop angle shall be changed to maintain a minimum height of 0.6 m and a centre of gravity of 1.8 m. Following the drop impact, the cylinders shall be pressure cycled from not more than 2 MPa to not less than 26 MPa for 1,000 cycles times the specified service life in years. The cylinders may leak but not rupture, during the cycling. Any cylinders completing the cycling test shall be destroyed. A.21. Permeation test This test is only required on type CNG-4 designs. One finished cylinder shall be filled with compressed natural gas or a 90 per cent nitrogen/10 per cent helium mixture to working pressure, placed in an enclosed sealed chamber at ambient temperature, and monitored for leakage for a time sufficient to establish a steady state permeation rate. The permeation rate shall be less than 0.25 ml of natural gas or helium per hour per litre water capacity of the cylinder. A.22. Tensile properties of plastics The tensile yield strength and ultimate elongation of plastic liner material shall be determined at -50 °C using ISO 3628, 527-2, and meet the requirements of paragraph 6.3.6. of Annex 3A. A.23. Melting Softening temperature of plastics Annex 3A – Appendix A Polymeric materials from finished liners shall be tested in accordance with the method described in ISO 306, and meet the requirements of paragraph 6.3.6. of Annex 3A. 306. The softening temperature shall be at least 100 °C . A.24. Pressure relief device requirements Pressure relief device specified by the manufacturer shall be shown to be compatible with the service conditions listed in paragraph 4. of Annex 3A and through the following qualification tests: (a) One specimen shall be held at a controlled temperature of not less than 95 °C and a pressure not less than test pressure (30 MPa) for 24 hours. At the end of this test there shall be no leakage or visible sign of extrusion of any fusible metal used in the design. (b) One specimen shall be fatigue tested at a pressure cycling rate not to exceed 4 cycles per minute as follows: (i) Held at 82 °C while pressured for 10,000 cycles between 2 MPa and 26 MPa; (ii) Held at -40 °C while pressure for 10,000 cycles between 2 MPa and 20 MPa. At the end of this test there shall be no leakage, or any visible sign of extrusion of any fusible metal used in the design. (c) Exposed brass pressure retaining components of pressure relief devices shall withstand, without stress corrosion cracking, a mercurous nitrate test as described in ASTM B154. The pressure relief device shall be immersed for 30 minutes in an aqueous mercurous nitrate solution containing 10 g of mercurous nitrate and 10 ml of nitric acid per litre of solution. Following the immersion, the pressure relief device shall be leak tested by applying an aerostatic pressure of 26 MPa for one minute during which time the component shall be checked for external leakage; Any leakage shall not exceed 200 cm3/h; (d) Exposed stainless steel pressure retaining components of pressure relief devices shall be made of an alloy type resistant to chloride induced stress corrosion cracking. A.25. Boss torque test The body of the cylinder shall be restrained against rotation and a torque of 500 Nm shall be applied to each end boss of the cylinder, first in the direction to tighten a threaded connection, then in the untightening direction, and finally again in the tightening direction. A.26. Resin shear strength Resin materials shall be tested on a sample coupon representative of the composite over-wrap in accordance with ASTM D2344, or an equivalent national standard. Following a 24-hour water boil the composite shall have a minimum shear strength of 13.8 MPa. A.27. Natural gas cycling test One finished cylinder shall be pressure cycled using compressed natural gas from less than 2 MPa to working pressure for 300 cycles. Each cycle, consisting of the filling and venting of the cylinder, shall not exceed 1 hour. The cylinder shall be leak tested in accordance with paragraph A.10. above Annex 3A – Appendix A and meet the requirements therein. Following the completion of the natural gas cycling the cylinder shall be sectioned and the liner/end boss interface inspected for evidence of any deterioration, such as fatigue cracking or electrostatic discharge. Note - Special consideration shall be given to safety when conducting this test. Prior to conducting this test, cylinders of this design shall have successfully passed the test requirements of paragraph A.12. above (hydrostatic pressure burst test), paragraph 8.6.3. of Annex 3A (ambient temperature pressure cycling test) and paragraph A.21. above (permeation test). Prior to conducting this test, the specific cylinders to be tested shall pass the test requirements of paragraph A.10. above (leak test). Annex 3A – Appendix B Annex 3A - Appendix B (Not allocated) Annex 3A – Appendix C Annex 3A - Appendix C (Not allocated) Annex 3A – Appendix D Annex 3A - Appendix D Report forms Note - This appendix is not a mandatory part of this annex. The following forms should be used: (1) Report of Manufacture and Certificate of Conformity - Required to be clear, legible and in the format of Form 1. (2) Report1 of Chemical Analysis of Material for Metallic Cylinders, Liners, or Bosses - Required essential elements, identification, etc. (3) Report1 of Mechanical Properties of Material for Metallic Cylinders and Liners - Required to report all tests required by this Regulation. (4) Report1 of Physical and Mechanical Properties of Materials for Non-Metallic Liners - Required to report all tests and information required in this Regulation. (5) Report1 of Composite Analysis - Required to report all tests and data required in this Regulation. (6) Report of Hydrostatic Tests, Periodic Pressure Cycling and Burst Tests - Required to report test and data required in this Regulation. Form 1: Report of Manufacturer and Certificate of Conformity Manufactured by: Located at: Regulatory Registration Number: Manufacturers Mark and Number: Serial Number: from ……… to ……… inclusive ……… Cylinder description: SIZE: Outside diameter: ………mm; Length: ………mm; Marks stamped on shoulder or on labels of the cylinder are: 1 Report Forms 2 through 6 shall be developed by the manufacturer and shall fully identify cylinders and requirements. Each report shall be signed by the Type Approval Authority and the manufacturer. Annex 3A – Appendix D Each cylinder was made in compliance with all requirements of UN Required reports Regulation of test results are attached. I hereby certify that all these test results proved satisfactory in every way and are in compliance with the requirements for the type listed above. Annex 3A – Appendix E Annex 3A - Appendix E Verification of stress ratios using strain gauges
4.added
Method 1 (applies to cylinders that do not use high tension winding) (a) Prior to auto-frettage, apply strain gauges and calibrate; (b) Measure strains at auto-frettage, zero after auto-frettage, working, and minimum burst pressure have been met; (c) Confirm that the strain at burst pressure divided by strain at working pressure meets the stress ratio requirements. For hybrid construction, the strain at working pressure is compared with the rupture strain of cylinders reinforced with a single fibre type.
5.changed
Method 2 (applies to all cylinders) (a) At zero pressure after winding and auto-frettage, apply strain gauges and calibrate; (b) Measure strains at zero, working, and minimum burst pressure; (c) At zero pressure, after strain measurements have been taken at the working and minimum burst pressures, and with strain gauges monitored, cut the cylinder section apart so that the region containing the strain gauge is approximately five inches long. Remove the liner without damaging the composite. Measure the strains after the liner is removed. (d) Adjust the strain readings at zero, working, and minimum burst pressures by the amount of strain measured at zero pressure with and without the liner. (e) Confirm that the strain at burst pressure divided by strain at working pressure meets the stress ratio requirements. For hybrid construction, the strain at working pressure is compared with the rupture strain of cylinders reinforced with a single fibre type. Annex 3A – Appendix F Annex 3A - Appendix F Fracture performance methods F.1. Determination of fatigue sensitive sites The location and orientation of fatigue failure in cylinders shall be determined by appropriate stress analysis or by full scale fatigue tests on finished cylinders as required under the design qualification tests for each type of design. If finite element stress analysis is used, the fatigue sensitive site shall be identified based on the location and orientation of the highest tensile principal stress concentration in the cylinder wall or liner at the working pressure. F.2. Leak-Before-Break (LBB) F.2.1. Engineering critical assessment. This analysis may be carried out to establish that the finished cylinder will leak in the event of a defect in the cylinder or liner growing into a through-wall crack. A leak-before-break assessment shall be performed at the cylinder side wall. If the fatigue sensitive location is outside the side wall, a leak-before-break assessment shall also be performed at that location using a Level II approach as outlined in BS PD6493. The assessment shall include the following steps: (a) Measure the maximum length (i.e. major axis) of the resultant through-wall through- wall surface crack (usually elliptical in shape) from the three cylinder cycle tested under the design qualification tests (according to paragraphs A.13. and A.14. of Appendix A to this annex) for each type of design. Use the longest crack length of the three cylinders in the analysis. Model a semi-elliptical through-wall crack with a major axis equal to twice the measured longest major axis and with a minor axis equal to 0.9 of wall thickness. The semi-elliptical crack shall be modelled at the locations specified in paragraph F.1. above. The crack shall be oriented such that the highest tensile principal stress shall drive the crack; (b) Stress levels in the wall/liner at 26 MPa obtained from the stress analysis as outlined in paragraph 6.6. of Annex 3A shall be used for the assessment. Appropriate crack driving forces shall be calculated using either Section 9.2 or 9.3. of BS PD6493; (c) Fracture toughness of the finished cylinder or the liner from a finished cylinder, as determined at room temperature for aluminium and at - 40 °C for steel, shall be established using a standardized testing technique (either ISO/DIS 12737 or ASTM 813-89 or BS 7448) in accordance with Sections 8.4 and 8.5 of BS PD6493; (d) Plastic collapse ratio shall be calculated in accordance with Section 9.4. of BS PD6493-91; (e) The modelled flaw shall be acceptable in accordance with Section 11.2. of BS PD6493-91. Annex 3A – Appendix F F.2.2. LBB by flawed cylinder burst A fracture test shall be performed by the cylinder side wall. If the fatigue sensitive locations as determined in paragraph F.1. above is outside the side wall, the fracture test shall also be performed at that location. The test procedure is as follows: (a) Determination of leak-before-break flaw length The length of the LBB flaw at the fatigue sensitive site shall be twice the length of the maximum length measured of the resultant through-wall surface crack from the three cylinders cycle tested to failure under the design qualification tests for each type of design; (b) Cylinder flaws For type CNG-1 designs having fatigue sensitive site in the cylindrical part in the axial direction, external flaws shall be machined longitudinally, approximately at mid-length of the cylindrical part of the cylinder. The flaws shall be located at minimum wall thickness of the midsection based on thickness measurements at four points around the cylinder. For type CNG-1 designs having fatigue sensitive site outside the cylindrical part, the LBB flaw shall be introduced at the internal surface of the cylinder along the fatigue sensitive orientation. For type CNG-2 and CNG-3 designs the LBB flaw shall be introduced in the metal liner; For flaws to be tested by monotonic pressure, the flaw cutter shall be approximately 12.5 mm thick with an angle of 45 °C and a tip radius of 0.25 mm maximum. The cutter diameter shall be 50 mm for cylinder with outside diameter less than 140 mm, and 65 to 80 mm for cylinders with outside diameter greater than 140 mm (a standard CVN cutter is recommended). Note - The cutter should be sharpened regularly to assure tip radius meets specification. The depth of the flaw may be adjusted to obtain a leak by monotonic hydro-pressurization. The crack shall not propagate by more than 10 per cent outside of the machined flaw measured on the external surface; (c) Test procedure The test shall be performed by monotonic pressurisation or cyclic pressurisation as described below: (i) Monotonic pressurisation to burst The cylinder shall be pressurised hydrostatically until pressure is released from the cylinder at the flaw location. The pressurisation shall be performed as described in paragraph A.12. (Appendix A to this annex); (ii) Cyclic pressure The test procedure shall be in accordance with the requirements of paragraph A.13. of Appendix A to this annex. Annex 3A – Appendix F (d) Acceptance criteria for the flawed cylinder test The cylinder passes the tests if the following conditions are met: (i) For monotonic pressurisation burst test, the failed pressure shall be equal or greater than 26 MPa. For monotonic pressurised burst test, a total crack length measured on the external surface of 1.1 times the original machined length is allowed. (ii) For cycle tested cylinders, fatigue crack growth beyond the original machined flaw length is allowed. However, the failure mode shall be a "leak". Propagation of the flaw by fatigue should occur over at least 90 per cent of the length of the original machined flaw. Note - If these requirements are not fulfilled (failure occurs below 26 MPa, even and if the failure is a leak), a new test can be performed with a less deep flaw. Also, if rupture type failure occurs at a pressure greater than 26 MPa and flaw depth is shallow, a new test can be performed with a deeper flaw. F.3. Defect size for non-destructive examination (NDE) F.3.1. NDE Defect size by engineering critical assessment Calculations shall be performed in accordance with British Standard (BS) PD 6493, Section 3., using the following steps: (a) Fatigue cracks shall be modelled at the high stress location in the wall/liner as planar flaws; (b) The applied stress range at the fatigue sensitive site, due to a pressure between 2 MPa and 20 MPa, shall be established from the stress analysis as outlined in paragraph F.1. of this appendix; (c) The bending and membrane stress component may be used separately; (d) The minimum number of pressure cycles is 15,000; (e) The fatigue crack propagation data shall be determined in air in accordance with ASTM E647. The crack plane orientation shall be in the C-L direction (i.e., crack plane perpendicular to the circumferences and along the axis of the cylinder), as illustrated in ASTM E399. The rate shall be determined as an average of 3 specimen tests. Where specific fatigue crack propagation data are available for the material and service condition, they may be used in the assessment. (f) The amount of crack growth in the thickness direction and in the length direction per pressures cycle shall be determined in accordance with the steps outlined in Section 14.2. of the BS PD 6493-91 standard by integrating the relationship between the rate of fatigue crack propagation, as established in e) above, and the range of crack driving force corresponding to the applied pressure cycle; (g) Using the above steps, calculate the maximum allowable defect depth and length which shall not cause the failure of the cylinder during the design life due to either fatigue or rupture. The defect size for NDE shall be equal to or less than the calculated maximum allowable defect size for the design. Annex 3A – Appendix F F.3.2. NDE Defect size by flawed cylinder cycling For type CNG-1, CNG-2 and CNG-3 designs, three cylinders containing artificial defects that exceed the defect length and depth detection capability of the NDE inspection method required in paragraph 6.15. of Annex 3A, shall be pressure cycled to failure in accordance with the test method in paragraph A.13. (Appendix A to this annex). For type CNG-1 designs having a fatigue sensitive site in the cylindrical part, external flaws shall be introduced on the side wall. For type CNG-1 designs having the fatigue sensitive site outside the side wall, and for type CNG-2 and CNG-3 designs, internal flaws shall be introduced. Internal flaws may be machined prior to the heat treating and closing of the end of the cylinder. The cylinders shall not leak or rupture in less than 15,000 cycles. The allowable defect size for NDE shall be equal to or less than the artificial flaw size at that location. Annex 3A – Appendix G Annex 3A - Appendix G Instructions by the container manufacturer on handling, use and inspection of cylinders G.1. General The primary function of this appendix is to provide guidance to the cylinder purchaser, distributor, installer and user for the safe use of the cylinder over its intended service life. G.2. Distribution The manufacturer shall advise the purchaser that the instructions shall be supplied to all parties involved in the distribution, handling, installation and use of the cylinders; The document may be reproduced to provide sufficient copies for this purpose, however it shall be marked to provide reference to the cylinders being delivered; G.3. Reference to existing codes, standards and regulations Specific instructions may be stated by reference to national or recognized codes, standards and regulations. G.4. Cylinder handling Handling procedures shall be provided to ensure that the cylinders will not suffer unacceptable damage or contamination during handling. G.5. Installation Installation instructions shall be provided to ensure that the cylinders will not suffer unacceptable damage during installation and during normal operation over the intended service life. Where the mounting is specified by the manufacturer, the instructions shall contain where relevant, details such as mounting design, the use of resilient gasket materials, the correct tightening torques and avoidance of direct exposure of the cylinder to an environment of chemical and mechanical contacts. Where the mounting is not specified by the manufacturer, the manufacturer shall draw the purchaser's attention to possible long term impacts of the vehicle mounting system, for example: vehicle body movements and cylinder expansion/contraction in the pressure and temperature conditions of service. Where applicable, the purchaser's attention shall be drawn to the need to provide installations such that liquids or solids cannot be collected to cause cylinder material damage; The correct pressure relieve device to be fitted shall be specified. G.6. Use of cylinders The manufacturer shall draw the purchaser's attention to the intended service conditions specified by this Regulation, in particular the cylinder's allowable number of pressure cycles, its life in years, the gas quality limits and the allowable maximum pressures. Annex 3A – Appendix G G.7. In-service inspection The manufacturer shall clearly specify the user's obligation to observe the required cylinder inspection requirements (e.g. reinspection interval, by authorized personnel). This information shall be in agreement with the design approval requirements. Annex 3A – Appendix H Annex 3A 3B Liquid tanks - Appendix H Environmental test H.1. Scope The environmental test is intended to demonstrate that NGV cylinders can withstand exposure to Vacuum insulated vessels for the on-board storage of natural gas as a fuel for automotive underbody environment and occasional exposure to other fluids. This test was developed by the United States of America (USA) automotive industry in response to cylinder failures initiated by stress corrosion cracking of the composite wrap. H.2. Summary of test method A cylinder is first preconditioned by a combination of pendulum and gravel impacts to simulate potential underbody conditions. The cylinder is then subjected to a sequence of immersion in simulated road salt/acid rain, exposure to other fluids, pressure cycles and high and low temperature exposures. At the conclusion of the test sequence the cylinder will be hydraulically pressured to destruction. The remaining residual burst strength of the cylinder shall be not less than 85 per cent of the minimum design burst strength. H.3. Cylinder set-up and preparation The cylinder shall be tested in a condition representative of installed geometry including coating (if applicable), brackets and gaskets, and pressure fittings using the same sealing configuration (i.e. O-rings) as that used in service. Brackets may be painted or coated prior to installation in the immersion test if they are painted or coated prior to vehicle installation. Cylinders will be tested horizontally and nominally divided along their horizontal centreline into "upper" and "lower" sections. The lower section of the cylinder will be alternatively immersed in road salt/acid rain environment and in heated or cooled air. The upper section will be divided into 5 distinct areas and marked for preconditioning and fluid exposure. The areas will be nominally 100 mm in diameter. The areas shall not overlap on the cylinder surface. While convenient for testing, the areas need not be oriented along a single line, but shall not overlap the immersed section of the cylinder. Although preconditioning and fluid exposure is performed on the cylindrical section of the cylinder, all of the cylinder, including the domed sections, should be as resistant to the exposure environments as are the exposed areas. Annex 3A – Appendix H Figure H.1 Cylinder orientation and layout of exposure areas Other fluid Exposure areas Immersion area (Lower third) H.4. Preconditioning apparatus The following apparatus are needed for preconditioning the test cylinder by pendulum and gravel impact. (a) Pendulum impact The impact body shall be of steel and have the shape of a pyramid with equilateral triangle faces and a square base, the summit and the edges being rounded to a radius of 3 mm. The centre of percussion of the pendulum shall coincide with the centre of gravity of the pyramid; its distance from the axis of rotation of the pendulum shall be 1 m. The total mass of the pendulum referred to its centre of percussion shall be 15 kg. The energy of the pendulum at the moment of impact shall be not less than 30 Nm and as close to that value as possible. During pendulum impact, the cylinder shall be held in position by the end bosses or by the intended mounting brackets. (b) Gravel impact Machine constructed according to the design specifications shown in Figure H.2. This procedure for operation of the equipment shall follow that described in ASTM D3170, Standard Test Method for Chip Resistance of Coatings with the exception that the cylinder may be at ambient temperature during gravel impact; (c) Gravel Alluvial road gravel passing through a 16 mm space screen but retained on a 9.5 mm space screen. Each application is to consist of 550 ml of graded gravel (approximately 250 to 300 stones). Annex 3A – Appendix H Figure H.2 Gravel impact test H.5. Exposure environments (a) Immersion environment At the specified stage in the test sequence (Table 1) the cylinder will be oriented horizontally with the lower third of the cylinder diameter immersed in a simulated acid rain/road salt water solution. The solution will consist of the following compounds: Deionized water; Sodium chloride: 2.5 per cent by weight ± 0.1 per cent; Calcium chloride: 2.5 per cent by weight ± 0.1 per cent; Sulphuric acid: Sufficient to achieve a solution pH of 4.0 ± 0.2; Solution level and pH are to be adjusted prior to each test step which uses this liquid. The temperature of the bath shall be 21 ± 5 °C. During immersion, the unsubmerged section of the cylinder shall be in ambient air. (b) Other fluid exposure At the appropriate stage in test sequence (Table 1) each marked area is to be exposed to one of five solutions for 30 minutes. The same environment shall be used for each location throughout the test. The solutions are: Sulphuric acid: 19 per cent solution by volume in water; Annex 3A – Appendix H Sodium hydroxide: 25 per cent solution by weight in water; Methanol/gasoline: 30/70 per cent concentrations; Ammonium nitrate: 28 per cent by weight in water; Windshield washer fluid When exposed, the test sample will be oriented with the exposure area uppermost. A pad of glass wool one layer thick (approximately 0.5 mm) and trimmed to the appropriate dimensions is to be placed on the exposure area. Using a pipet, apply 5 ml of the test fluid to the exposure area. Remove the gauze pad after pressurization of the cylinder for 30 minutes. H.6. Test conditions (a) Pressure cycle As defined in the test sequence, cylinder shall be hydraulically pressure cycled between not less than 2 MPa and not more than 26 MPa. The total cycle shall be not less than 66 seconds and will include a 60 second minimum hold at 26 MPa. The nominal cycle process will be: Ramp up from ≤ 20 MPa to ≥ 26 MPa; Hold at ≥ 26 MPa for 60 seconds minimum; Ramp down from ≥ 26 MPa to ≤ 2 MPa; Total minimum cycle time to be 66 seconds. (b) Pressure during other fluid exposure Following application of the other fluids, the cylinder shall be pressured to not less than 26 MPa for a minimum of 30 minutes; (c) High and low temperature exposure As defined in the test sequence, the entire cylinder shall be exposed to high or low temperature air in contact with external surface. The low temperature air shall be -40 °C or lower and the high temperature air shall be 82 °C ± 5 °C. For the low temperature exposure, the fluid temperature of type CNG-1 cylinders shall be monitored using a thermocouple installed within the cylinder to ensure it remains at -40 °C or lower. H.7. Test procedure (a) Preconditioning of the cylinder Each of the five areas marked for other fluid exposure on the upper section of the cylinder shall be preconditioned by a single impact of the pendulum body summit at their geometric centre. Following impact, the five areas shall be further conditioned by a gravel impact application. The central section of the bottom portion of the cylinder that will be submerged shall be preconditioned by an impact of the pendulum body summit at three locations spaced approximately 150 mm apart. Annex 3A – Appendix H Following impact, the same central section that was impacted shall be further conditioned by a gravel impact application. The cylinder shall be unpressured during preconditioning. (b) Test sequence and cycles The sequence of the environment exposure, pressure cycles, and temperature to be used are defined in Table 1. The cylinder surface is not to be washed or wiped between stages. H.8. Acceptable results Following the above test sequence, the cylinder shall be hydraulically tested to destruction in accordance with the procedure in paragraph A.12. of Appendix A to this annex. The burst pressure of the cylinder shall be not less than 85 per cent of the minimum design burst pressure. vehicles
4.10.deleted
For the approval of each tank type the material, design, manufacture and examination shall be proved to be adequate for their intended service by meeting the appropriate requirements of the material qualification tests summarized in Table 6.1 of this annex and the tank qualification tests summarized in Table 6.2 of this annex, with all tests in accordance with the relevant methods of test as described in Appendix A to this annex. The test tank shall be selected and the tests witnessed by the competent Authority. If more tanks are subjected to the tests than are required by this annex, all results shall be documented.
2.1.3.1.added
Periodic technical inspection means the inspection of vehicles performed at specified intervals according to national regulations. Guidelines for the visual inspection of each tank during its service life shall be provided by the tank manufacturer on the basis of use under service conditions specified herein. Each tank shall be visually inspected at least every 120 months after the date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration. The visual inspection shall be performed in accordance with the manufacturer's specifications: Tanks without a label containing mandatory information or with labels containing mandatory information that are illegible in any way shall be removed from service. If the tank can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the tank to remain in service.
2.1.3.2.changed
ISO 1307. Annex 4B Periodic requalification means an inspection or testing of tanks at specified intervals according to national regulations whereby tanks are re-qualified for a further period of service. For those countries that require a periodic requalification, the procedure shall be performed in accordance with the relevant regulations of the country(ies) where the tanks are used and also in consideration of the manufacturer’s specifications. Periodic requalification shall be done at least every 120 months after the date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration. The requalification shall be performed in accordance with the manufacturer's specifications: Tanks without a label containing mandatory information or with labels containing mandatory information that are illegible in any way shall be removed from service. If the tank can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the tank to remain in service..
2.6.changed
In the case of LNG tanks are located in enclosed spaces for extended periods of time (e.g. for service), leakage and venting of natural gas (or other flammable substances) from the tank shall be dealt with properly to avoid the dangers due to releasing flammable substances in enclosed spaces. Annex 3B
3.3.1.changed
Drawings shall show the following as a minimum: (a) Title, reference number, date of issue, and revision numbers with dates of issue if applicable; (b) Reference to this Regulation and the tank type; (c) All pressure vessel dimensions complete with tolerances, including details of end closure shapes with minimum thicknesses and of openings; (d) Mass, complete with tolerances, of tanks; (e) Material specifications complete with minimum mechanical and chemical properties or tolerance ranges; (f) Other data such as minimum test pressure. Annex 3B
3.3.7.changed
Descriptions of fabrication processes and production tests shall be provided. The following shall be in accordance with EN 1251-2 (2000): (a) Quality system; (b) Cutting; (c) Cold forming; (d) Hot forming; (e) Manufacturing tolerances; (f) Welding; (g) Non-welded joints. Annex 3B
3.3.8.changed
A summary of the documents providing the information required in paragraph 5.1. shall be listed on a specification sheet for each tank design. The title, reference number, revision numbers and dates of original issue and version issues of each document shall be given. All documents shall be signed or initialled by the issuer. The specification sheet shall be given a number, and revision numbers if applicable, that can be used to designate the tank design and shall carry the signature of the engineer responsible for the design. Space shall be provided on the specification sheet for a stamp indicating registration of the design.
5.1.changed
The materials constituting the excess flow valve which are in contact with the CNG when operating, shall be compatible with the test CNG. In order to verify this compatibility, the procedure described in Annex 5D listed on a specification sheet for each tank design. The title, reference number, revision numbers and dates of original issue and version issues of each document shall be used. given. All documents shall be signed or initialled by the issuer. The specification sheet shall be given a number, and revision numbers if applicable, that can be used to designate the tank design and shall carry the signature of the engineer responsible for the design. Space shall be provided on the specification sheet for a stamp indicating registration of the design.
4.3.changed
Materials used shall be suitable for the service conditions specified in paragraph 2. The design shall not have incompatible materials in contact. The design qualification tests for materials are summarized in Table 6.1. The materials of the fuel tank and its accessories shall be compatible, as applicable, with: (a) LNG; (b) Other media and fluids found in a vehicle environment such as coolants, brake fluid and battery acid. Annex 3B Materials used at low temperatures shall meet the toughness requirements of ISO 21028-1 (2004). For non-metallic materials, low temperature suitability shall be validated by an experimental method, taking into account the service conditions. The materials used for the outer jacket shall ensure the integrity of the insulation system and shall be made of austenitic stainless steel and their elongation at fracture, at the temperature of liquid nitrogen, shall be at least 12 per cent. For the inner vessel, it shall be ensured that the materials will resist all the in service fatigue loads. A corrosion allowance does not need to be added for the inner vessel. A corrosion allowance does not need to be added on other surfaces, if they are protected against corrosion. For welded vessels, welds shall have properties equivalent to those specified for the parent material for all temperatures that the material may encounter.
4.5.changed
A stress analysis shall be performed to justify the minimum design wall thicknesses. A stress analysis shall be performed to justify the internal support element design when exposed to the accelerations described in paragraph 18.4.4. of this Regulation. The stress shall not exceed the minimum ultimate tensile strength of the material when calculated according Annex 3B with a linear stress model. The allowable stress in the internal support elements may not have to be calculated, if it can be demonstrated that the fuel tank supports the accelerations given in paragraph 18.4.4. without any structure damage to the inner tank or its supports.
18.4.4.added
of this Regulation. The stress shall not exceed the minimum ultimate tensile strength of the material when calculated according with a linear stress model. The allowable stress in the internal support elements may not have to be calculated, if it can be demonstrated that the fuel tank supports the accelerations given in paragraph 18.4.4. without any structure damage to the inner tank or its supports.
4.10.added
For the approval of each tank type the material, design, manufacture and examination shall be proved to be adequate for their intended service by meeting the appropriate requirements of the material qualification tests summarized in Table 6.1 of this annex and the tank qualification tests summarized in Table 6.2 of this annex, with all tests in accordance with the relevant methods of test as described in Appendix A to this annex. The test tank shall be selected and the tests witnessed by the competent Authority. If more tanks are subjected to the tests than are required by this annex, all results shall be documented.
4.11.changed
Descriptions of production examinations and tests shall be provided. The following shall be in accordance with EN 1251-2 2000: (a) Inspection stages; (b) Production control test plans; (c) Non-destructive testing; (d) Rectification; (e) Pressure testing. Annex 3B
4.13.changed
A design change is any change in the selection of structural materials or dimensional change not attributable to normal manufacturing tolerances. Minor design changes shall be permitted to be qualified through a reduced test programme. Changes of design specified in Table 6.4 shall require design qualification testing as specified. Material design qualification tests Inner vessel material Relevant paragraph of this annex Tensile test 4.3.2. Impact test 4.3.3. Bending test 4.3.4. Weld examination 4.3.5. Tank design qualification tests Test and annex reference Bonfire test Annex 3B, Appendix A. paragraph A.1 Drop test Annex 3B, Appendix A. paragraph A.2 Hold-time test Annex 3B, Appendix A. paragraph A.3 Critical production inspection requirements Quality inspection Production control test plates Non-destructive testing Pressure testing Annex 3B Change of design Type of test Design change A.1 Bonfire A.2 Drop A.3 Hold-time Diameter > 20 per cent X X X Length > 50 per cent X X X Working pressure > 20 per cent X X X Insulation material / method X X
5.1.changed
On each tank, the manufacturer shall provide clear permanent markings not less than 6 mm high. Marking shall be made either by labels attached by adhesive or plates attached by welds. Adhesive labels and their application shall be in accordance with ISO 7225, or an equivalent standard. Multiple labels or plates are allowed and should be located such that they are not obscured by mounting brackets. Each tank complying with this annex shall be marked as follows: (a) Mandatory information: (i) "LNG ONLY"; (ii) Manufacturer's identification; (iii) Tank identification (applicable part number and a serial number unique for every cylinder); (iv) Working pressure and temperature; (v) Regulation number, along with tank type and certification registration number; (vi) The materials constituting the LNG excess flow valve, which pressure relief devices and/or valves that are in contact qualified for use with the LNG when operating, tank or the means for obtaining information on qualified fire protection systems; (vii) When labels are used, all tanks shall have a unique identification number stamped on an exposed metal surface to permit tracing in the event that the label is destroyed. (b) Non-mandatory information: On a separate label(s) the following non-mandatory information may be provided: (i) Gas temperature range, e.g. -195 °C to 65 °C; (ii) Nominal water capacity of the tank to two significant numbers. e.g. 120 litres; (iii) Date of original pressure test (month and year). The markings shall be compatible with placed in the test LNG. In order listed sequence but the specific arrangement may be varied to verify this compatibility, match the procedure described in Annex 5D shall be used. space available. An acceptable example of mandatory information is: LNG ONLY Manufacturer/Part Number/Serial Number 1.6 MPa (16 bar)/-160 °C ECE R 110 LNG (registration No. …) "Use Only Manufacturer-Approved Pressure Relief Device"
6.changed
Prior to dispatch from the manufacturer's shop, every tank shall be internally clean. Tanks not immediately closed by the fitting of a valve, and safety devices if applicable, shall have plugs, which prevent entry of moisture and protect threads, fitted to all openings. The manufacturer's statement of service and all necessary information to ensure the proper handling, use and in-service inspection of the tanks shall be supplied to the purchaser. The statement shall be in accordance with Appendix D to this annex. Annex 3B – Appendix A Annex 3B - Appendix A Test methods A.1. Bonfire test A.1.1. General The bonfire tests are designed to demonstrate that finished tanks complete with the fire protection system (tank valve, pressure relief valves and/or integral thermal insulation) specified in the design will not burst when tested under the specified fire conditions. Extreme caution shall be exercised during fire testing in the event that tank rupture occurs. A.1.2. Tank set-up The inner tank shall be at the same temperature as the temperature of the LNG. This requirement shall be deemed met if, during the previous 24 hours, the fuel tank has contained a volume of liquid LNG at least equal to half of the volume of the inner tank. The fuel tank shall be filled with LNG so that the quantity of LNG measured by the mass measurement system shall be within 10 per cent of the maximum allowed net quantity that may be contained in the inner tank. A.1.3. Fire source The length and the width of the fire shall exceed the plan dimensions of the fuel tank by 0.1 m. ISO 11439 contains directions to produce a suitable fire test. The average temperature shall remain above 590 °C for the duration of the test. Any fuel may be used for the fire source provided it supplies uniform heat sufficient to maintain the specified test temperatures until the tank is vented. The selection of fuel should take into consideration air pollution concerns. The arrangement of the fire shall be recorded in sufficient detail to ensure the rate of heat input to the tank is reproducible. Any failure or inconsistency of the fire source during a test invalidates the result. A.1.4. Temperature and pressure measurements The average temperature of space 10 mm below the fuel tank as measured by two or more thermocouples shall be at least 590 °C. Thermocouple temperatures and the tank pressure shall be recorded at intervals of every 30 seconds or less during the test. A.1.5. General test requirements The pressure of the fuel tank at the beginning of the test shall be within 0.1 MPa of the saturation pressure of LNG in the inner tank. The lapse of time, from the moment that the average temperature first reaches 590 °C until the opening of the primary pressure relief valve, shall be measured. Once the pressure relief valve opens, the test shall continue until the blow off of the pressure relief valve is complete. Annex 3B – Appendix A A.1.6. Acceptable results The holding time of the fuel tank, which is the lapse of time before the opening of the pressure relief valve, shall not be less than 5 minutes under an external fire. The fuel tank shall not burst and the pressure inside the inner tank shall not exceed the permissible fault range of the inner tank. The secondary pressure valve shall limit the pressure inside the inner tank to the test pressure specified in paragraph 4.4. of Annex 3B. A.2. Drop test Each family of fuel tanks shall be drop tested to verify tank integrity. Drop tests shall include a 9 m drop test of the fuel tank on the most critical area of the tank (other than the piping end) and 3 m drop test on the piping end. Tank shall contain an equivalent full weight of liquid nitrogen saturated to one-half the working pressure. There shall be no loss of product for a period of one hour subsequent to the drop test other than relief valve operation and vapour between the filler neck and the secondary check valve in the case of a drop test involving the filler neck. Loss of vacuum, denting of the vessel, piping and piping protection, and damage to the support structure system are acceptable. The tank shall be subject to a vertical drop test so that it falls on rigid, flat, non-resilient, non- resilient, smooth, and horizontal surface on areas defined below. To do so, the tank is suspended at a minimum height defined above the ground at a point diametrically opposite the impact area, so that the centre of gravity is vertically above. Fuel pumps and other tank attachments shall also meet the drop test requirements for the tank and be attached as part of the tests. A.3. Hold-time test The tank shall be filled within 10 per cent of maximum allowed net quantity of LNG at manufacturer's specified highest point in the design filling temperature / pressure range. Hydrostatic pressure shall be recorded every minute for at least 120 hours at ambient temperature of 20 ºC ± 5 °C. Hydrostatic pressure shall be stable (within 10 kPa) or increasing throughout duration of test. The combined tank and contents weight shall be measured and verified to be stable (within 1 per cent) throughout duration of test; release of any fluid (bubble tight) during duration of test shall be unacceptable. Acceptable measured hydrostatic pressure at 120 or more hours shall be less than nominal primary relief valve pressure setting of the tank. If hydrostatic pressure is less than nominal primary relief valve pressure setting at 120 hours, the test may be continued until that pressure is reached and manufacturer's highest point in the design filling temperature/pressure range may be defined as the hydrostatic pressure recorded 120 hours prior to reaching the nominal primary relief valve pressure setting. The manufacturer may also specify a longer hold-time than 120 hours, or a hold-time (longer than 120 hours) versus design filling temperature / pressure relationship based on the recorded hydrostatic pressure time history. Annex 3B – Appendix A A.4. Pressure test Each inner vessel shall be examined under the test pressure defined in paragraph 4.4. of Annex 3B, maintained for at least 30 seconds without evidence of leakage, visible distortion or other defect. Annex 3B – Appendix B Annex 3B – Appendix B Report form Note - This appendix is not a mandatory part of this annex. The following forms should be used:
5.changed
Annex 3B – Appendix C Annex 3B - Appendix C Instructions by the tanks manufacturer on handling, use and inspection of tanks C.1. General The primary function of this appendix is to provide guidance to the tank purchaser, distributor, installer and user for the safe use of the tank over its intended service life. C.2. Distribution The manufacturer shall advise the purchaser that the instructions shall be supplied to all parties involved in the distribution, handling, installation and use of the tank. The document may be reproduced to provide sufficient copies for this purpose, however, it shall be marked to provide reference to the tank being delivered; C.3. Reference to existing codes, standards and regulations Specific instructions may be stated by reference to national or recognized codes, standards and regulations. C.4. Tank handling Handling procedures shall be provided to ensure that the tank will not suffer unacceptable damage or contamination during handling. C.5. Installation Installation instructions shall be provided to ensure that the tanks will not suffer unacceptable damage during installation and during normal operation over the intended service life. Where the mounting is specified by the manufacturer, the instructions shall contain where relevant, details such as mounting design, the use of resilient gasket materials, the correct tightening torques and avoidance of direct exposure of the tank to an environment of chemical and mechanical contacts. Where the mounting is not specified by the manufacturer, the manufacturer shall draw the purchaser's attention to possible long term impacts of the vehicle mounting system, for example: vehicle body movements and tank expansion/contraction in the pressure and temperature conditions of service. Where applicable, the purchaser's attention shall be drawn to the need to provide installations such that liquids or solids cannot be collected to cause tank material damage; The correct pressure relieve device to be fitted shall be specified. C.6. Use of tanks The manufacturer shall draw the purchaser's attention to the intended service conditions specified by this Regulation, in particular the tanks allowable maximum pressures. Annex 3B – Appendix C C.7. In-service inspection The manufacturer shall clearly specify the user's obligation to observe the required tank inspection requirements (e.g. reinspection interval, by authorized personnel). This information shall be in agreement with the design approval requirements. Annex 3B – Appendix D Annex 3B - Appendix D Report form 1 Note - This appendix is not a mandatory part of this annex. The following forms should be used:
6.1.deleted
The manual valve device in Class 0 shall be designed to withstand a pressure of 1.5 times the working pressure.
10.changed
Each tank was made in compliance with all requirements of UN Regulation No. ... in accordance with the tank description above. Required reports of test results are attached.
11.changed
I hereby certify that all these test results proved satisfactory in every way and are in compliance with the requirements for the type listed above. Annex 4A Annex 4A Provisions on the approval of the CNG automatic valve, non-return valve, pressure relief valve, pressure relief device (temperature triggered), excess flow valve, manual valve and the pressure relief device (pressure triggered)
6.3.deleted
The manual valve device in Class 6 shall be designed to withstand a pressure of 1.5 times the working pressure.
2.4.changed
The automatic valve activated by an electric current shall be in a "closed" position when the current is switched off. Annex 4A
4.2.7.changed
The pressure relief valve of Class 6 shall be so designed to operate at temperatures as specified in Annex 5O. Annex 4A
5.1.added
The materials constituting the excess flow valve which are in contact with the CNG when operating, shall be compatible with the test CNG. In order to verify this compatibility, the procedure described in Annex 5D shall be used.
5.4.changed
The pressure-equalization type excess flow valve shall be designed with a bypass to allow for equalization pressures. The shut-off type excess flow valve shall have a device to reset actuation manually. For example, the actuation of pressures. such shut-off type excess flow valve can be cancelled by operating the manual valve.
5.6.changed
When the pressure-equalization type excess flow valve is at cut-off position, the by-pass flow through the valve shall not exceed 0.05 normal m3/minute m 3/minute at a differential pressure of 10,000 kPa. When the shut-off type excess flow valve is at cut-off position, the amount of leakage from the valve shall not exceed 2.5x10 -7 normal m3/minute during operation.
6.1.changed
The materials constituting the LNG manual valve which are device in contact with the LNG when operating, Class 0 shall be compatible with designed to withstand a pressure of 1.5 times the test LNG. In order to verify this compatibility, the procedure described in Annex 5D shall be used. working pressure.
6.3.changed
One specimen The manual valve device in Class 6 shall be submitted designed to withstand a fatigue test at a pressure-cycling rate not to exceed 4 cycles a minute as follows: Held at -162 °C or lower while pressured for 100 cycles between 0 and working pressure WP. The maximum torque on the valve shall than comply with 2 of 1.5 times the force mentioned in Table 5.3 in Annex 5L. After the test the LNG manual valve shall comply with the external leak test in Annex 5B. If during this test icing occurs, the LNG manual valve may be de-iced and dried. working pressure.
6.4.changed
The manual valve device in Class 6 shall be designed to operate at temperatures as specified in Annex 5O."6.5. Manual valve device requirements One specimen shall be submitted to a fatigue test at a pressure cycling rate not to exceed 4 cycles per minute as follows: held at 20 °C while pressured for 2,000 cycles between 2 MPa and 26 MPa (for Class 0) or between 2 MPa and declared working pressure (for Class 6). 5O.
6.5.added
One specimen shall be submitted to a fatigue test at a pressure cycling rate not to exceed 4 cycles per minute as follows: held at 20 °C while pressured for 2,000 cycles between 2 MPa and 26 MPa (for Class 0) or between 2 MPa and declared working pressure (for Class 6).
7.1.changed
The materials constituting the PRD (pressure triggered) which are in contact with the CNG when operating, shall be compatible with the test CNG. In Annex 4A order to verify this compatibility, the procedure described in Annex 5D shall be used.
Table 3changed
Temperature [ °C] Cycles 82 2,000 57 18,000 Annex 4A
7.4.2.2.3.changed
At the completion of the test, the Class 6 PRD (pressure triggered) burst pressure shall be at least 1.5 times working pressure at ambient temperature and at the maximum operating temperature as indicated in Annex 5O. Annex 4B Annex 4B Provisions on the approval of flexible fuel lines or hoses for CNG and hoses for LNG
0.changed
The purpose of this annex is to determine the provisions on regarding the approval of flexible hoses for use with CNG or LNG. This annex covers three types of CNG flexible hoses (a), (b), (c) and one type of LNG hose (d): (a) High pressure hoses (Class 0, Class 6); (b) Medium pressure hoses (Class 1); (c) Low pressure hoses (Class 2); (d) LNG hoses (Class 5).
1.1.3.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
1.3.1.changed
Tensile strength and elongation for rubber material and for thermoplastic elastomers (TPE) Annex 4B
1.3.2.2.changed
Resistance to n-pentane according to ISO 1817 with the following conditions: (a) Medium: n-pentane; (b) Temperature: 23 °C (tolerance according to ISO 1817); Annex 4B (c) Immersion period: 72 hours. Requirements: (a) Maximum change in volume 2 per cent; (b) Maximum change in tensile strength 10 per cent; (c) Maximum change in elongation at break 10 per cent. After storage in air with a temperature of 40 °C for a period of 48 hours the mass compared to the original value may not decrease more than 5 per cent.
1.4.1.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. Annex 4B After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 1.4.1.1. above. Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
1.4.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 1.4.2.1. above. Requirements: (a) Maximum change in tensile strength 20 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; Annex 4B (b) Maximum change in elongation at break 50 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
1.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
1.5.3.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose shall be capable of withstanding the test pressure as mentioned in paragraph 1.5.4.2. below. The test shall be performed on both new hose and after ageing according to ISO 188 as prescribed in paragraph 1.4.2.3. and subsequently to ISO 1817 as prescribed in paragraph 1.4.2.2. above.
1.4.2.3.added
and subsequently to ISO 1817 as prescribed in paragraph 1.4.2.2. above.
1.5.3.2.changed
Annex 4B Distance between centres (mm) Hose inside Bending radius (Figure 1) diameter (mm) (mm) (Figure 1) Vertical Horizontal b a up to 13 102 241 102 13 to 16 153 356 153 from 16 to 20 178 419 178
1.6.2.2.changed
The interface type for the hose coupling shall be: (a) Sealing cone of swivel-nut type of the type with a half vertical angle of 45°; or (b) Other couplings complying with the tests described in paragraph 1.7., as well as the tests mentioned in Annexes 5A and 5B. Annex 4B In the case of an interface type using a soft seal body (e.g. O-ring), the type of material chosen shall be tested in accordance with Annexes 5D, 5F and 5G. Couplings shall have complementary counterparts.1.6.2.3. The couplings can be made as swivel-nut type or as quick-connector type. counterparts.
1.6.2.3.added
The couplings can be made as swivel-nut type or as quick-connector type.
1.7.1.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant corrosion-resistant material.
2.1.3.added
ISO 1307.
2.3.2.changed
Tensile strength and elongation specific for thermoplastic material. Annex 4B
2.4.1.2.changed
Resistance to n-hexane according to ISO 1817 with the following conditions: (a) Medium: n-hexane; Annex 4B (b) Temperature: 23 °C (tolerance according to ISO 1817); (c) Immersion period: 72 hours. Requirements: (a) Maximum change in volume 30 per cent; (b) Maximum change in tensile strength 35 per cent; (c) Maximum change in elongation at break 35 per cent.
2.4.2.2.changed
Resistance to n-hexane according to ISO 1817 with the following conditions: (a) Medium: n-hexane; (b) Temperature: 23 °C (tolerance according to ISO 1817); (c) Immersion period: 72 hours. Requirements: (a) Maximum change in volume 2 per cent; (b) Maximum change in tensile strength 10 per cent; (c) Maximum change in elongation at break 10 per cent. After storage in air with a temperature of 40 °C for a period of 48 hours the mass compared to the original value may not decrease more than 5 per cent. Annex 4B
3.3.deleted
Annex 4B
2.5.3.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose shall be capable of withstanding the test pressure as mentioned in paragraph 2.5.4.2. below. The test shall be performed on both new hose and after ageing according to ISO 188 as prescribed in paragraph 2.4.2.3. and subsequently to ISO 1817 as prescribed in paragraph 2.4.2.2. above. Annex 4B
2.4.2.3.added
and subsequently to ISO 1817 as prescribed in paragraph 2.4.2.2. above.
2.6.1.changed
If a coupling is mounted on the hose the following conditions have to be met. Annex 4B
2.7.1.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant corrosion-resistant material.
3.3.2.1.changed
Tensile strength and elongation at break according to ISO 527-2 with the following conditions: (a) Specimen type: type 1 BA; (b) Tensile speed: 20 mm/minute. The material has to be conditioned for at least 21 days at 23 °C and 50 per cent relative humidity prior to testing. Requirements: (a) Tensile strength not less than 20 MPa; (b) Elongation at break not less than 100 per cent. Annex 4B
3.4.1.2.changed
Resistance to n-hexane according to ISO 1817 with the following conditions: (a) Medium: n-hexane; (b) Temperature: 23 °C (tolerance acc. to ISO 1817); (c) Immersion period: 72 hours. Requirements: (a) Maximum change in volume 30 per cent; (b) Maximum change in tensile strength 35 per cent; (c) Maximum change in elongation at break 35 per cent. Annex 4B
3.4.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 3.4.2.1. above. Annex 4B Requirements: (a) Maximum change in tensile strength 20 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 50 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
3.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
3.5.3.2.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
3.5.3.3.changed
10 minutes. The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
3.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. Annex 4B
3.6.2.changed
Every coupling shall bear the trade name or mark of the assembling manufacturer. Annex 4B
4.1.3.added
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
4.3.1.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. Annex 4B After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 4.3.1.1. of this annex. Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
4.3.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 4.3.2.1. of this annex. Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; Annex 4B (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
4.4.2.1.changed
Tensile strength and elongation at break according to ISO 527-2 with the following conditions: (a) Specimen type: type 1 BA; (b) Tensile speed: 20 mm/minute. The material has to be conditioned for at least 21 days at 23 °C and 50 per cent relative humidity prior to testing. Requirements: (a) Tensile strength not less than 20 MPa; (b) Elongation at break not less than 100 per cent. Annex 4B
4.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
4.5.2.1.changed
The test has to be carried out in compliance with the method described in standard ISO 4672-1978, method B. Annex 4B
4.5.7.1.changed
Mount one end of the test assembly on the static support and the other end on the vibration head, making sure that the tubing is bent at the minimum bending radius of 180° preventing the hose to kink. Using cryogenic fluid, pressurize the test sample at the manufacture declared working pressure. Test temperature: -163 °C (equivalent can be found in the table of Annex 5O). Vibrate the component for 30 minutes, pressurized, and sealed at the downstream side along each of the three orthogonal axes at the most severe resonant frequency determined as follows: (a) By an acceleration of 1.5 g; (b) Within a sinusoidal frequency range of 10 Hz to 500 Hz; (c) With a sweep time of 10 minutes. If the resonance frequency is not found in this range, the test shall be conducted at 500 Hz. On completion of the test, hose shall not show any indication of fatigue, cracks, or damage and shall be tested at a test pressure of 1.5 times the manufacture declared working pressure (MPa). This pressure shall be applied for 10 minutes, without any leakage. Annex 4B
4.7.1.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant corrosion-resistant material.
4.8.2.changed
Every coupling shall bear the trade name or mark of the assembling manufacturer. Annex 4C Annex 4C Provisions on the approval of the CNG filter
2.4.changed
The component has to comply with the test procedures for Class components according to the scheme in Figure 1-1 of paragraph 3. of this Regulation. Annex 4D Annex 4D Provisions on the approval of the CNG pressure regulator and CNG compressor
1.changed
The purpose of this annex is to determine the provisions on the approval of the CNG pressure regulator. regulator and CNG compressor.
2.2.changed
The materials constituting the regulator which are in contact with the heat exchange medium of the regulator when operating, shall be compatible with that fluid. fluid, the procedure in Annex 5Q shall be used.
2.3.changed
The component shall comply with the test procedures provided for in Class 0 or Class 6 for the parts subject to high pressure and Classes Class 1, 2, 3 and 4 for the parts subject to medium and low pressure.
2.4.changed
Durability test (continued operation) of the CNG pressure regulator: The regulator shall be able to withstand 50,000 cycles without any failure when tested according to the following procedure. Where the stages of pressure regulation are separate, the service pressure in subparagraphs (a) to (f) is considered to be the working pressure of the upstream stage. (a) Recycle the regulator for 95 per cent of the total number of cycles at room temperature and at the service pressure. Each cycle shall consist of flow until stable outlet pressure has been obtained, after which the gas flow shall be shut off by a downstream valve within 1 s, until the downstream lock-up pressure has stabilized. Stabilized outlet pressures are defined as set pressure ±15 per cent for at least 5 s. (b) Cycle the inlet pressure of the regulator for 1 per cent of the total number of cycles at room temperature from 100 per cent to 50 per cent of the service pressure. The duration of each cycle shall be no less than 10 s. (c) Repeat the cycling procedure of (a) at 120 °C at the service pressure for 1 per cent of the total number of cycles. (d) Repeat the cycling procedure of (b) at 120 °C at the service pressure for 1 per cent of the total number of cycles. (e) Repeat the cycling procedure of (a) at -40 °C or -20 °C as applicable and 50 per cent of service pressure for 1 per cent of the total number of cycles. (f) Repeat the cycling procedure of (b) at -40 °C or -20 °C as applicable and 50 per cent of service pressure for 1 per cent of the total number of cycles. Annex 4D (g) At the completion of all tests indicated in subparagraphs (a), (b), (c), (d), (e) and (f), the regulator shall be leak proof (see Annex 5B) at the temperatures of -40 °C or -20 °C, as applicable, and at the room temperature and at the temperature of +120 °C.
3.2.3.changed
The part of the pressure regulator that is in contact with pressure below 26 MPa is classified as per Part I, Section 3, of this Regulation.
3.2.3.3.changed
The Class 1 and Class 2 part of the CNG pressure regulator shall be leak- proof leak-proof (see Annex 5B) at a pressure up to twice the working pressure.
3.3.changed
The pressure regulator shall be so designed to operate at temperatures as specified in Annex 5O. Annex 4E Annex 4E Provisions on the approval of the CNG pressure and temperature sensors
3.3.deleted
Annex 4G
4.1.changed
M1 and N1.3 The material constituting the CNG compressor which is in contact with the compressed natural gas when operating shall be compatible with the test CNG. In order to verify this compatibility, the procedure in Annex 5D shall be used.
4.2.changed
M2, M3, N2 and N3.3 1 Road Vehicles — Compressed Natural Gas (CNG) refuelling connector - Part 1: 20 MPa (200 bar) connector. 2 Road vehicles — Compressed natural gas (CNG) refuelling connector — Part 2: 20 MPa (200 bar) connector, size 2. 3 As defined The materials constituting the CNG compressor which are in contact with the Consolidated Resolution on heat exchange medium of the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. – www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html CNG compressor when operating, shall be compatible with that fluid. In order to verify this compatibility, the procedure in Annex 4F 5Q shall be used.
4.3.changed
This annex refers The component shall comply with the test procedures for the Class of components according to receptacles designed for 20 MPa (200 bar) CNG storage systems. Receptacles for 25 MPa (250 bar) are acceptable, provided all other requirements the scheme in Figure 1-1 of paragraph 3. of this annex are met at increased pressures as defined in paragraph 1. of Annex 3A to this Regulation. In this case, dimensions: 25 +0/-0.1 becomes 24 +0/-0.1 in Figure 1, and 35 +0/-0.1 becomes 34+0/-0.1 in Figure 2.
4.4.changed
The LNG pressure relief valve has to comply with the test procedures for the Class 5 component. Compressor. Isolation resistance shall be > 10 MΩ.
4.4.1.added
Means shall be provided to ensure a safe discharge of static electricity in the compressor.
4.5.added
The CNG compressor shall be provided with a pressure control device to maintain the pressure within the operating pressure range.
4.5.1.added
The limitation of the power supplied by the actuating mechanism can be accepted in lieu of a pressure control device.
4.5.2.added
An electronic control system can be accepted in lieu of a pressure control device.
4.5.3.added
The pressure control device may function by restricting or closing off the inlet to the compressor.
4.5.4.added
The pressure control device is not allowed to vent natural gas to t h e atmosphere during normal function.
4.6.added
The CNG Compressor shall be provided with a pressure relief valve to limit the pressure to the maximum safe working pressure of the compressor.
4.6.1.added
A fuel system pressure relief valve may be used instead of a pump pressure relief valve if, by relieving system pressure, it relieves the pump pressure.
4.7.added
The CNG compressor is allowed to function before the engine is started or during commanded stop phases to produce required pressure in the fuel system. This function shall be achieved without delivering fuel to the engine, if the engine is not running.
4.8.added
Durability test (continued operation) of the CNG compressor: The CNG compressor shall be able to withstand 50,000 cycles without any failure when tested according to the following procedure: (a) Cycle the CNG compressor for 95 per cent of the total number of cycles at room temperature and at the service pressure. Each cycle shall consist of flow until a stable outlet pressure has been obtained, after which the gas flow shall be shut off by a downstream valve within 1 s, until the downstream lock-up pressure has stabilized. Stabilized outlet pressures are defined as set pressure ±15 per cent for at least 5 s; (b) Cycle the inlet pressure of the CNG compressor for 1 per cent of the total number of cycles at room temperature from 100 per cent to 50 per cent of the service pressure. The duration of each cycle shall be no less than 10 s; (c) Repeat the cycling procedure of (a) at 85 °C, 105 °C or 120 °C, as applicable, at the service pressure for 1 per cent of the total number of cycles; (d) Repeat the cycling procedure of (b) at 85 °C, 105 °C or 120 °C, as applicable, at the service pressure for 1 per cent of the total number of cycles; (e) Repeat the cycling procedure of (a) at -40 °C or -20 °C, as applicable, and 50 per cent of service pressure for 1 per cent of the total number of cycles; (f) Repeat the cycling procedure of (b) at -40 °C or -20 °C, as applicable, and 50 per cent of service pressure for 1 per cent of the total number of cycles; (g) At the …
5.1.added
The part of the CNG compressor which is in contact with the pressure of the container is considered as Class 0.
5.1.1.added
at a pressure up to 1.5 times the working pressure (MPa) with the outlet(s) of that part closed off.
5.1.2.added
The Class 0 part of the CNG compressor shall withstand a pressure of up to 1.5 times the working pressure (MPa).
5.1.3.added
Annex 5B) at a pressure of up to twice the working pressure.
5.1.4.added
The Class 1 and Class 2 part of the CNG compressor shall withstand a pressure of up to twice the working pressure.
5.1.5.added
The Class 3 part of the CNG compressor shall withstand a pressure of up to twice the relief pressure of the pressure relief valve, on which it is subject.
5.2.added
The part of the CNG compressor which is in contact with a pressure higher than 26 MPa is considered as Class 6.
5.2.1.changed
The LNG excess flow valve, if it is not mounted inside Class 6 part of the tank, CNG compressor shall be so designed as to withstand leak-proof (see Annex 5B) at a pressure of up to 1.5 times the working pressure (MPa) at cryogenic temperature. declared by the manufacturer with the outlet(s) of that part closed off.
5.2.2.changed
The LNG excess flow valve shall, if it is not mounted inside Class 6 part of the tank, be so designed as to be external leak-proof (Annex 5B) at CNG compressor shall withstand a pressure of up to 1.5 times the working pressure (MPa). (MPa) declared by the manufacturer.
5.2.3.changed
The LNG excess flow valve shall be so designed to operate at temperatures 26 MPa is classified as specified in Annex 5O. per Part I, Section 3, of this Regulation.
5.3.changed
The LNG excess flow valve CNG compressor shall be so designed with a bypass (internal leak) as to allow for equalization of pressures. operate at the temperatures as specified in Annex 4N 5O.
5.3.1.added
Where the CNG compressor is cooled by inclusion in the engine coolant circuit it shall be considered as an engine mounted in Annex 5O
5.3.2.added
Where the CNG compressor is using heat exchange fluids, the non- metallic parts in contact with the fluid shall comply with Annex 5Q. Annex 4E Provisions on the approval of the CNG pressure and temperature sensors
3.3.changed
The electrical system, if existing, shall be isolated from the body of the pressure and temperature sensors. Isolation resistance shall be > 10 MΩ. Annex 4F Annex 4F Provisions on the approval of the CNG filling unit (Receptacle)
2.2.changed
2004-11-011 or CNG filling units designed in accordance with ISO 14469-2:20072 14469 and meeting all the requirements therein are deemed to fulfill fulfil the requirements of paragraphs 3. and 4. of this annex.
4.added
of this annex.
4.1.changed
Figure 1 shows the dimensions of the LNG filling receptacle. Dimensions unit for vehicles of the receptacle all dimensions in millimeters The 50 mm dimension is the minimum distance to the mounting flange Annex 4K Annex 4K Provisions on the approval of the LNG pressure control regulator categories M1 and N1.1
4.2.added
Figure 2 shows the dimensions of the filling unit for vehicles of categories M 2, M3, N2 and N3.3
4.3.changed
The LNG pressure relief valve shall be so This annex refers to receptacles designed for 20 MPa (200 bar) CNG storage systems. Receptacles for 25 MPa (250 bar) are acceptable, provided all other requirements of this annex are met at increased pressures as defined in paragraph 1. of Annex 3A to operate at temperatures as specified this Regulation. In this case, dimensions: 25 +0/-0.1 becomes 24 +0/-0.1 in Annex 5O. Figure 1, and 35 +0/-0.1 becomes 34+0/-0.1 in Figure 2. 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. – https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
Figure 1changed
Key This area shall be kept free of all components. 1 Sealing surface equivalent to No. 110 O-ring of dimensions: Dimensions in millimetres 9.19 mm  0.127 mm ID Surface roughness < Ra 3.2 µm 2.62 mm  0.076 mm width Sealing surface finish: 0.8 µm to 0.05 µm Material hardness: 75 Rockwell (HRB 75) minimum a Minimum length of the receptacle which is clear of provisions for attachement of receptacle or protective caps. Annex 4F
Figure 2changed
Annex 4G Annex 4G Provisions on the approval of CNG gas flow adjuster and gas/air mixer, gas injector or fuel rail
2.3.4.changed
The CNG gas injector or fuel rail of Class 6 shall be shall be so designed to operate at temperatures as specified in Annex 5O.
3.4.changed
Electrical operated components containing CNG shall comply with the following: (a) They shall have a separate ground connection; (b) The electrical system of the component shall be isolated from the body. Annex 4 H Annex 4H Provisions on the approval of the electronic control unit
2.1.changed
The electronic control unit can be any device which controls the CNG/LNG demand of the engine and establishes the cut-off of the automatic valve in case of a switch off of the engine or a broken fuel supply pipe or or in case of stalling of the engine, or during a crash.
2.5.changed
The electronic control unit shall be so designed to operate at temperatures as specified in Annex 5O. Annex 4I Annex 4I Provisions on the approval of the LNG heat exchanger – vaporizer
2.2.changed
The material constituting the LNG heat exchanger - vaporizer which is in contact with the CNG when operating shall be compatible with the test CNG. In order to verify this compatibility, the procedure in Annex 5D shall be used. The materials constituting the LNG heat exchanger - vaporizer which are in contact with the heat exchange medium of the regulator when operating, shall be compatible with that fluid. The procedure in Annex 5Q shall be used.
2.8.changed
The LNG heat exchanger – vaporizer has to comply with the water jacket freezing test. Fill the part of the heat exchanger-vaporizer which normally contains an antifreeze solution, with water to normal capacity and expose it at -40 °C for 24 hours. Attach 1 m sections of coolant hose to the coolant inlet and outlet of the heat exchanger – vaporizer. Following the freezing conditioning, conduct an external leakage test according to Annex 5B at room temperature. A separate sample may be used for this test. Annex 4J Annex 4J Provisions on the approval of the LNG filling receptacle
3.1.4.3.changed
The component shall be operated through 2 per cent of the total cycles as above at the appropriate maximum temperature specified at rated service pressure. The component shall comply with the leakage test of Annex 5B at the high temperature at the completion of the high temperature cycles. Following cycling and leakage re-test the component shall be capable of remove of the filling nozzle without spilling more than 30 cm3 cm 3 LNG. Annex 4J
3.1.5.changed
The LNG filling receptacle shall be made out of non-sparking material and should comply with the no igniting evaluation tests described in ISO 14469-1:2004. 14469.
4.1.changed
The materials constituting Figure 1 shows the pressure relief valve which are in contact with dimensions of the LNG when operating, shall be compatible with filling receptacle. Dimensions of the test LNG. In order receptacle all dimensions in millimetres The 50 mm dimension is the minimum distance to verify this compatibility, the procedure described in mounting flange Annex 5D shall be used. 4K Provisions on the approval of the LNG pressure control regulator
3.3.1.changed
Perform the durability test mentioned in Annex 5L with the following exceptions: (a) The number of cycles is 7,000; (b) The component shall be connected to a source of pressurized cryogenic fluid. Annex 4L Annex 4L Provisions on the approval of LNG pressure and/or temperature sensor
3.5.changed
The Class 5 part of the LNG pressure and temperature sensors shall withstand a pressure up to 1.5 times the working pressure (MPa), at the temperature corresponding to rated service pressure from the table in Annex 5O, at room temperature and at the maximum temperature from Annex 5O. Annex 4M Annex 4M Provisions on the approval of the natural gas detector
3.3.changed
The natural gas detector shall comply with relevant electromagnetic compatibility (EMC) requirements according to UN Regulation No. 10, 03 series of amendments, or equivalent. Annex 4N Annex 4N Provisions on the approval of the automatic valve, check valve, pressure relief valve, excess flow valve, manual valve and non-return valve for LNG applications.
3.2.1.changed
The LNG check valve shall be so designed as to withstand a pressure of 1.5 times the working pressure (MPa) without leakage and deformation at cryogenic temperature. Annex 4N
4.1.added
The materials constituting the pressure relief valve which are in contact with the LNG when operating, shall be compatible with the test LNG. In order to verify this compatibility, the procedure described in Annex 5D shall be used.
4.3.added
The LNG pressure relief valve shall be so designed to operate at temperatures as specified in Annex 5O.
4.4.added
The LNG pressure relief valve has to comply with the test procedures for the Class 5 component.
5.1.added
The materials constituting the LNG excess flow valve, which are in contact with the LNG when operating, shall be compatible with the test LNG. In order to verify this compatibility, the procedure described in Annex 5D shall be used.
5.2.1.added
The LNG excess flow valve, if it is not mounted inside the tank, shall be so designed as to withstand a pressure of 1.5 times the working pressure (MPa) at cryogenic temperature.
5.2.2.added
The LNG excess flow valve shall, if it is not mounted inside the tank, be so designed as to be external leak-proof (Annex 5B) at a pressure of 1.5 times the working pressure (MPa).
5.2.3.added
The LNG excess flow valve shall be so designed to operate at temperatures as specified in Annex 5O.
5.3.added
The LNG excess flow valve shall be designed with a bypass (internal leak) to allow for equalization of pressures.
6.1.added
The materials constituting the LNG manual valve which are in contact with the LNG when operating, shall be compatible with the test LNG. In order to verify this compatibility, the procedure described in Annex 5D shall be used.
6.3.added
One specimen shall be submitted to a fatigue test at a pressure-cycling rate not to exceed 4 cycles a minute as follows: Held at -162 °C or lower while pressured for 100 cycles between 0 and working pressure WP. The maximum torque on the valve shall than comply with 2 times the force mentioned in Table 5.3 in Annex 5L. After the test the LNG manual valve shall comply with the external leak test in Annex 5B. If during this test icing occurs, the LNG manual valve may be de-iced and dried.
6.4.changed
The LNG manual valve has to comply with the test procedures for the Class 5 component. Annex 4O Annex 4O Provisions on the approval of the LNG fuel pump
3.1.changed
LNG fuel pump mounted inside the tank: LNG compatibility test Annex 5D Resistance to dry heat Annex 5F Ozone ageing Annex 5G Low temperature test Annex 5P Annex 4O
3.2.changed
LNG fuel pump mounted outside the tank: Overpressure or strength Annex 5A External leakage Annex 5B LNG compatibility Annex 5D Corrosion resistance Annex 5E Resistance to dry heat Annex 5F Ozone ageing Annex 5G Temperature cycle Annex 5H Vibration resistance Annex 5N Low temperature test Annex 5P Annex 5
Table 5changed
Test Class 0 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Annex Overpressure or strength X X X X O X X 5A External leakage X X X X O X X 5B Internal leakage A A A A O A A 5C Durability tests A A A A O A A 5L CNG/LNG compatibility A A A A A A A 5D Corrosion resistance X X X X X A X 5E Resistance to dry heat A A A A A A A 5F Ozone ageing A A A A A A A 5G Burst/destructive tests X O O O O A X 5M Temperature cycle A A A A O A A 5H Pressure cycle X O O O O A X 5I Vibration resistance A A A A O A A 5N Operating temperatures X X X X X X X 5O LNG low temperature O O O O O X O 5P Compatibility with heat exchange fluids of non- metallic parts A A A A A A A 5Q X = Applicable O = Not applicable A = As applicable Remarks: (a) Internal leakage: Applicable if the Class of the component consists of internal valve seats that are normally closed during engine "OFF" condition; (b) Durability test: Applicable if the Class of the component consists of integral parts that will move repeatedly during engine operation; (c) CNG compatibility, resistance to dry heat, ozone ageing: Applicable if the class of the component consists of synthetic / non-metallic parts; (d) Temperature cyclic test: Applicable if the class of the component consists of synthetic / non-metallic parts; (e) Vibration resistance test: Applicable if the Class of the component consists of integral parts that will move repeatedly during engine operation. (f) Compatibility with heat exchange fluids of non-metallic parts: Applicable, if the Class of the components consists out of material in contact with the heat exchange fluid. The materials used for the components shall have written specifications that fulfil at least or exceed the (test) requirements laid down in this annex with respect to: (a) Temperature; (b) Pressure; (c) CNG/LNG compatibility; (d) Durability.
3.3.changed
The test period for the leakage test and the hydrostatic strength test shall be not less than 3 minutes. Annex 5A Annex 5A Overpressure test (strength test)
3.changed
Table 5.2 below shows the working and burst test pressures according to the classification of paragraph 2. of this Regulation. Classification of Working pressure Overpressure component [kPa] [kPa] 1.5 times the working Class 0 3,000 < p < 26,000 pressure 1.5 times the working pressure Class 1 450 < p < 3,000 1.5 times the working pressure Class 2 20 < p < 450 2 times the working pressure Class 3 450 < p < 3,000 2 times the relief pressure Class 5 as specified by the manufacturer 1.5 times the working Class 5 manufacturer pressure Class 6 as specified by the manufacturer 1.5 times the working Class 6 manufacturer pressure Annex 5B Annex 5B External leakage test
5.changed
For CNG A CNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the outlet plugged when submitted to a gas pressure, at maximum operating temperature as indicated in Annex 5O, equal to the maximum working pressure. The component shall be conditioned for at least 8 hours at this temperature.
5.1.changed
A LNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the flow mentioned in paragraph 3.1. in place when submitted to an outside temperature at the maximum operating temperatures mentioned in Annex 5O. Annex 5B
6.changed
For CNG A CNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the outlet plugged when submitted to a gas pressure, at the minimum operating temperature, equal to the maximum working pressure as declared by the manufacturer. The component shall be conditioned for at least 8 hours at this temperature.
6.1.changed
A LNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the flow mentioned in paragraph 3.1. in place when submitted to an outside temperature at the minimum operating temperature mentioned in Annex 5O. Annex 5C Annex 5C Internal leakage test
4.changed
A CNG non-return valve provided with a metal-to-metal seat, when in the closed position, shall not leak at a rate exceeding 0.47 dm3/s dm 3/s when subjected to an aerostatic pressure difference of 138 kPa effective pressure.
7.changed
Compliance with paragraphs 2. to 5. below is to be determined by connecting a length of tubing to the valve outlet. The open end of this outlet tube is to be located within an inverted graduated cylinder which is calibrated in cubic centimetres. The inverted cylinder is to be closed by a water tight seal. The apparatus is to be adjusted so that: (a) The end of the outlet tube is located approximately 13 mm above the water level within the inverted graduated cylinder, and (b) The water within and exterior to the graduated cylinder is at the same level. With these adjustments made, the water level within the graduated cylinder is to be recorded. With the valve in the closed position assumed as the result of normal operation, air or nitrogen at the specified test pressure is to be applied to the valve inlet for a test period of not less than 2 minutes. During this time, the vertical position of the graduated cylinder is to be adjusted, if necessary, to maintain the same water level within and exterior to it. Annex 5C At the end of the test period and with the water within and exterior to the graduated cylinder at the same level, the level of water within the graduated cylinder is again recorded. From the change of volume within the graduated cylinder, the leakage rate is to be calculated according to the following formula: V1 = Vt • 60 •  273 • P  t  T 101 .3 101.3  Where: V1 = leakage rate, cubic centimetres of air or nitrogen per hour. Vt = increase in volume within graduated cylinder during test. t = time of test, minutes. P = barometric pressure during test, in kPa. T = ambient temperature during test, in K.
8.changed
Instead of the method described above, leakage may be measured by a flow meter installed on the inlet side of the valve under test. The flow meter shall be capable of indicating accurately, for the test fluid employed, the maximum leakage flow rates permitted. Annex 5D Annex 5D CNG/LNG compatibility test
2.changed
Requirements: Maximum change in volume 20 per cent; After storage in air with a temperature of 40 °C for a period of 48 hours the mass compared to the original value may not decrease more than 5 per cent. Annex 5E Annex 5E Corrosion resistance test Corrosion resistance test procedures:
2.changed
A copper or brass CNG/LNG containing component shall comply with the leakage tests mentioned in Annexes 5B and 5C and after having been submitted to 24 hours immersion in ammonia according to ISO 15500-2 with all connections closed. Annex 5F Annex 5F Resistance to dry heat
2.changed
The allowable change in tensile strength should not exceed +25 per cent. The allowable change in ultimate elongation shall not exceed the following values: (a) Maximum increase 10 per cent; (b) Maximum decrease 30 per cent. Annex 5G Annex 5G Ozone ageing
2.changed
No cracking of the test piece is allowed. Annex 5H Annex 5H Temperature cycle test A non-metallic part containing CNG/LNG shall comply with the leakage tests mentioned in Annexes 5B and 5C after having been submitted to 96 hours temperature cycle from the minimum operating temperature up to the maximum operating temperature with a cycle time of 120 minutes, under maximum working pressure. Annex 5I Annex 5I Pressure cycle test applicable only to cylinders (See Annex 3) Annexes 5J and 5K Annexes 5J and 5K - Not allocated Annex 5L Annex 5L Durability test (continued operation)
1.3.changed
Durability test for LNG products are mentioned in their specific Annex 4I up to Annex 4O, where applicable. Annex 5M Annex 5M Burst/destructive test applicable only to CNG cylinders (See Annex 3A) Annex 5N Annex 5N Vibration resistance test
2.1.changed
The component shall be secured in an apparatus and vibrated for 2 hours at 17 Hz with an amplitude of 1.5 mm (0.06 inch) in each of three orientation axes. On completion of 6 hours of vibration the component shall comply with Annex 5C. Annex 5O Annex 5O Operating temperatures The operating temperatures shall be: Engine compartment Assembled on the engine On board Moderate (M) -20 °C to 105 °C -20 °C to 120 °C -20 °C to 85 °C Cold (C) -40 °C to 105 °C -40 °C to 120 °C -40 °C to 85 °C LNG (L) -162 °C to 105 °C -162 °C to 120 °C -162 °C to 85 °C Note - The LNG (L) temperature is the temperature of the fluid inside the components. For surrounding temperatures use M or C. Since, for LNG, saturation temperature and pressure have a direct relationship as shown in the table below, higher minimum temperatures shall be allowed for LNG components based on the described test pressure. Temperature [°C] Pressure [barg] -161.6 0 -152.5 1 -146.4 2 -141.7 3 -137.8 4 -134.4 5 -131.4 6 -128.7 7 -126.3 8 -124.0 9 -121.9 10 -119.9 11 -118.1 12 -116.3 13 -114.6 14 -113.0 15 -111.5 16 -110.0 17 -108.6 18 -107.3 19 -106.0 20 -104.7 21 -103.5 22 -102.3 23 -101.2 24 Source: http://webbook.nist.gov/chemistry/fluid/Saturation Annex 5P Annex 5P LNG – Low temperature test
4.changed
Following cycling testing, perform the hydrostatic test. Annex 5Q Annex 5Q Compatibility with heat exchange fluids of non-metallic parts
2.changed
The test is deemed to be satisfactory if the change in volume is less than 20 per cent, the change in mass is less than 5 per cent, the change in tensile strength is less than -25 per cent and the change in elongation at break is within -30 per cent and +10 per cent. Annex 6
Annex 6changed
Provisions on CNG identification mark marks for vehicles of categories M2 M2/N2 and M3, N2 and N3 M3/N3. (Paragraph 18.1.8.1. 18.1.8. of this Regulation) The sign consists of a sticker which label shall be weather resistant. The centre zone indicates the first energy source The upper zone indicates the second energy source The left zone indicates the gas behaviour due to density The right zone indicates the state of aggregation of stored gaseous fuel Layout and symbols shall be in accordance with ISO 17840-4:2018 The colour and dimensions of the sticker label shall fulfil the following requirements: Colours: Background: green Green, RGB code 0, 176, 80 Border: white or white reflecting Letters: white or Letters and symbols: white reflecting Dimensions: Border width: 4 - 6 mm Character height: ≥ 25 mm Character thickness: ≥ 4 mm Sticker width: > 110 - 150 mm Sticker height: > 80 - 110 mm The word "CNG" shall be centred in the middle of the sticker. Annex 7 mm.
Annex 7changed
Provisions on LNG identification mark marks for vehicles of categories M2 M2/N2 and M3, N2 and N3 M3/N3. (Paragraph 18.1.8.2. 18.1.8. of this Regulation) The sign consists of a sticker which label shall be weather resistant. The centre zone indicates the first energy source The upper zone indicates the second energy source The left zone indicates the gas behaviour due to density The right zone indicates the state of aggregation of stored gaseous fuel Layout and symbols shall be in accordance with ISO 17840-4:2018 The colour and dimensions of the sticker label shall fulfil the following requirements: Colours: Background: green white Border: white or white reflecting Letters: white or white reflecting Green reflecting, RGB code 0, 176, 80 Letters and symbols: Green reflecting, RGB code 0, 176, 80 Dimensions: Border width: 4 - 6 mm Character height:  25 mm Character thickness:  4 mm Sticker width: > 110 - 150 mm Sticker height: > 80 - 110 mm The word "LNG" shall be centred in the middle of the sticker.