Compare versions of UN R110
I. Specific components of motor vehicles using compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system II. Vehicles with regard to the installation of specific components of an approved type for the use of compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system
01 series of amendments → latestSupplement 1 to the 01 series → latest02 series of amendments → latest03 series of amendments → latest04 series of amendments → latest
1.1.changed
Part I Specific components for vehicles of category M and N1 N 1 using compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system;
2.changed
The following standards contain provisions that, through reference in this text, constitute provisions of this Regulation. ASTM Standards2 ASTM B117-90 Test method of Salt Spray (Fog) Testing ASTM B154-92 Mercurous Nitrate Test for Copper and Copper Alloys ASTM D522-92 Mandrel Bend Test of attached Organic Coatings ASTM D1308-87 Effect of Household Chemicals on Clear and Pigmented Organic Finishes ASTM D2344-84 Test Method for Apparent interlaminar Shear Strength of Parallel Fibre Composites by Short Beam Method ASTM D2794-92 Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact) ASTM D3170-87 Chipping Resistance of Coatings ASTM D3418-83 Test Method for Transition Temperatures Polymers by Thermal Analysis ASTM D4814-17 Standard Specification for Automotive Spark- Ignition Engine Fuel ASTM E647-93 Standard Test, Method for Measurement of Fatigue Crack Growth Rates ASTM E813-89 Test Method for JIC, a Measure of Fracture Toughness 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. – www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions 2 American Society for Testing and Materials. ASTM G154-16 Standard Practice for Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials BSI Standards3 BS 5045 Part 1 (1982) Transportable Gas Containers – Specification for Seamless Steel Gas Containers Above 0.5 litre Water Capacity BS 7448-91 Fracture Mechanics Toughness Tests Part I – Method for Determination of KIC, Critical COD and Critical J Values of BS PD 6493-1991. Guidance an Methods for Assessing the A Acceptability of Flaws in Fusion Welded Structures; Metallic Materials EN Standards4 EN1251-2 2000 Cryogenic vessels. Vacuum insulated vessels of not more than 1,000 litres volume EN 895:1995 Destructive tests on welds in metallic materials. Transverse tensile test EN 910:1996 Destructive test methods on welds in metallic materials. Bend tests EN 1435:1997 Non-destructive examination of welds. Radiographic examination of welded joints EN 6892-1:2016 Metallic materials. Tensile test EN 10045-1:1990 Charpy impact test on metallic materials. Test method (V- and U-notches) ISO Standards5 ISO 37:2011 Rubber, vulcanized or thermoplastic – Determination of tensile stress-strain properties. ISO 148-1983 Steel – Charpy Impact Test (v-notch) ISO 188:2011 Rubber, volcanized or thermoplastic – Accelerated ageing and heat resistance tests ISO 306:2004 Plastics - Thermoplastic Materials – Determination of Vicat Softening Temperature ISO 527-2:2012 Plastics – Determination of tensile properties – Part 2: Test conditions for moulding and extrusion plastics ISO 642:1999 Steel-Hardenability Test by End Quenching (Jominy Test) 3 British Standards Institution. 4 European Norm. 5 International Organization for Standardization. ISO1307:2006 Rubber and plastics hoses – Hose sizes, minimum and maximum inside diameters, and tolerances on cut-to-length hoses ISO 1402:2009 Rubber and plastics hoses and hose assemblies – Hydrostatic testing ISO 1431:2009 Rubber, vulcanized or thermoplastic – Resistance to ozone cracking ISO 1436:2009 Rubber hoses and hose assemblies – Wire-braid- reinforced hydraulic types for oil-based or water- based fluids – Specification ISO 1817:2015 Rubber, vulcanized or thermoplastic – Determination of the effect of liquids ISO 2808:2007 Paints and Varnishes – Determination of film Thickness ISO 4080:2009 Rubber and plastics hoses and hose assemblies – Determination of permeability to gas ISO 4624:2016 Plastics and Varnishes – Pull-off Test for adhesion ISO 10619:2011 Rubber and plastics hoses and tubing - Measurement of flexibility and stiffness - Part 2: Bending tests at sub-ambient temperatures ISO 6892:2016 Metallic Materials – Tensile Testing ISO 6506-1:2014 Metallic Materials – Brinell hardness test – Part 1: Test method ISO 6508-1:2015 Metallic Materials – Rockwell hardness Test – Part 1: Test method ISO 7225:2005 Precautionary Labels for Gas Cylinders ISO 7866-2012 Refillable seamless aluminium alloy cylinders – Design, construction and testing ISO 9001:2015 Quality Assurance in Design/Development. Production, Installation and Servicing ISO/TS 9002:2016 Quality management systems - Guidelines for the application of ISO 9001:2015 ISO12991:2012 Liquefied natural gas (LNG) – transportable tanks for use on board of vehicles ISO14469:2017 Road Vehicles: compressed natural gas CNG refuelling connector ISO15500-2:2016 Road vehicles – Compressed natural gas (CNG) fuel system components Part 2: Performance and general test methods ISO 15500-17:2012 Road vehicles - Compressed natural gas (CNG) fuel system components - Part 17: Flexible fuel line ISO 21028-1:2016 Cryogenic vessels – Toughness requirements for materials at cryogenic temperature – Part I: Temperatures below -80 °C ISO 21029-1:2015 Cryogenic vessels – Transportable vacuum insulated vessels of not more than 1,000 litres volume – Part I: Design, fabrication, inspection and tests ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories ISO 9809-1:2010 Gas cylinders — Refillable seamless steel gas cylinders — Design, construction and testing — Part 1: Quenched and tempered steel cylinders with tensile strength less than 1,100 MPa ISO 11439:2013 Gas cylinders — High pressure cylinders for the on-board storage of natural gas as a fuel for automotive vehicles NACE Standard6 NACE TM0177-90 Laboratory Testing of Metals for Resistance to Sulphide Stress Cracking in H2S Environments UN Regulations7 UN Regulation No. 10 Uniform provisions concerning the approval of vehicles with regard to electromagnetic compatibility USA Federal Regulations8 49 CFR 393.67 Liquid fuel tanks (as amended in 78 FR 58484 on 24 September 2013) SAE Standards9 SAE J2343-2008 Recommended Practice for LNG Medium and Heavy-Duty Powered Vehicles
3.changed
Class 0 High pressure parts including tubes and fittings containing CNG at a pressure higher than 3 MPa and up to 26 MPa. Class 1 Medium pressure parts including tubes and fittings containing CNG at a pressure higher than 450 kPa and up to 3,000 kPa (3 MPa). Class 2 Low pressure parts including tubes and fittings containing CNG at a pressure higher than 20 kPa and up to 450 kPa. 6 National Association of Corrosion Engineers. 7 United Nations Economic Commission for Europe; Regulations. 8 United States of America Federal Regulations. 9 Society of Automotive Engineers. Class 3 Medium pressure parts as safety valves or protected by safety valve including tubes and fittings containing CNG at a pressure higher than 450 kPa and up to 3,000 kPa (3 MPa). Class 4 Parts in contact with gas subject to the pressure lower than 20 kPa. Class 5 Parts in contact with temperature range extending below -40 °C. Class 6 High pressure parts including tubes and fittings containing CNG, excluding CNG containers, at a pressure higher than 26 MPa. A component can consist of several parts, each part classified in its own class with regard to maximum working pressure and function. CNG and/or LNG components for use in vehicles shall be classified with regard to the working pressure, temperature and function, according to Figure 1-1.
Figure 1changed
Flow scheme for CNG and/or LNG components classification START In contact with No gas Yes Yes Temperature Class 5 ˂ -40 °C No Yes No po>3,000 kPa po ˂26,000 kPa Storage cylinder No Class 6 Yes No Class 0 Yes No Safety valve Class 1 450˂po˂3,000 kPa No Yes Class 3 Yes 20˂po˂450 kPa Class 2 No Class 4 Not subject to this Regulation Test applicable to specific classes of components (excluding CNG cylinders and LNG tank) Test Class 0 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Annex Overpressure or strength X X X X O X X 5A External leakage X X X X O X X 5B Internal leakage A A A A O A A 5C Durability tests A A A A O A A 5L CNG/LNG compatibility A A A A A A A 5D Corrosion resistance X X X X X A X 5E Resistance to dry heat A A A A A A A 5F Ozone ageing A A A A A A A 5G Burst/destructive tests X O O O O A X 5M Temperature cycle A A A A O A A 5H Pressure cycle X O O O O A X 5I Vibration resistance A A A A O A A 5N Operating temperatures X X X X X X X 5O LNG low temperature O O O O O X O 5P LNG low temperature O O O O O X O 5P Compatibility with heat exchange fluids of non- metallic parts A A A A A A A 5Q Note: X = Applicable O = Not applicable A = As applicable
4.32.changed
"Gas injector" means a device for introducing gaseous fuel into the engine or associated intake system. A gas injector shall be considered as a gas flow adjuster.
4.33.changed
"Gas flow adjuster" means a gas flow restricting device, installed downstream of a pressure regulator, controlling gas flow to the engine. The function of a gas flow adjuster can be performed by another component (e.g. gas injector).
4.56.changed
"Finished cylinders" means completed cylinders that are ready for use, typical of normal production, complete with identification marks and external coating including integral insulation and/or protection specified by the manufacturer, but free from non-integral insulation or protection. manufacturer on the design drawing for the cylinder.
4.75.changed
"Commanded stop phase" defines the period of time during which the combustion engine is switched off automatically for fuel saving and is allowed to start again automatically. Part I Approval of specific components of motor vehicles using compressed natural gas (CNG) and/or liquefied natural gas (LNG) in their propulsion system
4.76.added
"Certified cylinder" means a finished cylinder that complies with the tests
described in this Regulation for finished cylinders and is approved.
4.77.added
"CNG compressor" means a device to establish the supply of CNG to the
engine by increasing the pressure of the vapour.
4.78.added
"CNG accumulator" means a device which is used to store CNG downstream
of the LNG vaporizer and/or CNG storage system (cylinder(s)).
Part I
Approval of specific components of motor vehicles using
compressed natural gas (CNG) and/or liquefied natural gas
(LNG) in their propulsion system
6.1.1.changed
In addition to provisions of paragraph 6.1., one of the following additional marks shall be used for automatic cylinder valve which comply with paragraph 2.2.4. of Annex 4A: (a) "H1" 10 [n] stands for the sample size and shall be determined by the Type Approval Authority . (b) "H2" (c) "H3"
8.2.3.added
The CNG accumulator shall be type approved pursuant to the provisions
laid down in Annex 3A to this Regulation, taking into consideration:
(a) The CNG accumulator with a volume ≤ 0.75 liter shall be tested as
Class 6;
(b) The CNG accumulator with a volume > 0.75 liter is considered as a
CNG container(cylinder) with a maximum pressure of 26 MPa;
(c) The CNG accumulator shall be equipped with at least the following
safety components:
(i) Automatic cylinder valve according to paragraph 18.5.1.;
(ii) TPRD according to paragraph 18.5.2.;
(iii) Excess flow limiting according to paragraph 18.5.3.;
(iv) Manual valve according to paragraph 18.5.4.;
(v) Gas tight housing according to paragraph 18.5.5.;
(vi) PRD (pressure triggered) according to paragraph 18.5.6."
8.7.added
CNG Compressor
17.4.1.changed
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval; 12 12 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3, Annex 3 - www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html. https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions.
18.1.6.1.added
Notwithstanding the provisions of paragraph 18.1.6., it shall be possible to
make an external inspection (e.g. for periodic technical inspection) of the
CNG cylinder or LNG tank and their accessories according to the
specifications of the manufacturer, without the use of tools to dismantle, but
with visual aids, e.g. lamps, mirrors or endoscopes.
18.1.7.1.changed
Notwithstanding the provisions of paragraph 18.1.7., vehicles may be fitted with a an extra engine for use on the vehicle (e.g. for cooling, heating system to heat the passenger compartment and/or the load area or a refrigeration system to cool the cargo compartment etc.) which is connected to the CNG and/or LNG system.
18.1.7.2.changed
The heating or refrigeration system secondary engine referred to in paragraph 18.1.7.1. shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the heating or refrigeration system secondary engine is adequately protected and the required operation of the normal CNG and/or LNG system is not affected.
18.1.8.3.changed
The label shall be installed on the front and rear of the vehicle of category M2 M 2 or M3 and on the outside of the doors on the right-hand side (left hand drive vehicles), left-hand side (right hand drive vehicles).
18.5.1.1.changed
An automatic cylinder valve shall be installed directly on each CNG container. container and to each CNG accumulator.
18.5.1.3.changed
Notwithstanding the provisions of paragraph 18.5.1.2.: 18.5.1.2. (a) The automatic cylinder valve may stay in an open position during commanded stop phases; and (b) In the case where a fire alarm system is installed in the autonomous CNG and/or LNG heater compartment, the automatic valve(s) may be opened by an a CNG/LNG electronic control unit to permit the warming of the engine. Any defect or failure of the system shall cause the automatic valve of the cylinder supplying the heating system to close; and (c) In the case where a fire alarm system is installed in the refrigeration system compartment of the cargo compartment, the automatic valve(s) may be opened by an a CNG/LNG electronic control unit to permit the cooling of the cargo compartment. Any defect or failure of the system shall cause the automatic valve of the cylinder supplying the refrigeration system to close; and (d) In the case where a fire alarm system is installed in the secondary engine compartment, the automatic valve(s) may be opened by an electronic control unit to permit the provision of electrical power. Any defect or failure of the system shall cause the automatic valve of the cylinder supplying the refrigeration system to close.
18.5.2.1.changed
The pressure relief device (temperature triggered) shall be fitted to the CNG fuel container(s) and to each CNG accumulator in such a manner that can discharge into the gas-tight housing if that gas- tight gas-tight housing fulfils the requirements of paragraph 18.5.5. below. below.. However, in case of vehicles of categories M and N where the container(s) is (are) fitted outside the vehicle and on the roof or top of the bodywork of the vehicle, the pressure relief device (temperature triggered) shall be fitted to the fuel container(s) in such a manner that it can discharge the CNG only in a vertical upward direction.
18.5.3.1.changed
The excess flow limiting device shall be fitted in the CNG fuel container(s) and on each CNG accumulator on the automatic cylinder valve.
18.5.4.2.added
For accumulators a manual shut-off valve or a mechanism to empty the
accumulator prior to maintenance works shall be added
18.5.5.1.changed
A gas-tight housing over the CNG container(s) container(s)/CNG accumulator fittings, which fulfils the requirements of paragraphs 18.5.5.2. to 18.5.5.5. shall be fitted to the CNG fuel container, container/CNG accumulator, unless the CNG container(s) container(s)/CNG accumulator is installed outside the vehicle. vehicle, outside enclosed spaces such as passenger compartment or cargo area or engine compartment.
18.5.6.2.changed
The PRD (pressure triggered) shall be fitted to the fuel container(s) and to the CNG accumulator in such a manner that it can discharge into the gas-tight gas- tight housing if that gas-tight housing fulfils the requirements of paragraph 18.5.5. above. However, in case of vehicles of category M and N where the container(s) is (are) fitted outside the vehicle and on the roof or on the top of the bodywork of the vehicle, the pressure relief device (pressure triggered) shall be fitted to the fuel container(s) in such a manner that it can discharge the CNG only in a vertical upward direction.
18.5.5.added
above.
However, in case of vehicles of category M and N where the container(s) and/or CNG
accumulator is (are) fitted outside the vehicle and on the roof or on the top of the
bodywork of the vehicle, the pressure relief device (pressure triggered) shall be fitted
to the fuel container(s) and/or to the CNG accumulator in such a manner that it can
discharge the CNG only in a vertical upward direction.
18.5.6.3.added
CNG accumulators shall not be mounted inside the engine compartment
or be mounted in the crash zone of the vehicle, only inside the frame of the
vehicle.
24.21.changed
Contracting Parties applying this Regulation shall continue to accept UN type- approvals to the 02 series of amendments to this Regulation, first issued before 1 September 2021. Annex 1A Annex 1A Essential characteristics of the CNG/LNG components
24.22.added
As from the official date of entry into force of the 04 series of amendments,
no Contracting Party applying this Regulation shall refuse to grant or refuse
to accept type approvals under this Regulation as amended by the 04 series of
amendments.
24.23.added
As from 1 September 2022, Contracting Parties applying this Regulation
shall not be obliged to accept type approvals to the preceding series of
amendments, first issued after 1 September 2022.
24.24.added
Until 1 September 2024, Contracting Parties applying this Regulation shall
accept type approvals to the preceding series of amendments, first issued
before 1 September 2022.
1.2.4.5.8.2.deleted
24.25.added
As from 1 September 2024, Contracting Parties applying this Regulation shall not be
obliged to accept type approvals issued to the preceding series of amendments to this
Annex 1A
Annex 1A
Essential characteristics of the CNG/LNG components
1.2.4.5.2.added
CNG Compressor: yes/no1
1.2.4.5.4.changed
1 Strike out what does not apply. 2 Specify the tolerance. Annex 1A
1.2.4.5.7.changed
LNG tank(s) or vessel(s): yes/no1 CNG accumulator(s): yes/no1
1.2.4.5.15.deleted
1.2.4.5.8.1.added
Annex 1A
1.2.4.5.2.changed
CNG Pressure regulator(s): CNG Compressor:
1.2.4.5.4.changed
1 Specify the tolerance. 2 Strike out what does not apply. Annex 1B
1.2.4.5.7.changed
LNG tank(s) or vessel(s): yes/no2 CNG accumulator(s): yes/no2
1.2.4.5.15.deleted
1.2.5.changed
Annex 2A Annex 2A Arrangement of the CNG/LNG component type approval mark (See paragraph 7.2. of this Regulation) 110 R-032439 R-042439 "L" (or "M" or "C") a 8 mm The above approval mark affixed to the CNG and or LNG component shows that this component has been approved in Italy (E 3), pursuant to Regulation No. 110 under approval number 032439. 042439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 110 as amended by the 03 04 series of amendments. The letter "L" indicates that the product is suitable for use with LNG. The letter "M" indicates that the product is suitable in moderate temperatures. The letter "C" indicates that the product is suitable in cold temperatures. Annex 2B Annex 2B Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a type of CNG/LNG component pursuant to Regulation No. 110
1.changed
CNG/LNG component considered: Container(s) or cylinder(s)2 Tank(s) or vessel(s)2 CNG accumulator(s)2 Pressure indicator2 Pressure relief valve2 Automatic valve(s)2 Excess flow valve2 Gas-tight housing2 Pressure regulator(s)2 Non-return valve(s) or check valve(s)2 Pressure relief device (PRD) (temperature triggered)2 Manual valve2 Flexible fuel lines2 Filling unit or receptacle2 Gas injector(s)2 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 2B Gas injector(s)2 CNG Compressor2 Gas flow adjuster2 Gas/air mixer2 Electronic control unit2 Pressure and temperature sensor(s)2 CNG filter(s)2 PRD (pressure triggered)2 Fuel rail2 Heat exchanger(s) / vaporizer(s)2 Natural gas detector(s)2 LNG filling receptacle(s)2 LNG pressure control regulator(s)2 LNG pressure and/or temperature sensor(s)2 LNG manual valve(s)2 LNG automatic valve(s)2 LNG non-return valve(s)2 LNG pressure relief valve(s)2 LNG excess flow valve(s)2 LNG fuel pump(s)2
1.9.deleted
1.1.3.3.added
Capacity:……………………………………………………………………..
1.21.deleted
1.7.added
1 Specify the tolerance.
Annex 2B - Addendum
1.31.deleted
1.20.added
Annex 2B - Addendum
1.32.added
Annex 2B - Addendum
Annex 2C
Annex 2C
Arrangement of approval marks
Model A
(See paragraph 17.2. of this Regulation)
110 R-042439 "L"
(or "M" or "C")
a 8 mm
The above approval mark affixed to a vehicle shows that the vehicle has, with regard
to the installation of CNG/LNG system for the use of natural gas for propulsion, been
approved in Italy (E 3), pursuant to Regulation No. 110 under approval number 042439. The
first two digits of the approval number indicate that the approval was granted in accordance
with the requirements of Regulation No. 110 as amended by the 04 series of amendments.
The letter "L" indicates that the product is suitable for use with LNG.
The letter "M" indicates that the product is suitable in moderate temperatures.
The letter "C" indicates that the product is suitable in cold temperatures.
Model B
(See paragraph 17.2. of this Regulation)
110 042439 "L"
83 051628
(or "M" or "C")
a 8 mm
The above approval mark affixed to a vehicle shows that the vehicle has, with regard
to the installation of CNG/LNG system for the use of natural gas for propulsion, been
approved in Italy (E 3), pursuant to Regulation No. 110 under approval number 042439.
The first two digits of the approval number indicate that at the date the approval was
granted in accordance with the requirements of Regulation No. 110 as amended by the 04
series of amendments and that Regulation No. 83 included the 05 series of amendments.
The letter "L" indicates that the product is suit…
11.changed
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 2D
18.changed
The following documents filed with the application or extension of approval can be obtained upon request: Drawings, diagrams and scheme plans on the components and the installation of the CNG/LNG equipment considered to be of importance for the purpose of this Regulation; Where applicable drawings of the various equipment and their position in the vehicle. Annex 3
1.2.changed
Annex 3B sets out minimum requirements for refillable fuel tanks for liquefied natural gas (LNG) used in vehicles as well as the testing methods required. Annex 3A Annex 3A Gas cylinders - — High pressure cylinder for the on-board storage of CNG compressed natural gas as a fuel for automotive vehicles
4.1.2.changed
The service conditions specified are also intended to provide information on how cylinders made to this Regulation may safely be used to: (a) Manufacturers of cylinders; (b) Owners of certified cylinders; (c) Designers or contractors responsible for the installation of cylinders; (d) Designers or owners of equipment used to refuel vehicle cylinders; (e) Suppliers of natural gas; and (f) Regulatory authorities who have jurisdiction over cylinder use.
4.1.3.changed
The service life for which certified cylinders are safe shall be specified by the cylinder designer on the basis of use under service conditions specified herein. The maximum service life shall be 20 years.
4.1.4.changed
Recommendations for periodic requalification by visual inspection or testing during the service life shall be provided by the cylinder manufacturer on the basis of use under service conditions specified herein. Each certified cylinder shall be visually inspected at least every 48 months after the date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration, including deterioration. It is suggested to visually inspect under the support straps. straps as well. The visual inspection shall be performed by a competent agency approved or recognized by the Regulatory Authority, in accordance with consideration of the manufacturer's specifications: Cylinders Certified cylinders without label containing mandatory information or with labels containing mandatory information that are illegible in any way shall be removed from service. If the certified cylinder can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the certified cylinder to remain in service. Contracting Parties requiring a more frequent (than every 48 months) or more stringent periodic requalification of cylinders may do so in accordance with the national or regional requirements.
4.1.4.1.changed
Cylinders which have been involved in a vehicle collision shall be reinspected by an agency authorized by the manufacturer, unless otherwise directed by the Authority having jurisdiction. A certified cylinder that has not experienced any impact damage from the collision may be returned to service, otherwise the certified cylinder shall be returned to the manufacturer for evaluation. 4.1.4.2 Cylinders involved in fires Cylinders which Certified cylinders that have been subject to the action of fire shall be reinspected by an agency authorized by the manufacturer, or condemned and removed from service.
4.2.changed
The cylinder pressure shall be limited to the following: Annex 3A (a) A pressure that would settle to 20 MPa at a settled temperature of 15 °C; (b) 26 MPa, immediately after filling, regardless of temperature; Annex 3A
4.5.changed
Methanol and/or glycol shall not be deliberately added to the natural gas. Cylinder should be designed to tolerate being filled with natural gas meeting either of the following three conditions: (a) SAE J1616 (b) Dry gas Water vapour would normally be limited to less than 32 mg/m3 mg/m 3 at a pressure dew point of -9 °C at 20 MPa. There would be no constituent limits for dry gas, except for: Hydrogen sulphide and other soluble sulphides: 23 mg/m3 Oxygen: 1 per cent by volume Hydrogen shall be limited to 2 per cent by volume when cylinders are manufactured from steel with an ultimate tensile strength exceeding 950 MPa; (c) Wet gas Gas that contains water content higher than b) normally meets the following constituent limits; Hydrogen sulphide and other soluble sulphides: 23 mg/m3 Oxygen: 1 per cent by volume Carbon dioxide: 4 per cent by volume Hydrogen: 0.1 per cent by volume Annex 3A Under wet gas conditions, a minimum of 1 mg of compressor oil per kg of gas is necessary to protect metallic cylinders and liners. Annex 3A
5.2.changed
The purpose of this statement of service is to guide users and installers of cylinders as well as to inform the approving Type Approval Authority, or their designated representative. The statement of service shall include: (a) A statement that the cylinder design is suitable for use in the service conditions defined in paragraph 4. for the service life of the cylinder; Annex 3A (b) The service life; (c) The minimum in-service test and/or inspection requirements; Annex 3A (d) The pressure relief devices and/or insulation required; (e) Support methods, protective coatings, etc., required but not provided; (f) A description of the cylinder design; (g) Any other information necessary to ensure the safe use and inspection of the cylinder.
5.3.5.changed
The arrangement of pressure relief devices that will protect the cylinder from sudden rupture when exposed to the fire conditions in paragraph A.15 of Annex 3A Appendix A to this annex shall be specified. Test data shall substantiate the effectiveness of the specified fire protection system. Annex 3A
6.12.changed
The exterior of cylinders shall meet the requirements of the environmental test conditions of paragraph A.14. (Appendix A to this annex). Exterior protection shall be provided by using any of the following: (a) A surface finish giving adequate protection (e.g. metal sprayed on aluminium, anodizing); or (b) The use of a suitable fibre and matrix material (e.g. carbon fibre in resin); or (c) A protective coating (e.g. organic coating, paint) that shall meet the requirements of paragraph A.9. (Appendix A to this annex). Any coatings or protections applied to cylinders shall be such that the application process does not adversely affect the mechanical properties of the cylinder. The coating or protection shall be designed to facilitate subsequent in service inspection and the manufacturer shall provide guidance on coating or protection treatment during such inspection to ensure the continued integrity of the cylinder.
6.17.changed
A design change is any change in the selection of structural materials or dimensional change not attributable to normal manufacturing tolerances. Minor design changes shall be permitted to be qualified through a reduced test program. Changes of design specified in Table 6.7 below shall require design qualification testing as specified in the table. Annex 3A Material design qualification test Relevant paragraph of this annex Steel Aluminium Resins Fibres Plastic liners Tensile properties 6.3.2.2. 6.3.3.4. 6.3.5. 6.3.6. Impact properties 6.3.2.3. Sulphide stress cracking resistance 6.3.2.4. Sustained load crack resistance 6.3.3.3. Stress corrosion cracking 6.3.3.2. Shear strength 6.3.4.2. Glass transition temperature 6.3.4.3. Softening/Melting temperature 6.3.6. Fracture mechanics* 6.7. 6.7. * Not required if flawed cylinder test approach in paragraph A.7. of Appendix A to this annex is used. Impact test acceptable values Cylinder diameter D [mm] > 140 140 Direction of testing transverse longitudinal Width of test piece [mm] 3-5 > 5 - 7.5 > 7.5 - 10 3 to 5 Test temperature [C] -50 -50 Impact strength [J/cm²] Mean of 3 specimens 30 35 40 60 Individual specimen 24 28 32 48 Minimum actual burst values and stress ratios CNG-1 CNG-2 CNG-3 CNG-4 All-metal Hoop-wrapped Fully-wrapped All-composite Burst Stress Burst Stress Burst Stress Burst pressure ratio pressure ratio pressure ratio pressure [MPa] [MPa] [MPa] [MPa] [MPa] [MPa] [MPa] All metal 45 Glass 2.75 50 1) 3.65 70 1) 3.65 73 Aramid 2.35 47 3.10 60 1) 3.1 62 Carbon 2.35 47 2.35 47 2.35 47 Hybrid 2) 2) 2) Hybrid Note 1) - Minimum actual burst pressure. In addition, calculations shall be performed in accordance with paragraph 6.5. of this annex to confirm that the minimum stress ratio requirements are also met. Note 2) - Stress ratios and burst pressures shall be calculated in accordance with paragraph 6.5. of this annex. Annex 3A Cylinder design qualification tests Cylinder type Test and annex reference CNG-1 CNG-2 CNG-3 CNG-4 A.12. Burst X* X X X A.13. Ambient temperature/cycle X* X X X A.14. Environmental test X X X A.15. Bonfire X X X A.16. Penetration X X X X A.17. Flaw tolerance X X X X A.18. High temperature creep X X X A.19. Stress rupture X X X A.20. Drop test X X A.21. Permeation X A.24. PRD performance X X X A.25. Boss torque test X X A.27. Natural gas cycling X A.6. LBB assessment X X A.7. Extreme temperature/cycle X X X X X = required * = Not required for cylinders designed to ISO 9809 (ISO 9809 already provides for these tests). Annex 3A Batch tests Cylinder type Test and annex reference CNG-1 CNG-2 CNG-3 CNG-4 A.12. Burst X X X X A.13. Ambient temperature/cycle X X X X A.1. Tensile X X† X† A.2. Impact (steel) X X† X† A.9.2. Coating* X X X X X = required * = Except where no protective coating is used † = Tests on liner material Critical production inspection requirements Type Cylinder type Inspection requirements CNG-1 CNG-2 CNG-3 CNG-4 Critical dimensions X X X X Surface finish X X X X Flaws (ultrasonic or equivalent) X X X Hardness of metal cylinders and metal X X X liners Hydrostatic proof test X X X X Leak test X Markings X X X X X = required Annex 3A Change of design Type of test High temp: Permeation Creep A.18 A.21 CNG Stress Boss Cycling rupture torque A.19 A.25 PRD Burst ambient Flaw Hydrostatic temp: Environm. Bonfire Penetration tolerance Drop test Cycling performance Design change A.12 A.13 A.14 A.15 A.16 A.17 A.20 A.27 A.24 Fibre X X X* X† manufacturer Metallic cylinder or X X X* X X* X X* liner material Plastic liner X X X† material Fibre material X X X X X X X X† Resin material X X X X Diameter change X X 20 per cent Diameter change X X X X* X > 20 per cent Length change X X‡ 50 per cent Length change X X X‡ > 50 per cent Working pressure X X change 20 per cent@ Dome shape design X X X** X† Opening size X X Coating change X End boss X† design Change in X X manuf. process Pressure relief X X device X = required * Test not required on metal (CNG-1) designs: ** Drop test A.20 only required for CNG-3 and CNG-4 designs † Test only required on all-composite (CNG-4) designs ‡ Test only required when length increases @ Only when thickness changes proportional to diameter and/or pressure change. Annex 3A
10.7.1.changed
Cylinder design qualification tests shall be in accordance with the requirements of paragraphs 8.6., 10.7.2., 10.7.3. 10.7.3., 10.7.4. and 10.7.4. 10.7.5. of this annex, except that the LBB performance in paragraph 8.6.10. above is not required.
10.7.5.added
One or more finished cylinders shall be subjected to an impact damage test
according to Appendix A, paragraph A.20.
11.1.changed
On each cylinder the manufacturer shall provide clear permanent markings not less than 6 mm high. Marking shall be made either by labels incorporated into resin coatings, labels attached by adhesive, low stress stamps used on the thickened ends of type CNG-1 and CNG-2 designs, or any combination of the above. Adhesive labels and their application shall be in accordance with ISO 7225, or an equivalent standard. Multiple labels are allowed and should be located such that they are not obscured by mounting brackets. Each cylinder complying with this annex shall be marked as follows: (a) Mandatory information: (i) "CNG ONLY"; (ii) "DO NOT USE AFTER XX/XXXX", where "XX/XXX" identifies the month and year of expiry;1 (iii) Manufacturer's identification; (iv) Cylinder identification (applicable part number and a serial number unique for every cylinder); (v) Working pressure and temperature; (vi) ECE Regulation number, along with cylinder type and certification registration number; (vii) The pressure relief devices and/or valves which are qualified for use with the cylinder, or the means for obtaining information on qualified fire protection systems; 1 The expiry date shall not exceed the specified service life. The expiry date may be applied to the cylinder at the time of dispatch, provided that the cylinders have been stored in a dry location without internal pressure. Annex 3A (vii) The pressure relief devices and/or valves which are qualified for use with the cylinder, or the means for obtaining information on qualified fire protection systems; (viii) When labels are used, all cylinders shall have a unique identification number stamped on an exposed metal surface to permit tracing in the event that the label is destroyed. (b) Non-mandatory information: On a separate label(s) the following non-mandatory information may be provided: (i) Gas temperature range, e.g. -40 °C to 65 °C; (ii) Nominal water capacity of the cylinder to two significant numbers. e.g. 120 litres; (iii) Date of original pressure test (month and year). The markings shall be placed in the listed sequence but the specific arrangement may be varied to match the space available. An acceptable example of mandatory information is: CNG ONLY Manufacturer/Part Number/Serial Number 20 MPa/15 C ECE R 110 CNG-2 (registration No. …) "Use Only Manufacturer-Approved Pressure Relief Device"
12.changed
Prior to dispatch from the manufacturers shop, every cylinder shall be internally clean and dried. Cylinders not immediately closed by the fitting of a valve, and safety devices if applicable, shall have plugs, which prevent entry of moisture and protect threads, fitted to all openings. A corrosion inhibitor (e.g. oil-containing) shall be sprayed into all steel cylinders and liners prior to dispatch. The manufacturer's statement of service and all necessary information to ensure the proper handling, use and in-service inspection of the cylinder shall be supplied to the purchaser. The statement shall be in accordance with Appendix D to this annex. Annex 3A – Appendix A Annex 3A - Appendix A Test methods A.1. Tensile tests, steel and aluminum A tensile test shall be carried out on the material taken from the cylindrical part of the finished cylinder using a rectangular test piece shaped in accordance with the method described in ISO 9809 for steel and ISO 7866 for aluminum. The two faces of the test pieces representing the inside and outside surface of the cylinder shall not be machined. The tensile test shall be carried out in accordance with ISO 6892. Note - Attention is drawn to the method of measurement of elongation described in ISO 6892, particularly in cases where the tensile test piece is tapered, resulting in a point of fracture away from the middle of the gauge length. A.2. Impact test, steel cylinders and steel liners The impact test shall be carried out on the material taken from the cylindrical part of the finished cylinder on three test pieces in accordance with ISO 148. The impact test pieces shall be taken in the direction as required in Table 6.2 of Annex 3A from the wall of the cylinder. The notch shall be perpendicular to the face of the cylinder wall. For longitudinal tests the test piece shall be machined all over (on six faces), if the wall thickness does not permit a final test piece width of 10 mm, the width shall be as near as practicable to the nominal thickness of the cylinder wall. The test pieces taken in transverse direction shall be machined on four faces only, the inner and outer face of the cylinder wall unmachined. A.3. Sulphide stress cracking test for steel Except as identified in the following, testing shall be conducted in accordance with Method A-NACE Standard Tensile Test procedures, as described in NACE Standard TM0177-96. Tests shall be conducted on a minimum of three tensile specimens with a gauge diameter of 3.81 mm (0.150 inches) machined from the wall of a finished cylinder or liner. The specimens shall be placed under a constant tensile load equal to 60 per cent of the specified minimum yield strength of the steel, immersed in a solution of distilled water buffered with 0.5 per cent (mass fraction) sodium acetate trihydrate and adjusted to an initial pH of 4.0, using acetic acid. The solution shall be continuously saturated at room temperature and pressure with 0.414 kPa (0.06 psia) hydrogen sulphide (balance nitrogen). The tested specimens shall not fail within a test duration of 144 hours. A.4. Corrosion tests, aluminium Corrosion tests for aluminium alloys shall be carried out in accordance with Annex A of ISO/DIS 7866 and meet the requirements therein. A.5. Sustained load cracking tests, aluminium The resistance to SLC shall be carried out in accordance with Annex D of ISO/DIS 7866 and shall meet the requirements therein; A.6. Leak-Before-Break (LBB) performance test Three finished cylinders shall be pressure cycled between not more than 2 MPa and nor less than 30 MPa at a rate not to exceed 10 cycles per minute. Annex 3A – Appendix A All cylinders shall fail by leakage. A.7. Extreme temperature pressure cycling Finished cylinders, with the composite wrapping free of any protective coating, shall be cycle tested, without showing evidence of rupture, leakage, or fibre unravelling, as follows: (a) Condition for 48 hours at zero pressure, 65 °C or higher, and 95 per cent or greater relative humidity. The intent of this requirement shall be deemed met by spraying with a fine spray or mist of water in a chamber held at 65 °C; (b) Hydrostatically pressurized for 500 cycles times the specified service life in years between not more than 2 MPa and not less than 26 MPa at 65 °C or higher and 95 per cent humidity; (c) Stabilize at zero pressure and ambient temperature; (d) Then pressurize from not more than 2 MPa to not less than 20 MPa for 500 cycles times the specified service life in years at -40 °C or lower; The pressure cycling rate of (b) shall not exceed 10 cycles per minute. The pressure cycling rate of (d) shall not exceed 3 cycles per minute unless a pressure transducer is installed directly within the cylinder. Adequate recording instrumentation shall be provided to ensure the minimum temperature of the fluid is maintained during the low temperature cycling. Following pressure cycling at extreme temperatures, cylinders shall be hydrostatically pressured to failure in accordance with the hydrostatic burst test requirements, and achieve a minimum burst pressure of 85 per cent of the minimum design burst pressure. For type CNG-4 designs, prior to the hydrostatic burst test the cylinder shall be leak tested in accordance with paragraph A.10. below. A.8. Brinell hardness test Hardness tests shall be carried out on the parallel wall at the centre and a domed end of each cylinder or liner in accordance with ISO 6506. The test shall be carried out after the final heat treatment and the hardness values thus determined shall be in the range specified for the design. A.9. Coating tests (mandatory if paragraph 6.12.(c)) of Annex 3A is used) A.9.1. Coating performance tests Coatings shall be evaluated using the following test methods, or using equivalent national standards. (a) Adhesion testing in accordance with ISO 4624 using Method A or B as applicable. The coating shall exhibit an adhesion rating of either 4A or 4B, as applicable; (b) Flexibility in accordance with ASTM D522 Mandrel Bend Test of Attached Organic Coatings, using Test Method B with a 12.7 mm (0.5 inch) mandrel at the specified thickness at -20 °C. Samples for the flexibility test shall be prepared in accordance with the ASTM D522 standard. There shall not be any visually apparent cracks; (c) Impact resistance in accordance with ASTM D2794 Test method for Resistance of Organic Coatings to the Effects of Rapid Deformation Annex 3A – Appendix A (Impact). The coating at room temperature shall pass a forward impact test of 18 J (160 in-lbs); (d) Chemical resistance when tested in general accordance with ASTM D1308 Effect of Household Chemicals on Clear and Pigmented Organic Finishes. The tests shall be conducted using the Open Spot Test Method and 100 hour exposure to a 30 per cent sulfuric acid solution (battery acid with a specific gravity of 1.219) and 24 hours exposure to a polyalkalene glycol (e.g. brake fluid). There shall be no evidence of lifting, blistering or softening of the coating. The adhesion shall meet a rating of 3 when tested in accordance with ASTM D3359; (e) Minimum 1,000 hours exposure in accordance with ASTM G53 Practice for Operating Light- and Water-Exposure Apparatus (Fluorescent W-Condensation Type) for Exposure of non-metallic Materials. There shall be no evidence of blistering, and adhesion shall meet a rating of 3 when tested in accordance with ISO 4624. The maximum gloss loss allowed is 20 per cent; (f) Minimum 500 hours exposure in accordance with ASTM B117 Test Method of Salt Spray (Fog) Testing. Undercutting shall not exceed 3 mm at the scribe mark, there shall be no evidence of blistering, and adhesion shall meet a rating of 3 when tested in accordance with ASTM D3359; (g) Resistance to chipping at room temperature using the ASTM D3170 Chipping Resistance of Coatings. The coating shall have a rating of 7A or better and there shall not be any exposure of the substrate. A.9.2. Coating batch tests (a) Coating thickness The thickness of the coating shall meet the requirements of the design when tested in accordance with ISO 2808; (b) Coating adhesion The coating adhesion strength shall be measured in accordance with ISO 4624, and shall have a minimum rating of 4 when measured using either Test Method A or B, as appropriate. A.10. Leak test Type CNG-4 designs shall be leak tested using the following procedure (or an acceptable alternative); (a) Cylinders shall be thoroughly dried and pressurized to working pressure with dry air or nitrogen, and containing a detectable gas such as helium; (b) Any leakage measured at any point that exceeds 0.004 standard cm3/h cm 3/h shall be cause for rejection. A.11. Hydraulic test One of the following two options shall be used: Option 1: Water jacket test Annex 3A – Appendix A (a) The cylinder shall be hydrostatically tested to at least 1.5 times working pressure. In no case may the test pressure exceed the auto-frettage pressure; (b) Pressure shall be maintained for a sufficiently long period (at least 30 seconds) to ensure complete expansion. Any internal pressure applied after auto-frettage and previous to the hydrostatic test shall not exceed 90 per cent of the hydrostatic test pressure. If the test pressure cannot be maintained due to failure of the test apparatus, it is permissible to repeat the test at a pressure increased by 700 kPa. Not more than 2 such repeat rests are permitted; (c) The manufacturer shall define the appropriate limit of permanent volumetric expansion for the test pressure used, but in no case shall the permanent expansion exceed 5 per cent of the total volumetric expansion measured under the test pressure. For type CNG-4 designs, the elastic expansion shall be established by the manufacturer. Any cylinders not meeting the defined rejection limit shall be rejected and either destroyed or used for batch test purposes. Option 2: Proof pressure test The hydrostatic pressure in the cylinder shall be increased gradually and regularly until the test pressure, at least 1.5 times the working pressure, is reached. The cylinder test pressure shall be held for a sufficiently long period (at least 30 seconds) to ascertain that there is no tendency for the pressure to decrease and that tightness is guaranteed. A.12. Hydrostatic pressure burst test (a) The rate of pressurisation shall not exceed 1.4 MPa per second (200 psi/second) at pressures in excess of 80 per cent of the design burst pressure. If the rate of pressurisation at pressures in excess of 80 per cent of the design burst pressure exceeds 350 kPa/second (50 psi/second), then either the cylinder shall be placed schematically between the pressure source and the pressure measurement device, or there shall be a 5 second hold at the minimum design burst pressure; (b) The minimum required (calculated) burst pressure shall be at least 45 MPa, and in no case less than the value necessary to meet the stress ratio requirements. Actual burst pressure shall be recorded. Rupture may occur in either the cylindrical region or the dome region of the cylinder. A.13. Ambient temperature pressure cycling Pressure cycling shall be performed in accordance with the following procedure: (a) Fill the cylinder to be tested with a non-corrosive fluid such as oil, inhibited water or glycol; (b) Cycle the pressure in the cylinder between not more than 2 MPa and not less than 26 MPa at a rate not to exceed 10 cycles per minute. The number of cycles to failure shall be reported, along with the location and description of the failure initiation. A.14. Environmental test Annex 3A – Appendix A A.14.1. Scope This test is applicable to type CNG-2, CNG-3 and CNG-4 designs only. A.14.2. Cylinder set-up and preparation The upper section of the cylinder will be divided into 5 distinct areas and marked for preconditioning and fluid exposure (see Figure A.1). The areas will be nominally 100 mm in diameter. The areas shall not overlap on the cylinder surface. While convenient for testing, the areas need not be oriented along a single line, but shall not overlap the immersed section of the cylinder. Although preconditioning and fluid exposure is performed on the cylindrical section of the cylinder, all of the cylinder, including the domed sections, should be as resistant to the exposure environments as are the exposed areas. Figure A.1 Cylinder orientation and layout of exposure areas A.14.3. Pendulum impact preconditioning The impact body shall be of steel and have the shape of a pyramid with equilateral triangle faces and a square base, the summit and the edges being rounded to a radius of 3 mm. The centre of percussion of the pendulum shall coincide with the centre of gravity of the pyramid; its distance from the axis of rotation of the pendulum shall be 1 m. The total mass of the pendulum referred to its centre of percussion shall be 15 kg. The energy of the pendulum at the moment of impact shall be not less than 30 Nm and as close to that value as possible. During pendulum impact, the cylinder shall be held in position by the end bosses or by the intended mounting brackets. The cylinder shall be un- pressurized during preconditioning. A.14.4. Environmental fluids for exposure Each marked area is to be exposed to one of five solutions for 30 minutes. The same environment shall be used for each location throughout the test. The solutions are: Sulphuric acid: 19 per cent solution by volume in water; Sodium hydroxide: 25 per cent solution by weight in water; 5% Methanol/95% gasoline: gasoline concentration of M5 fuel meeting the requirements of ASTM D4814; Ammonium nitrate: 28 per cent by weight in water; Windshield washer fluid 50 per cent by volume solution of methyl alcohol and water. Annex 3A – Appendix A When exposed, the test sample will be oriented with the exposure area uppermost. A pad of glass wool (approximately 0.5 mm thick and between 90 and 100 mm in diameter) shall be placed on the exposure area. Apply an amount of the test fluid to the glass wool sufficient to ensure that the pad is wetted evenly across its surface and through its thickness for the duration of the test, and that the concentration of the fluid is not changed significantly during the duration of the test. A.14.5. Pressure cycle and hold The cylinder shall be hydraulically pressure cycled between not more than 2 MPa and not less than 26 MPa for a total of 3,000 cycles. The maximum pressurization rate shall be 2.75 MPa per second. After pressure cycling, the cylinder shall be pressurized to 26 MPa and held at that pressure a minimum of 24 hours and until the elapsed exposure time (pressure cycling and pressure hold) to the environmental fluids equals 48 hours. A.14.6. Acceptable results The cylinder shall be hydraulically tested to destruction in accordance with the procedure in paragraph A.12. The burst pressure of the cylinder shall be not less than 85 per cent of the minimum design burst pressure." A.15. Bonfire test A.15.1. General The bonfire tests are designed to demonstrate that finished cylinders complete with the fire protection system (cylinder valve, pressure relief devices and/or integral thermal insulation) specified in the design will not burst when tested under the specified fire conditions. Extreme caution shall be exercised during fire testing in the event that cylinder rupture occurs; A.15.2. Cylinder set-up Cylinders shall be placed horizontally with the cylinder bottom approximately 100 mm above the fire source; Metallic shielding shall be used to prevent direct flame impingement on cylinder valves, fittings, and/or pressure relief devices. The metallic shielding shall not be in direct contact with the specified fire protection system (pressure relief devices or cylinder valve). Any failure during the test of a valve, fitting or tubing that is not part of the intended protection system for the design shall invalidate the result. A.15.3. Fire source A uniform fire source of 1.65 m length shall provide direct flame impingement on the cylinder surface across its entire diameter. Any fuel may be used for the fire source provided it supplies uniform heat sufficient to maintain the specified test temperatures until the cylinder is vented. The selection of fuel should take into consideration air pollution concerns. The arrangement of the fire shall be recorded in sufficient detail to ensure the rate of heat input to the cylinder is reproducible. Any failure or inconsistency of the fire source during a test invalidates the result. A.15.4. Temperature and pressure measurements Surface temperatures shall be monitored by at least three thermocouples located along the bottom of the cylinder and spaced not more than 0.75 m Annex 3A – Appendix A apart. Metallic shielding shall be used to prevent direct flame impingement on the thermocouples. Alternatively, thermocouples may be inserted into blocks of metal measuring less than 25 square mm. The pressure inside the cylinder shall be measured by a pressure sensor without modify the configuration of the system under test. Thermocouple temperatures and the cylinder pressure shall be recorded at intervals of every 30 seconds or less during the test. A.15.5. General test requirements Cylinders shall be pressurized with natural gas and tested in the horizontal position at both: (a) Working pressure; (b) 25 per cent of the working pressure. Immediately following ignition, the fire shall produce flame impingement on the surface of the cylinder along the 1.65 m length of the fire source and across the cylinder diameter. Within 5 minutes of ignition, at least one thermocouple shall indicate a temperature of at least 590 °C. This minimum temperature shall be maintained for the remaining duration of the test. A.15.6. Cylinders 1.65 m length or less The centre of the cylinder shall be positioned over the centre of the fire source; A.15.7. Cylinders greater than 1.65 m length If the cylinder is fitted with a pressure relief device at one end, the fire source shall commence at the opposite end of the cylinder. If the cylinder is fitted with pressure relief devices at both ends, or at more than one location along the length of the cylinder, the centre of the fire source shall be centred midway between the pressure relief devices that are separated by the greatest horizontal distance. If the cylinder is additionally protected using thermal insulation, then two fire tests at service pressure shall be performed, one with the fire centred midway along the cylinder length, and the other with the fire commencing at one of the cylinder ends. A.15.8. Acceptable results The cylinder shall vent through a pressure relief device. A.16. Penetration tests A cylinder pressurised to 20 MPa ± 1 MPa with compressed gas shall be penetrated by an armour piercing bullet with a diameter of 7.62 mm or greater. The bullet shall completely penetrate at least one side wall of the cylinder. For type CNG-1 designs, the projectile shall impact the side wall at 90°. For type CNG-2, CNG-3 and CNG-4 designs, the projectile shall impact the side wall at an approximate angle of 45°. The cylinder shall reveal no evidence of fragmentation failure. Loss of small pieces of material, each not weighing more than 45 grams, shall not constitute failure of the test. The approximate size of entrance and exit openings and their locations shall be recorded. A.17. Composite flaw tolerance tests Annex 3A – Appendix A For type CNG-2, CNG-3 and CNG-4 designs only, one finished cylinder, complete with protective coating, a flaw tolerance test shall have be performed on the cylindrical wall as well as on the minimum composite wall thickness of the weakest part(s) of the container as identified by an appropriate stress analysis as determined in Annex 3A, Appendix F, paragraph F.1. or full scale tests on finished cylinders. The flaws shall be cut in the longitudinal direction cut into the composite. The flaws shall be greater than the visual inspection limits as specified by the manufacturer. The flawed cylinder shall then be pressure cycled from not more than 2 MPa to not less than 26 MPa for 3,000 cycles, followed by an additional 12,000 cycles at ambient temperature; The cylinder shall not leak or rupture within the first 3,000 cycles, but may fail by leakage during the last 12,000 cycles. All cylinders which complete this test shall be destroyed. A.18. High temperature creep test This test is required for all type CNG-4 designs, and all type CNG-2 and CNG-3 designs in which the glass transition temperature of the resin matrix does not exceed the maximum design material temperature given in paragraph 4.4.2. of Annex 3A by at least 20 °C. One finished cylinder shall be tested as follows: (a) The cylinder shall be pressurised to 26 MPa and held at a temperature of 100 °C for not less than 200 hours; (b) Following the test, the cylinder shall meet the requirements of the hydrostatic expansion test A.11., the leak test A.10., and the burst test A.12. above. A.19. Accelerated stress rupture test For type CNG-2, CNG-3, and CNG-4 designs only, one cylinder free of protective coating shall be hydrostatically pressurised to 26 MPa while immersed in water at 65 °C. The cylinder shall be held at this pressure and temperature for 1,000 hours. The cylinder shall then be pressured to burst in accordance with the procedure defined in paragraph A.12. above except that the burst pressure shall exceed 85 per cent of the minimum design burst pressure. A.20. Impact damage test One or more finished cylinders shall be drop tested at ambient temperature without internal pressurisation or attached valves. The surface onto which the cylinders are dropped shall be a smooth, horizontal concrete pad or flooring. One cylinder shall be dropped in a horizontal position with the bottom 1.8 m above the surface onto which it is dropped. One cylinder shall be dropped vertically on each end at a sufficient height above the floor or pad so that the potential energy is 488 J, but in no case shall the height of the lower end be greater than 1.8 m. One cylinder shall be dropped at a 45° angle onto a dome from a height such that the centre of gravity is at 1.8 m; however, if the lower end is closer to the ground than 0.6 m, the drop angle shall be changed to maintain a minimum height of 0.6 m and a centre of gravity of 1.8 m. Following the drop impact, the cylinders shall be pressure cycled from not more than 2 MPa to not less than 26 MPa for 1,000 cycles times the specified service life in years. The cylinders may leak but not rupture, during the cycling. Any cylinders completing the cycling test shall be destroyed. Annex 3A – Appendix A A.21. Permeation test This test is only required on type CNG-4 designs. One finished cylinder shall be filled with compressed natural gas or a 90 per cent nitrogen/10 per cent helium mixture to working pressure, placed in an enclosed sealed chamber at Annex 3A – Appendix A ambient temperature, and monitored for leakage for a time sufficient to establish a steady state permeation rate. The permeation rate shall be less than 0.25 ml of natural gas or helium per hour per litre water capacity of the cylinder. A.22. Tensile properties of plastics The tensile yield strength and ultimate elongation of plastic liner material shall be determined at -50 °C using ISO 527-2, and meet the requirements of paragraph 6.3.6. of Annex 3A. A.23. Softening temperature of plastics Polymeric materials from finished liners shall be tested in accordance with the method described in ISO 306. The softening temperature shall be at least 100 °C . A.24. Pressure relief device requirements Pressure relief device specified by the manufacturer shall be shown to be compatible with the service conditions listed in paragraph 4. of Annex 3A and through the following qualification tests: (a) One specimen shall be held at a controlled temperature of not less than 95 °C and a pressure not less than test pressure (30 MPa) for 24 hours. At the end of this test there shall be no leakage or visible sign of extrusion of any fusible metal used in the design. (b) One specimen shall be fatigue tested at a pressure cycling rate not to exceed 4 cycles per minute as follows: (i) Held at 82 °C while pressured for 10,000 cycles between 2 MPa and 26 MPa; (ii) Held at -40 °C while pressure for 10,000 cycles between 2 MPa and 20 MPa. At the end of this test there shall be no leakage, or any visible sign of extrusion of any fusible metal used in the design. (c) Exposed brass pressure retaining components of pressure relief devices shall withstand, without stress corrosion cracking, a mercurous nitrate test as described in ASTM B154. The pressure relief device shall be immersed for 30 minutes in an aqueous mercurous nitrate solution containing 10 g of mercurous nitrate and 10 ml of nitric acid per litre of solution. Following the immersion, the pressure relief device shall be leak tested by applying an aerostatic pressure of 26 MPa for one minute during which time the component shall be checked for external leakage; Any leakage shall not exceed 200 cm3/h; cm 3/h; (d) Exposed stainless steel pressure retaining components of pressure relief devices shall be made of an alloy type resistant to chloride induced stress corrosion cracking. Annex 3A – Appendix A A.25. Boss torque test The body of the cylinder shall be restrained against rotation and a torque of 500 Nm shall be applied to each end boss of the cylinder, first in the direction to tighten a threaded connection, then in the untightening direction, and finally again in the tightening direction. Annex 3A – Appendix A A.26. Resin shear strength Resin materials shall be tested on a sample coupon representative of the composite over-wrap in accordance with ASTM D2344, or an equivalent national standard. Following a 24-hour water boil the composite shall have a minimum shear strength of 13.8 MPa. A.27. Natural gas cycling test One finished cylinder shall be pressure cycled using compressed natural gas from less than 2 MPa to working pressure for 300 cycles. Each cycle, consisting of the filling and venting of the cylinder, shall not exceed 1 hour. The cylinder shall be leak tested in accordance with paragraph A.10. above and meet the requirements therein. Following the completion of the natural gas cycling the cylinder shall be sectioned and the liner/end boss interface inspected for evidence of any deterioration, such as fatigue cracking or electrostatic discharge. Note - Special consideration shall be given to safety when conducting this test. Prior to conducting this test, cylinders of this design shall have successfully passed the test requirements of paragraph A.12. above (hydrostatic pressure burst test), paragraph 8.6.3. of Annex 3A (ambient temperature pressure cycling test) and paragraph A.21. above (permeation test). Prior to conducting this test, the specific cylinders to be tested shall pass the test requirements of paragraph A.10. above (leak test). Annex 3A – Appendix B Annex 3A - Appendix B (Not allocated) Annex 3A – Appendix C Annex 3A - Appendix C (Not allocated) Annex 3A – Appendix D Annex 3A - Appendix D Report forms Note - This appendix is not a mandatory part of this annex. The following forms should be used: (1) Report of Manufacture and Certificate of Conformity - Required to be clear, legible and in the format of Form 1. (2) Report1 of Chemical Analysis of Material for Metallic Cylinders, Liners, or Bosses - Required essential elements, identification, etc. (3) Report1 of Mechanical Properties of Material for Metallic Cylinders and Liners - Required to report all tests required by this Regulation. (4) Report1 of Physical and Mechanical Properties of Materials for Non-Metallic Liners - Required to report all tests and information required in this Regulation. (5) Report1 of Composite Analysis - Required to report all tests and data required in this Regulation. (6) Report of Hydrostatic Tests, Periodic Pressure Cycling and Burst Tests - Required to report test and data required in this Regulation. Form 1: Report of Manufacturer and Certificate of Conformity Manufactured by: Located at: Regulatory Registration Number: Manufacturers Mark and Number: Serial Number: from ……… to ……… inclusive ……… Cylinder description: SIZE: Outside diameter: ………mm; Length: ………mm; Marks stamped on shoulder or on labels of the cylinder are: 1 Report Forms 2 through 6 shall be developed by the manufacturer and shall fully identify cylinders and requirements. Each report shall be signed by the Type Approval Authority and the manufacturer. Annex 3A – Appendix D Each cylinder was made in compliance with all requirements of Regulation of test results are attached. I hereby certify that all these test results proved satisfactory in every way and are in compliance with the requirements for the type listed above. Annex 3A – Appendix E Annex 3A - Appendix E Verification of stress ratios using strain gauges
2.1.3.changed
Recommendations for periodic requalification by visual inspection or testing during the service life shall be provided by the tank manufacturer on the basis of use under service conditions specified herein. Each tank shall be visually Annex 3B inspected at least every 120 months after the date of its entry into service on the vehicle (vehicle registration), and at the time of any reinstallation, for external damage and deterioration, including deterioration. It is suggested to visually inspect under the support straps. straps as well. The visual inspection shall be performed by a Technical Service designated or recognized by the Type Approval Authority, in accordance with consideration of the manufacturer's specifications: tanks without label containing mandatory information, or with labels containing mandatory information that are illegible in any way shall be removed from service. If the tank can be positively identified by manufacturer and serial number, a replacement label may be applied, allowing the tank to remain in service. Contracting Parties requiring a more frequent (than every 120 months) or more stringent periodic requalification of tanks may do so in accordance with the national or regional requirements .
2.6.changed
Annex 3B In the case of LNG tanks are located in enclosed spaces for extended periods of time (e.g. for service), leakage and venting of natural gas (or other flammable substances) from the tank shall be dealt with properly to avoid the dangers due to releasing flammable substances in enclosed spaces. Annex 3B
3.3.1.changed
Drawings shall show the following as a minimum: (a) Title, reference number, date of issue, and revision numbers with dates of issue if applicable; (b) Reference to this Regulation and the tank type; (c) All pressure vessel dimensions complete with tolerances, including details of end closure shapes with minimum thicknesses and of openings; (d) Mass, complete with tolerances, of tanks; Annex 3B (e) Material specifications complete with minimum mechanical and chemical properties or tolerance ranges; (f) Other data such as minimum test pressure. Annex 3B
Table 3changed
Temperature [ °C] Cycles 82 2,000 57 18,000 Annex 4A
7.4.2.2.1.changed
At the completion of the test, the component shall not leak more than 15 cm3/hour when submitted to a gas pressure equal to the maximum Annex 4A working pressure at ambient temperature and at the maximum operating temperature as indicated in Annex 5O.
1.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
2.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
3.5.3.3.changed
10 minutes. The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
4.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 cm 3 per metre of hose per 24 hours.
2.4.changed
The component has to comply with the test procedures for Class components according to the scheme in Figure 1-1 of paragraph 3. of this Regulation. Annex 4D Annex 4D Provisions on the approval of the CNG pressure regulator and CNG compressor
1.changed
The purpose of this annex is to determine the provisions on the approval of the CNG pressure regulator. regulator and CNG compressor.
2.2.changed
The materials constituting the regulator which are in contact with the heat exchange medium of the regulator when operating, shall be compatible with that fluid. fluid, the procedure in Annex 5Q shall be used.
3.3.changed
The pressure regulator shall be so designed to operate at temperatures as specified in Annex 5O. Annex 4E Annex 4E Provisions on the approval of the CNG pressure and temperature sensors
4.1.changed
4.2.changed
4.3.changed
4.4.changed
The LNG pressure relief valve has to comply with electrical system, if existing, shall be isolated from the test procedures for body of the Class 5 component. CNG Compressor. Isolation resistance shall be > 10 MΩ.
4.4.1.added
Means shall be provided to ensure a safe discharge of static electricity in
the compressor.
4.5.added
The CNG compressor shall be provided with a pressure control device to
maintain the pressure within the operating pressure range.
4.5.1.added
The limitation of the power supplied by the actuating mechanism can be
accepted in lieu of a pressure control device.
4.5.2.added
An electronic control system can be accepted in lieu of a pressure control
device.
4.5.3.added
The pressure control device may function by restricting or closing off the
inlet to the compressor.
4.5.4.added
The pressure control device is not allowed to vent natural gas to t h e
atmosphere during normal function.
4.6.added
The CNG Compressor shall be provided with a pressure relief valve to
limit the pressure to the maximum safe working pressure of the
compressor.
4.6.1.added
A fuel system pressure relief valve may be used instead of a pump
pressure relief valve if, by relieving system pressure, it relieves the pump
pressure.
4.7.added
The CNG compressor is allowed to function before the engine is started or
during commanded stop phases to produce required pressure in the fuel
system. This function shall be achieved without delivering fuel to the engine,
if the engine is not running.
4.8.added
Durability test (continued operation) of the CNG compressor:
The CNG compressor shall be able to withstand 50,000 cycles without any
failure when tested according to the following procedure:
(a) Cycle the CNG compressor for 95 per cent of the total number of
cycles at room temperature and at the service pressure. Each cycle
shall consist of flow until a stable outlet pressure has been obtained,
after which the gas flow shall be shut off by a downstream valve
within 1 s, until the downstream lock-up pressure has stabilized.
Stabilized outlet pressures are defined as set pressure ±15 per cent for
at least 5 s;
(b) Cycle the inlet pressure of the CNG compressor for 1 per cent of the
total number of cycles at room temperature from 100 per cent to 50
Annex 4D
per cent of the service pressure. The duration of each cycle shall be
no less than 10 s;
(c) Repeat the cycling procedure of (a) at 85 °C, 105 °C or 120 °C, as
applicable, at the service pressure for 1 per cent of the total number of
cycles;
(d) Repeat the cycling procedure of (b) at 85 °C, 105 °C or 120 °C, as
applicable, at the service pressure for 1 per cent of the total number of
cycles;
(e) Repeat the cycling procedure of (a) at -40 °C or -20 °C, as
applicable, and 50 per cent of service pressure for 1 per cent of the
total number of cycles;
(f) Repeat the cycling procedure of (b) at -40 °C or -20 °C, as applicable,
and 50 per cent of servic…
5.1.changed
The materials constituting part of the LNG excess flow valve, CNG compressor which are is in contact with the LNG when operating, shall be compatible with pressure of the test LNG. In order to verify this compatibility, the procedure described in Annex 5D shall be used. container is considered as Class 0.
5.1.1.added
The Class 0 part of the CNG compressor shall be leak-proof (see Annex 5B)
at a pressure up to 1.5 times the working pressure (MPa) with the outlet(s)
of that part closed off.
5.1.2.added
The Class 0 part of the CNG compressor shall withstand a pressure of up to
1.5 times the working pressure (MPa).
5.1.3.added
Annex 5B) at a pressure of up to twice the working pressure.
5.1.4.added
The Class 1 and Class 2 part of the CNG compressor shall withstand a
pressure of up to twice the working pressure.
5.1.5.added
The Class 3 part of the CNG compressor shall withstand a pressure of up to
twice the relief pressure of the pressure relief valve, on which it is
subject.
5.2.added
The part of the CNG compressor which is in contact with a pressure
higher than 26 MPa is considered as Class 6.
5.2.1.changed
The LNG excess flow valve, if it is not mounted inside Class 6 part of the tank, CNG compressor shall be so designed as to withstand leak-proof (see Annex 5B) at a pressure of up to 1.5 times the working pressure (MPa) at cryogenic temperature. declared by the manufacturer with the outlet(s) of that part closed off.
5.2.2.changed
The LNG excess flow valve shall, if it is not mounted inside Class 6 part of the tank, be so designed as to be external leak-proof (Annex 5B) at CNG compressor shall withstand a pressure of up to 1.5 times the working pressure (MPa). (MPa) declared by the manufacturer.
5.2.3.changed
5.3.changed
The LNG excess flow valve CNG compressor shall be so designed with a bypass (internal leak) as to allow for equalization of pressures. operate at the temperatures as specified in Annex 4N 5O. Annex 4D
5.3.1.added
Where the CNG compressor is cooled by inclusion in the engine coolant
circuit it shall be considered as an engine mounted in Annex 5O
5.3.2.added
Where the CNG compressor is using heat exchange fluids, the non- metallic
parts in contact with the fluid shall comply with Annex 5Q.
Annex 4E
Annex 4E
Provisions on the approval of the CNG pressure and
temperature sensors
4.1.changed
4.2.added
M2, M3, N2 and N3.3
4.3.changed
2.2.changed
The material constituting the LNG heat exchanger - vaporizer which is in contact with the CNG when operating shall be compatible with the test CNG. In order to verify this compatibility, the procedure in Annex 5D shall be used. The materials constituting the LNG heat exchanger - vaporizer which are in contact with the heat exchange medium of the regulator when operating, shall be compatible with that fluid. The procedure in Annex 5Q shall be used.
3.1.4.3.changed
The component shall be operated through 2 per cent of the total cycles as above at the appropriate maximum temperature specified at rated service pressure. The component shall comply with the leakage test of Annex 5B at the high temperature at the completion of the high temperature cycles. Following cycling and leakage re-test the component shall be capable of remove of the filling nozzle without spilling more than 30 cm3 cm 3 LNG. Annex 4J
4.1.changed
4.1.added
The materials constituting the pressure relief valve which are in contact with
the LNG when operating, shall be compatible with the test LNG. In order to
verify this compatibility, the procedure described in Annex 5D shall be used.
4.3.added
The LNG pressure relief valve shall be so designed to operate at temperatures
as specified in Annex 5O.
4.4.added
The LNG pressure relief valve has to comply with the test procedures for the
Class 5 component.
5.1.added
The materials constituting the LNG excess flow valve, which are in contact
with the LNG when operating, shall be compatible with the test LNG. In
order to verify this compatibility, the procedure described in Annex 5D shall
be used.
5.2.1.added
The LNG excess flow valve, if it is not mounted inside the tank, shall be so
designed as to withstand a pressure of 1.5 times the working pressure (MPa)
at cryogenic temperature.
5.2.2.added
The LNG excess flow valve shall, if it is not mounted inside the tank, be so
designed as to be external leak-proof (Annex 5B) at a pressure of 1.5 times
the working pressure (MPa).
5.2.3.added
The LNG excess flow valve shall be so designed to operate at temperatures as
specified in Annex 5O.
5.3.added
The LNG excess flow valve shall be designed with a bypass (internal leak) to
allow for equalization of pressures.
Annex 4N
Table 5changed
Test Class 0 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Annex Overpressure or strength X X X X O X X 5A External leakage X X X X O X X 5B Internal leakage A A A A O A A 5C Durability tests A A A A O A A 5L CNG/LNG compatibility A A A A A A A 5D Corrosion resistance X X X X X A X 5E Resistance to dry heat A A A A A A A 5F Ozone ageing A A A A A A A 5G Burst/destructive tests X O O O O A X 5M Temperature cycle A A A A O A A 5H Pressure cycle X O O O O A X 5I Vibration resistance A A A A O A A 5N Operating temperatures X X X X X X X 5O LNG low temperature O O O O O X O 5P Compatibility with heat exchange fluids of non- metallic parts A A A A A A A 5Q X = Applicable O = Not applicable A = As applicable Remarks: Annex 5 Remarks: (a) Internal leakage: Applicable if the Class of the component consists of internal valve seats that are normally closed during engine "OFF" condition; (b) Durability test: Applicable if the Class of the component consists of integral parts that will move repeatedly during engine operation; (c) CNG compatibility, resistance to dry heat, ozone ageing: Applicable if the class of the component consists of synthetic / non-metallic parts; (d) Temperature cyclic test: Applicable if the class of the component consists of synthetic / non-metallic parts; (e) Vibration resistance test: Applicable if the Class of the component consists of integral parts that will move repeatedly during engine operation. (f) Compatibility with heat exchange fluids of non-metallic parts: Applicable, if the Class of the components consists out of material in contact with the heat exchange fluid. The materials used for the components shall have written specifications that fulfil at least or exceed the (test) requirements laid down in this annex with respect to: (a) Temperature; (b) Pressure; (c) CNG/LNG compatibility; (d) Durability.
5.changed
For CNG A CNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the outlet plugged when submitted to a gas pressure, at maximum operating temperature as indicated in Annex 5O, equal to the maximum working pressure. The component shall be conditioned for at least 8 hours at this temperature.
5.1.changed
A LNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the flow mentioned in paragraph 3.1. in place when submitted to an outside temperature at the maximum operating temperatures mentioned in Annex 5O. Annex 5B
6.changed
For CNG A CNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the outlet plugged when submitted to a gas pressure, at the minimum operating temperature, equal to the maximum working pressure as declared by the manufacturer. The component shall be conditioned for at least 8 hours at this temperature.
6.1.changed
A LNG containing component shall not leak more than 15 cm3/hour cm 3/hour with the flow mentioned in paragraph 3.1. in place when submitted to an outside temperature at the minimum operating temperature mentioned in Annex 5O. Annex 5C Annex 5C Internal leakage test
7.changed
Compliance with paragraphs 2. to 5. below is to be determined by connecting a length of tubing to the valve outlet. The open end of this outlet tube is to be located within an inverted graduated cylinder which is calibrated in cubic centimetres. The inverted cylinder is to be closed by a water tight seal. The apparatus is to be adjusted so that: (a) The end of the outlet tube is located approximately 13 mm above the water level within the inverted graduated cylinder, and (b) The water within and exterior to the graduated cylinder is at the same level. With these adjustments made, the water level within the graduated cylinder is to be recorded. With the valve in the closed position assumed as the result of normal operation, air or nitrogen at the specified test pressure is to be applied to the valve inlet for a test period of not less than 2 minutes. During this time, the vertical position of the graduated cylinder is to be adjusted, if necessary, to maintain the same water level within and exterior to it. Annex 5C At the end of the test period and with the water within and exterior to the graduated cylinder at the same level, the level of water within the graduated cylinder is again recorded. From the change of volume within the graduated cylinder, the leakage rate is to be calculated according to the following formula: V1 = Vt • 60 • 273 • P t T 101.3 Where: V1 = leakage rate, cubic centimetres of air or nitrogen per hour. Vt = increase in volume within graduated cylinder during test. t = time of test, minutes. P = barometric pressure during test, in kPa. T = ambient temperature during test, in K.
Annex 6changed
Provisions on CNG identification mark for vehicles of categories M2 and M3, N2 and N3 (Paragraph 18.1.8.1. of this Regulation) The sign consists of a sticker which shall be weather resistant. The colour and dimensions of the sticker shall fulfil the following requirements: Colours: Background: green Border: white or white reflecting Letters: white or white reflecting Dimensions: Border width: 4 - 6 mm Character height: ≥ 25 mm Character thickness: ≥ 4 mm Sticker width: 110 - 150 mm Sticker height: 80 - 110 mm The word "CNG" shall be centred in the middle of the sticker. Annex 6 7