Skip to content

Compare versions of UN R136

Vehicles of category L with regard to specific requirements for the electric power train

128 changed · 237 added · 321 deleted
1.1.changed
Part I: Safety requirements with respect to the electric power train of vehicles of category L1 with a maximum design speed exceeding 6 km/h, equipped with an one or more traction motor(s) operated by electric power train, excluding vehicles and not permanently connected to the grid. Part I of this Regulation does not cover high-voltage grid, as well as their high voltage components and systems which are not galvanically connected to the high voltage bus of the electric power train.
1.2.changed
Energy Storage System (REESS) of vehicles of category L with a maximum design speed exceeding 6 km/h, equipped with an one or more traction motors operated by electric power train, excluding vehicles and not permanently connected to the grid. Part II of this Regulation does not apply to a battery REESS(s) whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries’ systems." auxiliaries systems.
2.2.changed
"Aqueous electrolyte" "Barrier" means an electrolyte based on water solvent for the compounds (e.g. acids, bases) part providing conducting ions after its dissociation. protection against direct contact to the live parts from any direction of access.
2.3.changed
"Automatic disconnect" "Basic insulation" means a device that when triggered, conductively separates the electric energy sources from the rest of the high voltage circuit of the electric power train. insulation applied to live parts for protection against direct contact under fault-free conditions.
2.4.changed
"Breakout harness" "Cell" means connector wires that are connected for testing purposes to the REESS on the traction side of the automatic disconnect. a single encased electrochemical unit containing one positive and one negative electrode which exhibits a voltage differential across its two terminals.
2.5.changed
"Basic insulation" "Chassis connected to the electric circuit" means insulation applied AC and DC electric circuits galvanically connected to live parts for protection against direct contact under fault-free conditions. the electrical chassis.
2.6.changed
"Cell" "Conductive connection" means a single encased electrochemical unit containing one positive and one negative terminal, which exhibits a voltage differential across its two terminals and used as rechargeable electrical energy storage device. the connection using connectors to an external power supply when the REESS is charged.
2.7.changed
"Conductive connection" "Coupling system for charging the REESS" means the connection using connectors to electrical circuit used for charging the REESS from an external electric power supply when including the REESS is charged. vehicle inlet or a permanently affixed charging cable. 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. - www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
2.8.changed
"Connector" means "C Rate" of "n C" is defined as the device that provides mechanical connection constant current of the tested-device, which takes 1/n hours to charge or discharge the tested-device between 0 per cent of the state of charge and disconnection 100 per cent of high voltage electrical conductors to a suitable mating component including its housing. the state of charge.
2.9.changed
"Coupling system for charging the REESS" "Direct contact" means the electrical circuit used for charging the REESS from an external electric power supply including the vehicle inlet or a permanently affixed charging cable. 1 As defined in the Consolidated Resolution on the Construction contact of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.6, para. 2. - https://unece.org/transport/standards/transport/vehicle- regulations-wp29/resolutions persons with live parts.
2.10.changed
"C Rate" of "n C" is defined as the constant current of the tested-device, which takes 1/n hours to charge or discharge the tested-device between 0 per cent of the state of charge "Double insulation" means insulation comprising both basic insulation and 100 per cent of the state of charge. supplementary insulation.
2.11.changed
"Direct contact" "Electrical chassis" means the contact a set made of persons with live parts. conductive parts electrically linked together, whose potential is taken as reference.
2.12.changed
"Double insulation" "Electrical circuit" means insulation comprising both basic insulation and supplementary insulation. an assembly of connected live parts which is designed to be electrically energized in normal operation.
2.13.changed
"Electrical chassis" "Electric energy conversion system" means a set made of conductive parts electrically linked together, whose potential is taken as reference. system that generates and provides electric energy for electric propulsion.
2.14.changed
"Electrical circuit" "Electric power train" means an assembly of connected live parts the electrical circuit which is designed to be electrically energized in normal operation. includes the traction motor(s), and may include the REESS, the electric energy conversion system, the electronic converters, the associated wiring harness and connectors, and the coupling system for charging the REESS.
2.15.changed
"Electric energy conversion system" "Electronic converter" means a system that generates and provides device capable of controlling and/or converting electric energy power for electric propulsion.
2.16.changed
"Electric power train" "Enclosure" means the electrical circuit which includes part enclosing the traction motor(s), internal units and may also include the REESS, the electric energy conversion system, the electronic converters, the associated wiring harness and connectors, and the coupling system for charging the REESS. providing protection against direct contact from any direction of access.
2.17.changed
"Electrical protection barrier" "Exposed conductive part" means the conductive part which can be touched under the provisions of the protection IPXXB, and which becomes electrically energized under isolation failure conditions. This includes parts under a cover that provides protection against direct contact with the high voltage live parts. can be removed without using tools.
2.18.changed
"Electrolyte leakage" "Explosion" means the escape sudden release of electrolyte from energy sufficient to cause pressure waves and/or projectiles that may cause structural and/or physical damage to the REESS in surrounding of the form of liquid. tested-device.
2.19.changed
"Electronic converter" means a device capable of controlling and/or converting "External electric power for supply" means an alternating current (AC) or direct current (DC) electric propulsion. power supply outside of the vehicle.
2.20.changed
"Enclosure" "High Voltage" means the part enclosing the internal units classification of an electric component or circuit, if its working voltage is > 60 V and providing protection against any direct contact from any direction of access. ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms).
2.21.changed
"Exposed conductive part" "Fire" means the conductive part which can emission of flames from a tested-device. Sparks and arcing shall not be touched under the provisions of the protection degree IPXXB, and which is not normally energized, but which can become electrically energized under isolation failure conditions. This includes parts under a cover that can be removed without using tools. considered as flames.
2.22.changed
"Explosion" "Flammable electrolyte" means an electrolyte that contains substances classified as Class 3 "flammable liquid" under "UN Recommendations on the sudden release Transport of energy sufficient to cause pressure waves and/or projectiles that may cause structural and/or physical damage to the surrounding of the tested-device. Dangerous Goods – Model Regulations (Revision 17 from June 2011), Volume I, Chapter 2.3".2
2.23.changed
"External electric power supply" "High voltage bus" means an alternating current (AC) the electrical circuit, including the coupling system for charging the REESS that operates on high voltage. 2 www.unece.org/trans/danger/publi/unrec/rev17/17files_e.html Where electrical circuits, that are galvanically connected to each other, are galvanically connected to the electrical chassis and the maximum voltage between any live part and the electrical chassis or direct current (DC) electric power supply outside any exposed conductive part is  30 V AC and  60 V DC, only the components or parts of the vehicle. electric circuit that operate on high voltage are classified as a high voltage bus.
2.24.changed
"High Voltage" "Indirect contact" means the classification contact of an electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms). persons with exposed conductive parts.
2.25.changed
"Fire" "Live parts" means the emission of flames from a tested-device. Sparks and arcing shall not conductive part(s) intended to be considered as flames. electrically energized in normal use.
2.26.changed
"Flammable electrolyte" "Luggage compartment" means an electrolyte that contains substances classified as Class 3 "flammable liquid" under "UN Recommendations on the Transport of Dangerous Goods – Model Regulations (Revision 17 from June 2011), Volume I, Chapter 2.3".2 enclosed space in the vehicle intended for luggage accommodation.
2.27.changed
"High voltage bus" "Manufacturer" means the electrical circuit, including the coupling system for charging the REESS that operates on high voltage. Where electrical circuits, that are galvanically connected to each other, are galvanically connected person or body who is responsible to the electrical chassis and the maximum voltage between any live part and the electrical chassis or any exposed conductive part 2 www.unece.org/trans/danger/publi/unrec/rev17/17files_e.html is  30 V AC and  60 V DC, only the components or parts approval authority for all aspects of the electric circuit type approval process and for ensuring conformity of production. It is not essential that operate on high voltage are classified as a high voltage bus. the person or body be directly involved in all stages of the construction of the vehicle, system or component which is the subject of the approval process.
2.28.changed
"Indirect contact" "Onboard isolation resistance monitoring system" means the contact of persons with exposed conductive parts. device which monitors the isolation resistance between the high voltage buses and the electrical chassis.
2.29.changed
"Live parts" "Open type traction battery" means a liquid type battery requiring refilling with water and generating hydrogen gas released to the conductive part(s) intended to be electrically energized under normal operating conditions. atmosphere.
2.30.changed
"Luggage "Passenger compartment" means the enclosed space in for occupant accommodation, bounded by at least 4 of the vehicle intended following: the roof, floor, side walls, doors, window glass, front bulkhead and rear bulkhead, or rear gate, as well as by the barriers and enclosures provided for luggage accommodation. protecting the occupants from direct contact with live parts.
2.31.changed
"Manufacturer" "Protection degree" means the person or body who is responsible protection provided by a barrier/enclosure related to the approval authority for all aspects of the approval process and for ensuring conformity of production. It is not essential that the person contact with live parts by a test probe, such as a test finger (IPXXB) or body is directly involved a test wire (IPXXD), as defined in all stages of the construction of the vehicle or component which is the subject of the approval process. Annex 3.
2.32.changed
"Non-aqueous electrolyte" "Rechargeable Electrical Energy Storage System (REESS)" means an electrolyte not based on water as the solvent. rechargeable energy storage system that provides electric energy for electric propulsion. The REESS may include subsystem(s) together with the necessary ancillary systems for physical support, thermal management, electronic control and enclosures.
2.33.changed
"Normal operating conditions" includes operating modes and conditions that can reasonably "Reinforced insulation" means insulation of live parts for protection against electric shock equivalent to double insulation. Insulation may compromise several layers which cannot be encountered during typical operation of the vehicle including driving at legally posted speeds, parking and standing in traffic, tested individually as well as charging using chargers that are compatible with the specific charging ports installed on the vehicle. It does not include conditions where the vehicle is damaged, either by a crash, road debris supplementary or vandalization, unintentional fall, subjected to fire or water submersion, or in a state where service and or maintenance is needed or being performed. basic insulation.
2.34.changed
"Onboard isolation resistance monitoring system" "Removable REESS" means a REESS that by design can be taken out from the device which monitors vehicle by the isolation resistance between the high voltage buses and the electrical chassis. vehicle user for off-board charging.
2.35.changed
"Open type traction battery" "Rupture" means opening(s) through the casing of any functional cell assembly created or enlarged by an event, large enough for a type of battery requiring filling 12 mm diameter test finger (IPXXB) to penetrate and make contact with liquid and generating hydrogen gas that is released to the atmosphere. live parts (see Annex 3).
2.36.changed
"Passenger compartment" "Service disconnect" means the space device for occupant accommodation, bounded by at least 4 deactivation of the following: electrical circuit when conducting checks and services of the roof, floor, side walls, doors, outside glazing, front bulkhead and rear bulkhead, or rear gate, as well as by the electrical protection barriers and enclosures provided for protecting the occupants from direct contact with high voltage live parts. REESS, fuel cell stack, etc.
2.37.changed
"Protection degree IPXXB" "State of Charge (SOC)" means protection from contact with high voltage live parts provided by either an the available electrical protection barrier or an enclosure and tested using charge in a Jointed Test Finger (IPXXB) tested- device expressed as described in Annex 3. a percentage of its rated capacity.
2.38.changed
"Protection degree IPXXD" "Solid insulator" means protection from contact with high voltage the insulating coating of wiring harnesses provided in order to cover and protect the live parts provided by either an electrical protection barrier against direct contact from any direction of access; covers for insulating the live parts of connectors, and varnish or an enclosure and tested using a Test Wire (IPXXD) as described in Annex 3. paint for the purpose of insulation.
2.39.changed
"Rechargeable Electrical Energy Storage System (REESS)" "Subsystem" means the rechargeable energy storage system that provides electric energy for electric propulsion. A battery whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries’ systems is not considered as a REESS. The any functional assembly of REESS may include the necessary systems for physical support, thermal management, electronic controls and casing. components.
2.40.changed
"REESS subsystem" "Supplementary insulation" means any assembly independent insulation applied in addition to basic insulation for protection against electric shock in the event of REESS components which stores energy. A REESS subsystem may or may not include the entire management system a failure of the REESS. basic insulation.
2.41.changed
"Reinforced insulation" "Tested-device" means insulation either the complete REESS or the subsystem of live parts for protection against electric shock equivalent a REESS that is subjected to double insulation. Insulation may compromise several layers which cannot be tested individually as supplementary or basic insulation. the tests prescribed by this Regulation.
2.42.changed
"Removable "Type of REESS" means a REESS that by design can be taken out from systems which do not differ significantly in such essential aspects as: (a) The manufacturer's trade name or mark; (b) The chemistry, capacity and physical dimensions of its cells; (c) The number of cells, the vehicle by mode of connection of the vehicle user cells and the physical support of the cells; (d) The construction, materials and physical dimensions of the casing; and (e) The necessary ancillary devices for off-board charging. physical support, thermal management and electronic control.
2.43.changed
"Rupture" "Vehicle type" means opening(s) through vehicles which do not differ in such essential aspects as: (a) Installation of the casing electric power train and the galvanically connected high voltage bus; (b) Nature and type of any functional cell assembly created or enlarged by an event, large enough for a 12 mm diameter test finger (IPXXB) to penetrate electric power train and make contact with live parts (see Annex 3). the galvanically connected high voltage components.
2.44.changed
"Service disconnect" "Withstand voltage" means the device for deactivation voltage to be applied to a specimen under prescribed test conditions which does not cause breakdown and/or flashover of the electrical circuit when conducting checks and services of the REESS, fuel cell stack, etc. a satisfactory specimen.
2.45.changed
"State of Charge (SOC)" "Working voltage" means the available highest value of an electrical charge circuit voltage rms, specified by the manufacturer, which may occur between any conductive parts in a tested- device expressed as a percentage of its rated capacity. open circuit conditions or under normal operating condition. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.
2.46.deleted
"Solid insulator" means the insulating coating of wiring harnesses provided in order to cover and prevent the high voltage live parts from any direct contact.
3.1.changed
Part I: Approval of a vehicle type with regard to specific requirements for its electrical safety, including the electric power train. High Voltage System
2.47.deleted
"Specific voltage condition" means the condition that the maximum voltage of a galvanically connected electrical circuit between a DC live part and any other live part (DC or AC) is ≤ 30 V AC (rms) and ≤ 60 V DC. Note 1: When a DC live part of such an electrical circuit is connected to electrical chassis and the specific voltage condition applies, the maximum voltage between any live part and the electrical chassis is ≤ 30 V AC (rms) and ≤ 60 V DC. Note 2: For pulsating DC voltages (alternating voltages without change of polarity) the DC threshold shall be applied.
2.48.deleted
"Supplementary insulation" means independent insulation applied in addition to basic insulation for protection against electric shock in the event of a failure of the basic insulation.
2.49.deleted
"Tested-Device" means either complete REESS or REESS subsystem that is subjected to the tests prescribed by this Regulation.
3.1.2.1.changed
Detailed description of the vehicle type with as regards to the electric power train and the galvanically connected high voltage bus galvanically connected to it. bus.
2.50.deleted
"Thermal event" means the condition when the temperature within the REESS is significantly higher (as defined by the manufacturer) than the maximum operating temperature.
2.51.deleted
"Thermal runaway" means an uncontrolled increase of cell temperature caused by exothermic reactions inside the cell.
2.52.deleted
"Thermal propagation" means the sequential occurrence of thermal runaway within a REESS triggered by thermal runaway of a cell in that REESS.
2.53.deleted
"Type of REESS" means systems which do not differ significantly in such essential aspects as: (a) The manufacturer's trade name or mark; (b) The chemistry, capacity and physical dimensions of its cells; (c) The number of cells, the mode of connection of the cells and the physical support of the cells; (d) The construction, materials and physical dimensions of the casing; and (e) The necessary ancillary devices for physical support, thermal management and electronic control.
2.54.deleted
"Vehicle connector" means the device which is inserted into the vehicle inlet to supply electric energy to the vehicle from an external electric power supply.
2.55.deleted
"Vehicle inlet" means the device on the externally chargeable vehicle into which the vehicle connector is inserted for the purpose of transferring electric energy from an external electric power supply
2.56.deleted
"Vehicle type" means vehicles which do not differ in such essential aspects as: (a) Installation of the electric power train and the galvanically connected high voltage bus; (b) Nature and type of electric power train and the galvanically connected high voltage components.
2.57.deleted
"Venting" means the release of excessive internal pressure from cell or REESS subsystem or REESS in a manner intended by design to preclude rupture or explosion.
2.58.deleted
"Withstand voltage" means voltage to be applied to a specimen under prescribed test conditions which does not cause breakdown and/or flashover of a satisfactory specimen.
2.59.deleted
"Working voltage" means the highest value of an electrical circuit voltage rms, specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating condition. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.
4.2.changed
An approval number shall be assigned to each type approved approved. Its first two digits (at present 00 for the Regulation in accordance with Schedule 4 its form) shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue of the Agreement (E/ECE/TRANS/505/Rev.3 and Amend.1). approval. The same Contracting Party shall not assign the same number to another vehicle type.
4.4.changed
There shall be affixed, conspicuously and in a readily accessible place specified on the approval form, to every vehicle or REESS or separate technical unit conforming to a type approved under this Regulation an international approval mark consisting of:
4.4.3.changed
In the case of an approval of a REESS or a separate technical unit of the REESS the "R" shall be followed by the symbol "ES".
4.6.2.changed
In the case of a REESS or separate technical unit approved as a REESS, the approval mark shall be affixed on the major element of the REESS by the manufacturer.
4.7.changed
Annex 2 to this Regulation gives examples of the arrangements of the approval mark. 3 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.7.
5.changed
Part I: Requirements of a vehicle with regard to specific requirements for the electric power train its electrical safety
5.1.changed
These electrical safety requirements apply to high voltage buses of electric power train and electrical components which are galvanically connected to the high voltage bus of electric power train under conditions where they are not connected to external high voltage power supplies.
5.1.1.changed
Protection against direct contact with high voltage live parts is also required for vehicles equipped with any REESS type approved under Part II of this Regulation. 3 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3. The protection against direct contact with the high voltage live parts, shall comply with paragraphs 5.1.1.1. and 5.1.1.2. These protections (solid insulator, electrical protection barrier, enclosure, etc.) shall not be able to be opened, disassembled or removed without the use of tools.
5.1.1.1.changed
For high voltage protection of live parts inside the passenger compartment or luggage compartment, the protection degree IPXXD shall be provided.
5.1.1.2.changed
For high voltage Protection of live parts in areas other than the passenger compartment or luggage compartment: compartment
5.1.1.2.1.changed
For vehicles with a passenger compartment, the protection degree IPXXB shall be provided. satisfied.
5.1.1.2.2.changed
For vehicles without passenger compartment, the protection degree IPXXD shall be provided. satisfied.
5.1.1.3.changed
Connectors (including the vehicle inlet) are deemed to meet this requirement if: (a) They comply with 5.1.1.1. and 5.1.1.2. when separated without the use of tools; or (b) They are located underneath the floor and are provided with a locking mechanism; or (c) They are provided with a locking mechanism (at least two distinct actions are needed to separate the connector from its mating component). Additionally, and other components, not being part of the connector, components shall be removed with the use of tools, tools in order to separate the connector; or (c) (d) The voltage of the live parts becomes equal or below 60 V DC or equal or below 30 V AC (rms) within one second after the connector is separated.
5.1.1.4.changed
For a high voltage service disconnect which can be opened, disassembled or removed without tools, it is acceptable if protection degree IPXXB shall be is satisfied when under a condition where it is opened, disassembled or removed. removed without tools.
5.1.1.5.1.changed
The symbol shown in Figure 1 shall be present on or near In the case of a REESS having high voltage capability. The capability the symbol background shall be yellow, the bordering and the arrow shall be black. This requirement shall also apply to a REESS which is part of a galvanically connected electrical circuit where the specific voltage condition is not fulfilled, independent of the maximum voltage of the REESS. shown in
Figure 1added
yellow, the bordering and the arrow shall be black. Marking of high voltage equipment
5.1.1.5.2.changed
The symbol shall also be visible on enclosures and electrical protection barriers, which, when removed expose live parts of high voltage circuits. This provision is optional to any connector for high voltage buses. This provision shall not apply to any of the following cases: (a) Where electrical protection barriers or enclosures cannot be physically accessed, opened, or removed; unless other vehicle components are removed with the use of tools; (b) Where electrical protection barriers or enclosures are located underneath the vehicle floor.5.1.1.5.3. Cables for high voltage buses which are not located within enclosures shall be identified by having an outer covering with the colour orange. floor.
5.1.1.5.3.added
Cables for high voltage buses which are not located within enclosures shall be identified by having an outer covering with the colour orange.
5.1.2.added
Protection against indirect contact is also required for vehicles with high voltage live parts equipped with any REESS type approved under Part II of this Regulation.
5.1.2.1.changed
For protection against electrical shock which could arise from indirect contact, the exposed conductive parts, such as the conductive electrical protection barrier and enclosure, shall be galvanically connected securely to the electrical chassis by connection with electrical wire or ground cable, or by welding, or by connection using bolts, etc. so that no dangerous potentials are produced.
5.1.2.2.changed
The resistance between all exposed conductive parts and the electrical chassis shall be lower than 0.1 Ω when there is current flow of at least 0.2 A. The resistance between any two simultaneously reachable exposed conductive parts of the electrical protection barriers that are less than 2.5 m from each other shall not exceed 0.2 Ω. This resistance may be calculated using the separately measured resistances of the relevant parts of electric path. This requirement is satisfied if the galvanic connection has been established by welding. In case of doubt or if the connection is established by other means than welding, a measurement shall be made by using one of the test procedures described in Annex 4.
5.1.2.3.changed
In the case of motor vehicles which are intended to be connected to the grounded external electric power supply through the conductive connection, a device to enable the galvanically galvanical connection of the electrical chassis to the earth ground for the external electric power supply shall be provided. The device shall enable connection to the earth ground before exterior voltage is applied to the vehicle and retain the connection until after the exterior voltage is removed from the vehicle. Compliance to this requirement may shall be demonstrated either by using the connector specified by the vehicle manufacturer, or by visual inspection or drawings. The above requirements are only applicable for vehicles when charging from a stationary charging point, with a charging cable of finite length, through a vehicle coupler. analysis.
5.1.2.4.1.1.changed
For vehicle with on-board charger the test shall be conducted according to Annex 10A 9A to this regulation.
5.1.2.4.2.1.changed
This test shall be conducted according to Annex 10B 9B of this UN Regulation. regulation.
5.1.3.changed
This paragraph shall not apply to chassis connected electrical circuits that are galvanically connected to each other, where the DC maximum voltage between any live part of these circuits is connected to and the electrical chassis and the specific voltage condition is fulfilled. or any exposed conductive part does not exceed 30 V AC (rms) or 60 V DC.
5.1.3.1.changed
Current (AC)-buses Current-buses If AC buses and DC buses are galvanically isolated from each other, the isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage for DC buses, and a minimum value of 500 Ω/V of the working voltage for AC buses. The measurement shall be conducted according to Annex 4A "Isolation resistance measurement method for vehicle based tests". 4 Example of the content in the manual: "If during charging, your vehicle or charger becomes submerged in water you should not touch either the vehicle nor the charger because of danger of electric shock. Also, do not use the battery nor the vehicle and ask your dealer to take (appropriate) measures."
5.1.3.2.changed
If AC buses and DC buses are galvanically connected, isolation resistance between any high voltage bus and the electrical chassis shall have a minimum value of 500 Ω/volt of the working voltage. However, if all AC high voltage buses are protected by one of the two following measures, isolation resistance between any high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage: 4 Example of the content in the manual: "If during charging, your vehicle or charger becomes submerged in water you should not touch either the vehicle nor the charger because of danger of electric shock. Also, do not use the battery nor the vehicle and ask your dealer to take (appropriate) measures." (a) Double or more layers of solid insulators, barriers or enclosures that meet the requirement in paragraph 5.1.1. independently, for example wiring harness; (b) Mechanically robust protections that have sufficient durability over vehicle service life such as motor housings, electronic converter cases or connectors; The isolation resistance between the high voltage bus and the electrical chassis may be demonstrated by calculation, measurement or a combination of both. The measurement shall be conducted according to Annex 4A "Isolation resistance measurement method for vehicle based tests".
5.1.3.3.changed
In fuel cell vehicles, DC high voltage buses If the minimum isolation resistance requirement cannot be maintained over time, then protection shall have an on-board be achieved by any of the following: (a) Double or more layers of solid insulators, barriers or enclosures that meet the requirement in paragraph 5.1.1. independently; (b) On-board isolation resistance monitoring system together with a warning to the driver if the isolation resistance drops below the minimum required value value. The isolation resistance between the high voltage bus of 100 Ω/V. the coupling system for charging the REESS and the electrical chassis need not be monitored, because the coupling system for charging is only energized during charging of the REESS. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 6. The isolation resistance between the high voltage bus of the coupling system for charging the REESS, which is not energized in conditions other than that during the charging of the REESS, and the electrical chassis need not to be monitored. 5.
5.1.3.4.changed
Isolation resistance requirement for the coupling system used to charge the REESS For the vehicle conductive connection device coupling system (used to charge the REESS and intended to be conductively connected to the grounded external AC power supply and the electrical circuit that is galvanically connected to the vehicle conductive connection device during charging of the REESS, supply) the isolation resistance between the high voltage bus and the electrical chassis shall be minimum 500 Ω/V at least 1 MΩ when the conductive connection charger coupler is disconnected and the isolation resistance is measured at the high voltage live parts (contacts) of the vehicle conductive connection device. disconnected. During the measurement, the REESS may be disconnected.
5.2.1.1.changed
For a REESS which has been type approved in accordance with Part II of this series of Amendments to this Regulation, installation shall be in accordance with the instructions provided by the manufacturer of the REESS, and in conformity with the description provided in Part 2 of Annex 1, Appendix 2 6 to this Regulation.
5.2.1.2.changed
The REESS including related vehicle components, systems and structure as applicable, shall comply with the respective requirements of paragraph 6. of this Regulation.
5.3.added
A momentary indication shall, as minimum, be given to the driver when the vehicle is in "active driving possible mode''. However, this provision does not apply under conditions where an internal combustion engine directly or indirectly provides the vehicle´s propulsion power. When leaving the vehicle, the driver shall be informed by a signal (e.g. optical or audible signal) if the vehicle is still in the active driving possible mode. If the onboard REESS can be externally charged by the user, movement caused by the vehicle's propulsion system shall not be possible while the external electric power supply is physically connected to the vehicle inlet. For vehicles with a permanently connected recharge cable, the requirement above is not applicable if using the cable to charge the vehicle prevents the use of the vehicle (e.g. seat cannot be closed, the cable position does not allow the rider to sit in or step into the vehicle). This requirement shall be demonstrated by using the connector specified by the vehicle manufacturer. The state of the drive direction control unit shall be identified to the driver.
5.3.1.1.added
At least two deliberate and distinctive actions shall be performed by the driver at the start-up to select the active driving possible mode.
5.3.1.2.added
Only a single action shall be required to deactivate the active driving possible mode.
5.3.1.3.added
Indication of temporary reduced power (i.e. not resulting from a failure) and/or of state of charge (SOC) of REESS.
5.3.1.3.1.added
The vehicle shall have a function/device that indicates to the driver/rider if the power is automatically reduced below a certain level, (e.g. due to activation of the output controller to protect the REESS or the propulsion system) or due to a low SOC.
5.3.1.3.2.added
The conditions under which these indications are given shall be determined by the manufacturer. A brief description of the power reduction and indicating strategy will be prescribed in Annex 6.
5.1.4.deleted
The vehicles shall maintain isolation resistance after exposure to water (e.g. washing, driving through standing water). This paragraph shall not apply to electrical circuits that are galvanically connected to each other, where the DC part of these circuits is connected to the electrical chassis and the specific voltage condition is fulfilled.
5.3.1.4.added
It shall not be possible to activate the vehicle reverse control function whilst the vehicle is in forward motion.
5.1.4.1.deleted
The vehicle manufacturer can choose to comply with requirements specified in paragraph 5.1.4.2., or those specified in paragraph 5.1.4.3., or those specified in paragraph 5.1.4.4.
5.1.4.2.deleted
The vehicle manufacturers shall provide evidence and/or documentation to the Type Approval Authority or Technical Service as applicable on how the electrical design or the components of the vehicle located outside the passenger compartment or externally attached, after water exposure remain safe and comply with the requirements described in Annex 7A. If the evidence and/or documentation provided is not satisfactory, the Type Approval Authority or Technical Service as applicable shall require the manufacturer to perform a physical component test based on the same specifications as those described in Annex 7A.
5.1.4.3.deleted
If the test procedures specified in Annex 7B are performed, just after each exposure, and with the vehicle still in wet condition, the vehicle shall undergo the isolation resistance test given in Annex 5A, and shall comply with the isolation resistance requirements given in paragraph 5.1.3. Subsequently, after a 24 hour pause, the isolation resistance test as specified in Annex 5A shall be performed again, and the isolation resistance requirements given in paragraph
5.4.2.changed
The test shall be conducted according to the method in Annex 7 of the present Regulation. The hydrogen sampling and analysis shall be prescribed. Other analysis methods can be approved if it is proven that they give equivalent results.
5.1.3.deleted
shall be met.
5.4.3.changed
During a normal charge procedure in the conditions given in Annex 8, 7, hydrogen emissions shall be below 125 g during 5 h, or below 25 x t2 t 2 g during t2 (in h).
5.1.4.4.deleted
If an isolation resistance monitoring system is provided, and the isolation resistance less than the requirements given in paragraph 5.1.3. is detected, a warning shall be indicated to the driver. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 6.
5.4.4.changed
During a charge carried out by a charger presenting a failure (conditions given in Annex 8), 7), hydrogen emissions shall be below 42 g. The charger shall limit such a failure to 30 minute maximum.
5.4.10.changed
The approval granted to a vehicle type relative to hydrogen emissions can be extended to different vehicle types belonging to the same family, in accordance with the definition of the family given in Annex 8, 7, Appendix 2.
5.2.5.deleted
The vehicle shall provide a warning to the driver when the vehicle is in active driving possible mode in the event specified in paragraphs 6.13. to 6.15., if applicable. In case of optical warning, the tell-tale shall, when illuminated, be sufficiently bright to be visible to the driver under both daylight and night-time driving conditions, when the driver has adapted to the ambient roadway light conditions. This tell-tale shall be activated as a check of lamp function either when the propulsion system is turned to the "On" position, or when the propulsion system is in a position between "On" and "Start" that is designated by the manufacturer as a check position. This requirement does not apply to the tell- tale or text shown in a common space.
6.1.changed
The procedures prescribed in Annex 9 8 of this Regulation shall be applied.
5.2.6.deleted
For pure electric vehicles (vehicles equipped with a powertrain containing exclusively electric machines as propulsion energy converters and exclusively rechargeable electric energy storage systems as propulsion energy storage systems), a warning to the driver in the event of low REESS state of charge shall be provided. Based on engineering judgment, the manufacturer shall determine the necessary level of REESS energy remaining, when the driver warning is first provided. In case of optical warning, the tell-tale shall, when illuminated, be sufficiently bright to be visible to the driver under both daylight and night-time driving conditions, when the driver has adapted to the ambient roadway light conditions.
6.2.1.changed
The test shall be conducted in accordance with Annex 9A 8A of this Regulation. A REESS that passes the vibration test in all three mutually perpendicular X, Y and Z directions may be mounted in any orientation on the vehicle.
5.3.1.deleted
At least a momentary indication shall be given to the driver each time when the vehicle is first placed in "active driving possible mode'' after activation of the propulsion system. However, this provision is optional under conditions where an internal combustion engine directly or indirectly provides the vehicle´s propulsion power upon vehicle start up.
5.3.2.deleted
When leaving the vehicle, the driver shall be informed by a signal (e.g. optical or audible signal) if the vehicle is still in the active driving possible mode. However, this provision is optional under conditions where an internal combustion engine provides directly or indirectly the vehicle´s propulsion power while leaving the vehicle or driver seat.
6.2.2.1.changed
During the test, there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS (s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
5.3.3.deleted
If the REESS can be externally charged, vehicle movement caused by the vehicle's propulsion system shall not be possible while the vehicle connector is physically connected to the vehicle inlet. For vehicles with a permanently connected recharge cable, the requirement above is not applicable if using the cable to charge the vehicle prevents the use of the vehicle (e.g. seat cannot be closed, the cable position does not allow the rider to sit in or step into the vehicle). This requirement shall be demonstrated by using the vehicle connector specified by the vehicle manufacturer. The state of the drive direction control unit shall be identified to the driver.
6.2.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B 4B to this Regulation shall not be less than 100 Ω/Volt.
5.3.4.1.deleted
At least two deliberate and distinctive actions shall be performed by the driver at the start-up to select the active driving possible mode.
6.3.1.changed
The test shall be conducted in accordance with Annex 9B 8B to this Regulation.
5.3.4.2.deleted
Only a single action shall be required to deactivate the active driving possible mode.
5.3.4.3.deleted
Indication of temporary reduced power (i.e. not resulting from a failure).
6.3.2.1.changed
During the test, there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS (s) REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
5.3.4.3.1.deleted
The vehicle shall have a function/device that indicates to the driver if the power is automatically reduced below a certain level, (e.g. due to activation of the output controller to protect the REESS or the propulsion system or due to a low SOC).
6.3.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B to 4B of this Regulation shall not be less than 100 Ω/Volt.
5.3.4.3.2.deleted
The conditions under which these indications are given shall be determined by the manufacturer. A brief description of the power reduction and indicating strategy will be prescribed in Annex 1 Appendix 1.
5.3.4.4.deleted
It shall not be possible to activate the vehicle reverse control function whilst the vehicle is in forward motion.
6.4.1.1.added
The test shall be conducted in accordance with Annex 8C of this Regulation.
6.4.1.2.1.changed
During the test there shall be no evidence of (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
6.4.1.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B 4B of this Regulation shall not be less than 100 Ω / Volt.
6.4.2.1.changed
This test shall apply to vehicles with a centre and/or side stand. The test shall be conducted in accordance with Annex 9D 8D of this Regulation.
6.4.2.2.1.changed
During the test there shall be no evidence of (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
6.4.2.2.2.changed
For a high voltage REESS the isolation resistance of the Tested-Device tested-device shall ensure at least 100 Ω/V Ω/Volt for the whole REESS measured after the test in accordance with Annex 5B 4B to this UN Regulation.
6.5.1.changed
The test shall be conducted in accordance with Annex 9E 8E in due consideration of paragraph 3.2.1. of Annex 9E. 8E. The approval of a REESS tested according to this paragraph shall be limited to approvals for a specific vehicle type.
6.5.2.changed
The test shall be conducted in accordance with Annex 9E 8E in due consideration of paragraph 3.2.2. of Annex 9E. 8E.
6.6.1.changed
The test shall be conducted in accordance with Annex 8F of this Regulation.
6.6.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
6.6.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B 4B to this Regulation shall not be less than 100 Ω/V.
6.7.1.changed
The test shall be conducted in accordance with Annex 9G 8G to this Regulation.
6.7.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
6.7.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B 4B to this Regulation shall not be less than 100 Ω/V.
6.8.1.changed
The test shall be conducted in accordance with Annex 9H 8H to this Regulation.
6.8.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
6.8.2.2.changed
For a high voltage REESS the isolation resistance measured after the test in accordance with Annex 5B 4B to this Regulation shall not be less than 100 Ω/V.
6.9.1.changed
The test shall be conducted in accordance with Annex 9I 8I to this Regulation.
6.9.2.1.changed
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); Fire; (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence Evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device. tested-device.
6.9.2.2.changed
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B 4B to this Regulation shall not be less than 100 Ω/V.
6.10.changed
Overcurrent protection. This test is required for REESS intended for Possible emission of gases caused by the energy conversion process during normal use on vehicles that have the capability of charging by DC external electricity supply. shall be considered.
6.10.1.changed
The test Open type traction batteries shall meet the requirements of paragraph 5.4. of this Regulation with regard to hydrogen emissions. Systems with a closed chemical process shall be conducted considered as emission-free under normal operation (e.g. lithium-ion battery). The closed chemical process shall be described and documented by the battery manufacturer in accordance with Annex 9J to this Regulation. 6 - Part 2. Other technologies shall be evaluated by the manufacturer and the Technical Service regarding any possible emissions under normal operation.
6.10.2.added
For hydrogen emissions see paragraph 5.4. of this Regulation. For emission free systems with closed chemical process no verification is necessary.
7.1.changed
Every modification of the vehicle or REESS type with regard to this Regulation shall be notified to the Type Approval Authority which approved the vehicle or REESS type. The Authority may then either: (a) Decide, in consultation with the manufacturer, that a new type approval is to be granted; or (b) Apply the procedure contained in paragraph 7.1.1. (Revision) and, if applicable, the procedure contained in paragraph 7.1.2. (Extension).
7.1.1.changed
When details recorded in the information documents of Annex 1 - Appendix 1 or Annex 1 - Appendix 2 have changed and the Type Approval Authority considers Consider that the modifications made are unlikely to have an appreciable adverse effect, effect and that in any case the vehicle or the REESS still meets complies with the requirements, the modification shall be designated a "revision". In such a case, the Type Approval Authority shall issue the revised pages of the information documents of Annex 1 – Appendix 1 or Annex 1 – Appendix 2 as necessary, marking each revised page to show clearly the nature of the modification and the date of reissue. A consolidated, updated version of the information documents of Annex 1 – Appendix 1 or Annex 1 – Appendix 2, accompanied by a detailed description of the modification, shall be deemed to meet this requirement.
7.1.2.changed
The modification shall be designated as an "extension" if, in addition to Require a further test report from the change of Technical Service responsible for conducting the particulars recorded in the information folder: (a) Further inspections or tests are required; or (b) Any information on the communication document (with the exception of its attachments) has changed; or (c) Approval to a later series of amendments is requested after its entry into force. tests.
7.2.added
Confirmation or refusal of approval, specifying the alteration, shall be communicated by the procedure specified in paragraph 4.3. above to the Parties to the Agreement applying this Regulation.
7.3.added
The Type Approval Authority issuing the extension of approval shall assign a series number to each communication form drawn up for such an extension and inform thereof the other Parties to the 1958 Agreement applying the Regulation by means of a communication form conforming to the model in Annex 1 (Part 1 or Part 2) to this Regulation.
8.3.added
The holder of the approval shall, in particular:
8.3.1.added
Ensure the existence of procedures for the effective quality control of vehicles or REESS;
8.3.2.added
Have access to the testing equipment necessary for checking the conformity of each approved type;
8.3.3.added
Ensure that test result data are recorded and that the annexed documents remain available for a period to be determined in agreement with the Type Approval Authority;
8.3.4.added
Analyse the results of each type of test, in order to verify and ensure the consistency of characteristics of the vehicle or REESS, making allowance for permissible variations in industrial production;
8.3.5.added
Ensure that for each type of vehicle or component type at least the tests prescribed in the relevant part(s) of this Regulation are carried out;
8.3.6.added
Ensure that any set of samples or test pieces giving evidence of non- conformity with the type of test in question shall give rise to a further sampling and test. All necessary steps shall be taken to re-establish conformity of the corresponding production.
8.4.added
The Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production unit.
8.4.1.added
At every inspection, the test records and production records shall be presented to the visiting inspector.
8.4.2.added
The inspector may take samples at random to be tested in the manufacturer's laboratory. The minimum number of samples may be determined according to the results of the manufacturer's own checks.
8.4.3.added
When the quality level appears unsatisfactory or when it seems necessary to verify the validity of the tests carried out in application of paragraph 8.4.2., the inspector shall select samples to be sent to the technical service which has conducted the type approval tests.
8.4.4.added
The Type Approval Authority may carry out any test prescribed in this Regulation.
8.4.5.added
The normal frequency of inspections by the Type Approval Authority shall be one per year. If unsatisfactory results are recorded during one of these visits, the Type Approval Authority shall ensure that all necessary steps are taken to re-establish the conformity of production as rapidly as possible.
9.1.changed
The approval granted in respect of a vehicle/REESS type, pursuant to this Regulation may be withdrawn if the requirements laid down in paragraph 8. above are not complied with. with, or if the vehicle/REESS or its components fail to pass the tests provided for in paragraph 8.3.5. above.
9.2.changed
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation, by means of a copy of communication form conforming to the approval form bearing at the end, Model in large letters, the signed and dated annotation "APPROVAL WITHDRAWN". Annex 1 (Part 1 or Part 2) to this Regulation.
6.10.2.1.deleted
During the test there shall be no evidence of: (a) Electrolyte leakage; (b) Rupture (applicable to high voltage REESS(s) only); (c) Venting (for REESS other than open-type traction battery); (d) Fire; (e) Explosion. The evidence of REESS venting shall be verified only for vehicles with a passenger compartment. The evidence of electrolyte leakage shall be verified by visual inspection without disassembling any part of the Tested-Device. An appropriate technique shall, if necessary, be used in order to confirm if there is any electrolyte leakage from the REESS resulting from the test. The evidence of venting shall be verified by visual inspection without disassembling any part of the Tested-Device.
10.changed
If the holder of the approval completely ceases to manufacture a vehicle/REESS type approved in accordance with this Regulation, he shall so inform the Type Approval Authority which granted the approval. Upon receiving the relevant communication, that Type Approval Authority shall inform thereof the other Contracting Parties to the 1958 Agreement applying this Regulation by means of a copy of communication form conforming to the approval form bearing at the end, model in large letters, the signed and dated annotation "PRODUCTION DISCONTINUED". Annex 1 (Part 1 or Part 2) to this Regulation.
6.10.2.2.deleted
The overcurrent protection control of the REESS shall terminate charging or the temperature measured on the casing of the REESS shall be stabilized, such that the temperature gradient varies by less than 4 °C through 2 hours after the maximum overcurrent charging level is reached.
11.changed
Names and addresses of Technical Services responsible for conducting approval tests and of Type Approval Authorities The Contracting Parties to the 1958 Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the Technical Services responsible for conducting approval tests and the Type Approval Authorities which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval or production definitively discontinued, issued in other countries are to be sent. Annex 1 – Part 1 Annex 1 - Part 1 Communication (Maximum format: A4 (210 x 297 mm)) Issued by: Name of administration: Concerning:2 Approval granted, Approval extended, Approval refused, Approval withdrawn, Production definitively discontinued, of a vehicle type with regard to its electrical safety pursuant to Regulation No. 136
6.10.2.3.deleted
For a high voltage REESS, the isolation resistance measured after the test in accordance with Annex 5B to this Regulation shall not be less than 100 Ω/V.
6.1.1.changed
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 1 – Part 1
6.11.deleted
Low-temperature protection. The REESS manufacturer must make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or subsystem level of the vehicle to demonstrate that the REESS monitors and appropriately controls REESS operations at low temperatures at the safety boundary limits of the REESS: (a) A system diagram; (b) Written explanation on the lower boundary temperature for safe operation of REESS; (c) Method of detecting REESS temperature; (d) Action taken when the REESS temperature is at or lower than the lower boundary for safe operation of the REESS.
17.changed
The documents filed with the request for approval or extension may be obtained on request. Annex 1 – Part 2 Annex 1 – Part 2 Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a REESS type as component/separate technical unit2 pursuant to Regulation No. 136 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 1 – Part 2
6.12.deleted
Management of gases emitted from REESS.
17.changed
The documents filed with the request for approval or extension may be obtained on request. Annex 2
6.12.1.deleted
Under vehicle operation including the operation with a failure, the vehicle occupants shall not be exposed to any hazardous environment caused by emissions from REESS.
6.12.2.deleted
Open-type traction batteries shall meet the requirements of paragraph 5.4. of this Regulation with regard to hydrogen emissions.
Figure 1changed
a = 8 mm min. The approval mark in Figure 1 affixed to a vehicle shows that the road vehicle type concerned has been approved in the Netherlands (E 4), pursuant to Regulation No. 136, and under the approval number 012492. 002492. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of UN Regulation No. 136 as amended by the 01 series of amendments. in its original form.
Figure 2changed
a = 8 mm min. The approval mark in Figure 2 affixed to a REESS shows that the REESS type ("ES") concerned has been approved in the Netherlands (E 4), pursuant to Regulation No. 136, and under the approval number 012492. 002492. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of UN Regulation No. 136 as amended by the 01 series of amendments. in its original form. Model B 136 01 00 2492 78 (See paragraph 4.5. of this Regulation) 03 1628 a = 8 mm min. (See paragraph 4.5. of this Regulation) The above approval mark affixed to a vehicle shows that the road vehicle concerned has been approved in the Netherlands (E4) pursuant to UN Regulations Nos. 136 and 781 . 781. The approval number indicates that, at the dates when the respective approvals were granted, UN Regulation No. 136 was amended by the 01 series of amendments still in its original form and UN Regulation No. 78 was amended by 03 series of amendments. 1 The latter number is given only as an example.
6.12.1.deleted
is deemed to be satisfied, if all applicable requirements of the following tests are met: paragraph 6.2. (vibration), paragraph 6.3. (thermal shock and cycling), paragraph 6.6. (external short circuit protection), paragraph 6.7. (overcharge protection), paragraph 6.8. (over-discharge protection), paragraph 6.9. (over-temperature protection) and paragraph 6.10. (overcurrent protection).
6.13.deleted
REESS safe operation. The REESS or vehicle system shall provide a signal to activate the warning specified in paragraph 5.2.5. in the event of operational failure of the vehicle controls (e.g. input and output signals to the management system of REESS, sensors within REESS, etc.) that manage the safe operation of the REESS. REESS or vehicle manufacturer shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or subsystem level of the vehicle:
6.13.1.deleted
A system diagram that identifies all the vehicle controls that manage REESS operations. The diagram must identify what components are used to generate a warning due to operational failure of vehicle controls to conduct one or more basic operations.
2.changed
The access probe is pushed against any openings of the enclosure with the force specified in Table 1. If it partly or fully penetrates, it is placed in every possible position, but in no case shall the stop face fully penetrate through the opening. Internal electrical protection barriers are considered part of the enclosure. A low-voltage supply (of not less than 40 V and not more than 50 V) in series with a suitable lamp should be connected, if necessary, between the probe and live parts inside the electrical protection barrier or enclosure. The signal-circuit method should also be applied to the moving live parts of high voltage equipment. Internal moving parts may be operated slowly, where this is possible.
6.13.2.deleted
A written explanation describing the basic operation of the vehicle controls that manage REESS operation. The explanation must identify the components of the vehicle control system, provide description of their functions and capability to manage the REESS, and provide a logic diagram and description of conditions that would lead to triggering of the warning.
3.changed
The access probe shall not touch live parts. If this requirement is verified by a signal circuit between the probe and live parts, the lamp shall not light. In the case of the test for protection degree IPXXB, the jointed test finger may penetrate to its 80 mm length, but the stop face (diameter 50 mm x 20 mm) shall not pass through the opening. Starting from the straight position, both joints of the test finger shall be successively bent through an angle of up to 90 degrees with respect to the axis of the adjoining section of the finger and shall be placed in every possible position. In case of the tests for protection degree IPXXD, the access probe may penetrate to its full length, but the stop face shall not fully penetrate through the opening. Annex 3
6.14.deleted
Warning in the case of a thermal event within the REESS. The REESS or vehicle system shall provide a signal to activate the warning specified in paragraph 5.2.5. in the case of a thermal event in the REESS (as specified by the manufacturer). The REESS or vehicle manufacturer shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or subsystem level of the vehicle:
6.14.1.deleted
The parameters and associated threshold levels that are used to indicate a thermal event (e.g. temperature, temperature rise rate, SOC level, voltage drop, electrical current, etc.) to trigger the warning.
Figure 1changed
R2 ± 0.05 cylindrical R4 ± 0.05 spherical Material: metal, except where otherwise specified Linear dimensions in millimeters Tolerances on dimensions without specific tolerance: (a) On angles: 0/-10 seconds; 0/-10°; (b) On linear dimensions: (i) up to 25 mm: 0/-0.05 mm. (ii) mm over 25 mm: ±0.2 mm. mm Both joints shall permit movement in the same plane and the same direction through an angle of 90° with a 0 to +10° tolerance. Annex 4A Annex 4A Isolation resistance measurement method for vehicle based tests
6.14.2.deleted
A system diagram and written explanation describing the sensors and operation of the vehicle controls to manage the REESS in the event of a thermal event.
1.added
The isolation resistance for each high voltage bus of the vehicle shall be measured or shall be determined by calculation using measurement values from each part or component unit of a high voltage bus (hereinafter referred to as the "divided measurement").
6.15.deleted
Thermal propagation. For a REESS containing flammable electrolyte, the vehicle occupants shall not be exposed to any hazardous environment caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway. To ensure this, the requirements of paragraphs 6.15.1. and 6.15.2. shall be satisfied.5 This test applies for vehicles with a passenger compartment only.
2.added
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 2.1. through 2.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the on-board isolation resistance monitoring system, etc., necessary modification for conducting the measurement may be carried out, such as stopping of the operation of the device concerned or removing it. Furthermore, when the device is removed, it shall be proven, using drawings, etc., that it will not change the isolation resistance between the live parts and the electrical chassis. Utmost care shall be exercised as to short circuit, electric shock, etc., for this confirmation might require direct operations of the high-voltage circuit.
6.15.1.deleted
The REESS or vehicle system shall provide a signal to activate the advance warning indication in the vehicle to allow egress or 5 minutes prior to the presence of a hazardous situation inside the passenger compartment caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway such as fire, explosion or smoke. This requirement is deemed to be satisfied if the thermal propagation does not lead to a hazardous situation for the vehicle occupants. The REESS or vehicle manufacturer shall make available, at the request of the Technical Service with its necessity, the 5 The manufacturer will be accountable for the verity and integrity of the documentation submitted, and assume full responsibility for the safety of occupants against adverse effects arising from thermal propagation caused by internal short circuit. following documentation explaining safety performance of the system level or subsystem level of the vehicle:
6.15.1.1.deleted
The parameters (for example, temperature, voltage or electrical current) which trigger the warning indication.
2.1.1.added
An isolation resistance test instrument capable of applying a DC voltage higher than the working voltage of the high voltage bus shall be used.
6.15.1.2.deleted
Description of the warning system.
2.1.2.added
An insulator resistance test instrument shall be connected between the live parts and the electrical chassis. Then, the isolation resistance shall be measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those component disconnected. Annex4A
6.15.2.deleted
The REESS or vehicle system shall have functions or characteristics in the cell or REESS intended to protect vehicle occupants (as described in paragraph 6.15.) in conditions caused by thermal propagation which is triggered by an internal short circuit leading to a single cell thermal runaway. The REESS or vehicle manufacturers shall make available, at the request of the Technical Service with its necessity, the following documentation explaining safety performance of the system level or subsystem level of the vehicle:
6.15.2.1.deleted
A risk reduction analysis using appropriate industry standard methodology, which documents the risk to vehicle occupants caused by thermal propagation that is triggered by an internal short circuit leading to a single cell thermal runaway and documents the reduction of risk resulting from implementation of the identified risk mitigation functions or characteristics.
2.2.1.added
The high voltage-bus shall be energized by the vehicle’s own REESS and/or energy conversion system and the voltage level of the REESS and/or energy conversion system throughout the test shall be at least the nominal operating voltage as specified by the vehicle manufacturer.
6.15.2.2.deleted
A system diagram of all relevant physical systems and components. Relevant systems and components are those which contribute to protection of vehicle occupants from hazardous effects caused by thermal propagation triggered by a single cell thermal runaway.
2.2.2.added
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
6.15.2.3.deleted
A diagram showing the functional operation of the relevant systems and components, identifying all risk mitigation functions or characteristics.
6.15.2.4.deleted
For each identified risk mitigation function or characteristic:
2.2.3.1.added
The voltage is measured as shown in Figure 1 and the high voltage bus voltage (Vb) is recorded. Vb shall be equal to or greater than the nominal operating voltage of the REESS and/or energy conversion system as specified by the vehicle manufacturer. Measurement of Vb, V1, V2 Electrical Chassis Energy Conversion System Assembly V2 REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Vb System - - V1 Electrical Chassis
6.15.2.4.1.deleted
A description of its operation strategy;
2.2.3.2.added
Measure and record the voltage (V1) between the negative side of the high voltage bus and the electrical chassis (see Figure 1).
6.15.2.4.2.deleted
Identification of the physical system or component which implements the function;
2.2.3.3.added
Measure and record the voltage (V2) between the positive side of the high voltage bus and the electrical chassis (see Figure 1). ECE/TRANS/WP.29/2015/69 Annex 4A
6.15.2.4.3.deleted
One or more of the following engineering documents relevant to the manufacturers design which demonstrates the effectiveness of the risk mitigation function: (a) Tests performed including procedure used and conditions and resulting data; (b) Analysis or validated simulation methodology and resulting data.
2.2.3.4.added
If V1 is greater than or equal to V2, insert a standard known resistance (Ro) between the negative side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (V1’) between the negative side of the high voltage bus and the electrical chassis (see Figure 2). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V1’ – Vb/V1) or Ri = Ro*Vb*(1/V1’ – 1/V1)
Figure 2added
Electrical Chassis Energy Conversion System Assembly REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Vb System - - V1´ Ro Electrical Chassis If V2 is greater than V1, insert a standard known resistance (Ro) between the positive side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (V2’) between the positive side of the high voltage bus and the electrical chassis (see Figure 3). Calculate the electrical isolation (Ri) according to the formula shown. Divide this electrical isolation value (in Ω) by the nominal operating voltage of the high voltage bus (in Volts). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V2’ – Vb/V2) or Ri = Ro*Vb*(1/V2’ – 1/V2) Annex4A
Figure 3added
Electrical Chassis Energy Conversion Ro System Assembly REESS Assembly V2' High Voltage Bus + + Energy Conversion Traction System REESS System - - Electrical Chassis
2.2.3.5.added
The electrical isolation value Ri (in Ω) divided by the working voltage of the high voltage bus (in Volts) results in the isolation resistance (in Ω/V). Note: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the working voltage of the vehicle plus/minus 20 per cent (in volts). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements. Annex 4B Annex 4B Isolation resistance measurement method for component based tests of a REESS
1.added
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 1.1. through 1.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. If the operating voltage of the tested-device (Vb, Figure 1) cannot be measured (e.g. due to disconnection of the electric circuit caused by main contactors or fuse operation) the test may be performed with a modified test device to allow measurement of the internal voltages (upstream the main contactors). These modifications shall not influence the test results. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. If the high voltage buses are galvanically isolated from each other, isolation resistance shall be measured for each electrical circuit. Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc.. In cases where the measured values are not stable due to the operation of the isolation resistance monitoring system, etc., necessary modification for conducting the measurement may be carried out, such as stopping the operation of the device concerned or removing it. Furthermore, when the device is removed, it shall be proven, using drawings, etc., that it will not change the isolation resistance b…
8.deleted
The conformity of production procedure shall comply with the requirements set out in Schedule 1 of the Agreement (E/ECE/TRANS/505/Rev.3 and Amend.1).
1.1.1.added
An isolation resistance test instrument capable of applying a DC voltage higher than the nominal voltage of the tested-device shall be used.
1.1.2.added
An insulation resistance test instrument shall be connected between the live parts and the ground connection. Then, the isolation resistance shall be measured. If the system has several voltage ranges (e.g. because of boost converter) in a galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those Annex 4B components and the ground connection can be measured separately by applying at least half of their own working voltage with those component disconnected.
1.2.1.added
The voltage level of the tested-device throughout the test shall be at least the nominal operating voltage of the tested-device.
1.2.2.added
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
1.2.3.1.added
The voltage is measured as shown in Figure 1 and the operating voltage of the tested-device (Vb, Figure 1) is recorded. Vb shall be equal to or greater than the nominal operating voltage of the tested-device. + Tested- Vb device - V2 V1 Ground connection
1.2.3.2.added
Measure and record the voltage (V1) between the negative pole of the tested- device and the ground connection (Figure 1).
12.1.deleted
As from the official date of entry into force of the 01 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 01 series of amendments.
1.2.3.3.added
Measure and record the voltage (V2) between the positive pole of the tested- device and the ground connection (Figure 1).
12.2.deleted
As from 1 September 2025, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2025.
1.2.3.4.added
If V1 is greater than or equal to V2, insert a standard known resistance (Ro) between the negative pole of the tested-device and the ground connection. With Ro installed, measure the voltage (V1’) between the negative pole of the tested-device and the ground connection (see Annex 4B Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V1’ – Vb/V1) or Ri = Ro*Vb*(1/V1’ – 1/V1) + Tested- Vb device - R0 V1’ Ground connection If V2 is greater than V1, insert a standard known resistance (Ro) between the positive pole of the tested-device and the ground connection. With Ro installed, measure the voltage (V2’) between the positive pole of the tested- device and the ground connection (see Figure 3). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*(Vb/V2’ – Vb/V2) or Ri = Ro*Vb*(1/V2’ – 1/V2) + Tested- Vb device R0 - V2’ Ground connection Annex 4B
12.3.deleted
Until 1 September 2027, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2025.
1.2.3.5.added
The electrical isolation value Ri (in Ω) divided by the nominal voltage of the tested-device (in Volts) results in the isolation resistance (in Ω/V). Note 1: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the nominal voltage of the tested-device plus/minus 20 per cent (in volts). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements. Annex 5
12.4.deleted
As from 1 September 2027, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation.
Annex 5added
resistance monitoring system The function of the on-board isolation resistance monitoring system shall be confirmed by the following method: Insert a resistor that does not cause the isolation resistance between the terminal being monitored and the electrical chassis to drop below the minimum required isolation resistance value. The warning shall be activated. Annex 6 – Part 1 Annex 6 - Part 1 Essential characteristics of road vehicles or systems
12.5.deleted
Contracting Parties applying this Regulation may grant type approvals according to any preceding series of amendments to this Regulation.
12.6.deleted
Contracting Parties applying this Regulation shall continue to grant extensions of existing approvals to any preceding series of amendments to this Regulation.
12.7.deleted
Notwithstanding the transitional provisions above, Contracting Parties whose application of this Regulation comes into force after the date of entry into force of the most recent series of amendments are not obliged to accept approvals which were granted in accordance with any of the preceding series of amendments to this Regulation. Annex 1 - Part 1 Communication (Maximum format: A4 (210 x 297 mm)) Issued by: Name of administration: Concerning:2 Approval granted, Approval extended, Approval refused, Approval withdrawn, Production definitively discontinued, of a vehicle type with regard to its electrical safety pursuant to Regulation No. 136
3.3.added
Description or drawing(s) or picture(s) of the REESS explaining: 1 Strike out what does not apply. Annex 6 – Part 1
3.6.added
Description or drawing(s) or picture(s) of the installation of the REESS in the
4.added
Fuel Cell (if any)
6.3.deleted
1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply.
8.1.added
Brief description of the power circuit components installation or drawings/ pictures showing the location of the power circuit components installation: ...
8.4.1.added
Systems’ SOC level(s) for which power reduction is activated, descriptions,
8.4.2.added
Descriptions for systems’ reduced power mode(s) and similar mode(s), Annex 6 – Part 2 Annex 6 - Part 2 Essential characteristics of REESS
3.3.deleted
Description or drawing(s) or picture(s) of the REESS explaining: 1 Strike out what does not apply.
3.6.deleted
Description or drawing(s) or picture(s) of the installation of the REESS in the
4.deleted
Fuel Cell (if any)
1.6.added
Description or drawing(s) or picture(s) of the installation of the REESS in the Annex 6 – Part 3 Annex 6 - Part 3 Essential characteristics of road vehicles or systems with chassis connected to electrical circuits
2.3.added
Electrical specification:
8.1.deleted
Brief description of the power circuit components installation or drawings/ pictures showing the location of the power circuit components installation: ...
2.5.added
Description or drawing(s) or picture(s) of the installation of the RESSS in the
8.4.1.deleted
Systems’ SOC level(s) for which power reduction is activated, descriptions,
3.added
1 Strike out what does not apply.
8.4.2.deleted
Descriptions for systems’ reduced power mode(s) and similar mode(s),
Annex 7added
procedures of the REESS
1.added
This annex describes the procedure for the determination of hydrogen emissions during the charge procedures of the REESS of all road vehicles, according to paragraph 5.4. of this Regulation.
2.added
The hydrogen emission test (Figure 7.1 of the present annex) is conducted in order to determine hydrogen emissions during the charge procedures of the REESS with the charger. The test consists in the following steps: (a) Vehicle/REESS preparation, (b) Discharge of the REESS, (c) Determination of hydrogen emissions during a normal charge, (d) Determination of hydrogen emissions during a charge carried out with the charger failure.
1.6.deleted
Description or drawing(s) or picture(s) of the installation of the REESS in the
3.1.1.added
The vehicle shall be in good mechanical condition and have been driven at least 300 km during seven days before the test. The vehicle shall be equipped with the REESS subject to the test of hydrogen emissions, over this period.
3.1.2.added
If the REESS is used at a temperature above the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system of the REESS is neither damaged nor presenting a capacity defect.
3.2.1.added
The REESS shall be in good mechanical condition and have been subject to minimum of 5 standard cycles (as specified in Annex 8, Appendix 1).
3.2.2.added
If the REESS is used at a temperature above the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in its normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system of the REESS is neither damaged nor presenting a capacity defect Annex 7
Figure 7added
Determination of hydrogen emissions during the charge procedures of the REESS START Vehicle/REESS preparation (if necessary) Maximum 7 days days days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to Soak 36 h Maximum 2 min after connection to mains Hydrogen emission test during a normal charge Maximum 7 days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to Soak 36 h Maximum 2 min after connection to mains Hydrogen emission test during a charger failure Ambient temperature 293 K ± 2 K END
4.1.added
The hydrogen emission measurement enclosure shall be a gas-tight measuring chamber able to contain the vehicle/REESS under test. The vehicle/REESS shall be accessible from all sides and the enclosure when sealed shall be gas- tight in accordance with Appendix 1 to this annex. The inner surface of the enclosure shall be impermeable and non-reactive to hydrogen. The temperature conditioning system shall be capable of controlling the internal enclosure air temperature to follow the prescribed temperature throughout the test, with an average tolerance of ±2 K over the duration of the test. To accommodate the volume changes due to enclosure hydrogen emissions, either a variable-volume or another test equipment may be used. The variable-volume enclosure expands and contracts in response to the hydrogen emissions in the enclosure. Two potential means of accommodating the internal volume changes are movable panels, or a bellows design, in which impermeable bags inside the enclosure expand and contract in response to internal pressure changes by exchanging air from outside the enclosure. Any design for volume accommodation shall maintain the integrity of the enclosure as specified in Appendix 1 to this annex. Any method of volume accommodation shall limit the differential between the enclosure internal pressure and the barometric pressure to a maximum value of ±5hPa. The enclosure shall be capable of latching to a fixed volume. A variable volume enclosure shall be capabl…
4.2.1.1.added
The atmosphere within the chamber is monitored using a hydrogen analyser (electrochemical detector type) or a chromatograph with thermal conductivity detection. Sample gas shall be drawn from the mid-point of one side-wall or roof of the chamber and any bypass flow shall be returned to the enclosure, preferably to a point immediately downstream of the mixing fan.
1.deleted
Test method using a resistance tester. The resistance tester is connected to the measuring points (typically, electrical chassis and electro conductive enclosure/electrical protection barrier) and the resistance is measured using a resistance tester that meets the specification that follows: (a) Resistance tester: Measurement current at least 0.2 A; (b) Resolution: 0.01 Ω or less; (c) The resistance R shall be less than 0.1 Ω.
4.2.1.2.added
The hydrogen analyser shall have a response time to 90 per cent of final reading of less than 10 seconds. Its stability shall be better than 2 per cent of full scale at zero and at 80 per cent ± 20 per cent of full scale, over a 15-minute period for all operational ranges.
2.deleted
Test method using DC power supply, voltmeter and ammeter. Example of the test method using DC power supply, voltmeter and ammeter is shown below.
4.2.1.3.added
The repeatability of the analyser expressed as one standard deviation shall be better than 1 per cent of full scale, at zero and at 80 per cent ± 20 per cent of full scale on all ranges used.
Figure 1deleted
Connection to exposed Conductive Parts Exposed Conductive DC Parts Power U Supply Electrical Chassis Connection to Electrical Chassis
4.2.1.4.added
The operational ranges of the analyser shall be chosen to give best resolution over the measurement, calibration and leak checking procedures.
2.1.deleted
Test Procedure. The DC power supply, voltmeter and ammeter are connected to the measuring points (Typically, electrical chassis and electro conductive enclosure/electrical protection barrier). The voltage of the DC power supply is adjusted so that the current flow becomes at least 0.2 A. The current "I" and the voltage "U" are measured. The resistance "R" is calculated according to the following formula: R=U/I The resistance R shall be less than 0.1 Ω. Note: If lead wires are used for voltage and current measurement, each lead wire shall be independently connected to the electrical protection barrier/enclosure/electrical chassis. Terminal can be common for voltage measurement and current measurement. Annex 5A Isolation resistance measurement method for vehicle based tests
4.2.2.added
The hydrogen analyser shall be fitted with a device to record electrical signal output, at a frequency of at least once per minute. The recording system shall have operating characteristics at least equivalent to the signal being recorded and Annex 7 shall provide a permanent record of results. The recording shall show a clear indication of the beginning and end of the normal charge test and charging failure operation.
1.deleted
The isolation resistance for each high voltage bus of the vehicle shall be measured or shall be determined by calculation using measurement values from each part or component unit of a high voltage bus (hereinafter referred to as the "divided measurement").
2.deleted
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 2.1. through 2.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. Megohmmeter or oscilloscope measurements are appropriate alternatives to the procedure described below for measuring isolation resistance. In this case, it may be necessary to deactivate the on-board isolation resistance monitoring system. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. If the high voltage buses are conductively isolated from each other, isolation resistance shall be measured for each electrical circuit. Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the on-board isolation resistance monitoring system, necessary modification for conducting the measurement may be carried out by stopping of the operation of the device concerned or removing it. Furthermore, when the device is removed, a set of drawings will be used to prove that the isolation resistance between the live parts and the electrical chassis remains unchanged. These modifications shall not influence the test results. Utmost care shall be e…
4.3.1.added
The temperature in the chamber is recorded at two points by temperature sensors, which are connected so as to show a mean value. The measuring points are extended approximately 0.1 m into the enclosure from the vertical centre line of each side-wall at a height of 0.9 ± 0.2 m.
4.3.2.added
The temperatures in the proximity of the cells are recorded by means of the sensors.
2.1.1.deleted
An isolation resistance test instrument capable of applying a DC voltage higher than the working voltage of the high voltage bus shall be used.
4.3.3.added
Temperatures shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
2.1.2.deleted
An isolation resistance test instrument shall be connected between the live parts and the electrical chassis. Then, the isolation resistance shall be measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those component disconnected.
4.3.4.added
The accuracy of the temperature recording system shall be within ±1.0 K and the temperature shall be capable of being resolved to ±0.1 K.
4.3.5.added
The recording or data processing system shall be capable of resolving time to ±15 seconds.
2.2.1.deleted
The high voltage-bus shall be energized by the vehicle’s own REESS and/or energy conversion system and the voltage level of the REESS and/or energy conversion system throughout the test shall be at least the nominal operating voltage as specified by the vehicle manufacturer.
2.2.2.deleted
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
4.4.1.added
The difference p between barometric pressure within the test area and the enclosure internal pressure shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
4.4.2.added
The accuracy of the pressure recording system shall be within ±2 hPa and the pressure shall be capable of being resolved to ±0.2 hPa.
2.2.3.1.deleted
The voltage is measured as shown in Figure 1 and the high voltage bus voltage (Ub) is recorded. Ub shall be equal to or greater than the nominal operating voltage of the REESS and/or energy conversion system as specified by the vehicle manufacturer. Measurement of Ub, U1, U2 Electrical Chassis Energy Conversion System Assembly U2 REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Ub System - - U1 Electrical Chassis
4.4.3.added
The recording or data processing system shall be capable of resolving time to ±15 seconds.
2.2.3.2.deleted
Measure and record the voltage (U1) between the negative side of the high voltage bus and the electrical chassis (see Figure 1).
2.2.3.3.deleted
Measure and record the voltage (U2) between the positive side of the high voltage bus and the electrical chassis (see Figure 1).
4.5.1.added
The charger voltage and current intensity (battery) shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
2.2.3.4.deleted
If U1 is greater than or equal to U2, insert a standard known resistance (Ro) between the negative side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (U1’) between the negative side of the high voltage bus and the electrical chassis (see Figure 2). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U1’ – 1/U1)
4.5.2.added
The accuracy of the voltage recording system shall be within ±1 V and the voltage shall be capable of being resolved to ±0.1 V.
Figure 2deleted
Electrical Chassis Energy Conversion System Assembly REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion Ub System - - U1´ Ro Electrical Chassis If U2 is greater than U1, insert a standard known resistance (Ro) between the positive side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (U2’) between the positive side of the high voltage bus and the electrical chassis (see Figure 3). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U2’ – 1/U2)
4.5.3.added
The accuracy of the current intensity recording system shall be within ±0.5 A and the current intensity shall be capable of being resolved to ±0.05 A.
Figure 3deleted
Electrical Chassis Energy Conversion Ro System Assembly REESS Assembly U2' High Voltage Bus + + Energy Conversion Traction System REESS System - - Electrical Chassis
4.5.4.added
The recording or data processing system shall be capable of resolving time to ±15 seconds.
2.2.3.5.deleted
The electrical isolation value Ri (in Ω) divided by the working voltage of the high voltage bus (in Vvolts) results in the isolation resistance (in Ω/V). Note: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the working voltage of the vehicle plus/minus 20 per cent (in Vvolts). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements. Annex 5B Isolation resistance measurement method for component based tests of a REESS
4.6.added
The chamber shall be equipped with one or more fans or blowers with a possible flow of 0.1 to 0.5 m3/second in order to thoroughly mix the atmosphere in the enclosure. It shall be possible to reach a homogeneous temperature and hydrogen concentration in the chamber during measurements. The vehicle in the enclosure shall not be subjected to a direct stream of air from the fans or blowers.
1.deleted
The isolation resistance measurement shall be conducted by selecting an appropriate measurement method from among those listed in paragraphs 1.1. through 1.2. of this annex, depending on the electrical charge of the live parts or the isolation resistance, etc. Megohmmeter or oscilloscope measurements are appropriate alternatives to the procedure described below for measuring isolation resistance. In this case, it may be necessary to deactivate the on-board isolation resistance monitoring system. The range of the electrical circuit to be measured shall be clarified in advance, using electrical circuit diagrams, etc. If the high voltage buses are galvanically isolated from each other, isolation resistance shall be measured for each electrical circuit. If the operating voltage of the Tested-Device (Ub, Figure 1) cannot be measured (e.g. due to disconnection of the electric circuit caused by main contactors or fuse operation) the test may be performed with a modified test device to allow measurement of the internal voltages (upstream the main contactors). Moreover, modification necessary for measuring the isolation resistance may be carried out, such as removal of the cover in order to reach the live parts, drawing of measurement lines, change in software, etc. In cases where the measured values are not stable due to the operation of the isolation resistance monitoring system, necessary modification for conducting the measurement may be carried out by stopping the operation of t…
4.7.1.added
The following pure gases shall be available for calibration and operation: (a) Purified synthetic air (purity < 1 ppm C1 equivalent; < 1 ppm CO; < 400 ppm CO2; < 0.1 ppm NO ); oxygen content between 18 and 21 per cent by volume, (b) Hydrogen (H2 ), 99.5 per cent minimum purity.
1.1.1.deleted
An isolation resistance test instrument capable of applying a DC voltage higher than the nominal voltage of the tested-device shall be used.
4.7.2.added
Calibration and span gases shall contain mixtures of hydrogen (H 2) and purified synthetic air. The real concentrations of a calibration gas shall be within ±2 per cent of the nominal values. The accuracy of the diluted gases obtained when using a gas divider shall be within ±2 per cent of the nominal value. The concentrations specified in Appendix 1 may also be obtained by a gas divider using synthetic air as the dilution gas.
1.1.2.deleted
An insulation test instrument shall be connected between the live parts and the ground connection. Then, the isolation resistance shall be measured. If the system has several voltage ranges (e.g. because of boost converter) in a galvanically connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the ground connection can be measured separately by applying at least half of their own working voltage with those component disconnected.
5.added
The test consists in the five following steps: (a) Vehicle/REESS preparation; (b) Discharge of the REESS; (c) Determination of hydrogen emissions during a normal charge; (d) Discharge of the traction battery; (e) Determination of hydrogen emissions during a charge carried out with the charger failure. If the vehicle/REESS has to be moved between two steps, it shall be pushed to the following test area.
1.2.1.deleted
The voltage level of the tested-device throughout the test shall be at least the nominal operating voltage of the tested-device.
5.1.1.added
The ageing of REESS shall be checked, proving that the vehicle has performed at least 300 km during seven days before the test. During this period, the vehicle shall be equipped with the traction battery submitted to the hydrogen emission test. If this cannot be demonstrated then the following procedure will be applied.
1.2.2.deleted
The voltmeter used in this test shall measure DC values and shall have an internal resistance of at least 10 MΩ.
5.1.1.1.added
The procedure starts with the discharge of the REESS of the vehicle while driving on the test track at a steady speed of 70 per cent ± 5 per cent of the maximum speed of the vehicle during 30 minutes. Discharging is stopped: (a) When the vehicle is not able to run at 65 per cent of the maximum thirty minutes speed, or (b) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (c) After having covered the distance of 100 km. Annex 7
5.1.1.2.added
The charge is carried out: (a) With the charger; (b) In an ambient temperature between 293 K and 303 K. The procedure excludes all types of external chargers. The end of REESS charge criteria corresponds to an automatic stop given by the charger. This procedure includes all types of special charges that could be automatically or manually initiated like, for instance, the equalisation charges or the servicing charges.
1.2.3.1.deleted
The voltage is measured as shown in Figure 1 and the operating voltage of the tested-device (Ub, Figure 1) is recorded. Ub shall be equal to or greater than the nominal operating voltage of the tested-device. + Tested- Vb device Ub - U2 V2 U1 V1 Ground connection
5.1.1.3.added
Procedure from paragraphs 5.1.1.1. and 5.1.1.2. shall be repeated two times.
1.2.3.2.deleted
Measure and record the voltage (U1) between the negative pole of the tested- device and the ground connection (Figure 1).
5.1.2.added
The REESS is discharged while driving on the test track at a steady speed of 70 per cent ±5 per cent from the maximum thirty minutes speed of the vehicle. Stopping the discharge occurs: (a) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (b) When the maximum speed of the vehicle is lower than 20 km/h.
1.2.3.3.deleted
Measure and record the voltage (U2) between the positive pole of the tested-device and the ground connection (Figure 1).
5.1.3.added
Within fifteen minutes of completing the battery discharge operation specified in paragraph 5.2., the vehicle is parked in the soak area. The vehicle is parked for a minimum of 12 hours and a maximum of 36 hours, between the end of the traction battery discharge and the start of the hydrogen emission test during a normal charge. For this period, the vehicle shall be soaked at 293 K ± 2 K.
1.2.3.4.deleted
If U1 is greater than or equal to U2, insert a standard known resistance (Ro) between the negative pole of the Tested-Device and the ground connection. With Ro installed, measure the voltage (U1’) between the negative pole of the Tested-Device and the ground connection (see Figure 2). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U1’ – 1/U1) + Tested- Vb Ub device - R0 V1’ U1’ Ground connection If U2 is greater than U1, insert a standard known resistance (Ro) between the positive pole of the Tested-Device and the ground connection. With Ro installed, measure the voltage (U2’) between the positive pole of the Tested- Device and the ground connection (see Figure 3). Calculate the electrical isolation (Ri) according to the following formula: Ri = Ro*Ub*(1/U2’ – 1/U2) + Tested- Vb Ub device R0 - V2’ U2’ Ground connection
1.2.3.5.deleted
The electrical isolation value Ri (in Ω) divided by the nominal voltage of the Tested-Device (in V) results in the isolation resistance (in Ω/V). Note 1: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the nominal voltage of the Tested-Device plus/minus 20 per cent (in V). Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide good resolution for the voltage measurements.
5.1.4.1.added
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
Annex 6deleted
resistance monitoring system The on-board isolation resistance monitoring system shall be tested using the following procedure: (a) Determine the isolation resistance, Ri, of the electric power train with the electrical isolation monitoring system using the procedure outlined Annex 5A. (b) If the minimum isolation resistance value required in accordance with paragraph 5.1.3.1. or 5.1.3.2. is 100 Ω/V, insert a resistor with resistance Ro between either side of the high voltage bus that exhibits lower value in U1 or U2 measured in accordance with paragraph 2.2.3. of Annex 5A and the electrical chassis. The magnitude of the resistor, Ro, shall be such that: 1/(1/(95xU) – 1/Ri) ≤ Ro < 1/(1/(100xU) – 1/Ri) where U is the working voltage of the electric power train. (c) If the minimum isolation resistance value required in accordance with paragraph 5.1.3.1. or 5.1.3.2. is 500 Ω/V, insert a resistor with resistance Ro between either side of the high voltage bus that exhibits lower value in U1 or U2 measured in accordance with paragraph 2.2.3. of Annex 5A and the electrical chassis. The magnitude of the resistor, Ro, shall be such that: 1/(1/(475xU) – 1/Ri) ≤ Ro < 1/(1/(500xU) – 1/Ri) where U is the working voltage of the electric power train. Annex 7A Verification method for testing authorities confirming document based isolation resistance compliance of electrical design of the vehicle after water exposure This annex describes the applicable requirements when certifying th…
5.1.4.2.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
1.deleted
Documentation shall contain the following information: (a) on how the manufacturer tested isolation resistance compliance of electrical design of the vehicle by using fresh water; (b) on how, after the test had been carried out, the high-voltage component or system was inspected for ingress of water and how, depending on its mounting location, each high voltage component/system met the appropriate degree of protection against water.
5.1.4.3.added
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
2.deleted
The testing authority will verify and confirm the authenticity of documented conditions that have been observed, and should have been complied with, during the process of certification by manufacturer:
5.1.4.4.added
The vehicle shall be connected to the mains. The REESS is charged according to normal charge procedure as specified in paragraph 5.1.4.7. below.
2.1.deleted
It is permitted that, during the test, the moisture contained inside the enclosure is partly condensed. The dew which may be deposited is not considered as ingress of water. For the purpose of the tests, the surface area of the tested high-voltage component or system is calculated with an accuracy of 10 per cent. If possible, the tested high-voltage component or system is run energized. If the tested high-voltage component or system is energized, adequate safety precautions are taken.
5.1.4.5.added
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the normal charge step.
2.2.deleted
For electrical components, externally attached (e.g. in engine compartment), open underneath, both exposed or protected locations, the testing authority shall verify, with a view to confirming the compliance, whether the test is conducted by spraying the high-voltage component or system from all practicable directions with a stream of water from a standard test nozzle as shown in Figure 1. The following parameters are observed during the test in particular: (a) Nozzle internal diameter: 6.3 mm; (b) Delivery rate: 11.9 – 13.2 l/min; (c) Water pressure at the nozzle: approximately 30 kPa (0.3 bar); (d) Test duration per m2 of surface area of the tested high-voltage component or system: 1 min; (e) Minimum test duration: 3 min; (f) Distance from nozzle to tested high-voltage component or system surface: approximately 3 m (this distance may be reduced, if necessary to ensure proper wetting when spraying upwards).
5.1.4.6.added
The start of a normal charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
Figure 1deleted
Dimensions in millimetres D is 6.3 mm as specified in (a) above.
5.1.4.7.added
The normal charge is carried out with the charger and consists of the following steps: (a) Charging at constant power during t1; (b) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponds to the one used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given to the driver by the standard instrumentation that the battery is not yet fully charged.
2.3.deleted
For externally attached electrical components (e.g. in the engine compartment), covered from underneath, the testing authority shall verify the compliance, whether: (a) The cover protects the component against direct spray water from underneath and is not visible; (b) The test is conducted by using the splashing test nozzle as shown in Figure 2; (c) The moving shield is removed from the spray nozzle and the machine is sprayed from all practicable directions; (d) The water pressure is adjusted to a delivery rate of (10 ± 0.5) l/min (pressure approximately 80 kPa to 100 kPa (0.8 bar to 1.0 bar)); (e) The test duration is 1 min/m2 of calculated surface area of the machine (excluding any mounting surface and cooling fin) with a minimum duration of 5 min. Splashing Test Nozzle Viewed according to arrow A (with shield removed) Dimensions in millimetres IEC 927/01 Note:
5.1.4.8.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
5.1.4.9.added
The end of the emission sampling period occurs t1 + t2 or t1 + 5 hours after the beginning of the initial sampling, as specified in paragraph 5.1.4.6. of this annex. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in paragraph 6. of this annex.
1.deleted
Cock 7. Spray nozzle – brass with 121 holes  0.5:
5.1.5.1.added
Within seven days maximum after having completed the prior test, the procedure starts with the discharge of the REESS of the vehicle according to paragraph 5.1.2. of this annex.
5.1.5.2.added
The steps of the procedure in paragraph 5.1.3. of this annex shall be repeated.
5.1.5.3.added
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
5.1.5.4.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.1.5.5.added
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
3.deleted
The entire high voltage system or each component is checked to comply with the isolation resistance requirement in paragraph 5.1.3. with the following conditions: (a) The electric chassis shall be simulated by an electric conductor, e.g. a metal plate, and the components are attached with their standard mounting devices to it; (b) Cables, where provided, shall be connected to the component.
5.1.5.6.added
The vehicle shall be connected to the mains. The REESS is charged according to failure charge procedure as specified in paragraph 5.1.5.9. below.
4.deleted
The parts designed not to be wet during operation are not allowed to be wet and no accumulation of water which could have reached them is tolerated inside the high-voltage component or system. Annex 7B Vehicle-based test procedure for protection against water effects
5.1.5.7.added
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step. Annex 7
1.deleted
This test is intended to simulate the normal washing of vehicles, but not specific cleaning using high water pressure or underbody washing. The areas of the vehicle regarding this test are border lines, i.e. a seal of two parts such as flaps, glass seals, outline of opening parts, outline of front grille and seals of lamps. All border lines shall be exposed and followed in all directions with the water stream using a hose nozzle and conditions in accordance with IPX5 as specified in Annex 7A.
5.1.5.8.added
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
2.deleted
The vehicle shall be driven in a wade pool, with 10 cm water depth, over a distance of 500 m at a speed of 20 km/h, in a time of approximately 1.5 min. If the wade pool used is less than 500 m in length, then the vehicle shall be driven through it several times. The total time, including the periods outside the wade pool, shall be less than 10 min.
5.1.5.9.added
The charging failure is carried out with the suitable charger and consists of the following steps: (a) Charging at constant power during t'1; (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
5.1.5.10.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
5.1.5.11.added
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.1.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in paragraph 6. of this annex.
2.deleted
The hydrogen emission test (Figure 1 of Annex 8) is conducted in order to determine hydrogen emissions during the charge procedures of the REESS with the charger. The test consists in the following steps: (a) Vehicle/REESS preparation, (b) Discharge of the REESS, (c) Determination of hydrogen emissions during a normal charge, (d) Determination of hydrogen emissions during a charge carried out with the charger failure.
5.2.1.added
The ageing of REESS shall be checked, to confirm that the REESS has performed at least 5 standard cycles (as specified in Annex 8, Appendix 1).
5.2.2.added
The REESS is discharged at 70 per cent ±5 per cent of the nominal power of the system. Stopping the discharge occurs when minimum SOC as specified by the manufacturer is reached.
3.1.1.deleted
The vehicle shall be in good mechanical condition and have been driven at least 300 km during seven days before the test. The vehicle shall be equipped with the REESS subject to the test of hydrogen emissions, over this period.
5.2.3.added
Within 15 minutes of the end of the REESS discharge operation specified in paragraph 5.2.2. above, and before the start of the hydrogen emission test, the REESS shall be soaked at 293 K ± 2 K for a minimum period of 12 hours and a maximum of period of 36 hours.
5.2.4.1.added
Before the completion of the REESS's soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
5.2.4.2.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.2.4.3.added
At the end of the soak period, the REESS shall be moved into the measuring chamber.
Figure 1deleted
START Vehicle/REESS preparation (if necessary) Maximum 7 days days days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to Soak 36 h Maximum 2 min after connection to mains Hydrogen emission test during a normal charge Maximum 7 days Discharge of the REESS Ambient temperature of 293 to 303 K Maximum 15 min 12 to Soak 36 h Maximum 2 min after connection to mains Hydrogen emission test during a charger failure Ambient temperature 293 K ± 2 K END
5.2.4.4.added
The REESS shall be charged in accordance with the normal charge procedure as specified in paragraph 5.2.4.7. below.
5.2.4.5.added
The chamber shall be closed and sealed gas-tight within two minutes of the electrical interlock of the normal charge step.
4.1.deleted
The hydrogen emission measurement enclosure shall be a gas-tight measuring chamber able to contain the vehicle/REESS under test. The vehicle/REESS shall be accessible from all sides and the enclosure when sealed shall be gas-tight in accordance with Annex 8, Appendix 1 to this annex. The inner surface of the enclosure shall be impermeable and non-reactive to hydrogen. The temperature conditioning system shall be capable of controlling the internal enclosure air temperature to follow the prescribed temperature throughout the test, with an average tolerance of ±2 K over the duration of the test. To accommodate the volume changes due to enclosure hydrogen emissions, either a variable-volume or another test equipment may be used. The variable- volume enclosure expands and contracts in response to the hydrogen emissions in the enclosure. Two potential means of accommodating the internal volume changes are movable panels, or a bellows design, in which impermeable bags inside the enclosure expand and contract in response to internal pressure changes by exchanging air from outside the enclosure. Any design for volume accommodation shall maintain the integrity of the enclosure as specified in Annex 8, Appendix 1. Any method of volume accommodation shall limit the differential between the enclosure internal pressure and the barometric pressure to a maximum value of ±5hPa. The enclosure shall be capable of latching to a fixed volume. A variable volume enclosure shall be capable of acco…
5.2.4.6.added
The start of a normal charge for hydrogen emission test period shall begin when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
5.2.4.7.added
The normal charge is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t1; (a) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponding to that used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given by a suitable instrumentation that the REESS is not yet fully charged.
5.2.4.8.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
4.2.1.1.deleted
The atmosphere within the chamber is monitored using a hydrogen analyser (electrochemical detector type) or a chromatograph with thermal conductivity detection. Sample gas shall be drawn from the mid-point of one side-wall or roof of the chamber and any bypass flow shall be returned to the enclosure, preferably to a point immediately downstream of the mixing fan.
5.2.4.9.added
The end of the emission sampling period occurs t 1 + t2 or t1 + 5 h after the beginning of the initial sampling, as specified in paragraph 5.2.4.6. above. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in paragraph 6. of this annex
4.2.1.2.deleted
The hydrogen analyser shall have a response time to 90 per cent of final reading of less than 10 seconds. Its stability shall be better than 2 per cent of full scale at zero and at 80 per cent ± 20 per cent of full scale, over a 15-minute period for all operational ranges.
4.2.1.3.deleted
The repeatability of the analyser expressed as one standard deviation shall be better than 1 per cent of full scale, at zero and at 80 per cent ± 20 per cent of full scale on all ranges used.
5.2.5.1.added
The test procedure shall start within a maximum of seven days after having completed the test in paragraph 5.2.4. above, the procedure shall start with the discharge of the REESS of the vehicle in accordance with paragraph 5.2.2. above.
4.2.1.4.deleted
The operational ranges of the analyser shall be chosen to give best resolution over the measurement, calibration and leak checking procedures.
5.2.5.2.added
The steps of the procedure in paragraph 5.2.3. above shall be repeated.
4.2.2.deleted
The hydrogen analyser shall be fitted with a device to record electrical signal output, at a frequency of at least once per minute. The recording system shall have operating characteristics at least equivalent to the signal being recorded and shall provide a permanent record of results. The recording shall show a clear indication of the beginning and end of the normal charge test and charging failure operation.
5.2.5.3.added
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
5.2.5.4.added
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
4.3.1.deleted
The temperature in the chamber is recorded at two points by temperature sensors, which are connected so as to show a mean value. The measuring points are extended approximately 0.1 m into the enclosure from the vertical centre line of each side-wall at a height of 0.9 ± 0.2 m.
5.2.5.5.added
At the end of the soak the REESS shall be moved into the measuring chamber. Annex 7
4.3.2.deleted
The temperatures in the proximity of the cells are recorded by means of the sensors.
5.2.5.6.added
The REESS shall be charged according to the failure charge procedure as specified in paragraph 5.2.5.9. below.
4.3.3.deleted
Temperatures shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
5.2.5.7.added
The chamber shall be closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
4.3.4.deleted
The accuracy of the temperature recording system shall be within ±1.0 K and the temperature shall be capable of being resolved to ±0.1 K.
5.2.5.8.added
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings C H2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (paragraph 6. of this annex). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
4.3.5.deleted
The recording or data processing system shall be capable of resolving time to ±15 seconds.
5.2.5.9.added
The charging failure is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t'1, (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
5.2.5.10.added
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
4.4.1.deleted
The difference p between barometric pressure within the test area and the enclosure internal pressure shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
5.2.5.11.added
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.2.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in paragraph 6. below.
4.4.2.deleted
The accuracy of the pressure recording system shall be within ±2 hPa and the pressure shall be capable of being resolved to ±0.2 hPa.
6.added
The hydrogen emission tests described in paragraph 5. above allow the calculation of the hydrogen emissions from the normal charge and charging failure phases. Hydrogen emissions from each of these phases are calculated using the initial and final hydrogen concentrations, temperatures and pressures in the enclosure, together with the net enclosure volume. The formula below is used:  V   (1  out )  C H 2 f  Pf C  P  M H 2  k  V  10   4 V  H 2 i i   Tf Ti      Where: MH2 = hydrogen mass, in grams CH2 = measured hydrogen concentration in the enclosure, in ppm volume V = net enclosure volume in cubic metres (m3) corrected for the volume of the vehicle, with the windows and the luggage compartment open. If the volume of the vehicle is not determined a volume of 1.42 m³ is subtracted. Vout = compensation volume in m³, at the test temperature and pressure T = ambient chamber temperature, in K P = absolute enclosure pressure, in kPa k = 2.42 Where: i is the initial reading f is the final reading
4.4.3.deleted
The recording or data processing system shall be capable of resolving time to ±15 seconds.
6.1.added
The hydrogen mass emissions for the REESS are: MN = hydrogen mass emission for normal charge test, in grams MD = hydrogen mass emission for charging failure test, in grams Annex 7 - Appendix 1
4.5.1.deleted
The charger voltage and current intensity (battery) shall, throughout the hydrogen emission measurements, be recorded at a frequency of at least once per minute.
1.added
All equipment shall be calibrated before its initial use and then calibrated as often as necessary and in any case in the month before type approval testing. The calibration methods to be used are described in this appendix.
4.5.2.deleted
The accuracy of the voltage recording system shall be within ±1 V and the voltage shall be capable of being resolved to ±0.1 V.
4.5.3.deleted
The accuracy of the current intensity recording system shall be within ±0.5 A and the current intensity shall be capable of being resolved to ±0.05 A.
4.5.4.deleted
The recording or data processing system shall be capable of resolving time to ±15 seconds.
2.1.1.added
Before its initial use, the internal volume of the chamber shall be determined as follows: The internal dimensions of the chamber are carefully measured, taking into account any irregularities such as bracing struts. The internal volume of the chamber is determined from these measurements. The enclosure shall be latched to a fixed volume when the enclosure is held at an ambient temperature of 293 K. This nominal volume shall be repeatable within ±0.5 per cent of the reported value.
4.6.deleted
The chamber shall be equipped with one or more fans or blowers with a possible flow of 0.1 to 0.5 m3/second in order to thoroughly mix the atmosphere in the enclosure. It shall be possible to reach a homogeneous temperature and hydrogen concentration in the chamber during measurements. The vehicle in the enclosure shall not be subjected to a direct stream of air from the fans or blowers.
2.1.2.added
The net internal volume is determined by subtracting 1.42 m3 from the internal volume of the chamber. Alternatively the volume of the test vehicle with the luggage compartment and windows open or REESS may be used instead of the 1.42 m3.
2.1.3.added
The chamber shall be checked as in paragraph 2.3. of this appendix. If the hydrogen mass does not agree with the injected mass to within ±2 per cent then corrective action is required.
4.7.1.deleted
The following pure gases shall be available for calibration and operation: (a) Purified synthetic air (purity < 1 ppm C1 equivalent; < 1 ppm CO; < 400 ppm CO2; < 0.1 ppm NO ); oxygen content between 18 and 21 per cent by volume, (b) Hydrogen (H2 ), 99.5 per cent minimum purity.
2.2.added
This operation determines that the chamber does not contain any materials that emit significant amounts of hydrogen. The check shall be carried out at the enclosure's introduction to service, after any operations in the enclosure which may affect background emissions and at a frequency of at least once per year.
4.7.2.deleted
Calibration and span gases shall contain mixtures of hydrogen (H2) and purified synthetic air. The real concentrations of a calibration gas shall be within ±2 per cent of the nominal values. The accuracy of the diluted gases obtained when using a gas divider shall be within ±2 per cent of the nominal value. The concentrations specified in Annex 8, Appendix 1 may also be obtained by a gas divider using synthetic air as the dilution gas.
2.2.1.added
Variable-volume enclosure may be operated in either latched or unlatched volume configuration, as described in paragraph 2.1.1. above. Ambient temperature shall be maintained at 293 K ± 2 K, throughout the four-hour period mentioned below.
5.deleted
The test consists in the five following steps: (a) Vehicle/REESS preparation; (b) Discharge of the REESS; (c) Determination of hydrogen emissions during a normal charge; (d) Discharge of the traction battery; (e) Determination of hydrogen emissions during a charge carried out with the charger failure. If the vehicle/REESS has to be moved between two steps, it shall be pushed to the following test area.
2.2.2.added
The enclosure may be sealed and the mixing fan operated for a period of up to 12 hours before the four-hour background-sampling period begins.
2.2.3.added
The analyser (if required) shall be calibrated, then zeroed and spanned.
5.1.1.deleted
The ageing of REESS shall be checked, proving that the vehicle has performed at least 300 km during seven days before the test. During this period, the vehicle shall be equipped with the traction battery submitted to the hydrogen emission test. If this cannot be demonstrated then the following procedure will be applied.
2.2.4.added
The enclosure shall be purged until a stable hydrogen reading is obtained, and the mixing fan turned on if not already on.
5.1.1.1.deleted
The procedure starts with the discharge of the REESS of the vehicle while driving on the test track at a steady speed of 70 ± 5 per cent of the maximum speed of the vehicle during 30 minutes. Discharging is stopped: (a) When the vehicle is not able to run at 65 per cent of the maximum thirty minutes speed, or (b) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (c) After having covered the distance of 100 km.
2.2.5.added
The chamber is then sealed and the background hydrogen concentration, temperature and barometric pressure are measured. These are the initial readings CH2i, Ti and Pi used in the enclosure background calculation.
5.1.1.2.deleted
The charge is carried out: (a) With the charger; (b) In an ambient temperature between 293 and 303 K. The procedure excludes all types of external chargers. The end of REESS charge criteria corresponds to an automatic stop given by the charger. This procedure includes all types of special charges that could be automatically or manually initiated like, for instance, the equalisation charges or the servicing charges.
2.2.6.added
The enclosure is allowed to stand undisturbed with the mixing fan on for a period of four hours.
5.1.1.3.deleted
Procedure from paragraphs 5.1.1.1. and 5.1.1.2. shall be repeated two times.
2.2.7.added
At the end of this time the same analyser is used to measure the hydrogen concentration in the chamber. The temperature and the barometric pressure are also measured. These are the final readings CH2f, Tf and Pf.
5.1.2.deleted
The REESS is discharged while driving on the test track at a steady speed of 70 ±5 per cent from the maximum thirty minutes speed of the vehicle. Stopping the discharge occurs: (a) When an indication to stop the vehicle is given to the driver by the standard on-board instrumentation, or (b) When the maximum speed of the vehicle is lower than 20 km/h.
2.2.8.added
The change in mass of hydrogen in the enclosure shall be calculated over the time of the test in accordance with paragraph 2.4. of this annex and shall not exceed 0.5 g.
5.1.3.deleted
Within fifteen minutes of completing the battery discharge operation specified in paragraph 5.1.2., the vehicle is parked in the soak area. The vehicle is parked for a minimum of 12 hours and a maximum of 36 hours, between the end of the traction battery discharge and the start of the hydrogen emission test during a normal charge. For this period, the vehicle shall be soaked at 293 ± 2 K.
2.3.added
The calibration and hydrogen retention test in the chamber provides a check on the calculated volume (paragraph 2.1. above) and also measures any leak rate. The enclosure leak rate shall be determined at the enclosure's introduction to service, after any operations in the enclosure which may affect the integrity of the enclosure, and at least monthly thereafter. If six consecutive monthly retention checks are successfully completed without corrective action, the enclosure leak rate may be determined quarterly thereafter as long as no corrective action is required.
2.3.1.added
The enclosure shall be purged until a stable hydrogen concentration is reached. The mixing fan is turned on, if not already switched on. The hydrogen analyser is zeroed, calibrated if required, and spanned.
5.1.4.1.deleted
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
2.3.2.added
The enclosure shall be latched to the nominal volume position.
5.1.4.2.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
2.3.3.added
The ambient temperature control system is then turned on (if not already on) and adjusted for an initial temperature of 293 K.
5.1.4.3.deleted
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
2.3.4.added
When the enclosure temperature stabilizes at 293 K ± 2 K, the enclosure is sealed and the background concentration, temperature and barometric pressure measured. These are the initial readings CH2i, Ti and Pi used in the enclosure calibration.
5.1.4.4.deleted
The vehicle shall be connected to the mains. The REESS is charged according to normal charge procedure as specified in paragraph 5.1.4.7. below.
2.3.5.added
The enclosure shall be unlatched from the nominal volume.
5.1.4.5.deleted
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the normal charge step.
2.3.6.added
A quantity of approximately 100 g of hydrogen is injected into the enclosure. This mass of hydrogen shall be measured to an accuracy of ±2 per cent of the measured value.
5.1.4.6.deleted
The start of a normal charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
2.3.7.added
The contents of the chamber shall be allowed to mix for five minutes and then the hydrogen concentration, temperature and barometric pressure are measured. These are the final readings CH2f, Tf and Pf for the calibration of the enclosure as well as the initial readings CH2i, Ti and Pi for the retention check.
5.1.4.7.deleted
The normal charge is carried out with the charger and consists of the following steps: (a) Charging at constant power during t1; (b) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponds to the one used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given to the driver by the standard instrumentation that the battery is not yet fully charged.
2.3.8.added
On the basis of the readings taken in paragraphs 2.3.4 and 2.3.7 above and the formula in paragraph 2.4. below, the mass of hydrogen in the enclosure is calculated. This shall be within ±2 per cent of the mass of hydrogen measured in paragraph 2.3.6. above.
5.1.4.8.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
2.3.9.added
The contents of the chamber shall be allowed to mix for a minimum of 10 hours. At the completion of the period, the final hydrogen concentration, temperature and barometric pressure are measured and recorded. These are the final readings CH2f, Tf and Pf for the hydrogen retention check. Annex 7 – Appendix 1
5.1.4.9.deleted
The end of the emission sampling period occurs t1 + t2 or t1 + 5 hours after the beginning of the initial sampling, as specified in Annex 8, paragraph 5.1.4.6. . The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in Annex 8, paragraph 6..
2.3.10.added
Using the formula in paragraph 2.4. below, the hydrogen mass is then calculated from the readings taken in paragraphs 2.3.7 and 2.3.9. above. This mass may not differ by more than 5 per cent from the hydrogen mass given by paragraph 2.3.8. above.
2.4.added
The calculation of net hydrogen mass change within the enclosure is used to determine the chamber's hydrocarbon background and leak rate. Initial and final readings of hydrogen concentration, temperature and barometric pressure are used in the following formula to calculate the mass change.  V   (1  out )  C H 2f  Pf C  P  M H 2  k  V  10   4 V  H 2i i   Tf Ti      Where: MH2 = hydrogen mass, in grams CH2 = measured hydrogen concentration into the enclosure, in ppm volume V = enclosure volume in cubic metres (m3) as measured in paragraph 2.1.1. above. Vout = compensation volume in m³, at the test temperature and pressure T = ambient chamber temperature, in K P = absolute enclosure pressure, in kPa k = 2.42 Where: i is the initial reading f is the final reading
5.1.5.1.deleted
Within seven days maximum after having completed the prior test, the procedure starts with the discharge of the REESS of the vehicle according to Annex 8, paragraph 5.1.2. .
3.added
The analyser should be calibrated using hydrogen in air and purified synthetic air. See paragraph 4.8.2. of Annex 7. Each of the normally used operating ranges are calibrated by the following procedure:
5.1.5.2.deleted
The steps of the procedure in Annex 8, paragraph 5.1.3. shall be repeated.
3.1.added
Establish the calibration curve by at least five calibration points spaced as evenly as possible over the operating range. The nominal concentration of the calibration gas with the highest concentrations to be at least 80 per cent of the full scale.
5.1.5.3.deleted
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
3.2.added
Calculate the calibration curve by the method of least squares. If the resulting polynomial degree is greater than three, then the number of calibration points shall be at least the number of the polynomial degree plus two.
5.1.5.4.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
3.3.added
The calibration curve shall not differ by more than two per cent from the nominal value of each calibration gas.
5.1.5.5.deleted
At the end of the soak, the test vehicle, with the engine shut off and the test vehicle windows and luggage compartment opened shall be moved into the measuring chamber.
3.4.added
Using the coefficients of the polynomial derived from paragraph 3.2. above, a table of analyser readings against true concentrations shall be drawn by steps no greater than 1 per cent of full scale. This is to be carried out for each analyser range calibrated. This table shall also contain other relevant data such as: (a) Date of calibration; (b) Span and zero potentiometer readings (where applicable); (c) Nominal scale; (d) Reference data of each calibration gas used; (e) Real and indicated value of each calibration gas used together with the percentage differences; (f) Calibration pressure of analyser.
5.1.5.6.deleted
The vehicle shall be connected to the mains. The REESS is charged according to failure charge procedure as specified in paragraph 5.1.5.9. below.
3.5.added
Alternative methods (e.g. computer, electronically controlled range switch) can be used if it is proven to the technical service that these methods give equivalent accuracy. Annex 7 - Appendix 2
5.1.5.7.deleted
The enclosure doors are closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
5.1.5.8.deleted
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
1.added
The family may be defined by basic design parameters which shall be common to vehicles within the family. In some cases there may be interaction of parameters. These effects shall also be taken into consideration to ensure that only vehicles with similar hydrogen emission characteristics are included within the family.
5.1.5.9.deleted
The charging failure is carried out with the suitable charger and consists of the following steps: (a) Charging at constant power during t'1; (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
2.added
To this end, those vehicle types whose parameters described below are identical are considered to belong to the same hydrogen emissions. REESS: (a) Trade name or mark of the REESS; (b) Indication of all types of electrochemical couples used; (c) Number of REESS cells; (d) Number of REESS subsystems; (e) Nominal voltage of the REESS (V); (f) REESS energy (kWh); (g) Gas combination rate (in per cent); (h) Type(s) of ventilation for REESS subsystem(s); (i) Type of cooling system (if any). On-board charger: (a) Make and type of different charger parts; (b) Output nominal power (kW); (c) Maximum voltage of charge (V); (d) Maximum intensity of charge (A); (e) Make and type of control unit (if any); (f) Diagram of operating, controls and safety; (g) Characteristics of charge periods.
5.1.5.10.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
Annex 8changed
procedures of * Note by the REESS secretariat: This annex currently contains the appendix only. Annex 8 - Appendix Annex 8 - Appendix Procedure for conducting a standard cycle A standard cycle will start with a standard discharge followed by a standard charge. Standard discharge: Discharge rate: The discharge procedure including termination criteria shall be defined by the manufacturer. If not specified, then it shall be a discharge with 1C current. Discharge limit (end voltage): Specified by the manufacturer Rest period after discharge: Minimum 30 min Standard charge: The charge procedure including termination criteria shall be defined by the manufacturer. If not specified, then it shall be a charge with C/3 current. Annex 8A Annex 8A Vibration test
5.1.5.11.deleted
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.1.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in Annex 8, paragraph 6.
1.changed
This annex describes The purpose of this test is to verify the procedure for the determination of hydrogen emissions during the charge procedures safety performance of the REESS under a vibration environment which the REESS will likely experience during the normal operation of all road vehicles, according to paragraph 5.4. of this Regulation. the vehicle.
5.2.1.deleted
The ageing of REESS shall be checked, to confirm that the REESS has performed at least 5 standard cycles (as specified in Annex 9, Appendix 1).
2.1.added
REESS subsystem(s) including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested-device if so requested by the manufacturer.
5.2.2.deleted
The REESS is discharged at 70 ±5 per cent of the nominal power of the system. Stopping the discharge occurs when minimum SOC as specified by the manufacturer is reached.
2.2.added
The tested-device shall be firmly secured to the platform of the vibration machine in such a manner as to ensure that the vibrations are directly transmitted to the tested-device.
5.2.3.deleted
Within 15 minutes of the end of the REESS discharge operation specified in paragraph 5.2.2. above, and before the start of the hydrogen emission test, the REESS shall be soaked at 293 ± 2 K for a minimum period of 12 hours and a maximum of period of 36 hours.
3.1.added
The following conditions shall apply to the tested-device: (a) The test shall be conducted at an ambient temperature of 20 ± 10 °C; (b) At the beginning of the test, the SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range of the tested- device; (c) At the beginning of the test, all protection devices which affect the function(s) of the tested-device that are relevant to the outcome of the test shall be operational.
5.2.4.1.deleted
Before the completion of the REESS's soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
3.2.added
The tested-devices shall be subjected to a vibration having a sinusoidal waveform with a logarithmic sweep between 7 Hz and 200 Hz and back to 7 Hz traversed in 15 minutes This cycle shall be repeated 12 times for a total of 3 hours in the vertical direction of the mounting orientation of the REESS as specified by the manufacturer. The correlation between frequency and acceleration shall be as shown in
5.2.4.2.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
Table 1added
Annex 8A Frequency and acceleration (gross mass of tested-device less than 12 kg) Frequency [Hz] Acceleration [m/s2] 7 - 18 10 18 - approximately 50 1) gradually increased from 10 to 80 50 - 200 80
5.2.4.3.deleted
At the end of the soak period, the REESS shall be moved into the measuring chamber.
Table 2added
Frequency [Hz] Acceleration [m/s2] 7 - 18 10 1) 18 - approximately 25 gradually increased from 10 to 20 25 - 200 20 1) The amplitude is then maintained at 0.8 mm (1.6 mm total excursion) and the frequency is increased until the maximum acceleration as described in table 1 or At the request of the manufacturer, a higher acceleration level as well as a higher maximum frequency may be used. At the request of the manufacturer a vibration test profile determined by the vehicle-manufacturer, verified for the vehicle application and agreed with the Technical Service may be used as a substitute for the frequency - acceleration correlation of Table 1 or Table 2. The approval of a REESS tested according to this condition shall be limited to approvals for a specific vehicle type. After the vibration, a standard cycle as described in Annex 8, Appendix 1 shall be conducted, if not inhibited by the tested-device. The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8B Annex 8B Thermal shock and cycling test
5.2.4.4.deleted
The REESS shall be charged in accordance with the normal charge procedure as specified in paragraph 5.2.4.7. below.
1.added
The purpose of this test is to verify the resistance of the REESS to sudden changes in temperature. The REESS shall undergo a specified number of temperature cycles, which start at ambient temperature followed by high and low temperature cycling. It simulates a rapid environmental temperature change which a REESS would likely experience during its life.
5.2.4.5.deleted
The chamber shall be closed and sealed gas-tight within two minutes of the electrical interlock of the normal charge step.
2.added
This test shall be conducted either with the complete REESS or with related REESS subsystem(s) of the REESS including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested- device if so requested by the manufacturer.
5.2.4.6.deleted
The start of a normal charge for hydrogen emission test period shall begin when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the normal charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the normal charge period.
5.2.4.7.deleted
The normal charge is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t1; (a) Over-charging at constant current during t2. Over-charging intensity is specified by manufacturer and corresponding to that used during equalisation charging. The end of REESS charge criteria corresponds to an automatic stop given by the charger to a charging time of t1 + t2. This charging time will be limited to t1 + 5 h, even if a clear indication is given by a suitable instrumentation that the REESS is not yet fully charged.
3.1.changed
If The following conditions shall apply to the REESS is used tested-device at a temperature above the ambient temperature, start of the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in normal functioning range. test: (a) The manufacturer's representative SOC shall be able adjusted to certify that a value in the temperature conditioning system upper 50 per cent of the REESS is neither damaged nor presenting a capacity defect. normal operating SOC range; (b) All protection devices, which would affect the function of the tested- device and which are relevant to the outcome of the test shall be operational.
5.2.4.8.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
3.2.changed
If the REESS is used The tested-device shall be stored for at least six hours at a test temperature above equal to 60 °C ± 2 °C or higher if requested by the manufacturer, followed by storage for at least six hours at a test temperature equal to -40 °C ± 2 °C or lower if requested by the manufacturer. The maximum time interval between test temperature extremes shall be 30 minutes. This procedure shall be repeated until a minimum of 5 total cycles are completed, after which the tested-device shall be stored for 24 hours at an ambient temperature of 20 °C ± 10 °C. After the storage for 24 hours, a standard cycle as described in Annex 8, Appendix 1 shall be conducted, if not inhibited by the tested-device. The test shall end with an observation period of 1 h at the ambient temperature, the operator shall follow the manufacturer's procedure in order to keep the REESS temperature in its normal functioning range. The manufacturer's representative shall be able to certify that the temperature conditioning system conditions of the test environment. Annex 8C Annex 8C Mechanical drop test for removable REESS is neither damaged nor presenting a capacity defect
5.2.4.9.deleted
The end of the emission sampling period occurs t1 + t2 or t1 + 5 h after the beginning of the initial sampling, as specified in paragraph 5.2.4.6. above. The different times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the normal charge test, used for the calculation in Annex 8, paragraph 6.
1.added
Simulates a mechanical impact load which may occur at an unintended drop after REESS removal.
5.2.5.1.deleted
The test procedure shall start within a maximum of seven days after having completed the test in paragraph 5.2.4. above, the procedure shall start with the discharge of the REESS of the vehicle in accordance with paragraph 5.2.2. above.
2.1.added
The following conditions shall apply to the removed REESS at the start of the test: (a) Adjust the SOC to at least 90 per cent of the rated capacity as specified in the Annex 6, Part 1, paragraph 3.4.3. or Annex 6, Part 2, paragraph 1.4.3. or Annex 6, Part 3, paragraph 2.3.2. (b) The test shall be performed at 20° C ± 10° C
5.2.5.2.deleted
The steps of the procedure in paragraph 5.2.3. above shall be repeated.
2.2.added
Free fall of the removed REESS from a height of 1.0 m (from bottom of the REESS) to a smooth, horizontal concrete pad or other flooring type with equivalent hardness. The removed REESS shall be dropped six times from different orientations as decided by the Technical Service. The manufacturer may decide to use a different removed REESS for each drop. Directly after the termination of the drop test a standard cycle as described in Annex 8, Appendix 1 shall be conducted, if not inhibited. The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8D Annex 8D Mechanical shock
5.2.5.3.deleted
Before the completion of the soak period, the measuring chamber shall be purged for several minutes until a stable hydrogen background is obtained. The enclosure mixing fan(s) shall also be turned on at this time.
1.added
The purpose of this test is to verify the safety performance of the REESS under mechanical shock which may occur during fall on the side from stationary or parked situation.
5.2.5.4.deleted
The hydrogen analyser shall be zeroed and spanned immediately prior to the test.
5.2.5.5.deleted
At the end of the soak the REESS shall be moved into the measuring chamber.
2.1.added
This test shall be conducted either with the complete REESS or with related subsystems of the REESS including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated, then such a control unit may be omitted from installation on the Tested-Device if so requested by the manufacturer.
5.2.5.6.deleted
The REESS shall be charged according to the failure charge procedure as specified in paragraph 5.2.5.9. below.
2.2.added
The Tested-Device shall be connected to the test fixture only by the intended mountings provided for the purpose of attaching the REESS or REESS subsystem to the vehicle.
5.2.5.7.deleted
The chamber shall be closed and sealed gas-tight within two minutes from electrical interlock of the failure charge step.
5.2.5.8.deleted
The start of a failure charge for hydrogen emission test period begins when the chamber is sealed. The hydrogen concentration, temperature and barometric pressure are measured to give the initial readings CH2i, Ti and Pi for the failure charge test. These figures are used in the hydrogen emission calculation (Annex 8, paragraph 6). The ambient enclosure temperature T shall not be less than 291 K and no more than 295 K during the charging failure period.
3.1.added
General test conditions and requirements. The following condition shall apply to the test: (a) The test shall be conducted at an ambient temperature of 20 °C ± 10 °C. (b) At the beginning of the test, the SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range. (c) At the beginning of the test, all protection devices which effect the function of the tested-device and which are relevant to the outcome of the test, shall be operational.
5.2.5.9.deleted
The charging failure is carried out with a suitable charger and consists of the following steps: (a) Charging at constant power during t'1, (b) Charging at maximum current as recommended by the manufacturer during 30 minutes. During this phase, the charger shall supply maximum current as recommended by the manufacturer.
3.2.added
The tested-device shall be secured to the testing machine by means of a rigid mount which will support all mounting surfaces of the tested-device. The tested-device with (a) A gross mass of less than 12 kg shall be subjected to a half-sine shock of peak acceleration of 1,500 m/s2 and pulse duration of 6 milliseconds. (b) A gross mass of 12 kg or more shall be subjected to a half-sine shock of peak acceleration of 500 m/s2 and pulse duration of 11 milliseconds. Annex 8D For both the tested-device shall be subjected to three shocks in the positive direction followed by three shocks in the negative direction of each three mutually perpendicular mounting positions of the tested-device for a total of 18 shocks. Directly after the termination of the mechanical shock test a standard cycle as described in Annex 8, Appendix 1 shall be conducted, if not inhibited. The test shall end with an observation period of 1 h at the ambient temperature conditions of the test environment. Annex 8E Annex 8E Fire resistance
5.2.5.10.deleted
The hydrogen analyser shall be zeroed and spanned immediately before the end of the test.
1.added
The purpose of this test is to verify the resistance of the REESS, against exposure to fire from outside of the vehicle due to e.g. a fuel spill from a vehicle (either the vehicle itself or a nearby vehicle). This situation should leave the driver and passengers with enough time to evacuate.
5.2.5.11.deleted
The end of test period occurs t'1 + 30 minutes after the beginning of the initial sampling, as specified in paragraph 5.2.5.8. above. The times elapsed are recorded. The hydrogen concentration, temperature and barometric pressure are measured to give the final readings CH2f, Tf and Pf for the charging failure test, used for the calculation in paragraph 6. below.
6.deleted
The hydrogen emission tests described in paragraph 5. above allow the calculation of the hydrogen emissions from the normal charge and charging failure phases. Hydrogen emissions from each of these phases are calculated using the initial and final hydrogen concentrations, temperatures and pressures in the enclosure, together with the net enclosure volume. The formula below is used:  V   (1 + out )  C H 2f  Pf C  P  M H 2 = k  V  10   −4 V − H 2 i i   Tf Ti      Where: MH2 = hydrogen mass, in grams CH2 = measured hydrogen concentration in the enclosure, in ppm volume V = net enclosure volume in cubic metres (m3) corrected for the volume of the vehicle, with the windows and the luggage compartment open. If the volume of the vehicle is not determined a volume of 1.42 m³ is subtracted. Vout = compensation volume in m³, at the test temperature and pressure T = ambient chamber temperature, in K P = absolute enclosure pressure, in kPa k = 2.42 Where: i is the initial reading f is the final reading
2.1.added
REESS subsystem(s) including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the tested-device if so requested by the manufacturer. Where the relevant REESS subsystems are distributed throughout the vehicle, the test may be conducted on each relevant of the REESS subsystem.
6.1.deleted
The hydrogen mass emissions for the REESS are: MN = hydrogen mass emission for normal charge test, in grams MD = hydrogen mass emission for charging failure test, in grams
3.1.added
The following requirements and conditions shall apply to the test: (a) The test shall be conducted at a temperature of at least 0 °C; (b) At the beginning of the test, the SOC shall be adjusted to a value in the upper 50 per cent of the normal operating SOC range; (c) At the beginning of the test, all protection devices which effect the function of the tested-device and are relevant for the outcome of the test shall be operational.
1.deleted
All equipment shall be calibrated before its initial use and then calibrated as often as necessary and in any case in the month before type approval testing. The calibration methods to be used are described in this appendix.
3.2.added
A vehicle based test or a component based test shall be performed at the discretion of the manufacturer:
3.2.1.changed
The REESS tested-device shall be mounted in good mechanical condition and have been subject a testing fixture simulating actual mounting conditions as far as possible; no combustible material should be used for this with the exception of material that is part of the REESS. The method whereby the tested-device is fixed in the fixture shall correspond to minimum the relevant specifications for its installation in a vehicle. In the case of 5 standard cycles (as specified a REESS designed for a specific vehicle use, vehicle parts which affect the course of the fire in any way shall be taken into consideration. Annex 9, Appendix 1). 8E
3.2.2.added
The tested-device shall be placed on a grating table positioned above the pan, in an orientation according to the manufacturer’s design intent. The grating table shall be constructed by steel rods, diameter 6-10 mm, with 4-6 cm in between. If needed the steel rods could be supported by flat steel parts.
2.1.1.deleted
Before its initial use, the internal volume of the chamber shall be determined as follows: The internal dimensions of the chamber are carefully measured, taking into account any irregularities such as bracing struts. The internal volume of the chamber is determined from these measurements. The enclosure shall be latched to a fixed volume when the enclosure is held at an ambient temperature of 293 K. This nominal volume shall be repeatable within ±0.5 per cent of the reported value.
3.3.added
The flame to which the tested-device is exposed shall be obtained by burning commercial fuel for positive-ignition engines (hereafter called "fuel") in a pan. The quantity of fuel shall be sufficient to permit the flame, under free- burning conditions, to burn for the whole test procedure. The fire shall cover the whole area of the pan during whole fire exposure. The pan dimensions shall be chosen so as to ensure that the sides of the tested-device are exposed to the flame. The pan shall therefore exceed the horizontal projection of the tested-device by at least 20 cm, but not more than 50 cm. The sidewalls of the pan shall not project more than 8 cm above the level of the fuel at the start of the test.
2.1.2.deleted
The net internal volume is determined by subtracting 1.42 m3 from the internal volume of the chamber. Alternatively the volume of the test vehicle with the luggage compartment and windows open or REESS may be used instead of the 1.42 m3.
3.4.added
The pan filled with fuel shall be placed under the tested-device in such a way that the distance between the level of the fuel in the pan and the bottom of the tested-device corresponds to the design height of the tested-device above the road surface at the unladen mass if paragraph 3.2.1. above is applied or approximately 50 cm if paragraph 3.2.2. above is applied. Either the pan, or the testing fixture, or both, shall be freely movable.
2.1.3.deleted
The chamber shall be checked as in Annex 8, Appendix 1, paragraph 2.3. If the hydrogen mass does not agree with the injected mass to within ±2 per cent then corrective action is required.
3.5.added
During phase C of the test, the pan shall be covered by a screen. The screen shall be placed 3 cm ± 1 cm above the fuel level measured prior to the ignition of the fuel. The screen shall be made of a refractory material, as prescribed in Annex 8E - Appendix 1. There shall be no gap between the bricks and they shall be supported over the fuel pan in such a manner that the holes in the bricks are not obstructed. The length and width of the frame shall be 2 cm to 4 cm smaller than the interior dimensions of the pan so that a gap of 1 cm to 2 cm exists between the frame and the wall of the pan to allow ventilation. Before the test the screen shall be at least at the ambient temperature. The firebricks may be wetted in order to guarantee repeatable test conditions.
2.2.deleted
This operation determines that the chamber does not contain any materials that emit significant amounts of hydrogen. The check shall be carried out at the enclosure's introduction to service, after any operations in the enclosure which may affect background emissions and at a frequency of at least once per year.
3.6.added
If the tests are carried out in the open air, sufficient wind protection shall be provided and the wind velocity at pan level shall not exceed 2.5 km/h.
2.2.1.deleted
Variable-volume enclosure may be operated in either latched or unlatched volume configuration, as described in paragraph 2.1.1. above. Ambient temperature shall be maintained at 293 ± 2 K, throughout the four-hour period mentioned below.
2.2.2.deleted
The enclosure may be sealed and the mixing fan operated for a period of up to 12 hours before the four-hour background-sampling period begins.
2.2.3.deleted
The analyser (if required) shall be calibrated, then zeroed and spanned.
2.2.4.deleted
The enclosure shall be purged until a stable hydrogen reading is obtained, and the mixing fan turned on if not already on.
2.2.5.deleted
The chamber is then sealed and the background hydrogen concentration, temperature and barometric pressure are measured. These are the initial readings CH2i, Ti and Pi used in the enclosure background calculation.
2.2.6.deleted
The enclosure is allowed to stand undisturbed with the mixing fan on for a period of four hours.
2.2.7.deleted
At the end of this time the same analyser is used to measure the hydrogen concentration in the chamber. The temperature and the barometric pressure are also measured. These are the final readings CH2f, Tf and Pf.