Compare versions of UN R95
The protection of the occupants in the event of a lateral collision
03 series of amendments → latestSupplement 3 to the 03 series → latest04 series of amendments → latest
1.changed
This Regulation applies to the lateral collision behaviour vehicles of the structure category M1 with a maximum permissible mass not exceeding 3,500 kg and to vehicles of the passenger compartment of M1 and N1 1 categories of vehicles where the "R" point of the lowest seat is not more than 700 mm from ground level when the vehicle is in the condition corresponding to the reference mass defined in paragraph 2.10. of this Regulation. category N 1.1.
2.3.changed
"Passenger compartment" means the space for occupant accommodation, bounded by the roof, floor, side walls, doors, outside glazing and front bulkhead and the plane of the rear compartment bulkhead or the plane of the rear-seat back support. As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2 - www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
2.3.1.changed
"Passenger compartment with regard to occupant protection" means the space for occupant accommodation, bounded by the roof, floor, side walls, doors, outside glazing and front bulkhead and the plane of the rear compartment bulkhead or the plane of the rear-seat back support. 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.6, para. 2 - https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
2.16.changed
"Rechargeable energy storage system Electrical Energy Storage System (REESS)" means the rechargeable energy storage system which that provides electrical electric energy for electrical propulsion. A battery whose primary use is to supply power for starting the engine and/or lighting and/or other vehicle auxiliaries’ systems is not considered as a REESS. The REESS may include the necessary systems for physical support, thermal management, electronic controls and casing.
2.17.changed
"Electrical protection barrier" means the part providing protection against any direct contact to the high voltage live parts.
2.18.changed
2.19.changed
"Live parts" means conductive part(s) intended to be electrically energized in under normal use. operating conditions.
2.20.changed
"Exposed conductive part" means the conductive part which can be touched under the provisions of the protection degree IPXXB and which becomes is not normally energized, but which can become electrically energized under isolation failure conditions. This includes parts under a cover that can be removed without using tools.
2.23.changed
"Protection degree IPXXB" means protection from contact with high voltage live parts provided by either an electrical protection barrier or an enclosure and tested using a Jointed Test Finger (IPXXB) (degree IPXXB) as described in paragraph 4. of Annex 9.
2.24.changed
"Working voltage" means the highest value of an electrical circuit voltage root-mean-square root- mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating conditions. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.
2.25.changed
2.27.changed
"Electrical circuit" means an assembly of connected high voltage live parts which is designed to be electrically energized in normal operation.
2.31.changed
"High voltage bus" means the electrical circuit, including the coupling system for charging the REESS REESS, that operates on a high voltage. Where electric circuits are galvanically connected to each other and fulfil the specific voltage condition, only the components or parts of the electric circuit that operate on high voltage are classified as a high voltage bus.
2.32.changed
"Solid insulator" means the insulating coating of wiring harnesses, provided in order to cover and prevent the high voltage live parts from any direct contact. This includes covers for insulating the high voltage live parts of connectors and varnish or paint for the purpose of insulation.
2.33.changed
"Automatic disconnect" means a device that when triggered, galvanically separates the electrical energy sources from the rest of the high voltage circuit of the electrical electric power train.
2.34.changed
"Open type traction battery" means a type of battery requiring filling with liquid and generating hydrogen gas that is released to the atmosphere.
2.36.added
"Latched" means any coupling condition of the door latch system, where the
latch is in a fully latched position, a secondary latched position, or in between
a fully latched position and a secondary latched position.
2.37.added
"Latch" is a device employed to maintain the door in a closed position relative
to the vehicle body with provisions for deliberate release (or operation).
2.38.added
"Fully latched position" is the coupling condition of the latch that retains the
door in a completely closed position.
2.39.added
"Secondary latched position" refers to the coupling condition of the latch that
retains the door in a partially closed position.
2.40.added
"Displacement system" means a device by which the seat or one of its parts can
be displaced and/or rotated, without a fixed intermediate position, to permit
easy access of occupants to and from the space behind the seat concerned.
2.41.added
"Aqueous electrolyte" means an electrolyte based on water solvent for the
compounds (e.g. acids, bases) providing conducting ions after its dissociation.
2.42.added
"Electrolyte leakage" means the escape of electrolyte from the REESS in the
form of liquid.
2.43.added
"Non-aqueous electrolyte" means an electrolyte not based on water as the
solvent.
2.44.added
"Normal operating conditions" includes operating modes and conditions that
can reasonably be encountered during typical operation of the vehicle
including driving at legally posted speeds, parking and standing in traffic, as
well as, charging using chargers that are compatible with the specific charging
ports installed on the vehicle. It does not include, conditions where the vehicle
is damaged, either by a crash, road debris or vandalization, subjected to fire or
water submersion, or in a state where service and or maintenance is needed or
being performed.
2.45.added
"Specific voltage condition" means the condition that the maximum voltage of
a galvanically connected electric circuit between a DC live part and any other
live part (DC or AC) is ≤ 30 V AC (rms) and ≤ 60 V DC.
Note: When a DC live part of such an electric circuit is connected to electrical
chassis and the specific voltage condition applies, the maximum voltage
between any live part and the electrical chassis is ≤ 30 V AC (rms) and ≤ 60 V
DC.
2.46.added
"State of Charge (SOC)" means the available electrical charge in a REESS
expressed as a percentage of its rated capacity.
2.47.added
"Fire" means the emission of flames from the vehicle. Sparks and arcing shall
not be considered as flames.
2.48.added
"Explosion" means the sudden release of energy sufficient to cause pressure
waves and/or projectiles that may cause structural and/or physical damage to
the surrounding of the vehicle
4.2.changed
4.3.changed
4.8.changed
4.9.changed
Annex 2 to this Regulation gives examples of approval marks. The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev. 3, Annex 3 - www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
5.1.1.changed
The test will be carried out on the driver’s side unless asymmetric side structures, if any, are so different as to affect the performance in a side impact. In that case either of the alternatives in paragraph 5.1.1.1. or 5.1.1.2. below may be used by agreement between the manufacturer and Type Approval Authority. 2 The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev. 3, Annex 3 - https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
5.2.1.2.changed
The thorax performance criteria shall be: (a) Rib Deflection Criterion (RDC) less than or equal to 42 mm; (b) Soft Tissue Criterion (VC) less or equal to 1.0 m/sec. Until 30 September 2000, for the purposes of the test requirements, the range of normal longitudinal adjustments shall be limited such that the H-point lies within the length of the door aperture. For a transitional period of two years after the date specified in paragraph 10.2. of this Regulation the V * C value is not a pass/fail criterion for the approval testing, but this value has to be recorded in the test report and to be collected by the approval authorities. After this transitional period, the VC value of 1.0 m/sec shall apply as a pass/fail criterion unless the Contracting Parties applying this Regulation decide otherwise.
5.2.1.4.changed
The abdomen performance criterion shall be: 3 Until 30 September 2000, for the purposes of the test requirements, the range of normal longitudinal adjustments shall be limited such that the H-point lies within the length of the door aperture. Abdominal Peak Force (APF) less than or equal to 2.5 kN internal force (equivalent to external force of 4.5 kN).
5.3.1.changed
No door shall open during the test. This requirement is deemed to be fulfilled: (a) If it is clearly visible, that the door lock is latched; or (b) If the door does not open under a static tractive force of at least 400 N in the y-direction applied to the door, according to the Figure below, as close as possible to the window sill and to the edge of the door opposite to the hinged side, except to the door handle itself. Figure 400N 90° +/- 5° X 400N Y 90° +/- 5° 400N 90° +/- 5° Z Y
5.3.3.1.changed
Open at least one door per row of seats. Where there is no such door, it shall be possible to allow the evacuation of all the occupants by activating the displacement system of seats, if necessary. In case no displacement system is available for the evacuation of a sufficient rear seated occupant, it shall be shown that a 50th percentile manikin can be evacuated without the use of any devices to support its weight and any other tools. For vehicles of category N1 this evacuation may be done via an emergency window if this window can be easily opened, but if tools are necessary, (e.g. for breaking the window) these tools shall then be provided by the manufacturer and shall be visible and located in close proximity to that emergency window. This shall be assessed for all configurations or worst-case configuration for number of doors provided on each side of the vehicle and for normal entry both left-hand drive and exit of passengers, and if necessary tilt the seat-backs or seats to allow evacuation of all occupants; right-hand drive vehicles, when applicable.
5.3.7.2.deleted
5.3.7.changed
Following the test conducted in accordance with the procedure defined in Annex 4 to this Regulation, the electrical electric power train operating on high voltage, and the high voltage components and systems, systems which are galvanically connected to the high voltage bus of the electric power train, shall meet the following requirements:
5.3.7.1.changed
After the impact impact, the high voltage buses shall meet at least one of the four criteria specified in paragraph 5.3.7.1.1. through paragraph 5.3.7.1.4.2. shall be met. If the vehicle has an automatic disconnect function, or device(s) that galvanically conductively divide the electric power train circuit during driving condition, at least one of the following criteria shall apply to the disconnected circuit or to each divided circuit individually after the disconnect function is activated. However However, criteria defined in 5.3.7.1.4. shall not apply if more than a single potential of a part of the high voltage bus is not protected under the conditions of protection degree IPXXB. In the case that the crash test is performed under the condition that part(s) of the high voltage system are not energized, energized and with the exception of any coupling system for charging the REESS which is not energized during driving condition, the protection against electrical shock shall be proved by either paragraphs 5.3.7.1.3. or 5.3.7.1.4. below for the relevant part(s).
6.1.2.1.deleted
5.3.7.1.1.changed
The voltages Vb, V1 Ub, U1 and V2 U2 of the high voltage buses shall be equal or less than 30 VAC or 60 VDC as specified within 60 s after the impact when measured in accordance with paragraph 2. of Annex 9.
6.1.2.2.deleted
5.3.7.1.2.changed
The total energy (TE) on the high voltage buses shall be less than 2.0 0.2 joules when measured according to the test procedure as specified in paragraph 3. of Annex 9 with the formula (a). Alternatively Alternatively, the total energy (TE) may be calculated by the measured voltage Vb Ub of the high voltage bus and the capacitance of the X-capacitors (Cx) specified by the manufacturer according to formula (b) of paragraph 3. of Annex 9. The energy stored in the Y-capacitors (TEy1, TEy2) shall also be less than 2.0 0.2 joules. This shall be calculated by measuring the voltages V1 U1 and V2 U2 of the high voltage buses and the electrical chassis, and the capacitance of the Y-capacitors specified by the manufacturer according to formula (c) of paragraph 3. of Annex 9.
5.3.7.1.3.changed
For protection against direct contact with high voltage live parts, the protection degree IPXXB shall be provided. The assessment shall be conducted in accordance with paragraph 4 of Annex 9. In addition, for protection against electrical shock which could arise from indirect contact, the resistance between all exposed conductive parts of electrical protection barriers/enclosures and the electrical chassis shall be lower than 0.1 ohm Ω and the resistance between any two simultaneously reachable exposed conductive parts of electrical protection barriers/enclosures that are less than 2.5 m from each other shall be less than 0.2 Ω when there is current flow of at least 0.2 ampere. A. This requirement is resistance may be calculated using the separately measured resistances of the relevant parts of electric path. These requirements are satisfied if the galvanic connection has been made by welding. In case of doubt or the connection is established by mean other than welding, measurements shall be made by using one of the test procedures described in paragraph 4 of Annex 9.
6.3.deleted
5.3.7.1.4.1.changed
Electrical power train consisting of separate DC- or AC-buses. If the AC high voltage buses and the DC high voltage buses are galvanically isolated from each other, isolation resistance between the high voltage bus and the electrical chassis (Ri, as defined in paragraph 5. of Annex 9) shall have a minimum value of 100 Ω/V Ω/V of the working voltage for DC buses, and a minimum value of 500 Ω/V Ω/V of the working voltage for AC buses.
5.3.7.1.4.2.changed
If the AC high voltage buses and the DC high voltage buses are galvanically connected isolation conductively connected, they shall meet one of the following requirements: (a) Isolation resistance between the high voltage bus and the electrical chassis (Ri, as defined in paragraph 5. of Annex 9) shall have a minimum value of 500 Ω/V Ω/V of the working voltage. However, if the protection IPXXB is satisfied for all AC high voltage buses or the AC voltage is equal or less than 30 V after the vehicle impact, the isolation voltage; (b) Isolation resistance between the high voltage bus and the electrical chassis (Ri, as defined in paragraph 5. of Annex 9) shall have a minimum value of 100 Ω/V Ω/V of the working voltage. voltage and the AC bus meets the physical protection as described in paragraph 5.3.7.1.3; (c) Isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage and the AC bus meets the absence of high voltage as described in paragraph 5.3.7.1.1.
5.3.7.2.1.added
In case of aqueous electrolyte REESS.
For a period from the impact until 60 minutes after the impact, there shall be
no electrolyte leakage from the REESS into the passenger compartment and
no more than 7 per cent by volume of the REESS electrolyte with a maximum
of 5.0 l leaked from the REESS to the outside of the passenger compartment.
The leaked amount of electrolyte can be measured by usual techniques of
determination of liquid volumes after its collection. For containers containing
Stoddard, coloured coolant and electrolyte, the fluids shall be allowed to
separate by specific gravity then measured.
5.3.7.2.2.added
In case of non-aqueous electrolyte REESS.
For a period from the impact until 60 minutes after the impact, there shall be
no liquid electrolyte leakage from the REESS into the passenger compartment,
luggage compartment and no liquid electrolyte leakage to outside the vehicle.
This requirement shall be verified by visual inspection without disassembling
any part of the vehicle
5.3.7.3.changed
REESS located inside the passenger compartment shall remain in attached to the location in which they are installed vehicle by at least one component anchorage, bracket, or any structure that transfers loads from REESS to the vehicle structure, and REESS components shall remain inside REESS boundaries. No part of any REESS that is located outside the passenger compartment for electric safety assessment shall not enter the passenger compartment during or after the impact test. The manufacturer shall demonstrate compliance in accordance with paragraph 7. of Annex 9. compartment.
5.3.7.4.added
For a period from the impact until 60 minutes after the impact, there shall be
no evidence of fire or explosion from the REESS.
5.3.8.added
The fuel system and high voltage system shall be assessed for all
configurations or worst-case configuration for left-hand drive and right-hand
drive vehicles, when applicable.
10.1.deleted
6.1.changed
10.2.deleted
6.1.1.changed
10.3.deleted
6.1.2.changed
10.4.deleted
6.2.changed
10.5.deleted
7.changed
The conformity of production procedures procedure shall comply with those the requirements set out in Schedule 1 of the Agreement, Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2) with the following requirements. Agreement (E/ECE/TRANS/505/Rev.3).
10.6.deleted
7.1.changed
10.7.deleted
7.2.changed
10.8.deleted
10.9.deleted
10.10.deleted
8.1.changed
The approval granted in respect of a vehicle type, type pursuant to this Regulation, Regulation may be withdrawn if the requirement laid down in paragraph 7.1. above is not complied with, or if the vehicle or vehicles selected have failed to pass the checks prescribed in paragraph 7.2. above. with.
10.11.deleted
8.2.changed
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation Regulation, by means of a communication copy of the approval form conforming to bearing at the model end, in Annex 1 to this Regulation. large letters, the signed and dated annotation "APPROVAL WITHDRAWN".
10.12.deleted
9.changed
If the holder of the approval completely ceases to manufacture a the type of vehicle approved in accordance with this the Regulation, he shall so inform the Type Approval Authority which granted the approval. Upon receiving the relevant communication that Type Approval Authority shall inform thereof the other Parties to the 1958 Agreement applying this Regulation by means of a communication copy of the approval form conforming to bearing at the model end, in Annex 1 to this Regulation. large letters, the signed and dated annotation "PRODUCTION DISCONTINUED".
11.deleted
10.added
Names and addresses of Technical Services
responsible for conducting approval tests, and of
Type Approval Authorities
The Contracting Parties to the Agreement applying this Regulation shall
communicate to the United Nations secretariat the names and addresses of the
Technical Services responsible for conducting approval tests, and of the Type
Approval Authority which grant approval and to which forms certifying
approval or extension, or refusal or withdrawal of approval, issued in other
countries, are to be sent.
11.1.added
As from the official date of entry into force of the 05 series of amendments,
no Contracting Party applying this Regulation shall refuse to grant or refuse
to accept type-approvals under this Regulation as amended by the 05 series
of amendments.
11.2.added
As from 1 September 2023, Contracting Parties applying this Regulation
shall not be obliged to accept type-approvals of vehicles having an electric
power train operating on high voltage according to the preceding series of
amendments, first issued after 1 September 2023.
11.3.added
Contracting Parties applying this Regulation shall continue to accept type-
approvals of vehicles not having an electric power train operating on high
voltage according to the 04 series of amendments to this Regulation or type-
approvals issued according to the preceding series of amendments to this
Regulation, for the vehicles which are not affected by the changes introduced
by the 04 series of amendments.
11.4.added
Contracting Parties applying this Regulation shall not refuse to grant type-
approvals according to any preceding series of amendments to this Regulation
or extensions thereof.
11.5.added
Notwithstanding the transitional provisions above, Contracting Parties who
start to apply this Regulation after the date of entry into force of the most recent
series of amendments are not obliged to accept type-approvals which were
granted in accordance with any of the preceding series of amendments to this
Regulation.
Annex 1changed
(maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a vehicle type with regard to protection of occupants in the event of a lateral collision pursuant to Regulation No. 95 Approval No. …………………….………. Extension No. …………………………… 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation). 2 Strike out what does not apply. Annex 1
Annex 2changed
Model A (See paragraph 4.5. of this Regulation) E4 a a 2 E4 a 3 95R – 031424 041424 a a = 8 mm min. The above approval mark affixed to a vehicle shows that the vehicle type concerned has, with regard to the protection of the occupants in the event of a lateral collision, been approved in the Netherlands (E 4) pursuant to UN Regulation No. 95 under approval number 031424. 041424. The approval number indicates that the approval was granted in accordance with the requirements of UN Regulation No. 95 as amended by the 03 04 series of amendments. Model B (See paragraph 4.6. of this Regulation) 95 03 04 2492 24 03 1628 a = 8 mm min. The above approval mark affixed to a vehicle shows that the vehicle type concerned has been approved in the Netherlands (E 4) pursuant to UN Regulations Nos. 95 and 24.1 The first two digits of the approval numbers indicate that, at the dates when the respective approvals were granted. UN Regulation No. 95 incorporated the 03 04 series of amendments and UN Regulation No. 24 incorporated the 03 series of amendments. 1 The latter number is given only as an example. Annex 3
Annex 3changed
torso angle for seating positions in motor vehicles1 Appendix 1 - Description of the three dimensional "H" point machine (3-D H machine)1 Appendix 2 - Three-dimensional reference system1 Appendix 3 - Reference data concerning seating positions1 1 The procedure is described in Annex 1 to the Consolidated Resolution on the Construction of Vehicles (RE.3) (document ECE/TRANS/WP.29/78/Rev.3). www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
5.11.1.changed
5.11.1.1.added
10 °C.
5.11.1.2.added
The SOC shall be adjusted according to one of the following procedures as
applicable. Where different charging procedures are possible, the REESS shall
be charged using the procedure which yields the highest SOC:
(a) For a vehicle with a REESS designed to be externally charged, the
REESS shall be charged to the highest SOC in accordance with the
procedure specified by the manufacturer for normal operation until the
charging process is normally terminated.
Annex 4
(b) For a vehicle with a REESS designed to be charged only by an energy
source on the vehicle, the REESS shall be charged to the highest SOC
which is achievable with normal operation of the vehicle. The
manufacturer shall advise on the vehicle operation mode to achieve this
SOC.
5.11.1.3.added
When the vehicle is tested, the SOC shall be no less than 95 per cent of the
SOC according to paragraphs 5.11.1.1. and 5.11.1.2. for REESS designed to
be externally charged and shall be no less than 90 per cent of SOC according
to paragraphs 5.11.1.1. and 5.11.1.2. for REESS designed to be charged only
by an energy source on the vehicle. The SOC will be confirmed by a method
provided by the manufacturer.
5.11.2.1.changed
By the agreement between Technical Service and manufacturer it shall be permissible to perform the test with all or parts of the electrical power train not being energized insofar as there is no negative influence on the test result. For parts of the electrical power train not energized, the protection against electrical shock shall be proved by either physical protection or isolation resistance and appropriate additional evidence. Annex 4
7.1.4.changed
The abdomen force channels shall comply with ISO 6487:1987 CFC: 1,000 Hz CAC: 5 kN Annex 4 - Appendix 1
1.changed
When head contact takes place, this performance criterion is calculated for the total duration between the initial contact and the last instant of the final contact. HPC is the maximum value of the expression: 2.5 ⎛ 1 t2 ⎞ (t 2 − t1 ) ⎜⎜ ∫ a dt ⎟ ⎟ t − t ⎝ 2 1 t1 ⎠ Where a is the resultant acceleration at the centre of gravity of the head in metres per second divided by 9.81 recorded versus time and filtered at channel frequency class 1,000 Hz; t1 and t2 are any two times between the initial contact and the last instant of the final contact.
2.2.changed
Viscous criterion: the peak viscous response is the maximum value of VC on any rib which is calculated from the instantaneous product of the relative thorax compression related to the half thorax and the velocity of compression derived by differentiation of the compression, filtered at channel frequency class 180 Hz. For the purposes of this calculation the standard width of the half thorax rib cage is 140 mm. ⎛ D dD ⎞ VC = max ⎜ . ⎟ ⎝ 0.14 dt ⎠ Where D (metres) = rib deflection The calculation algorithm to be used is set out in Annex 4, Appendix 2.
4.changed
The pubic symphisis peak force (PSPF) is the maximum force measured by a load cell at the pubic symphysis of the pelvis, filtered at channel frequency class 600 Hz. Annex 4 - Appendix 2
Annex 4 - Appendix 2changed
for EUROSID 1 The Viscous Criterion, VC, is calculated as the instantaneous product of the compression and the rate of deflection of the rib. Both are derived from the measurement of rib deflection. The rib deflection response is filtered once at Channel Frequency Class 180. The compression at time (t) is calculated as the deflection from this filtered signal expressed as the proportion of the half width of the EUROSID 1 chest, measured at the metal ribs (0.14 metres): D( t ) C( t ) = 0.14 The rib deflection velocity at time (t) is calculated from the filtered deflection as: 8 [D(t D( t +1) − D( t −1) ] − [D(t D( t + 2 ) − D( t − 2 ) ] V( t ) = 12∂t 12t where D(t) is the deflection at time (t) in metres and ∂t t is the time interval in seconds between the measurements of deflection. The maximum value of ∂t t shall be 1,25 x 10-4seconds. This calculation procedure is shown diagrammatically below: Measured deflection D(t) Filter at CFC 180 Calculated deflection Calculate compression Velocity: V(t) C(t) Calculate viscous Criterion at time (t) (VC)(t) = V(t) . C(t) Determine the maximum value of VC (VC) max = max [(VC) (t) ] Annex 5
2.1.2.3.changed
Blocks 4, 5 and 6 should be crushed by 10 ± 2 mm on the top surface prior to testing to give a depth of 440 ± 2 mm. Annex 5
2.1.5.2.4.changed
2.1.5.6.changed
The rigidity of block 4 is such that its force deflection curves fall between corridors of Figure 2c. Annex 5
2.2.2.1.changed
The front plates are manufactured from aluminium of series AlMg2 AlMg 2 to AlMg3 with elongation ≥ 12 per cent, and a UTS ≥ 175 N/mm2.
2.3.2.1.changed
The back plate shall consist of a 3 mm aluminium sheet. The back plate shall be manufactured from aluminium of series AlMg2 to AlMg3 with hardness between 50 and 65 HBS. This plate shall be perforated with holes for ventilation: the location, the diameter and pitch are shown in Figures 5 and 7. 1 The amounts of energy indicated are the amounts of energy dissipated by the system when the extent to which the impactor is crushed is greatest. Annex 5
2.7.1.changed
3.2.5.changed
Re-mount the ventilation device to the front of the trolley and tighten to exclude air gaps. Annex 5
4.1.6.changed
Ensure that any set of samples or test pieces giving evidence of non- conformity non-conformity gives rise to a further sampling and test. All the necessary steps must be taken to restore conformity of the corresponding production.
4.4.3.changed
Once experience is gained with the consistency of production control, it may be possible to combine both sampling approaches, so that more than one groups of parallel production can be considered to be a batch provided samples from the first and last production groups comply. Annex 5
6.1.2.4.changed
The rigid wall shall be either anchored in the ground or placed on the ground with, if necessary, additional arresting devices to limit its deflection. A rigid wall (to which the load cells are attached) having different characteristics but giving results that are at least equally conclusive may be used. Annex 5
6.3.1.changed
The impact speed shall be 35 ± 0.5 km/h the instrument used to record the speed on impact shall be accurate to within 0.1 per cent.
6.6.1.changed
Raw data: At time T = T0, all offsets should be removed from the data. The method by which offsets are removed shall be recorded in the test report. Annex 5
6.6.3.8.changed
The mean deflection-time data will be combined with the load cell wall force-time force- time data to generate the force-deflection result for each block.
6.6.4.changed
The absorbed energy for each block and for the whole MDB face should be calculated up to the point of peak deflection of the barrier. t1 E n = ∫ Fn .ds mean t1 t0 Where: t0 is the time of first contact, Annex 5 t1 is the time where the trolley comes to rest, i.e. where u = 0, s is the deflection of the trolley deformable element calculated according to paragraph 6.6.3.
6.6.5.2.changed
Compare the total energy change to the change in kinetic energy of the MDB, given by: E = 1 MV 2 K 2 i Where Vi is the impact velocity and M the whole mass of the MDB If the momentum change (M*)V) is not equal to the total impulse (I) ± 5 per cent, or if the total energy absorbed (Ε ( En) is not equal to the kinetic energy, EK ± 5 per cent, then the test data must be examined to determine the cause of this error.
Figure 1changed
500 + 5 500 + 5 500 + 5 250 + 3 Zone 5 Zone 4 Zone 6 500 + 2.5 250 + 3 Zone 1 Zone 2 Zone 3 1500 + 2.5 2 All dimensions are in mm. The tolerances on the dimensins of the blocks allow for the difficulties of measuring cut aluminium honeycomb. The tolerance on the overall dimension of the impactor is less than that for the individual blocks since the honeycomb blocks can be adjusted, with overlap if necessary, to maintain a more closely defined impact face dimension. Annex 5
Figure 4changed
19 mm ± 1.9 mm Annex 5
Figure 6changed
Ventilation device Front plate of trolley 514 + 1 mm Cork gasket Side View > 53 mm Spacer Annex 5
Figure 7changed
12 mm + 0,2 12 mm + 0,2 ∅ 8 mm + 0,2 Top and bottom back plate flanges 150 + 1 mm 600 + 1 mm 600 + 1 mm 28 + 1 mm > 17 mm > 3 mm R 5 mm Note: The attachment holes in the bottom flange may be opened to slots, as shown below, for ease of attachment provided sufficient grip can be developed to avoid detachment during the whole impact test.
Figure 8changed
Barrier side 28 ± 1mm R 5mm Trolley side Bottom Annex 5
Figure 9changed
The ventilation device is a structure made of a plate that is 5 mm thick and 20 mm wide. Only the vertical plates are perforated with nine 8 mm holes in order to let air circulate horizontally. 1 500 + 2.5 mm 500 + 2.5 mm 50 mm between 2 plates 250 mm 250 mm 250 mm 250 mm 250 mm Thickness: 20 mm Plates (50*50*4 mm) to fixe the device on trolley by M8 screws. Front View 5 mm Section ∅ 8 mm Lateral view of vertical struts Side View Annex 5 - Appendix 1
1.deleted
Figure 1bchanged
Force (kN) 0 2 5 10 15 20 25 30 35 40 De flection Deflection (cm ) Annex 5 - Appendix 1
Figure 1cchanged
Force (kN) 0 2 5 10 15 20 25 30 D e fle c tio n (c m ) 35 40 Deflection (cm)
2.1.deleted
Figure 1dchanged
16 15,5 Force (kN) 10 24 0 1 5 10 15 20 25 30 35 Deflection (cm ) Annex 5 - Appendix 2
2.2.1.deleted
2.2.2.deleted
Figure 2bchanged
Force (kN) 0 10 20 30 40 Deflection (cm) Annex 5 - Appendix 2
3.deleted
Figure 2cchanged
Force (kN) 20 28.5 18.5 0 10 20 30 40 Deflection (cm)
Figure 2dchanged
Force (kN) 25,5 20 30 0 5 8 0 10 20 30 40 Deflection (cm) Annex 5 - Appendix 2
4.1.deleted
Figure 2echanged
Force (kN) 0 00 3 10 20 30 40 Deflection (cm) Annex 5 – Appendix 6
4.2.deleted
4.3.deleted
5.1.deleted
1.2.changed
The dimensions and masses of the side impact dummy represent a 50th 50 th percentile adult male, without lower arms.
6.1.deleted
6.2.deleted
2.3.5.changed
The neck is mounted on the neck-bracket, shown as part No. 2d in Figure 1 of this annex. This bracket can optionally be replaced with a lower neck load- cell. The dummy is corresponding with the specification of the ES-2 dummy. The number of the table of contents of the technical drawing is: No. E-AA-DRAWING-LIST-7-25-032 dated on 25 July 2003. The complete set of ES-2 technical drawings and the ES-2 User Manual are deposited with the United Nations Economic Commission for Europe (UNECE), Palais des Nations, Geneva, Switzerland and may be consulted on request at the secretariat. Annex 6 load-cell.
2.4.added
1 The dummy is corresponding with the specification of the ES-2 dummy. The number of the table of
contents of the technical drawing is: No. E-AA-DRAWING-LIST-7-25-032 dated on 25 July 2003.
The complete set of ES-2 technical drawings and the ES-2 User Manual are deposited with the United
Nations Economic Commission for Europe (UNECE), Palais des Nations, Geneva, Switzerland and
may be consulted on request at the secretariat.
2.5.5.changed
2.7.added
Annex 6
2.9.7.changed
The iliac wings are attached to the sacrum block at the aft side and linked together at the pubic symphysis location by a force transducer (part No. 8f) or a replacement transducer. Annex 6
5.5.3.changed
The peak resultant head acceleration, filtered using ISO 6487:2000 CFC 1000, should be between and including 100 g and 150 g.
5.6.1.changed
The head-neck interface of the neck is mounted to a special certification head-form head- form with a mass of 3.9 ± 0.05 kg (see Figure 6), with the help of a 12 mm thick interface plate with a mass of 0.205 ± 0.05 kg.
5.6.7.changed
The maximum head-form centre of gravity displacements measured in angle dθA and dθB (see Figure 6) should be: Fore pendulum base angle dθA between and including 32.0 and 37.0° occurring between and including 53.0 and 63.0 m/s and aft pendulum base angle dθB between and including 0.81*(angle dθA) +1.75 and 0.81*(angle dθA) +4.25° occurring between and including 54.0 and 64.0 m/s. 2 Neck pendulum corresponding with American Code of Federal Regulation 49 CFR. Chapter V Part 572.33 (10-1-00 Edition) (See also Figure 5). 3 The use of 3-inch honeycomb is recommended (see Figure 5). including 0.81*(angle dθA) +1.75 and 0.81*(angle dθA) +4.25° occurring between and including 54.0 and 64.0 m/s.
5.7.7.changed
The peak acceleration of the impactor, filtered using ISO 6487:2000 CFC 180, should be between and including 7.5 and 10.5 g.
5.9.5.changed
The impact severity is specified by the drop heights of 815, 204 and 459 mm. These drop heights result in velocities of approximately 4, 2 and 3 m/s respectively. Impact drop heights should be applied with an accuracy of 1 per cent. Pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.36(a) (10-1-00 Edition) (See also Figure 4). Annex 6
5.9.7.changed
The rib certification requirements are given in Table 5 of this annex. 4 Pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.36(a) (10-1-00 Edition) (See also Figure 4). Annex 6
5.10.5.changed
The neck-pendulum is decelerated from impact velocity to zero by an appropriate device,6 as described in the neck pendulum specification (see Figure 5), resulting in a velocity change - time history inside the corridor specified in Figure 8 and Table 6 of this annex. All channels have to be recorded according to the ISO 6487-2000 or SAE J211 (March 1995) data channel recording specification and filtered digitally using ISO 6487:2000 CFC 180 or SAE J211:1995 CFC 180. The pendulum deceleration has to be filtered using ISO 6487:2000 CFC 60 or SAE J211:1995 CFC 60. 5 Neck pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.33 (10-1-00 Edition) (See also Figure 5). 6 The use of 6-inch honeycomb is recommended (see Figure 5).
Figure 5deleted
5.11.6.changed
The impact direction is perpendicular to the anterior-posterior axis of the dummy and the axis of the impactor is aligned with the centre of the middle abdominal force transducer. Pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.36(a) (10-1-00 Edition) (See also Figure 4). Annex 6
5.11.7.changed
The peak force of the impactor, obtained from the impactor acceleration filtered using ISO 6487:2000 CFC 180 and multiplied by the impactor/armrest 7 Pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.36(a) (10-1-00 Edition) (See also Figure 4). Annex 6 mass, should be between and including 4.0 and 4.8 kN, and occur between and including 10.6 and 13.0 m/s.
5.13.1.changed
8 Pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.36(a) (10-1-00 Edition) (See also Figure 4).
Figure 6changed
Pendulum base plate 10 mm dΘB dΘA dB dA Neck or Lumbar dΘC dC Spine length 47 mm including mounting plate Head form
Figure 7added
0.0
-1.0
-2.0
Velocity in [m/s]
-3.0
-4.0
-5.0
-6.0
-7.0
0 5 10 15 20 25 30 35
Time in [ms]
Figure 8changed
0.deleted
2.10.changed
For the driver’s seating position, without inducing pelvis or torso movement, place the right foot of the dummy on the non-depressed accelerator pedal with the heel resting as far forward as possible on the floor-pan. Set the left The dummy can be equipped with tilt sensors in the thorax and the pelvis. These instruments can help to obtain the desired position. Annex 7 foot perpendicular to the lower leg with the heel resting on the floor-pan in the same lateral line as the right heel. Set the knees of the dummy such that their outside surfaces are 150 ± 10 mm from the plane of symmetry of the dummy. If 1 The dummy can be equipped with tilt sensors in the thorax and the pelvis. These instruments can help to obtain the desired position. possible within these constraints place the thighs of the dummy in contact with the seat cushion.
2.11.changed
For other seating positions, without inducing pelvis or torso movement, place the heels of the dummy as far forward as possible on the floor-pan without compressing the seat cushion more than the compression due to the weight of the leg. Set the knees of the dummy such that their outside surfaces are 150 ± 10 mm from the plane of symmetry of the dummy. Annex 8
3.1.2.changed
The head form shall be fitted with two accelerometers and a speed-measuring device, all capable of measuring values in the impact direction. Annex 8
3.2.2.changed
The body block shall be fitted with two accelerometers and a speed- measuring speed-measuring device, all capable of measuring values in the impact direction. Annex 9
Annex 9changed
1.changed
If a high voltage disconnect function is used, measurements are to be taken from both sides of the device performing the disconnect function. However, if the high voltage disconnect is integral to the REESS or the energy conversion system and the high-voltage bus of the REESS or the energy conversion system is protected according to protection degree IPXXB following the impact test, measurements may only be taken between the device performing the disconnect function and the electrical loads. The voltmeter used in this test shall measure DC values and have an internal resistance of at least 10 MΩ. MΩ.
2.changed
The following instructions may be used if voltage is measured. After the impact test, determine the high voltage bus voltages (Vb, V1, V2) (Ub, U1, U2) (see Figure 1). 1 below). The voltage measurement shall be made not earlier than 5 10 seconds, but, not later than 60 seconds after the impact. This procedure is not applicable if the test is performed under the condition where the electric power train is not energized. Annex 9 Measurement of Ub, U1, U2 Energy Conversion REESS assembly System Assembly V2 High Voltage Bus + + Energy REESS Traction System Conversion Vb System - - V1 Electrical Chassis
3.changed
Prior to the impact a switch S1 and a known discharge resistor Re is connected in parallel to the relevant capacitance (see (ref. Figure 2). 2 below). (a) Not earlier than 5 10 seconds and not later than 60 seconds after the impact the switch S1 shall be closed while the voltage Vb Ub and the current Ie are measured and recorded. The product of the voltage Vb Ub and the current Ie shall be integrated over the period of time, starting from the moment when the switch S1 is closed (tc) until the voltage Vb Ub falls below the high voltage threshold of 60 V DC (th). The resulting integration equals the total energy Total Energy (TE) in joules. th (a) TE = ∫ V b ×I U Vbb I e dt tc (b) When Vb Ub is measured at a point in time between 5 10 seconds and 60 seconds after the impact and the capacitance of the X-capacitors (Cx) is specified by the manufacturer, total energy Total Energy (TE) shall be calculated according to the following formula: (b) TE = 0.5 x Cx x(Vb2 – 3 600) When V1, V2 x Ub2 Annex 9 (c) WhenU1 and U2 (see Figure 1) 1 above) are measured at a point in time between 5 10 seconds and 60 seconds after the impact and the capacitances of the Y-capacitors (Cy1, Cy2) are specified by the manufacturer, total energy Total Energy (TEy1, TEy2) shall be calculated according to the following formulas: (c) TEy1 = 0.5 x Cy1 x (V12 -3 600) U12 TEy2 = 0.5 x Cy2 x (V22- 3 600) U22 This procedure is not applicable if the test is performed under the condition where the electric power train is not energized.
Figure 2changed
Energy Conversion System Assembly REESS Assembly High Voltage Bus + + S1 Energy Conversion Traction System Vb Ub REESS Conversion System Re - - Ie Electrical Chassis
4.changed
Following the vehicle impact test any parts surrounding the high voltage components shall be, without the use of tools, opened, disassembled or removed. All remaining surrounding parts shall be considered part of the physical protection. The jointed test finger described in Figure 1 of Appendix 1 to this annex 3 shall be inserted into any gaps or openings of the physical protection with a test force of 10 N ± 10 per cent for electrical safety assessment. If partial or full penetration into the physical protection by the jointed test finger occurs, the jointed test finger shall be placed in every position as specified below. Starting from the straight position, both joints of the test finger shall be rotated progressively through an angle of up to 90° 90 degrees with respect to the axis of the adjoining section of the finger and shall be placed in every possible position. Internal electrical protection barriers are considered part of the enclosure. enclosure If appropriate a low-voltage supply (of not less than 40 V and not more than 50 V) in series with a suitable lamp should be connected, between the jointed test finger and high voltage live parts inside the electrical protection barrier or enclosure. Annex 9
Figure 3changed
4.1.changed
Test method for measuring electric resistance: (a) Test method using a resistance tester. The requirements of paragraph 5.3.7.1.3. resistance tester is connected to the measuring points (typically, electrical chassis and electro conductive enclosure/electrical protection barrier) and the resistance is measured using a resistance tester that meets the specification that follows: (i) Resistance tester: Measurement current at least 0.2 A; (ii) Resolution: 0.01 Ω or less; (iii) The resistance R shall be considered less than 0.1 Ω. (b) Test method using DC power supply, voltmeter and ammeter. The DC power supply, voltmeter and ammeter are connected to the measuring points (Typically, electrical chassis and electro conductive enclosure/electrical protection barrier). The voltage of the DC power supply is adjusted so that the current flow becomes at least 0.2 A. The current "I" and the voltage "U" are measured. The resistance "R" is calculated according to the following formula: R=U/I The resistance R shall be met if less than 0.1 Ω. Note: If lead wires are used for voltage and current measurement, each lead wire shall be independently connected to the jointed electrical protection barrier/enclosure/electrical chassis. Terminal can be common for voltage measurement and current measurement. Example of the test finger described in Figure 1 of Appendix 1 to this annex method using DC power supply, voltmeter and ammeter is unable to contact high voltage live parts. If necessary a mirror or a fiberscope may be used in order to inspect whether the Jointed Test Finger touches the high voltage buses. If this requirement is verified by a signal circuit between the jointed test finger and high voltage live parts, the lamp shall not light. Annex 9 shown below.
Figure 4changed
Connection to Exposed Conductive Parts Exposed Conductive D.C. Parts Power Supply U Electrical Chassis Energy Conversion System Assembly V2’ R0 REESS Assembly High Voltage Bus + + Energy Traction System REESS Conversion System - - Connection to Electrical Chassis Note 1: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (in Ω/V) multiplied by the working voltage (in V) of the vehicle plus/minus 20 per cent. Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide a good resolution for the voltage measurements.
Figure 1deleted
5.1.added
General.
The isolation resistance for each high voltage bus of the vehicle is measured
or shall be determined by calculating the measurement values of each part or
component unit of a high voltage bus.
All measurements for calculating voltage(s) and electrical isolation are made
after a minimum of 10 s after the impact.
5.2.added
Measurement method.
Annex 9
The isolation resistance measurement is conducted by selecting an appropriate
measurement method from among those listed in paragraphs 5.2.1. to 5.2.2. of
this Annex, depending on the electrical charge of the live parts or the isolation
resistance.
The range of the electrical circuit to be measured is clarified in advance, using
electrical circuit diagrams. If the high voltage buses are conductively isolated
from each other, isolation resistance shall be measured for each electrical
circuit.
Moreover, modifications necessary for measuring the isolation resistance may
be carried out, such as removal of the cover in order to reach the live parts,
drawing of measurement lines and change in software.
In cases where the measured values are not stable due to the operation of the
on-board isolation resistance monitoring system, necessary modifications for
conducting the measurement may be carried out by stopping the operation of
the device concerned or by removing it. Furthermore, when the device is
removed, a set of drawings will be used to prove that the isolation resistance
between the live parts and the electrical chassis remains unchanged.
These modifications shall not influence the test results.
Utmost care shall be exercised to avoid short circuit and electric shock since
this confirmation might require direct operations of the high-voltage circuit.
5.2.1.added
Measurement method using DC voltage from external sources.
5.2.1.1.added
Measurement instrument.
An isolation resistance test instrument capable of applying a DC voltage higher
than the working voltage of the high voltage bus shall be used.
5.2.1.2.added
Measurement method.
An isolation resistance test instrument is connected between the live parts and
the electrical chassis. The isolation resistance is subsequently measured by
applying a DC voltage at least half of the working voltage of the high voltage
bus.
If the system has several voltage ranges (e.g. because of boost converter) in
conductively connected circuit and some of the components cannot withstand
the working voltage of the entire circuit, the isolation resistance between those
components and the electrical chassis can be measured separately by applying
at least half of their own working voltage with those components disconnected.
5.deleted
5.2.2.added
Measurement method using the vehicle's own REESS as DC voltage source.
5.2.2.1.added
Test vehicle conditions.
The high voltage-bus is energized by the vehicle's own REESS and/or energy
conversion system and the voltage level of the REESS and/or energy
conversion system throughout the test shall be at least the nominal operating
voltage as specified by the vehicle manufacturer.
5.2.2.2.added
Measurement instrument.
The voltmeter used in this test shall measure DC values and have an internal
resistance of at least 10 MΩ.
5.2.2.3.added
Measurement method.
5.2.2.3.1.added
First step.
The voltage is measured as shown in Figure 1 and the high voltage bus voltage
(Ub) is recorded. Ub shall be equal to or greater than the nominal operating
voltage of the REESS and/or energy conversion system as specified by the
vehicle manufacturer.
5.2.2.3.2.added
Second step.
The voltage (U1) between the negative side of the high voltage bus and the
electrical chassis is measured and recorded (see Figure 1).
Figure 1deleted
5.2.2.3.3.added
Third step.
The voltage (U2) between the positive side of the high voltage bus and the
electrical chassis is measured and recorded (see Figure 1).
5.2.2.3.4.added
Fourth step.
If U1 is greater than or equal to U2, a standard known resistance (Ro) is inserted
between the negative side of the high voltage bus and the electrical chassis.
With Ro installed, the voltage (U1') between the negative side of the high
voltage bus and the electrical chassis is measured (see Figure 5).
The electrical isolation (Ri) is calculated according to the following formula:
Ri = Ro*Ub*(1/U1' – 1/U1)
Figure 5added
Electrical Chassis
Energy Conversion
System Assembly REESS
Assembly
High Voltage Bus
+ +
Energy
Traction System REESS
Conversion
System
- -
U1’ R0
Electrical Chassis
If U2 is greater than U1, insert a standard known resistance (Ro) between the
positive side of the high voltage bus and the electrical chassis. With R o
Annex 9
installed, measure the voltage (U2’) between the positive side of the high
voltage bus and the electrical chassis (see Figure 6 below). The electrical
isolation (Ri) is calculated according to the following formula:
Ri = Ro*Ub*(1/U2’ – 1/U2)
Figure 6added
U2’
5.2.2.3.5.added
Fifth step.
The electrical isolation value Ri (in Ω) divided by the working voltage of the
high voltage bus (in V) results in the isolation resistance (in Ω/V).
Note: The standard known resistance Ro (in Ω) should be the value of the
minimum required isolation resistance (Ω/V) multiplied by the working
voltage (V) of the vehicle plus/minus 20 per cent. Ro is not required to be
precisely this value since the equations are valid for any Ro; however, a Ro
value in this range should provide a good resolution for the voltage
measurements.
6.changed
7.changed
REESS retention compliance shall be determined by visual inspection. Annex 9 – Appendix 1