Compare versions of UN R67
I. Specific equipment of vehicles of category M and N using liquefied petroleum gases in their propulsion system II. Vehicles of category M and N fitted with specific equipment for the use of liquefied petroleum gases in their propulsion system with regard to the installation of such equipment
Supplement 10 to the 01 series → latestSupplement 14 to the 01 series → latest02 series of amendments → latest03 series of amendments → latest
1.1.changed
Part I Approval of specific equipment of vehicles of category M and N1 N 1 using liquefied petroleum gases in their propulsion system;
2.changed
LPG components for use in vehicles shall be classified with regard to the maximum operating pressure and function, according to Figure 1. Class 0 High pressure parts including tubes and fittings containing liquid LPG with a pressure > 3,000 kPa. Class 1 High pressure parts including tubes and fittings containing liquid LPG at vapour pressure or increased vapour pressure up to 3,000 kPa. Class 2 Low pressure parts including tubes and fittings containing vaporized LPG with a maximum operating pressure below 450 kPa and over 20 kPa above atmospheric pressure. Class 2A Low pressure parts for a limited pressure range including tubes and fittings containing vaporized LPG with a maximum operating pressure below 120 kPa and over 20 kPa above atmospheric pressure. Class 3 Shut-off valves and pressure relief valves, when operating in the liquid phase. LPG components designed for a maximum operating pressure below 20 kPa above atmospheric pressure are not subjected to this Regulation. A component can consist of several parts, each part classified in his own class with regard to maximum operating pressure and function. 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.2, ECE/TRANS/WP.29/78/Rev.6, para. 2 https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
Figure 1changed
Start Yes Operating pressure >3 > 3 MPa? No Yes Yes Maximum operating Safety pressure Safety >450kPa? > valves? 450kPa? No No Yes Maximum operating pressure <20kPa No < 20kPa? Not subjected to this regulation. Yes Maximum operation pressure <120kPa? < 120kPa? No Or Class 2 Class 2A Class 1 Class3 Class 0 STOP
2.1.3.changed
"Working pressure" pressure (WP)" means the maximum pressure to which the component is designed to be subjected and on the basis of which its strength is determined.
2.2.changed
"Specific equipment" means: (a) The container; (b) The accessories fitted to the container; (c) The vaporizer/pressure regulator; (d) The shut-off valve; (e) The gas injection device or injector or gas mixing piece; (f) The gas dosage unit, unit either separate or combined with the gas injection device; (g) Flexible hoses; (h) Filling unit; (i) Non-return valve; (j) Gas-tube pressure relief valve; (k) Filter unit; (l) Pressure or temperature sensor; (m) Fuel pump; (n) Service coupling; (o) Electronic control unit; (p) Fuel rail; (q) Pressure relief device; (r) Multi-component. Multi-component; (s) Non-seamless and seamless gas tubes and their couplings; (t) Gas tubes made of materials other than copper, stainless steel, and steel with corrosion-resistant coating and their couplings.
2.4.changed
"Type of container" means containers which do not differ in respect to the following characteristics as specified in Annex 10: (a) The trade name(s) or trade mark(s), mark(s); (b) The shape (cylindrical, special shape), shape); (c) The openings (plate for accessories/metal ring), ring); (d) The material, material; (e) The welding process (in case of metal containers), containers); (f) The heat treatment (in case of metal containers), containers); (g) The production line, line; (h) The nominal wall thickness, thickness; (i) The diameter diameter; (j) The height (in case of special containers).
2.5.1.changed
80 per cent of the capacity of the container; container.
2.5.2.changed
"Level indicator" means a device to verify the level of liquid in the container; container.
2.5.3.changed
"Pressure relief valve (discharge valve)" means a device to limit the pressure build-up in the container; container.
2.5.3.1.changed
"Pressure relief device" means a device aimed to protect the container from burst which can occur in case of fire, by venting the LPG contained; contained.
2.5.4.changed
"Remotely controlled service valve with excess flow valve" means a device which allows the establishment and interruption of LPG supply to the evaporator/pressure regulator; remotely controlled means that the service valve is controlled by the electronic control unit; when the engine of the vehicle is not running the valve is closed; an excess flow valve means a device to limit the flow of LPG; LPG.
2.5.5.changed
"Fuel pump" means a device to establish the supply of liquid LPG to the engine by increasing the pressure of the container with the fuel pump supply pressure; pressure.
2.5.6.changed
"Multivalve" means a device consisting of all or part of the accessories mentioned in paragraphs 2.5.1. to 2.5.3. and 2.5.8.; 2.5.8.
2.5.7.changed
"Gas-tight housing" means a device to protect the accessories and to vent any leakages to the open air; air.
2.5.8.changed
Power supply bushing (fuel pump/actuators/fuel level sensor); sensor).
2.5.9.changed
"Non-return valve" means a device to allow the flow of liquid LPG in one direction and to prevent the flow of liquid LPG in the opposite direction; direction.
2.12.changed
"Electronic control unit" means a device which controls the LPG demand of the engine and cuts off automatically the power to the shut-off valves of the LPG-system LPG system in case of a broken fuel supply pipe caused by an accident, or by stalling of the engine.
2.19.changed
"Liquefied petroleum gas (LPG)" means any product essentially composed of the following hydrocarbons: Propane, propene (propylene), normal butane, isobutane, isobutylene, butene (butylene) and ethane. European Standard EN 589:1993 specifies requirements and methods of test for automotive LPG as marketed and delivered in the countries of the members of CEN (European Committee for Standardization). Part I - Approval of specific equipment of vehicles of category M and N using liquefied petroleum gases in their propulsion system
2.20.added
"Hose assembly" means an assembly of a flexible hose and couplings.
2.21.added
"LPG-system" means a set of LPG specific equipment intended to be fitted in
a vehicle to constitute an integrated and functional whole aimed at enabling
the propulsion with LPG;
2.22.added
"Interconnected LPG-system (ICS)" means a LPG-system having hydraulic
interconnections with the petrol or diesel fuelling system;
2.23.added
"Multi-component" means any of the above mentioned specific components
combined or fitted together as a component.
2.24.added
"Gas tube" means tubing made of metallic material which has been designed
not to flex in normal operation and through which LPG flows.
Part I - Approval of specific equipment of vehicles of
categories M and N using liquefied petroleum gases
in their propulsion system
3.2.changed
It shall be accompanied by the undermentioned under mentioned documents in triplicate and by the following particulars:
3.2.3.changed
Verification of compliance with the specifications prescribed in paragraph 6. of this Regulation; Regulation.
4.2.changed
All equipment shall have a space large enough to accommodate the approval mark including the classification of the component (see Annex 2A) and in case of components of Class 0 also the working pressure (WP); this space shall be shown on the drawings referred to in paragraph 3.2.2. above. In the case of limited space for the approval mark(s), other means of identification that link it to the approval mark shall be provided.
5.4.deleted
4.4.added
In addition to provisions of paragraphs 4.1. and 4.2., one of the following
additional marks shall be used for remotely controlled service valves and
remotely controlled shut-off valves which comply respectively with
paragraph 4.7. of Annex 3 or with paragraph 1.7. of Annex 7:
(a) "H1"
(b) "H2"
(c) "H3"
5.2.changed
An approval number shall be assigned to each type of equipment approved. Its first two digits (at present 01 corresponding to the 01 series of amendments which entered into force on 13 November 1999) shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue approved in accordance with Schedule 4 of the approval. The same Contracting Party shall not assign this alphanumeric code to another type of equipment. Agreement (E/ECE/TRANS/505/Rev.3).
5.3.changed
Notice of approval or of refusal or of extension of approval of an LPG equipment type/part pursuant to this Regulation shall be communicated to the Parties to the Agreement applying this Regulation, by means of a form conforming to the model in Annex 2B to this Regulation. If it concerns a container, Annex 2B - Appendix 1 shall be added.
4.2.added
above, to all equipment conforming to a type approved under this
Regulation, in addition to the mark prescribed in paragraphs 4.1. and 4.3.
above, an international approval mark consisting of:
5.4.2.changed
The number of this Regulation, followed by the letter "R", a dash and the 2 The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.6. https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions approval number to the right of the circle prescribed in paragraph 5.4.1. above. This approval number consists of the component type approval number which appears on the certificate completed for this type (see paragraph 5.2. above and Annex 2B) preceded by two figures indicating the sequence of the latest series of amendments to this Regulation.
5.7.changed
In case of a Class 0 component also the working pressure shall be marked in the vicinity of the approval mark mentioned in paragraph 5.4. above.
6.1.changed
The specific equipment of vehicles using LPG in their propulsion system shall function in a correct and safe way. The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.2/Amend.1. The materials of the equipment which are in contact with LPG shall be compatible with it. Those parts of equipment whose correct and safe functioning is liable to be influenced by LPG, high pressure or vibrations has to be submitted to relevant test procedures described in the annexes to this Regulation. In particular the provisions of paragraphs 6.2. to 6.13. below are to be fulfilled. The installation of LPG-equipment LPG equipment approved by this regulation Regulation shall comply with relevant electromagnetic compatibility (E.M.C) (EMC) requirements according to Regulation No. 10, 02 series of amendments, or equivalent.
6.2.changed
The LPG containers shall be type-approved type approved pursuant to the provisions laid down in Annex 10 to this Regulation.
6.3.1.1.changed
80 per cent stop valve, valve;
6.3.1.2.changed
Level indicator, indicator;
6.3.1.3.changed
Pressure relief valve (discharge valve), valve);
6.3.1.4.changed
Remotely controlled service valve with excess flow valve, valve.
6.3.6.changed
The container shall be equipped with a pressure relief device (PRD). Devices or functions may be approved as PRD being: (a) A fusible plug (temperature triggered) (fuse), or (b) A pressure relief valve provided that it complies to paragraph 6.15.8.3., 6.15.8.3. below, or (c) A combination of the two above devices, or (d) Any other equivalent technical solution, solution provided that it ensures the same degree of performance.
6.3.7.changed
The accessories mentioned in paragraphs 6.3.1. to 6.3.6. above shall be type- type approved pursuant to the provisions laid down in: (a) Annex 3 to this Regulation for accessories mentioned in paragraphs 6.3.1., 6.3.2., 6.3.3. and 6.3.6.; 6.3.6. above; (b) Annex 4 to this Regulation for accessories mentioned in paragraph 6.3.4.; 6.3.4. above; (c) Annex 7 to this Regulation for accessories mentioned in paragraph 6.3.5. above.
6.5.changed
Pressure regulator regulator1
6.9.changed
Gas injection devices/Gas mixing piece3 11 or Injectors
6.15.1.1.deleted
6.15.1.2.deleted
6.15.1.3.deleted
6.15.1.4.deleted
6.14.changed
6.15.1.5.deleted
6.16.added
Multi-component Annexes
applicable to the
single
components
1 Either combined or separate
2 Only applicable when the gas dosage actuator is not integrated in the gas injection device.
3 Applicable only when the operating pressure of the gas mixing piece exceeds 20 kPa (Class 2).
6.15.2.deleted
6.15.2.1.deleted
6.15.2.2.deleted
6.17.1.1.added
The connection between the float and the closing unit of the 80 per cent stop
valve shall not be deformed under normal conditions of use.
6.15.2.3.deleted
6.17.1.2.added
If the 80 per cent stop valve of the container comprises a float, the latter shall
withstand an outside pressure of 4,500 kPa.
6.15.3.deleted
6.17.1.3.added
The closing unit of the device that limits the filling at 80 per cent +0/-5 per
cent of the capacity of the container, for which the 80 per cent stop valve is
designed, shall withstand a pressure of 6,750 kPa. At the cut-off position, the
filling rate at a differential pressure of 700 kPa shall not exceed
500 cm3/minute. The valve shall be tested with all the containers on which it
is intended to be fitted or the manufacturer shall declare by calculation for
which container types this valve is suitable.
6.15.3.1.deleted
6.17.1.4.added
When the 80 per cent stop valve does not comprise any float, it shall not be
possible to continue filling, after closing-off, at a rate exceeding
500 cm3/minute.
6.15.3.2.deleted
6.17.1.5.added
The device shall bear a permanent marking, indicating the container-type for
which it has been designed, diameter and angle, and if applicable mounting
indication.
6.17.2.added
Electrical operated devices containing LPG shall, in order to prevent in case of
fracture of the component electric sparks on the surface of fracture:
(a) Be insulated in a manner that no current is lead through LPG containing
parts;
(b) Have the electrical system of the device isolated:
(i) From the body;
(ii) From the container for the fuel pump.
Isolation resistance shall be > 10 M.
6.15.4.1.deleted
6.17.2.1.added
The electrical connections inside the boot and passengers compartment shall
comply with protection degree class IP 40 according to IEC Standard 60529-
1989+A1:1999.
6.15.4.2.deleted
6.17.2.2.added
All other electrical connections shall comply with protection degree
class IP 54 according to IEC Standard 60529-1989+A1:1999.
6.15.5.deleted
6.17.2.3.added
The power supply bushing (fuel pump/actuators/fuel level sensor) to establish
an isolated and tight electrical connection shall be of a hermetic sealed type.
6.17.3.added
Specific provisions on valves activated by an electric/external (hydraulic,
pneumatic) power
6.15.6.1.deleted
6.17.3.1.added
In the case of valves activated by an electric/external power (e.g. 80 per cent
stop valve, service valve, shut-off valves, non-return valves, gas tube pressure
relief valve, service coupling), those valves shall be in "closed" position when
their power is switched off.
6.15.6.2.deleted
6.17.3.2.added
The power of the fuel pump shall be switched off when the electronic control
unit becomes defective or loses power.
6.17.3.3.added
Without prejudice to paragraph 1.7. of Annex 7 of this Regulation
(commanded stop phases), a remotely controlled shut-off valve (when intended
to be fitted as a component of an interconnected LPG-system for the purpose
of paragraph 17.13.2.2.) shall be submitted, during approval, to an endurance
test according to paragraph 9. of Annex 16 with a number of cycles equal to
20,000.
The valve shall bear a marking with the following data clearly legible and
indelible:
(a) The wording "ICS", and
(b) The approval mark according to paragraph 5.4. of this Regulation.
6.15.7.1.deleted
6.15.7.2.deleted
6.17.4.1.added
The materials constituting a device which are in contact with the heat exchange
medium of a device when operating shall be compatible with that fluid and
shall be designed to withstand a pressure of 200 kPa of the heat exchange
medium. The material shall meet the prescriptions laid down in Annex 15,
paragraph 17.
6.17.4.2.added
The compartment containing the heat exchange medium of the
vaporizer/pressure regulator shall be leak proof at a pressure of 200 kPa.
6.15.8.1.deleted
6.17.5.added
A component consisting of both high pressure and low pressure parts shall be
so designed to prevent a pressure build up in the low pressure part above
2.25 times the maximum working pressure for which it has been tested.
Components connected directly to the tank pressure shall be designed for the
classification pressure of 3,000 kPa. Venting to the motor compartment or
outside of the vehicle is not allowed.
6.15.8.2.deleted
6.15.8.3.deleted
6.17.6.1.added
3,000 kPa, when there is e.g. blocking of the tubing or not opening of a shut-off
valve. This can be realized by switching off the pump or by recirculating to the
container.
Pumps of Class 0 shall be so designed that the outlet pressure never exceeds
the WP of the components downstream of the pump, when there is, e.g.
blocking of the tubing or not opening of a shut-off valve. This can be realized
by switching off the pump or by recirculation to the container.
6.15.8.4.deleted
6.17.6.2.added
The pressure regulator/vaporizer shall be so designed as to prevent any gas
flow when the regulator/vaporizer unit is supplied with LPG at a pressure
4,500 kPa when the regulator is not operating.
6.15.8.5.deleted
6.15.8.6.deleted
6.17.7.1.added
Gas-tube pressure relief valves of Class 1 shall be so designed as to open at a
pressure of 3,200 ± 100 kPa.
Gas-tube pressure relief valves of Class 0 shall be so designed as to open at a
pressure of 1.07 WP of the pipe ± 100 kPa (if needed).
6.15.8.7.deleted
6.17.7.2.added
Gas-tube pressure relief valves of Class 1 shall not have internal leakage up to
3,000 kPa.
Gas-tube pressure relief valves of Class 0 shall not have internal leakage up to
WP of the pipe.
6.15.8.8.deleted
6.15.8.9.deleted
6.17.8.1.added
The pressure relief valve shall be mounted inside the container or on the
container, in the area where the fuel is in gaseous state.
6.15.9.deleted
6.17.8.2.added
The pressure relief valve shall be so designed as to open at a pressure
of 2,700 100 kPa.
6.17.8.3.added
The flow capacity of the pressure relief valve, determined with compressed air
at a pressure which is 20 per cent higher than the normal operating-pressure
shall be at least
Q 10.66 A0.82
In which:
Q= flow of air in standard m3/min (100 kPa absolute and temperature of
15 °C)
A= exterior surface of the container in m2.
The flow test results shall be corrected to standard conditions:
Air pressure of 100 kPa absolute and temperature of 15 °C.
When the pressure relief valve is considered as a pressure relief device, the
flow shall be at least 17.7 standard m3/min.
6.15.10.1.deleted
6.17.8.4.added
The pressure relief valve shall not have internal leakage up to 2,600 kPa.
6.15.10.2.deleted
6.17.8.5.added
The pressure relief device (fuse) shall be designed to open at a temperature of
120 10 °C.
6.15.10.3.deleted
6.17.8.6.added
The pressure relief device (fuse) shall be designed to have, when opened, a
flow capacity of:
Q 2.73 A
In which:
Q= flow of air in standard m3/min (100 kPa absolute and temperature of
15 °C)
A= exterior surface of the container in m2.
The flow test shall be carried out at an upstream air pressure of 200 kPa
absolute, and at temperature of 15 °C.
The flow test results shall be corrected to standard conditions:
Air pressure of 100 kPa absolute, and temperature of 15 °C.
6.15.10.4.deleted
6.17.8.7.added
The pressure relief device shall be mounted on the container in the gaseous
zone.
6.15.10.5.deleted
6.17.8.8.added
The pressure relief device shall be fitted to the container in such a manner that
it can discharge into the gas tight housing, when its presence is prescribed.
6.17.8.9.added
The pressure relief device (fuse) shall be tested according to the provisions
described in Annex 3, paragraph 7.
6.17.9.added
At minimum fuel level whereby the engine is still operating the heat build-up
by the fuel pump(s) should never cause the pressure relief valve to open.
6.15.10.6.1.deleted
6.15.10.6.2.deleted
6.17.10.1.added
The filling unit shall be equipped with at least one soft-seated non-return valve,
and it shall not be dismountable by design.
6.15.10.7.deleted
6.17.10.2.added
The filling unit shall be protected against contamination.
6.15.10.7.1.deleted
6.17.10.3.added
The design and dimensions of the connecting area of the filling unit shall
comply with those in the figures in Annex 9.
The filling unit shown in Figure 5 is only applicable for motor vehicles of
categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.
6.15.10.7.2.deleted
6.17.10.4.added
The filling unit shown in Figure 4 may also apply for motor vehicles of
categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.3
3 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document
ECE/TRANS/WP.29/78/Rev.6, para. 2.
https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
6.15.10.7.3.deleted
6.17.10.5.added
The outside filling unit is connected to the container by a hose or pipe.
6.17.10.6.added
Specific provisions regarding the K15 filling unit (Annex 9 – Figure 3):
6.15.11.1.deleted
6.17.10.6.1.added
The dead volume between the front sealing surface and the front of the non-
return valve shall not exceed 0.1 cm3;
6.15.11.2.deleted
6.17.10.6.2.added
The flow through the connector at a pressure difference of 30 kPa shall be at
least 60 litres/min, if tested with water.
6.15.12.deleted
6.17.10.7.added
Specific provisions regarding the heavy-duty vehicle Euro filling unit
(Annex 9 – Figure 5):
6.15.12.1.deleted
6.17.10.7.1.added
The dead volume between the front sealing surface and the front of the non-
return valve shall not exceed 0.5 cm3;
6.15.12.2.deleted
6.17.10.7.2.added
The flow through the filling unit, with the non-return valve mechanically
opened, at a pressure difference of 50 kPa shall be at least 200 litres/min, when
tested with water.
6.15.12.3.deleted
6.17.10.7.3.added
The Euro filling unit shall comply with the impact test as described in Annex 9,
paragraph 7.4.
6.15.13.deleted
6.17.10.8.added
The J15, K15 and heavy-duty vehicle Euro filling units shall comply with the
impact test as described in Annex 9, paragraph 7.
6.15.13.1.1.deleted
6.17.11.1.added
The device to verify the level of liquid in the container shall be of an indirect
type (for example magnetic) between the inside and outside of the container.
If the device to verify the level of liquid in the container is of a direct type, the
electric power connections should meet IP54 specifications according to
IEC EN 60529:1997-06.
6.15.13.1.2.deleted
6.17.11.2.added
If the level indicator of the container comprises a float, the latter shall
withstand an outside pressure of 3,000 kPa.
6.15.13.1.3.deleted
6.17.12.added
Provisions regarding the gas tight housing of the container.
6.17.12.1.added
450 mm2.
6.15.13.2.1.deleted
6.17.12.2.added
The gas-tight housing shall be leak-proof at a pressure of 10 kPa with the
aperture(s) closed off, maximum allowed leak rate of 100 cm 3/h vapour and
show no permanent deformation.
6.15.13.2.2.deleted
6.17.12.3.added
The gas-tight housing shall be designed to withstand a pressure of 50 kPa.
6.15.13.2.3.deleted
6.17.13.added
Provisions regarding the remotely controlled service valve with excess flow
valve.
6.15.13.2.4.deleted
6.17.13.1.1.added
In case of the service valve is combined with a LPG fuel supply pump,
identification of the pump shall be realised by the marking "PUMP INSIDE"
and the identification of the pump either on the marking plate of the LPG
container or on the multivalve if present. Electrical connections inside the LPG
container shall comply with protection degree class IP 40 according to IEC
Standard 60529-1989+A1:1999.
6.17.13.1.2.added
Service valves of Class 1 shall withstand a pressure of 6,750 kPa in the open
and closed position. Service valves of Class 0 shall withstand a pressure of
2.25 WP in the open and closed position.
6.17.13.1.3.added
The service valve shall not, at the shut-off position, allow an internal leak rate
in the flow direction. There may be leak in the back flow direction.
6.17.13.2.1.added
The excess flow valve shall be mounted inside the container.
6.17.13.2.2.added
The excess flow valve shall be designed with a bypass to allow for equalization
of pressures.
6.17.13.2.3.added
The excess flow valve shall cut off at a pressure difference over the valve of
90 kPa. At this pressure difference the flow shall not exceed 8,000 cm 3/min.
6.17.13.2.4.added
When the excess flow valve is at cut-off position, the flow through the by-pass
shall not exceed 500 cm3/min. at a differential pressure of 700 kPa.
6.17.14.1.added
When a non-return valve is intended to be fitted as a component of an
interconnected LPG-system for the purpose of paragraph 17.13.1.1., 17.13.1.2.
or 17.13.2.1., it shall be submitted, during approval, to an endurance test
according to paragraph 9.7. of Annex 16.
The valve shall bear a marking with the following data clearly legible and
indelible:
(a) The wording "ICS", and
(b) The approval mark according to paragraph 5.4. of this Regulation.
6.18.added
When intended to be fitted as components or parts of an interconnected LPG-
system, non-metallic, metallic or a mixture of metallic and non-metallic LPG
components, including flexible hoses and their elements, and non-metallic,
metallic or a mixture of metallic and non-metallic parts of LPG components
which may come into contact with petrol shall meet the requirements specified
in Annex 19 to this Regulation.
Non-metallic, metallic or a mixture of metallic and non-metallic components
or components containing non-metallic parts shall bear an approval mark
according to Annex A, Appendix 1.
7.3.changed
The competent authority Type Approval Authority issuing the extension of approval shall assign a series number to each communication form drawn up for such an extension.
9.3.changed
The minimum requirements for conformity of production control tests set forth in Annexes 8, 10 and 15 16 to this Regulation shall be complied with.
9.4.changed
The authority Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production facility. The normal frequency of these verifications shall be once every year.
9.6.changed
Every hose assembly which is applied in the high pressure class (Class 1) according to the classification as prescribed in paragraph 2. of this Regulation, shall, during half a minute, be subjected to a test with gas under a pressure of 3,000 kPa. kPa by the approval holder.
9.6.1.changed
Every hose assembly which is applied in the high pressure class (Class 0) according to the classification as prescribed in paragraph 2. of this Regulation, shall, during half a minute, be subjected to a test with gas under a pressure of the declared WP. WP by the approval holder.
11.1.changed
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall refuse to grant ECE approval under this Regulation as amended by the 01 series of amendments.
11.2.changed
As from 3 months after the official date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation shall grant ECE approvals only if the type of component to be approved meets the requirements of this Regulation as amended by the 01 series of amendments.
11.6.added
As from 1 September 2022, Contracting Parties applying this Regulation may
refuse the sale of a type of component which does not meet the requirements
of the 02 series of amendments to this Regulation, unless the component is
intended as a replacement for fitting on vehicles in use.
12.changed
If the holder of the approval completely ceases to manufacture a type of equipment approved in accordance with this Regulation, he shall so inform the authority Type Approval Authority which granted the approval. Upon receiving the relevant communication, that authority Authority shall inform thereof the other Contracting Parties to the Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2B to this Regulation.
13.changed
Names and addresses of Technical Services responsible for conducting approval tests, and of Type Approval Authorities The Contracting Parties to the Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the Technical Services responsible for conducting approval tests and of the Type Approval Authorities which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval, issued in other countries, are to be sent. Part II - Approval of vehicles of category categories M and N fitted with specific equipment for the use of liquefied petroleum gases in their propulsion system with regard to the installation of such equipment
14.1.3.added
"Commanded stop phase" defines the period of time during which the
combustion engine is switched off automatically for fuel saving and is allowed
to start again automatically.
15.3.changed
A vehicle representative of the vehicle type to be approved, approved shall be submitted to the Technical Service conducting the approval tests.
16.2.changed
An approval number shall be assigned to each type of vehicle approved. Its first two digits shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue approved in accordance with Schedule 4 of the approval. Agreement (E/ECE/TRANS/505/Rev.3).
16.4.1.changed
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval4. approval.4
16.4.2.changed
The number of this Regulation, followed by the letter "R", a dash and the approval number to the right of the circle prescribed in paragraph 16.4.1. above.
16.5.changed
Regulations annexed to the Agreement, in the country which has granted approval under this Regulation, the symbol prescribed in paragraph 16.4.1. above need not be repeated; in such case, the Regulation and approval numbers and the additional symbols of all the Regulations under which approval has 4 The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.6 https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions been granted in the country which has granted approval under this Regulation shall be placed in vertical columns to the right of the symbol prescribed in paragraph 16.4.1. above.
17.1.8.deleted
17.1.8.1.deleted
17.1.2.1.added
Notwithstanding the provisions of paragraph 17.1.2. above, if the LPG
electronic control unit is integrated into the engine electronic control unit and
is covered with a vehicle installation type approval according to Part II of this
Regulation and to Regulation No. 10, no separate type approval of the LPG
electronic control unit is necessary. The vehicle type approval shall also be
approved pursuant to the applicable provisions laid down in Annex 14 to this
Regulation.
17.2.2.deleted
17.1.5.changed
The LPG-system LPG system shall show no leaks. The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.2/Amend.1.
17.1.6.changed
The LPG-system LPG system shall be installed such that is has the best possible protection against damage, such as damage due to moving vehicle components, collision, grit or due to the loading or unloading of the vehicle or the shifting of those loads.
17.1.6.1.added
Notwithstanding the provisions of paragraph 17.1.6., it shall be possible to
make an external inspection (e.g. for periodic technical inspection) of the LPG-
container and its accessories, when located outside the vehicle, according to
the specifications of the manufacturer, without the use of tools to dismantle,
but with visual aids, e.g. lamps, mirrors or endoscopes.
17.1.7.changed
No appliances shall be connected to the LPG-system LPG system other than those strictly required for the proper operation of the engine of the motor vehicle.
17.1.7.1.changed
Notwithstanding the provisions of paragraph 17.1.7., 17.1.7. above, motor vehicles of categories M2, M3, N2, N3 and M1 having either a maximum total mass > 3500 kg or a body type SA1 5, may be fitted with a heating system to heat the passenger compartment which is connected to the LPG-system. LPG system.
17.1.7.2.changed
The heating system referred to in paragraph 17.1.7.1. above shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the heating system is adequately protected and the required operation 5 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.6, para. 2. https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions of the normal LPG-system LPG system is not affected.
17.1.7.3.changed
Notwithstanding the provisions of paragraph 17.1.7., 17.1.7. above, a mono-fuel vehicle without limp-home system may be equipped with a service coupling in the LPG-system. LPG system.
17.1.7.4.changed
The service coupling referred to in paragraph 17.1.7.3. above shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the service coupling is adequately protected and the required operation of the normal LPG-system LPG system is not affected. The service coupling must shall be combined with a separate gas-tight non-return valve whereby it is only possible to operate the engine.
17.3.1.6.deleted
17.1.7.5.changed
Mono-fuel vehicles installed with a service coupling shall carry a sticker near the service coupling as specified in Annex 17 18 to this Regulation.
17.1.8.2.changed
17.2.1.changed
No component of the LPG-system, LPG system, including any protective materials which form part of such components, shall project beyond the external surface of the vehicle, with the exception of the filling unit if this does not project more than 10 mm beyond the nominal line of the body panel.
17.2.2.added
With the exception of the LPG fuel container, in no cross section of the vehicle
any component of the LPG system, including any protective material which
forms part of such components, may extend beyond the lower edge of the
vehicle unless another part of the vehicle, within a radius of 150 mm is situated
lower.
17.2.3.changed
No component of the LPG-system LPG system shall be located within 100 mm of the exhaust or similar heat source, unless such components are adequately shielded against heat.
17.3.1.changed
An LPG-system LPG system shall contain at least the following components:
17.3.1.10.changed
Gas-carrying connections between the LPG-system LPG system components; 6 These components might not be necessary in case of liquid LPG injection.
17.3.2.1.changed
17.3.3.changed
The container fittings referred to in paragraphs 17.3.1.2. to 17.3.1.5. above may be combined.
17.3.4.changed
The remotely controlled shut-off valve referred to in paragraph 17.3.1.7. above may be combined with the pressure regulator/vaporizer. These components might not be necessary in case of liquid LPG injection.
17.3.5.changed
Additional components required for the effective operation of the engine may be installed in that part of the LPG-system LPG system where the pressure is less than 20 kPa.
17.4.5.1.changed
The provisions of paragraph 17.4.5. above shall not apply if the container is adequately protected, at the front and the sides and no part of the container is located lower than this protective structure.
17.4.6.changed
The fuel container(s) must shall be mounted and fixed so that the following accelerations can be absorbed (without damage occurring) when the containers are full: Vehicles of categories M1 and N1: (a) 20 g in the direction of travel; (b) 8 g horizontally perpendicular to the direction of travel. Vehicles of categories M2 and N2: (a) 10 g in the direction of travel; (b) 5 g horizontally perpendicular to the direction of travel. Vehicles of categories M3 and N3: (a) 6.6 g in the direction of travel; (b) 5 g horizontally perpendicular to the direction of travel. A calculation method can be used instead of practical testing if its equivalence can be demonstrated by the applicant for approval to the satisfaction of the Technical Service.
17.7.2.deleted
17.6.1.3.changed
Notwithstanding the provision of paragraph 17.6.1.2., 17.6.1.2.above , in case of liquid injection systems, if a fuel recirculation is required to purge the system from gas bubbles (vapour lock), it is allowed to keep the remotely controlled service valve with excess flow valve open for a period not longer than 10 seconds before starting the engine in LPG running mode.
17.7.3.deleted
17.6.1.4.added
Notwithstanding the provisions of paragraph 17.6.1.2. above, the remotely
controlled service valve may stay in an open position during the commanded
stop phases.
17.7.4.deleted
17.6.1.5.added
If the remotely controlled service valve is closed during commanded stop
phases, the valve shall comply with paragraph 4.7. of Annex 3.
17.7.5.deleted
17.7.6.deleted
17.6.2.1.changed
The spring-loaded pressure relief valve shall be installed in the fuel container in such a manner that it is connected to the vapour space and can discharge to the surrounding atmosphere. The spring-loaded pressure relief valve may discharge into the gas-tight housing if that gas-tight housing fulfils the requirements of paragraph 17.6.5. below.
17.7.7.deleted
17.7.8.deleted
17.7.9.deleted
17.7.10.deleted
17.8.1.deleted
17.6.5.1.changed
A gas-tight housing over the container fittings, which fulfils the requirements of paragraphs 17.6.5.2. to 17.6.5.5. below shall be fitted to the fuel container, unless the container is installed outside the vehicle and the container fittings are protected against dirt and water.
17.8.2.deleted
17.8.3.deleted
17.8.4.deleted
17.8.5.deleted
17.8.6.deleted
17.8.7.deleted
17.8.8.deleted
17.7.1.changed
Gas tubes shall be of seamless type made of seamless material: either copper or stainless steel or steel with corrosion-resistant coating.
17.8.8.1.deleted
17.7.1.1.added
If seamless copper is used the tube shall be protected by a rubber or plastic sleeve.
17.8.8.2.deleted
17.7.1.2.added
The outer diameter of Class 1 gas tubes made of copper shall not exceed 12
mm with a wall thickness of at least 0.8 mm, gas tubes of Class 1 from steel
and stainless steel shall not exceed 25 mm with, for gas services, an appropriate
wall thickness.
17.9.1.deleted
17.7.1.added
shall comply with the applicable tests according to the provisions of
17.9.2.deleted
17.9.3.deleted
17.7.3.added
Gas tubes of non-seamless type shall comply with the applicable tests according
to the provisions of Annex 15.
17.9.4.deleted
17.7.4.added
Gas pipes made of a non-metallic material shall comply with the requirements
of this Regulation, paragraph 6.7.
17.9.5.deleted
17.7.5.added
The gas tube may be replaced by a gas hose if this hose fulfils the requirement
of this Regulation, paragraph 6.7.
17.7.6.added
Gas tubes, other than non-metallic gas tubes, shall be secured such that they
shall not be subjected to vibration or stresses.
17.10.1.deleted
17.7.7.added
Gas hoses and non-metallic gas tubes shall be secured such that they shall not
be subjected to stresses.
17.10.2.deleted
17.7.8.added
At the fixing point the gas tube or hose shall be fitted with a protective material.
17.7.9.added
Gas tubes or hoses shall not be located at jacking points.
17.11.1.deleted
17.7.10.added
sleeve, shall be fitted with protective material.
17.11.1.1.deleted
17.11.2.deleted
17.8.1.added
Soldered or welded joints and bite-type compression joints are not permitted.
Soldering or welding can be permitted for connecting the individual parts of
detachable couplings to the gas tube or component.
17.11.3.deleted
17.8.2.added
Gas tubes shall only be connected by compatible fittings with regard to
corrosion.
17.11.4.deleted
17.8.3.added
Stainless steel tubes shall only be joined by stainless steel fittings.
17.8.4.added
Distributing-blocks shall be made of corrosion-resistant material.
17.11.7.deleted
17.8.5.added
Gas tubes shall be connected by appropriate joints, for example, two-part
compression joints in steel tubes and joints with olives tapered on both sides
or two flanges in copper tubes. Gas tubes shall be connected with appropriate
connections. Under no circumstances couplings may be used whereby the
tube will be damaged. The burst pressure of the mounted couplings shall be
the same or higher as specified for the tube.
17.8.6.added
The number of joints shall be limited to a minimum.
17.12.1.deleted
17.8.7.added
Any joints shall be made in locations where access is possible for inspection.
18.deleted
17.8.8.added
In a passenger compartment or enclosed luggage compartment the gas tube or
hose shall be no longer than reasonably required; this provision is fulfilled
when the gas tube or hose does not extend further than from the fuel container
to the side of vehicle.
18.1.deleted
17.8.8.1.added
There shall be no gas-conveying connections in the passenger compartment or
enclosed luggage compartment with the exception of:
(a) The connections on the gas-tight housing; and
(b) The connection between the gas tube or hose and the filling unit if this
connection is fitted with a sleeve which is resistant against LPG and any
leaking gas will be discharged directly into the atmosphere.
18.2.deleted
17.8.8.2.added
The provisions of paragraph 17.8.8. and paragraph 17.8.8.1. above shall not
apply for M2 or M3 category vehicles if the gas tubes or hoses and connections
are fitted with a sleeve which is resistant against LPG and which has an open
connection to the atmosphere. The open end of the sleeve or ducting shall be
situated at the lowest point.
18.3.deleted
17.9.1.added
A remotely controlled shut-off valve shall be installed in the gas tube from the
LPG container to the pressure regulator/vaporizer, as close as possible to the
pressure regulator/vaporizer.
19.1.deleted
17.9.2.added
The remotely controlled shut-off valve may be incorporated into the pressure
regulator/vaporizer.
19.2.deleted
17.9.3.added
Notwithstanding the provisions of paragraph 17.9.1. above, the remotely
controlled shut-off valve may be installed at a location in the engine bay
specified by the manufacturer of the LPG system if a fuel return system is
provided between the pressure regulator and the LPG container.
20.deleted
17.9.4.added
The remotely controlled shut-off valve shall be installed such that the fuel
supply is cut off when the engine is not running or, if the vehicle is also
equipped with another fuel system, when the other fuel is selected. A delay of
2 seconds is permitted for diagnostic purposes.
20.1.deleted
17.9.5.added
Notwithstanding the provision of paragraph 17.9.4. above, in case of liquid
injection systems, if a fuel recirculation is required to purge the system from
gas bubbles (vapour lock), it is allowed to keep the remotely controlled shut-
off valve open for a period not longer than 10 seconds before starting the
engine in LPG running mode and during the fuel switching-over.
20.1.1.deleted
17.9.6.added
Notwithstanding the provisions of paragraph 17.9.4. above, the remotely
controlled shut-off valve may stay in an open position during the commanded
stop phases.
20.1.2.deleted
17.9.7.added
If the remotely controlled shut-off valve is closed during commanded stop
phases, the valve shall comply with paragraph 1.7. of Annex 7.17.10. Filling
unit
20.2.deleted
17.10.1.added
The filling unit shall be secured against rotation and shall be protected against
dirt and water.
20.3.deleted
17.10.2.added
When the LPG container is installed in the passenger compartment or an
enclosed (luggage) compartment, the filling unit shall be located at the outside
of the vehicle.
21.deleted
22.deleted
17.11.1.added
The electrical components of the LPG system shall be protected against
overloads and at least one separate fuse shall be provided in the supply cable.
22.1.deleted
17.11.1.1.added
The fuse shall be installed in a known location where it can be reached without
the use of tools.
22.2.deleted
17.11.2.added
The electrical power to LPG system components which also carry gas may not
be conducted by a gas tube.
22.3.deleted
17.11.3.added
All electrical components installed in a part of the LPG system where the
pressure exceeds 20 kPa shall be connected and insulated in a manner that no
current is led through LPG containing parts.
22.4.deleted
17.11.4.added
Electrical cables shall be adequately protected against damage. The electrical
connections inside the boot and passengers compartment shall comply with
protection degree class IP 40 according to IEC Standard 60529-
1989+A1:1999. All other electrical connections shall comply with protection
degree class IP 54 according to IEC Standard 60529-1989+A1:1999.
22.5.deleted
23.deleted
17.11.6.added
The electrical connections and components in the gas-tight housing shall be
constructed such that no sparks are generated.
1.deleted
17.12.1.added
The pressure relief device shall be fitted to the fuel container(s) in such a
manner that it can discharge into the gas tight housing, when its presence is
prescribed, if that gas tight housing fulfils the requirements of
paragraph 17.6.5. above.
17.13.1.1.added
Means shall be provided to prevent any flow of LPG into the diesel tank. The
installation of two non-return valves along the flow line shall be considered as
meeting this requirement if the valves comply with the provisions of paragraph
1.2.4.5.1.deleted
17.13.1.2.added
Means shall be provided to prevent any flow of diesel into the LPG container.
The installation of two non-return valves along the flow line shall be
considered as meeting this requirement if the valves comply with the
provisions of paragraph 6.17.14.1.
17.13.2.1.added
Means shall be provided to prevent any flow of LPG into the petrol tank. The
installation of two non-return valves along the flow line shall be considered as
meeting this requirement if the valves comply with the provisions of paragraph
17.13.2.2.added
In order to prevent that flows of petrol into LPG container, occurring during
switch-over operations, could lead to an overfilling of the LPG tank (i.e. above
80 per cent of its capacity which means 80 per cent liquid and 20 per cent
gaseous fuel), the LPG-system shall contain an Electronic Control Unit
complying also with paragraph 6. of Annex 14.
A remotely controlled shut-off valve complying with the provisions of
paragraph 6.17.3.3. shall be installed along the flow line.
17.13.2.3.added
Means shall be provided to prevent that flows of petrol into the LPG fuel
container could lead to a content of petrol higher than 16 per cent of the actual
volume contained in the LPG tank.
This measure shall be demonstrated in accordance with the procedures laid
down in Annex 20.
The present requirement shall be fulfilled also in case of faults by use of a
malfunction indication to the driver, and optionally activation of limp home
mode.
17.13.2.4.added
Non-metallic, metallic or a mixture of metallic and non-metallic LPG
components, including flexible hoses and their elements, and non-metallic,
metallic or a mixture of metallic and non-metallic parts of LPG components
which may come into contact with petrol shall comply with the requirements
set out in paragraph 6.18.
17.13.2.5.added
The ECU complying with the requirements of paragraph 17.13.2.2. shall be
installed:
(a) In vehicles where the flushed volume is less than or equal to 0.4 litre;
and
(b) In vehicles equipped with a LPG container having a capacity higher than 20 litres.
18.added
The conformity of production procedures shall comply with those set out in
the Agreement, Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2) with the
following requirements:
18.1.added
All vehicles approved under this Regulation shall be so manufactured as to
conform to the type approved by meeting the requirements of paragraph 17.
above.
18.2.added
In order to verify that the requirements of paragraph 18.1. above are met,
suitable controls of the production shall be carried out.
1.2.4.5.7.6.deleted
18.3.added
The Type Approval Authority which has granted type approval may at any
time verify the conformity control methods applied in each production facility.
The normal frequency of these verifications shall be once every year.
19.1.added
The approval granted in respect of a type of vehicle pursuant to this Regulation
may be withdrawn if the requirements laid down in paragraph 18. above are
not complied with.
19.2.added
If a Contracting Party to the Agreement applying this Regulation withdraws an
approval it has previously granted, it shall forthwith so notify the other
Contracting Parties applying this Regulation, by means of a communication
form conforming to the model in Annex 2D to this Regulation.
20.added
Modification and extension of approval of a vehicle
type
20.1.added
Every modification of the installation of the specific equipment for the use of
liquefied petroleum gases in the propulsion system of the vehicle shall be
notified to the Type Approval Authority which approved the vehicle type. That
Type Approval Authority may then either:
20.1.1.added
Consider that the modifications made are unlikely to have an appreciably
adverse effect and that in any case the vehicle still complies with the
requirements; or
20.1.2.added
Require a further test report from the Technical Service responsible for
conducting the tests.
20.2.added
Confirmation or refusal of approval, specifying the alteration, shall be
communicated by the procedure specified in paragraph 16.3. above to the
Parties to the Agreement applying this Regulation.
20.3.added
The Type Approval Authority issuing the extension of approval shall assign a
series number for such an extension and inform thereof the other Contracting
Parties to the 1958 Agreement applying this Regulation by means of a
communication form conforming to the model in Annex 2D to this Regulation.
21.added
If the holder of the approval completely ceases to manufacture a type of vehicle
approved in accordance with this Regulation, he shall so inform the Type
Approval Authority which granted the approval. Upon receiving the relevant
communication, that Authority shall inform thereof the other Contracting
Parties to the Agreement applying this Regulation by means of a
communication form conforming to the model in Annex 2D to this Regulation.
22.added
Transitional provisions regarding the installation of
various components of the LPG equipment and the
type approval of a vehicle fitted with specific
equipment for the use of liquefied petroleum gas in
its propulsion system with regard to the installation
of such equipment
22.1.added
As from the official date of entry into force of the 01 series of amendments to
this Regulation, no Contracting Party applying this Regulation shall refuse to
grant approval under this Regulation as amended by the 01 series of
amendments.
1.2.4.5.11.deleted
22.2.added
As from the official date of entry into force of the 01 series of amendments to
this Regulation, no Contracting Party applying this Regulation shall prohibit
the fitting on a vehicle and the use as first equipment of a component approved
under this Regulation as amended by the 01 series of amendments.
22.3.added
During the period of 12 months after the date of entry into force of the 01 series
of amendments to this Regulation, Contracting Parties applying this
Regulation may allow the use of as first equipment of a type of component
approved to this Regulation in its original form, when fitted on a vehicle
transformed for LPG propulsion.
1.2.4.5.13.deleted
22.4.added
Upon the expiration of a period of 12 months after the date of entry into force
of the 01 series of amendments to this Regulation, Contracting Parties applying
this Regulation shall prohibit the use as first equipment of a component which
does not meet the requirements of this Regulation as amended by the 01 series
of amendments, when fitted on a vehicle transformed for LPG propulsion.
1.2.4.5.14.deleted
22.5.added
Upon the expiration of a period of 12 months after the date of entry into
force of the 01 series of amendments to this Regulation, Contracting Parties
applying this Regulation may refuse first National Registration (first entry
into service) of a vehicle which does not meet the requirements of this
Regulation as amended by the 01 series of amendments.
1.2.4.5.15.deleted
22.6.added
As from the official date of entry into force of the 02 series of amendments,
no Contracting Party applying this Regulation shall refuse to grant or refuse
to accept type approvals under this Regulation as amended by the 02 series
of amendments.
1.2.4.5.16.deleted
22.7.added
As from 1 September 2020, Contracting Parties applying this Regulation shall
not be obliged to accept type approvals to the preceding series of amendments,
first issued after 1 September 2020.
1.2.4.5.17.deleted
22.8.added
Until 1 September 2021, Contracting Parties applying this Regulation shall
accept type approvals to the preceding series of amendments, first issued
before 1 September 2020.
1.2.4.5.19.deleted
22.9.added
As from 1 September 2021, Contracting Parties applying this Regulation shall
not be obliged to accept type approvals issued to the preceding series of
amendments to this Regulation.
1.2.4.5.19.1.deleted
22.10.added
Notwithstanding paragraph 22.9., Contracting Parties applying the Regulation
shall continue to accept type approvals of the equipment/parts issued according
to the preceding series of amendments to the Regulation.
1.2.4.5.19.2.deleted
22.11.added
Notwithstanding paragraph 22.9., Contracting Parties applying this Regulation
shall continue to accept type approvals issued according to the preceding series
of amendments to this Regulation, for the vehicles/vehicle systems which are
not affected by the changes introduced by the 02 series of amendments.
22.12.added
Contracting Parties applying this Regulation shall not refuse to grant type
approvals according to any preceding series of amendments to this Regulation
or extensions thereof.
1.2.5.1.deleted
22.13.added
As from 1 September 2021, Contracting Parties applying this Regulation may
refuse national or regional type-approval and may refuse first registration of a
vehicle type, if the vehicle type is affected by the changes introduced by the
02 series of amendments but does not meet the requirements of the 02 series
of amendments to this Regulation.
22.14.added
As from the official date of entry into force of the 03 series of amendments,
no Contracting Party applying this Regulation shall refuse to grant or refuse
to accept type approvals under this Regulation as amended by the 03 series of
amendments.
22.15.added
As from 1 September 2021, Contracting Parties applying this Regulation
shall not be obliged to accept type approvals to the preceding series of
amendments, first issued after 1 September 2021.
22.16.added
Until 1 September 2022, Contracting Parties applying this Regulation shall
accept type approvals to the preceding series of amendments, first issued
before 1 September 2021.
22.17.added
As from 1 September 2022, Contracting Parties applying this Regulation
shall not be obliged to accept type approvals issued to the preceding series of
amendments to this Regulation.
22.18.added
Regulation shall continue to accept UN type-approvals issued according to the
preceding series of amendments to the UN Regulation, for the vehicles /
vehicle systems / vehicle components which are not affected by the changes
introduced by the 03 series of amendments.
22.19.added
As from the official date of entry into force of the 04 series of amendments,
no Contracting Party applying this Regulation shall refuse to grant or refuse
to accept type approvals under this Regulation as amended by the 03 series of
amendments.
22.20.added
As from 1 September 2023, Contracting Parties applying this Regulation
shall not be obliged to accept type approvals to the preceding series of
amendments, first issued after 1 September 2023.
22.21.added
Until 1 September 2025, Contracting Parties applying this Regulation shall
accept type approvals to the preceding series of amendments, first issued
before 1 September 2023.
6.deleted
22.22.added
As from 1 September 2025, Contracting Parties applying this Regulation
shall not be obliged to accept type approvals issued to the preceding series of
amendments to this Regulation.
22.23.added
Regulation shall continue to accept UN type-approvals issued according to the
preceding series of amendments to the UN Regulation, for the vehicles /
vehicle systems / vehicle components which are not affected by the changes
introduced by the 04 series of amendments.
23.added
Names and addresses of Technical Services
responsible for conducting approval tests, and of
Type Approval Authorities
The Parties to the Agreement applying this Regulation shall communicate to
the United Nations Secretariat the names and addresses of the Technical
Services responsible for conducting approval tests and of the Type Approval
Authorities which grant approval and to which forms certifying approval or
extension or refusal or withdrawal of approval, issued in other countries, are
to be sent.
1.1.1.added
Manufacturer's engine code(s) (as marked on the engine or other means of
1.2.changed
1.2.4.5.3.added
1 Specify the tolerance.
2 Strike out what does not apply.
1.2.4.5.8.1.changed
80 % per cent stop valve:
1.2.4.5.10.changed
Shut-off valve/Non-return valve/Gas tube pressure relief valve: yes/no1 yes/no2
1.2.4.5.20.added
Seamless gas tubes made of materials other than copper, stainless steel and
steel with corrosion-resistant coating and their couplings
1.2.4.5.21.added
Further documentation:
1.2.4.5.21.1.added
Description of the LPG equipment and the physical safeguarding of the
catalyst at switch-over from petrol to LPG or back
1.2.4.5.21.2.added
System lay-out (electrical connections, vacuum connections compensation
hoses, etc.)
1.2.7.added
Documentation of the provisions for interconnected LPG systems (Annex 20):
Annex 2A
Arrangement of the LPG equipment type approval mark
(See paragraph 5.4. of this Regulation)
a 5 mm
1 Class 0, 1, 2, 2A or 3.
Indication mark of technical modification
to be marked only on multivalve or, when
approved separately, on pressure relief valve
(discharge valve) and pressure relief device.
The above approval mark affixed to the LPG equipment shows that this equipment has been
approved in the Netherlands (E 4), pursuant to UN Regulation No. 67 under approval
number 032439. The first two digits of the approval number indicate that the approval was
granted in accordance with the requirements of UN Regulation No. 67 as amended by the
03 series of amendments. The indication mark of technical modification (A in the example),
preceded by the star symbol, is required only for the approval mark of the accessories of the
container (multivalve or, when approved separately, pressure relief valve (discharge valve)
and pressure relief device,).
Annex 2A - Appendix
Arrangement of the type-approval mark of non-metallic, metallic or a mixture of metallic and
non-metallic LPG components and LPG components containing non-metallic, metallic or a
mixture of metallic and non-metallic parts compatible with petrol. The letter N indicates non-
metallic components. The letter M indicates metallic components. The letters NM indicates
a combination of metallic…
1.changed
14.changed
The documents filed with the application or extension of approval can be obtained upon request. Annex 2B - Appendix Annex 2B - Appendix (Containers only) Containers only
Table 1changed
No. Item Type Approval No. Extension No. Indication mark(s)1 a 80 per cent stop valve b Level indicator c Pressure relief valve d Remotely controlled service valve with excess valve e Fuel pump f Multi-valve g Gas-tight housing h Power supply bushing i Non return valve j Pressure relief device 1 The indication marks of technical modification apply only to Multivalve, or, when approved separately, to Pressure relief valve (discharge valve) and Pressure relief device.
Table 2changed
No. Type Diameter/height [mm] Capacity [L] External Configuration of surface[cm2] accessories [codes]1 Code 00 and, if applicable, same code(s) from Table 3. Annex 2B - Appendix
Table 3changed
No. Accessories Type Approval No. Extension Configuration of No. accessories [code] a b c d Annex 2C Annex 2C Arrangement of approval marks Model A (See paragraph 16.4. of this Regulation) 67 R—012439 R—032439 a 8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of specific equipment for the use of LPG for propulsion, been approved in the Netherlands (E4), (E 4), pursuant to Regulation No. 67 under approval number 012439. 032439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 03 series of amendments. Model B (See paragraph 16.4. of this Regulation) 67 012439 032439 83 041628 a 8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of specific equipment for the use of LPG for propulsion, been approved in the Netherlands (E4), (E 4), pursuant to Regulation No. 67 under approval number 012439. 032439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 03 series of amendments and that Regulation No. 83 included the 04 series of amendments. Annex 2D Annex 2D Communication (Maximum format: A4 (210 x 297 mm)) issued by : Name of administration: concerning2: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a vehicle type with regard to the installation of LPG systems pursuant to Regulation No. 67
17.changed
The following documents filed with the application or extension of approval can be obtained upon request. 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation.) 2 Strike out what does not apply. Drawings, diagrams and scheme plans regarding the components and the installation of the LPG equipment considered to be of importance for the purpose of this Regulation; Where applicable drawings of the various equipment and their position in the vehicle.
1.1.changed
Definition: see See paragraph 2.5.1. of this Regulation.
1.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. Operational test tests Annex 15, 16, para. 10. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
2.3.changed
Classification pressure: 3,000 kPa. Annex 3
2.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
3.added
Pressure relief valve (discharge valve) and components connecting the
pressure relief valve with the gaseous phase inside the LPG container
3.1.changed
Definition: see See paragraph 2.5.3. of this Regulation.
3.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 200 operation cycles) Operational test Annex 15, 16, para. 10. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 1.6.** 16.** Test on non-metallic material inside a container Annex 16, para. 18.**
4.2.changed
4.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. Operational test Annex 15, 16, para. 10 LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** Annex 3
4.7.added
If the remotely controlled service valve is closed during commanded stop
phases, the valve shall be submitted to the following numbers of operations
during the endurance test of paragraph 9. of Annex 16:
(a) 200,000 cycles (mark "H1") if the engine shuts off automatically when
the vehicle comes to a halt.
(b) 500,000 cycles (mark "H2") if, in addition to (a), the engine also shuts
off automatically when the vehicle drives with the electric motor only.
(c) 1,000,000 cycles (mark "H3") if, in addition to (a) or (b), the engine also
shuts off automatically when the accelerator pedal is released.
Notwithstanding the above-mentioned provisions, the valve complying with
(b) shall be deemed to satisfy (a), and the valve complying with (c) shall be
deemed to satisfy (a) and (b).
5.2.changed
Component classification (according to Figure 1, para. 2.): Class 0 for the part which is in contact with liquid LPG at a pressure > 3,000 kPa; Class 1 or Class 0. for the part which is in contact with liquid LPG at a pressure ≤ 3,000 kPa.
5.4.changed
5.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
6.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. (at 50 kPa) External leakage Annex 15, 16, para. 5. (at 10 kPa) High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7.
7.added
Provisions regarding the approval of the pressure relief device (fuse) and
components connecting the pressure relief device with the gaseous phase
inside the LPG container.
7.6.changed
Test procedures to be applied: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat (if any) leakage Annex 15, 16, para. 8. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycles Annex 15, 16, para. 16.** Test on non-metallic material inside a container Annex 16, para. 18.**
7.7.changed
Pressure relief device (fuse) specified by the manufacturer shall be shown to be compatible with the service conditions by means of the following tests: (a) One specimen shall be held at a controlled temperature of not less than 90 °C and a pressure not less than test pressure (3,000 kPa) for 24 hours. At the end of this test there shall be no leakage or visible sign of extrusion of any fusible metal used in the design. (b) One specimen shall be fatigue tested at a pressure cycling rate not to exceed 4 cycles per minute as follows: (i) Held at 82 °C while pressured for 10,000 cycles between 300 and 3,000 kPa; Annex 3 (ii) Held at -20 °C while pressured for 10,000 cycles between 300 and 3,000 kPa. At the end of this test there shall be no leakage, or any visible sign of extrusion of any fusible metal used in the design. (c) Exposed brass pressure retaining components of pressure relief device shall withstand, without stress corrosion cracking, a mercurous nitrate test as described in ASTM B154***. The pressure relief device shall be immersed for 30 minutes in an aqueous mercurous nitrate solution containing 10 g of mercurous nitrate and 10 ml of nitric acid per litre of solution. Following the immersion, the pressure relief device shall be leak tested by applying an aerostatic pressure of 3,000 kPa for one minute during which time the component shall be checked for external leakage. Any leakage shall not exceed 200 cm3/h. (d) Exposed stainless steel pressure retaining components of pressure relief device shall be made of an alloy type resistant to chloride induced stress corrosion cracking. ___________ * Only for metallic parts. ** Only for non-metallic parts. *** This procedure, or other equivalent, is allowed until an international standard will be available.
Annex 4changed
1 Definition: see See paragraph 2.5.5. of this Regulation.
6.1.changed
Fuel pump mounted inside the container: LPG compatibility Annex 15, 16, para. 11.**
6.2.changed
Fuel pump mounted outside the container: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** ____________ * Only for metallic parts. ** Only for non-metallic parts. Annex 5
1.changed
Definition: see See paragraph 2.14. of this Regulation.
6.1.changed
For parts of Class 1: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
6.2.changed
For parts of Class 2 and/or 2A: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.** _________________ * Only for metallic parts. ** Only for non-metallic parts.
1.changed
Definition: Vaporizer: see See paragraph 2.6. of this Regulation. Pressure regulator: see paragraph 2.7. of this Regulation.
6.1.changed
For parts of Class 1: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Annex 6 Seat leakage Annex 15, 16, para. 8. Endurance (Number of cycles shall be 50,000 cycles) Annex 15, 16, para. 9. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
6.2.changed
For parts of Class 2 and/or 2A: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Remarks: The shut-off valve can be integrated in the vaporizer, regulator, in this case Annex 7 is also applicable. The parts of the pressure regulator/vaporizer (Class 1, 2 or 2A) shall be leakproof leak proof with the outlet(s) of that part closed off. For the overpressure test all the outlets including those of the coolant compartment shall be closed off. __________________ * Only for metallic parts. ** Only for non-metallic parts.
1.1.changed
Definition: see See paragraph 2.8. of this Regulation.
1.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
1.7.added
If the remotely controlled shut-off valve is closed during commanded stop
phases, the valve shall be submitted to the numbers of operations according to
paragraph 4.7. of Annex 3 during the endurance test of paragraph 9. of Annex
1.8.added
If a remotely controlled shut-off valve is used in an interconnected LPG-
system, the provisions of paragraph 6.17.3.3. shall apply.
2.1.changed
Definition: see See paragraph 2.5.9. of this Regulation.
2.3.changed
Classification pressure: 3,000 kPa. Annex 7
2.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
2.7.added
If a non-return valve is used in accordance with paragraph 6.17.14.1.
(interconnected LPG-system), the provisions set out in that paragraph shall
apply.
3.1.changed
Definition: see See paragraph 2.9. of this Regulation.
3.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 200 operation cycles) LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
4.1.changed
Definition: see See paragraph 2.17. of this Regulation.
4.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 6,000 operation cycles) LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** __________________ * Only for metallic parts. ** Only for non-metallic parts. Annex 8
1.1.2.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +80 °C. For operating temperatures exceeding the above- mentioned above-mentioned values, the test temperatures must shall be adapted.
1.1.3.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
1.2.1.changed
The hose must shall embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s).
1.2.3.changed
The lining and the cover must shall be smooth and free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
1.4.2.1.changed
The test has to be performed in compliance with standard ISO 1431/1. Annex 8
1.5.1.1.changed
A hose at a free length of 1 m has to be connected to a container filled with liquid propane, having a temperature of 23 °C 2 °C.
1.5.2.2.changed
Test-temperature: -25 °C 3 °C.
1.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test- pressure test-pressure as mentioned in paragraph 1.5.5.2. below.
1.5.4.3.changed
The testing machine (see Figure 1) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of c.a. 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be as indicated in paragraph 1.5.4.2. above. The longitudinal median planes of both wheels must shall be in the same vertical plane and the distance between the wheel-centres must shall be in accordance with paragraph 1.5.4.2. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
1.5.4.4.changed
The hose shall be S-shape-like installed over the wheels (see Figure 1). The end that runs over the upper wheel shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
1.6.1.changed
The couplings shall be made from steel or brass and the surface must shall be corrosion-resistant.
1.6.2.changed
The couplings must shall be of the crimp-fitting type.
1.6.2.1.changed
The swivel-nut must shall be provided with U.N.F. thread.
1.6.2.2.changed
The sealing cone of swivel-nut type must shall be of the type with a half vertical angle of 45 °. 45°.
2.7.2.1.deleted
2.7.2.2.deleted
1.7.1.changed
The construction of the couplings must shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant corrosion-resistant material.
2.7.2.3.deleted
1.7.2.2.changed
The hose has to be subjected to 150,000 impulses. Annex 8
1.7.2.3.changed
After the impulse test the hose has to withstand the test-pressure as mentioned in paragraph 1.5.5.2. above.
1.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
2.1.2.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +125 °C. For operating temperatures exceeding the above- mentioned values, the test temperatures must shall be adapted.
2.2.1.changed
The hose must shall embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s).
2.2.3.changed
The lining and the cover must shall be smooth and free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
2.4.2.3.changed
No cracking of the test pieces is allowed. Annex 8
2.5.3.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test pressure as mentioned in paragraph 2.5.4.2. 2.5.3.2
2.5.3.3.changed
The testing machine (see Figure 2) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of c.a. 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be as indicated in paragraph 2.5.3.2. above. The longitudinal median planes of both wheels must shall be in the same vertical plane and the distance between the wheel-centres must shall be in accordance with paragraph 2.5.3.2. above. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
2.5.3.4.changed
The hose shall be S-shape-like installed over the wheels (see Figure 2). The end that runs over the upper wheel shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
2.6.3.changed
The couplings must shall be of the crimp-fitting type.
2.7.1.changed
If hose and couplings are not assembled by the approval holder, the approval shall consist of: (a) Hose; (b) Couplings; and (c) Assembly instruction. The construction assembly instruction shall be written in the language of the country to which the type of hose or couplings must will be such, that it is not necessary to peel delivered, or at least in English. It shall include detailed characteristics of equipment used for the cover unless the reinforcement of the hose consists of corrosion- resistant material. assembly operation.
2.7.2.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose assembly has to be subjected to an impulse test in compliance with standard ISO 1436. consists of corrosion-resistant material.
2.7.3.added
The hose assembly has to be subjected to an impulse test in compliance with
standard ISO 1436.
2.7.3.1.changed
The hose assembly (hose with couplings) test has to withstand during five minutes be completed with circulating oil having a gas temperature of 93 °C, and a minimum pressure of 1,015 kPa without any leakage. kPa.
2.7.3.2.added
The hose has to be subjected to 150,000 impulses.
2.7.3.3.added
After the impulse test the hose has to withstand the test-pressure as mentioned
in paragraph 2.5.4.2. above.
2.7.4.1.added
The hose assembly (hose with couplings) has to withstand during five minutes
a gas pressure of 1,015 kPa without any leakage.
2.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
3.1.4.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +125 °C. For operating temperatures exceeding the above-mentioned values, the test temperatures must shall be adapted.
3.1.5.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
3.2.1.changed
The synthetic hose must shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion- resistant corrosion-resistant material is used (i.e. stainless-steel) a cover is not required.
3.2.2.changed
The lining and the cover must shall be free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
3.3.2.2.changed
Resistance to n-pentane according to ISO 1817 with the following conditions: (a) Medium: n-pentane; (b) Temperature: 23 °C (tolerance according to ISO 1817); (c) Immersion period: 72 hours. Requirements: (a) Maximum change in volume 2 per cent; (b) Maximum change in tensile strength 10 per cent. Maximum change in elongation at break 10 per cent After storage in air with a temperature of 40 °C for a period of 48 hours the mass compared to the original value may not decrease more than 5 per cent. Annex 8
3.3.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 3.3.2.1. above. Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
3.4.3.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned for at least 21 days before carrying out the tensile test according to paragraph 3.3.1.1. above. Requirements: (a) Maximum change in tensile strength 20 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 50 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
3.5.1.1.changed
A hose at a free length of 1 m has to be connected to a container filled with liquid propane, having a temperature of 23 °C 2 °C.
4.4.3.3.1.deleted
4.4.3.3.2.deleted
3.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 of vapour per metre of hose per 24 h. Annex 8
4.4.3.3.3.deleted
3.5.2.2.changed
Test temperature: -25 °C 3 °C.
3.5.3.1.changed
A piece of hose, pressurized at 3,000 kPa, with a minimal length of 0.5 m must shall be put in an oven at a temperature of 125 °C 2 °C during 24 hours.
3.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test pressure as mentioned in paragraph 3.5.5.2. below.
Figure 3changed
b mass propulsion mechanism a 1,2m (a ((a = 102 mm; b= 241 mm)
3.5.4.2.changed
The testing machine (see Figure 3) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of approximately 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be 102 mm. The longitudinal median planes of both wheels must shall be in the same vertical plane. The distance between the wheel-centres must shall be vertical 241 mm and horizontal 102 mm. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
3.5.4.3.changed
The hose shall be S-shape-like installed over the wheels (see Figure 3). The end, that runs over the upper wheel, shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
3.6.1.changed
The couplings shall be made from steel or brass and the surface must shall be corrosion-resistant.
3.6.2.changed
The couplings must shall be of the crimp-fitting type and made up of a hose- coupling hose-coupling or banjo bolt. The sealing shall be resistant to LPG and comply with paragraph 3.3.1.2. above.
3.7.1.3.changed
After the impulse-test the hose has to withstand the test pressure as mentioned in paragraph 3.5.5.2. above.
3.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
3.8.2.changed
Every coupling shall bear the trade name or mark of the assembling manufacturer. Annex 8
4.1.4.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +125 °C. For operating temperatures exceeding the above-mentioned values, the test temperatures must shall be adapted.
4.1.5.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
4.2.1.changed
The synthetic hose must shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion-resistant material is used (i.e. stainless-steel) a cover is not required.
4.2.2.changed
The lining and the cover must shall be free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
Figure 1deleted
4.3.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 4.3.2.1. above. Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
4.4.1.1.changed
Tensile strength and elongation at break according to ISO 37. Tensile strength not less than 20 MPa and elongation at break not less than 250 per cent. Annex 8
Figure 4deleted
4.4.2.1.added
1:2004/Amd 1:2009.
4.4.2.2.added
The test-pieces, which have to be stretched to an elongation of 20 per cent shall
be exposed to air of 40 °C and a relative humidity of 50 per cent ± 10 per cent
with an ozone concentration of 50 parts per hundred million during 120 hours.
4.4.2.3.added
Cracking of the test pieces is not allowed.
4.4.3.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned for at least 21 days before carrying out the tensile test according to paragraph 4.3.1.1. above. Requirements: (a) Maximum change in tensile strength 20 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 50 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
4.5.1.1.changed
A hose at a free length of 1 m has to be connected to a container filled with liquid propane, having a temperature of 23 °C ± 2 °C.
4.5.2.2.changed
Test temperature: -25 °C ± 3 °C.
4.5.3.1.changed
A piece of hose, pressurized at WP, with a minimal length of 0.5 m must shall be put in an oven at a temperature of 125 °C ± 2 °C during 24 hours.
4.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test pressure as mentioned in paragraph 4.5.5.2. Annex 8 below.
Figure 4added
(a = 102 mm; b = 241 mm)
4.5.4.2.changed
The testing machine (see Figure 4) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of approximately 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be 102 mm. The longitudinal median planes of both wheels must shall be in the same vertical plane. The distance between the wheel-centres must shall be vertical 241 mm and horizontal 102 mm. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
4.5.4.3.changed
The hose shall be S-shape-like installed over the wheels (see Figure 4). The end, which runs over the upper wheel, shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
4.5.5.3.changed
The burst pressure shall not be less than 10,000 kPa and at least 2.25 WP.
4.6.1.changed
The couplings shall be made from steel or brass and the surface must shall be corrosion-resistant.
4.6.2.changed
The couplings must shall be of the crimp-fitting type and made up of a hose- coupling hose-coupling or banjo bolt. The sealing shall be resistant to LPG and comply with paragraph 4.3.1.2.
4.3.1.2.added
above.
4.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
4.8.2.changed
Every coupling shall bear the trade name or mark of the assembling manufacturer. Annex 9
1.changed
Definition: see See paragraph 2.16. of this Regulation.
2.changed
Component classification (according to Figure 1, para. 2.): 2. of this Regulation): Filling unit: Class 3 Non-return valve: Class 3
6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage test Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 6,000 operation cycles) LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13. Ozone ageing Annex 15, 16, para. 14. Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** Impact test paragraph 7. of this annex
7.added
Impact test requirements for the J15, K15 and heavy-duty vehicle Euro filling
units
Figure 5changed
Dimensions in millimetres Keys: 1 Nozzle sealing surface 2 Minimum valve travel 3 General tolerance ________________ * Only for metallic parts. ** Only for-non metallic for-non-metallic parts.
Annex 10changed
The meaning of symbols and terms used in this annex Ph = hydraulic test pressure in kPa; Pr = container bursting pressure measured in the bursting test, in kPa; Re = minimum yield stress in N/mm2 guaranteed by the material standard; Rm = minimum tensile strength in N/mm2 guaranteed by the material standard Rmt = actual tensile strength, in N/mm2; a = calculated minimum thickness of the cylindrical shell wall, in mm; b = calculated minimum thickness of dished ends, in mm; D = nominal outside diameter of the container, in mm; R = inside radius of the dished end of the standard cylindrical container, in mm; r = inside knuckle of the dished end of the standard cylindrical container, in mm; H = outside height of dished part of container end, in mm; h = height of cylindrical part of dished end, in mm; L = length of container's stress-resistant shell, in mm; A = elongation value (per cent) of parent material; V0 = initial volume of the container at the moment when the pressure is increased in the burst test, in dm3; V = final volume of the container on bursting, in dm3; dm 3; g = gravity, in m/s2; c = shape factor; Z = stress reduction factor.
1.2.changed
For all dimensions without indication of tolerances, general tolerances of EN 22768-1 shall apply. Annex 10
1.3.1.changed
The material used for the manufacture of the stress-resistant container shells must shall be steel as specified in Euronorm EN 10120 (however, other materials may be used provided that the container has the same safety characteristics, to be certified by the authorities Type Approval Authorities granting type approval).
1.3.3.changed
All components of the container body and all the parts welded thereto must shall be made of mutually compatible materials.
1.3.4.changed
The filler materials must shall be compatible with the parent material so as to form welds with properties equivalent to those specified for the parent material (EN 288-39).
1.3.5.changed
The container manufacturer must shall obtain and provide: (a) For metal containers: chemical cast analysis certificates; (b) For all-composite containers: chemical resistance analysis certificates related to tests performed according to the requirements of Appendix 6; (c) Mechanical properties of the material in respect of the steels or other materials applied for the construction of the parts subject to pressure.
1.3.6.changed
The inspection authority must shall have the opportunity to make independent analyses. These analyses must shall be carried out either on specimens taken from the materials as supplied to the container manufacturer or on the finished containers.
1.3.7.changed
The manufacturer must shall make available to the inspection authority the results of metallurgical and mechanical tests and analyses of parent and filler materials carried out on welds and must shall also provide it with a description of the welding methods and processes which can be regarded as representative of the welds made during production.
1.5.2.changed
Those parts of a container having been deformed by more than 5 per cent must shall be submitted to the following heat treatment: normalize.
1.5.3.changed
Containers with a wall thickness 5 mm must shall be submitted to the following heat treatment:
1.5.4.changed
The manufacturer must shall submit the procedure for the heat treatment used.
1.6.1.1.changed
The wall thickness of the cylindrical shell of the containers must shall not be less than that calculated by the formula:
1.6.1.1.1.changed
Containers without longitudinal welds: Ph D Ph D a a= = 2000 e + Ph 1500 R e + Ph Re R 4/3
1.6.1.1.2.changed
Containers with longitudinal welds: Ph D Ph D a a= = 2000 e z + Ph 1500 R e z + Ph Re R 4/3 (a) z = 0.85 where the manufacturer radiographs each weld intersection and 100 m of the adjacent longitudinal weld and 50 mm (25 mm each side of the intersection) of the adjacent circumferential weld. This test has to be performed per machine at the beginning and end of each work shift period from continuous production. (b) z = 1 where each weld intersection and 100 mm of the adjacent longitudinal weld and 50 mm (25 each side of the intersection) of the adjacent circumferential weld is spot radiographed. This test has to be performed at 10 per cent of the container production: the containers to be tested are chosen randomly. Should these radiograph tests reveal unacceptable defects, as defined in paragraph 2.4.1.4., all the necessary steps must be taken to examine the production run in question and eliminate the defects.
2.4.1.4.changed
1.6.1.2.1.changed
The container ends shall be in one piece, shall encave to the pressure and shall have either a torispherical or an elliptical form (examples are given in Appendix 5). Annex 10 5 of this annex).
1.6.1.2.2.changed
The container ends must shall fulfil the following conditions: Torispherical ends simultaneous limits: 0.003 D b 0.08 D r 0.1 D RD H 0.18 D r2b h4b h 0.15 D (not applicable for containers as shown in Appendix 2 to this annex, Figure 2a) Elliptical ends simultaneous limits: 0.003 D b 0.08 D H 0.18 D h4b h 0.15 D (not applicable for containers as shown in Appendix 2 to this annex, Figure 2a)
1.6.1.2.3.changed
The thickness of these barrelled ends must shall not be in toto be less than the figure calculated by means of the following formula: Ph D b b= C 1500 R e The shape factor C to be used for full ends is given in the table and in the graphs contained in Appendix 4 to this annex. The wall thickness of the cylindrical edge of the ends may not be less or differ more than 15 per cent from the smallest wall thickness of the shell.
1.6.1.3.changed
The nominal wall thickness of the cylindrical part and of the barrelled end may not, under any circumstances; be less than: D + 1 mm with a minimum of 1.5 mm.
1.6.1.4.changed
The shell of the container may be made up of one, two or three parts. When the shell is made up from two or three parts, the longitudinal welds must shall be shifted/rotated with a minimum of 10 times the thickness of the container wall (10 a). The ends must shall be in one piece and convex.
1.7.1.2.changed
The manufacturer must shall ensure through adequate supervision that the parent materials and pressed parts used to manufacture the containers are free from defects likely to jeopardize the safe use of the containers.
1.7.2.1.changed
The manufacturer must shall describe the welding methods and processes used and indicate the inspections carried out during production.
1.7.2.2.changed
The butt welds must shall be executed by an automatic welding process. The butt welds on the stress-resistant shell may not be located in any area where there are changes of profile. Angle welds may not be superimposed on butt welds and must shall be at least 10 mm away from them. Welds joining parts making up the shell of the container must shall satisfy the following conditions (see figures given as examples in Appendix 1 of to this annex): Longitudinal weld: this weld is executed in the form of a butt weld on the full section of the material of the wall; Circumferential weld: this weld is executed in the form of a butt weld on the full section of the material of the wall. A joggle weld is considered to be a special type of butt weld; Welds of the studded valve plate or ring shall be carried out according to Appendix 1, Figure 3. A weld fixing the collar or supports to the container shall be either a butt or angle weld. Welded mounting supports shall be welded in the circumferential way. The welds shall be strong enough to withstand vibration, braking actions and outside forces of at least 30 g in all directions. In this case of butt welds, the misalignment of the joint faces may not exceed one-fifth of the thickness of the walls (1/5 a).
1.7.2.3.changed
The manufacturer must shall ensure that the welds show continuous penetration without any deviation of the weld seam, and that they are free from defects likely to jeopardize the safe use of the container. For containers in two pieces, a radiographical test has to be performed on the circumferential butt welds over 100 mm, with the exception of the welds in conformity with joggle weld on page 1 of Appendix 1 of to this annex. On one container selected at the beginning and end of each shift period from continuous production and, in the event of production being interrupted for a period of more than 12 hours, the first container welded should also be radiographed. Annex 10
1.7.2.4.changed
The out-of-roundness of the cylindrical shell of the container must shall be limited so that the difference between the maximum and minimum outside diameter of the same cross-section is not more than 1 per cent of the average of those diameters.
1.7.3.1.changed
The supports must shall be manufactured and attached to the container body in such a way as not to cause dangerous concentrations of stresses or be conducive conductive to the collection of water.
1.7.3.2.changed
The base of the container must shall be sufficiently strong and made of metal compatible with the type of steel used for the container. The form of the base must shall give the container sufficient stability. The top edge of the base must shall be welded to the container in such a way as not to be conducive to the collection of water nor to allow water to penetrate between the base and the container.
1.7.3.4.changed
Where fitted, identification plates must shall be fixed on to the stress resistant shell and shall not be removable. All the necessary corrosion prevention measures must shall be taken.
1.7.4.1.changed
A container representative of the type of container, all accessories fitted on it and any added insulation or protective material, material shall be covered by a bonfire test as specified in paragraph 2.6. of this annex.
2.changed
Tables 1 and 2 below give an overview of the tests to be performed on the LPG containers on prototypes as well as during the production process according to their nature. All tests shall be performed at ambient temperature of 20 °C 5 °C, unless otherwise stated.
Table 1changed
Test to be performed Production Number of containers Test description Batch tests to be tested for type approval Tensile test 1 per batch 2 1/ 21 See para. 2.1.2.2. Bend test 1 per batch 2 1/ 21 See para. 2.1.2.3. Burst test 2 See para. 2.2. Hydraulic test Each container 100 % See para. 2.3. Bonfire test 1 See para. 2.6. Radiographic 1 per batch 100 % See para. 2.4.1. examination Macroscopic examination 1 per batch 2 1/ 21 See para. 2.4.2. Inspection of welds 1 per batch 100 % See para. 1.7.2.3. Visual inspection of the 1 per batch 100 % parts of the container These test pieces can be taken from one container container. Note 1: 6 containers shall be submitted for type approval. Note 2: On one of these prototypes the volume of the container and the wall thickness of each part of the container shall be determined.
Table 2changed
Test to be performed Production Number of containers Test description Batch tests to be tested for type approval Burst test 1 per batch 3 See para. 2.2. Hydraulic test Each container All containers See para. 2.3. Ambient temperature pressure 1 per 5 batches 3 See para. 2.3.6.1. cycling test High temperature pressure 1 See para. 2.3.6.2. cycling test External leak test 1 See para. 2.3.6.3. Permeation test 1 See para. 2.3.6.4. LPG cycling test 1 See para. 2.3.6.5. High temperature creep test 1 See para. 2.3.6.6. Bonfire test 1 See para. 2.6. Impact test 1 See para. 2.7. Drop test 1 See para. 2.8. Boss torque test 1 See para. 2.9. Acid environment test 1 See para. 2.10. Ultra-violet radiation test 1 See para. 2.11. Annex 10
2.1.1.1.1.changed
The frequency of the tests for metal containers shall be: 1 container from each batch during production and for type testing, see Table 1. Test pieces which are not flat shall be flattened by a cold process. In test pieces containing a weld, the weld shall be machined to trim the surplus. Metal containers shall be subjected to the tests as described in Table 1. Test pieces from containers with one circumferential weld only (two sections) shall be taken from the places shown in Appendix 2, Figure 1. Test pieces from containers with longitudinal and circumferential welds (three or more sections) shall be taken from the places shown in Appendix 2, Figure
2.1.2.1.1.changed
Containers with longitudinal and circumferential welds (three sections) on test-pieces test- pieces taken from the places shown in Figure 1 of Appendix 2 of to this annex: (a) One tensile test on parent material; the test piece to be taken in the longitudinal direction (if this is not possible, it may be taken in a circumferential direction); (b) One tensile test on parent material of the bottom; (c) One tensile test perpendicular to the longitudinal weld; (d) One tensile test perpendicular to the circumferential weld; (e) One bend test on the longitudinal weld, the inner surface in tension; (f) One bend test on the longitudinal weld, the outer surface in tension; (g) One bend test on the circumferential weld, the inner surface in tension; (h) One bend test on the circumferential weld, the outer surface in tension; and (i) One macroscopic test of a welded section; (ml, m2) A minimum of two macroscopic tests of valve boss/plate sections in case of the sidewall mounted valves referred to in paragraph 2.4.2. below.
2.1.2.1.3.changed
Test-pieces which are not sufficiently flat must shall be flattened by cold pressing.
2.1.2.2.1.1.changed
2.1.2.2.1.2.changed
The values determined for yield stress, tensile strength and elongation after break must shall comply with the characteristics of the metal as required in paragraph 1.3. of this annex.
2.1.2.2.2.1.changed
This tensile test perpendicular to the weld must shall be carried out on a test-piece having a reduced cross-section 25 mm in width for a length extending up to 15 mm beyond the edges of the weld, as shown in Figure 2 of Appendix 3 to this annex. Beyond this central part the width of the test-piece must shall increase progressively.
2.1.2.2.2.2.changed
The tensile strength value obtained must shall meet the minimum levels required by EN 10120.
2.1.2.3.1.changed
The bend test shall be carried out in accordance with standards ISO 7438:2000 7438:2005 and ISO 7799:2000 7799:1985 and Euronorm EN 910 ISO 5173:2009 + Amd 1:2011 for welded parts. The bend tests shall be carried out on the inner surface in tension and the outer surface in tension.
2.1.2.3.2.changed
Cracks must shall not appear in the test-piece when it is bent round a mandrel as long as the inside edges are separated by a distance not greater than the diameter of the mandrel + 3a +3a (see Figure 1 in of Appendix 3 of to this annex). 2.1.2.3.3 The ratio (n) between the diameter of the mandrel and the thickness of the test piece must shall not exceed the values given in the following table: Actual tensile strength Value (n) Rt in (N/mm2) up Up to 440 inclusive 2 above Above 440 to 520 inclusive 3 above Above 520 4
2.1.2.4.1.changed
Retesting is permitted for the tensile and bend test. A second test shall consist of two test pieces taken from the same container. Annex 10 If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected.
2.2.1.changed
Containers subjected to this test must shall bear the inscriptions which it is proposed to affix on the section of the container subjected to pressure,
2.2.1.1.changed
The burst test under hydraulic pressure must shall be carried out with equipment which enables the pressure to be increased at an even rate, until the container bursts and the change in pressure over time to be recorded. The maximum flow rate during the test should not exceed 3 per cent of the capacity of the container per minute.
2.2.3.1.changed
The measured bursting pressure (P r) must (Pr) shall not under any circumstances be less than 2.25 3,000 = 6,750 kPa.
2.2.3.2.changed
The specific change in the volume of the metal container at the time of bursting must shall not be less than: 20 per cent if the length of the metal container is greater than the diameter; 17 per cent if the length of the metal container is equal to or less than the diameter. 8 per cent in the case of a special metal container as shown in Appendix 5, 5 to this annex, page 1, Figures A, B and C.
2.2.3.3.changed
The burst test must shall not cause any fragmentation of the container.
2.2.3.3.1.changed
The main fracture must shall not show any brittleness, i.e. the edges of the fracture must shall not be radial but must shall be at an angle to a diametrical plane and display a reduction of area throughout their thickness.
2.2.3.3.2.changed
For metal containers the fracture must shall not reveal an inherent defect in the metal. The weld must shall be at least as strong as the original metal but preferably stronger. For all-composite containers, the fracture shall not reveal any defects in the structure.
2.3.2.changed
The water pressure in the container must shall increase at an even rate until the test pressure of 3,000 kPa is reached.
2.3.3.changed
The container must shall remain under the test pressure long enough to make it possible to establish that the pressure is not falling off and that the container can be guaranteed leakproof. leak proof.
2.3.4.changed
After the test the container must shall show no signs of permanent deformation.
2.3.5.changed
Any container tested which does not pass the test must shall be rejected.
Figure 3deleted
2.3.6.1.3.changed
Retesting is permitted for the ambient temperature pressure cycling test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected. Annex 10
2.3.6.2.2.changed
The container shall comply with the external leak test requirements as defined in paragraph 2.3.6.3. below. The container shall achieve a minimum burst pressure of 85 per cent of the burst pressure.
Figure 2deleted
2.3.6.5.3.changed
Retesting is permitted for the LPG cycling test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected. Annex 10
2.3.6.6.1.changed
This test shall only be performed on all-composite containers with a resin matrix having a glass transition temperature (T G) (TG) below the design temperature +50 °C.
2.4.1.1.changed
Welds must shall be radiographed in compliance with ISO specification R 1106, using classification B.
2.4.1.3.changed
Assessment of the weld radiographs must shall be based on the original films in compliance with the practice recommended in standard ISO 2504, paragraph 6.
2.4.1.4.changed
2.4.1.4.2.added
For the container wall thickness < 4 mm, the inclusions listed below are
regarded as acceptable:
Any gas inclusion measuring not more than a/2 mm;
Any gas inclusion measuring more than a/2 mm but not more than a/1.5 mm,
which is more than 25 mm away from other gas inclusion measuring more than
a/2 mm and measuring not more than a/1.5 mm;
Any elongated inclusion or any group of rounded inclusions in a row where
the length represented (over a weld length of 12a) is not greater than 6 mm;
Gas inclusions over any 100 mm weld length, where the total area of all the
figures is not greater than 2a mm2.
2.4.2.changed
The macroscopic examination of a full transverse section of the weld must shall show a complete fusion on the surface treated with any acid from the macro- preparation and must shall not show any assembly fault or a significant inclusion or other defects. In case of doubt, a microscopic examination should be made of the suspect area.
2.5.1.changed
This examination is carried out when the weld has been completed. The welded surface examined must shall be well illuminated, and must shall be free from grease, dust, scale residue or protective coating of any kind.
2.5.2.changed
The fusion of the welded metal with the parent metal must shall be smooth and free from etching. There must shall be no cracks, notching or porous patches in the welded surface and the surface adjacent to the wall. The welded surface must shall be regular and even. Where a butt weld has been used, the excess thickness must shall not exceed 1/4 of the width of the weld. Annex 10
2.6.1.changed
The bonfire test is designed to demonstrate that a container complete with the fire protection system, specified in the design, will prevent the burst of the container when tested under the specified fire conditions. The manufacturer shall describe the behaviour of the complete fire protection system including the designed drop to atmospheric pressure. The requirements of this test shall be deemed to be fulfilled for any container having the following characteristics in common with the parent container: (a) Same type approval owner, (b) Same shape (cylindrical, special shape), (c) Same material, (d) Same or greater wall thickness, (e) Same or smaller diameter (cylindrical container), (f) Same height or smaller height (special container shape), (g) Same or smaller external surface, (h) Same configuration of accessories fitted to the container 1. container.1
2.6.2.changed
Container set-up (a) The container shall be placed in the designed position by the manufacturer with the container bottom approximately 100 mm above the fire source. (b) Shielding shall be used to prevent direct flame impingement on the fusible plug (PRD) if present. The shielding shall not be in direct contact with the fusible plug (PRD). (c) Any failure during the test of a valve, fitting or tubing that is not part of the intended protection system for the design shall invalidate the result. (d) Containers with a length of less than 1.65 m. The center of the container shall be positioned over the center of the fire source. 1 Additional accessories, modifications and extensions of the accessories fitted to the container is possible without retesting, if notified to the Type Approval Authority which approved the container, considered to be unlikely to have an appreciable adverse effect. The Type Approval Authority may require a further test report from the Technical Service responsible. The container and its configurations of accessories will be indicated in the appendix to Annex 2B. Multivalve or, when approved separately, pressure relief valve (discharge valve) and pressure relief device, extended for technical modifications and marked in accordance to Annex 2A need to have a new bonfire test. The container and its configurations of accessories will be indicated in the appendix to Annex 2B. (e) Containers with a length equal to or larger than 1.65 m. If the container is fitted with a pressure relief device at one side, the fire source shall commence at the opposite side of the container. If the container is fitted with pressure relief devices at both sides, or at more than one location along the length of the container, the center of the fire source shall be centered midway between the pressure relief devices that are separated by the greatest horizontal distance. Additional accessories, modifications and extensions of the accessories fitted to the container is possible without retesting, if notified to the Type Approval Authority which approved the container, considered to be unlikely to have an appreciable adverse effect. The Type Approval Authority may require a further test report from the Technical Service responsible. The container and its configurations of accessories will be indicated in Appendix 1 to Annex 2B.
2.6.6.changed
Test results: results (a) A burst of the container shall invalidate the test result. (b) A pressure of more than 3,700 kPa, i.e. 136 per cent of the set pressure of the PRV (2,700 kPa), during the test shall invalidate the test result. A pressure between 3,000 and 3,700 kPa shall only invalidate the test result in case visible plastic deformation is observed. Annex 10 (c) In case the behaviour of the protection system does not comply with the specification of the manufacturer and it leads to a mitigating test condition the result shall be invalidated. (d) For a composite container a release of LPG via the surface is accepted in case of a controlled release. A release of gaseous LPG within 2 minutes after the start of the test or a release capacity of more than 30 litres per minute shall invalidate the test result. (e) The results shall be presented in a test summary and shall include the following data for each container as a minimum: (i) Description of the container configuration. (ii) Photo of the container set-up and PRD. (iii) Applied method including time interval between measurements. (iv) The elapsed time from ignition of the fire to the start of venting of LPG and actual pressure. (v) Time to reach atmospheric pressure. (vi) Pressure and temperature diagrams.
2.7.2.changed
For this test, the fluid medium shall be water/glycol mixture or another liquid having a low freezing point which does not change the properties of the container material. A container filled with the fluid medium to the weight that equals the filling with 80 per cent of LPG with a reference mass of 0.568 kg/l, is projected, parallel to the length axle (x-axis in Figure 1) of the vehicle in which it is intended to be fitted at a velocity, V of 50 km/h, against a solid wedge, fixed horizontally, perpendicular to the movement of the container. The wedge shall be installed so that the centre of gravity (c.g.) of the container hits the centre of the wedge. The wedge shall have an angle α of 90 degrees and the point of impact shall be rounded with a maximum radius of 2.5 mm. The length of the wedge L, shall be at least equal to the width of the container in respect to its movement during the test. The height H of the wedge shall be at least 600 millimetres millimetres.
2.8.1.changed
One finished container shall be drop tested at ambient temperature without internal pressurization or attached valves. The surface onto which the containers are dropped shall be a smooth, horizontal concrete pad or flooring. The drop height (Hd) shall be 2 m (measured to the lowest point of the container). The same empty container shall be dropped: (a) In a horizontal position; (b) Vertically on each end; (c) At an angle of 45°. Following the drop test, the containers shall be submitted to an ambient temperature pressure cycling test according the requirements of paragraph 2.3.6.1. of this annex. Annex 10
2.11.3.changed
Retesting is permitted for the ultra-violet test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected. Annex 10 – Appendix 1
1.1.deleted
Table 1deleted
3.1.deleted
3.2.deleted
Figure 1changed
(a) Tensile test on parent material (b) Tensile test on parent material of the bottom (c) Tensile test on a longitudinal weld (d) Tensile test on a circumferential weld (e) Bend test on a longitudinal weld, the inner surface in tension (f) Bend test on a longitudinal weld, the outer surface in tension (g) Bend test on a circumferential weld, the inner surface in tension (h) Bend test on a circumferential weld, the outer surface in tension (m1, m2) Macro sections through valve boss/plate welds (side-mounted valve block) Annex 10 – Appendix 2
3.3.deleted
3.4.deleted
Figure 2bchanged
Containers with circumferential welds only and valve boss/plate fitted to the end. (m1, m2) Macro sections through valve boss/plate welds (Refer to Figure 2a for other locations of test-pieces) Annex 10 – Appendix 3
3.5.deleted
Table 2deleted
Annex 10 - Appendix 4changed
Relationship between H/D and shape factor C 1.5 1.4 b/D 0.005 C 0.0075 0.01 0.02 1.3 0.03 0.04 1.2 1.1 0.2 0.21 0.22 0.23 0.24 0.25 H/D Values of shape factor C for H/D between 0.20 and 0.25 Annex 10 – Appendix 4 Relationship between H/D and shape factor C Values of shape factor C for H/D between 0.25 and 0.50
5.1.deleted
5.2.deleted
5.3.deleted
1.changed
Materials used in an all-composite container must shall be tested according to standard ISO 175 for 72 hours at room temperature. Demonstrating the chemical resistance by using data from literature is also allowed. Compatibility with the following media shall be checked: (a) Brake fluid; (b) Window cleaner; (c) Cooling liquid; (d) Non-leaded petrol; (e) Solution of deionized water, sodium chloride (2.5 % per cent by mass 0.1 %), per cent), (calcium chloride (2.5 % per cent by mass 0.1 %) per cent) and sulphuric acid sufficient to achieve a solution of pH 4.0 0.2. Test acceptance criteria: (a) Elongation: The elongation of a thermoplastic material, after testing, must shall be at least 85 per cent of the initial elongation. The elongation of an elastomer, after testing, must shall be at least larger than 100 per cent. (b) For structural components (e.g., fibres): The residual strength for a structural component after testing must shall be at least 80 per cent of the original tensile strength. (c) Non-structural components (e.g., coating): There are no visual cracks allowed.
Table 3deleted
5.4.deleted
3.changed
4.changed
The Vicat softening temperature of a thermoplastic component must shall be above 70 °C. For structural components, the Vicat softening temperature must shall be at least 75 °C.
7.deleted
5.changed
The Vicat softening temperature of a thermo-set component must shall be above 70 °C.
6.changed
The glass transition temperature (Tg) of an elastomer component must shall be lower than -40 °C. The glass transition temperature shall be tested according ISO 6721 "Plastics - Determination of dynamic mechanical properties". The Tg-onset Tg- onset is derived from the plotted diagram storage modulus versus temperature by determining the temperature, where the two tangents, which are representing the slopes of the diagram before and after the dramatic loss of stiffness, intersects.
8.1.deleted
8.1.1.deleted
8.1.2.deleted
1.1.changed
Definition: see See paragraph 2.10. of this Regulation.
8.1.3.deleted
8.2.deleted
8.3.deleted
8.4.deleted
8.5.deleted
1.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
8.6.deleted
8.7.deleted
2.1.changed
Definition: see See paragraph 2.10. of this Regulation.
8.8.deleted
2.2.changed
Component classification (according to Figure 1, para. 2.): Class 2: for the part with a maximum regulated pressure during operation of 450 kPa. Annex 11 Class 2A: for the part with a maximum regulated pressure during operation of 120 kPa.
9.1.deleted
9.2.deleted
9.3.deleted
2.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.*
9.4.deleted
3.1.changed
Definition: see See paragraph 2.18. of this Regulation.
9.5.1.deleted
9.6.deleted
10.1.1.deleted
3.6.1.changed
For fuel rails of Class 0 and 1: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11. ** Corrosion resistance Annex 15, 16, para. 12. * Resistance to dry heat Annex 15, 16, para. 13. ** Ozone ageing Annex 15, 16, para. 14. ** Creep Annex 15, 16, para. 15. ** Temperature cycle Annex 15, 16, para. 16. **
10.1.2.1.deleted
3.6.2.changed
For fuel rails of Class 2 and/or 2A: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* _________________ * Only for metallic parts. ** Only for non-metallic parts. Annex 12
10.1.2.2.deleted
10.1.2.3.deleted
1.changed
Definition: see See paragraph 2.11. of this Regulation.
10.1.2.4.deleted
10.1.3.1.deleted
10.1.3.2.deleted
10.1.3.3.deleted
6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Remarks: The parts of the gas dosage unit (Class 2 or 2A) shall be leakproof with the outlet(s) of that part closed. For the overpressure test all the outlets including those of the coolant compartment shall be closed off. * Only for metallic parts. ** Only for non-metallic parts.
10.1.3.4.deleted
10.1.3.5.deleted
1.changed
Definition: Pressure sensor: see See paragraph 2.13. of this Regulation. Temperature sensor: see See paragraph 2.13. of this Regulation.
10.1.3.6.deleted
10.1.3.7.deleted
10.1.3.8.deleted
10.1.3.9.deleted
10.1.3.10.deleted
10.1.3.11.deleted
6.1.changed
For parts of Class 0 and 1: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** Annex 13
10.1.4.deleted
6.2.changed
For parts of Class 2 or 2A: Over pressure Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* __________________ * Only for metallic parts. ** Only for non-metallic parts.
10.1.4.1.deleted
10.1.4.2.deleted
1.changed
The electronic control unit can be any device which controls the LPG demand of the engine and establishes the cut-off of the remotely-controlled service valve(s), cut-off valves and fuel pump of the LPG-system LPG system in case of a broken fuel supply pipe or/and in case of stalling of the engine.
10.2.1.deleted
2.1.added
Notwithstanding the provisions of paragraphs 1. and 2. above, the remotely
controlled service valve(s) and shut-off valves may stay in an open position
during the commanded stop phases.
10.2.2.deleted
10.2.3.deleted
10.2.4.deleted
5.changed
The output of the electronic control unit shall be inactive when the electric power is switched off or removed. Annex 15
10.2.5.deleted
6.added
When the Electronic Control Unit (ECU) is intended to be fitted as a
component of an interconnected LPG-system, it shall inhibit, by controlling
the fuel selection system, the vehicle operation in petrol mode after each
switch-over operation to LPG mode until a volume of liquid fuel equivalent to
that flown into the LPG tank during such an operation is consumed.
Notwithstanding this, the ECU may permit the switch over to petrol mode if a
fault in the LPG-system determines the inoperability of the system. Such a fault
shall be clearly indicated to the driver.
In case of the inoperability of the LPG-system, a remotely controlled shut-off
valve complying with the requirements of paragraph 6.17.3.3. shall be installed
along the flow line in order to prevent any flow of petrol into the LPG container
after switching-over to petrol mode.
10.2.6.deleted
6.1.added
The maximum volume of liquid fuel that flows during a switch-over operation
shall not exceed 0.4 litre and the minimum volume of the tank shall not be
lower than 20 litres.
10.2.7.deleted
6.2.added
To verify compliance with paragraph 6. of this annex, the ECU shall be tested
as follows:
(a) Install the LPG-system on a vehicle;
(b) Set the fuel selection system in LPG mode;
(c) Warm up the engine until all temperatures of cooling and lubrication
means and the pressure of lubrication means have reached equilibrium;
(d) Let the engine run at the lowest idling speed;
(e) Switch over from LPG mode to petrol mode and vice versa;
(f) Set the fuel selection system in petrol mode.
Test interpretation
The criteria adopted for the interpretation of the test is as follows:
(i) Petrol mode is disabled until a volume of liquid fuel equal to 0.4
litre is consumed. Such consumption shall be calculated by a test
bench measuring device. It may be calculated making use of the
fuel flow signals of the LPG ECU read out by means of an
appropriate scan tool, if the reliability of such signals has been
previously verified.
The test shall be repeated also at the highest idling speed.
10.2.8.deleted
6.3.added
To measure the volume of liquid fuel that flows during the switch-over
operations, the following test shall be carried out:
(a) Install the LPG-system other than the container on a vehicle;
(b) Place the container on a weighing system and fill up the LPG tank;
(c) After having pressurized the LPG-system up to the normal operating
conditions, record the reading of the weighing system (W1);
(d) Disable the ECU feature described in paragraph 6. above;
(e) Switch-over from LPG to petrol and vice versa for at least 10 times;
(f) Record the reading of the weighing system (W2).
The volume of petrol flown per switch-over operation shall be calculated as
follows:
Vsw = (W2-W1) / #SW / Dpetrol
where:
Dpetrol = 743 kg/m3;
#SW = number of switch-over operations from LPG to petrol mode and vice
versa during the test.
The weighing system shall have the following:
(a) A precision of ± 0.02 per cent of full scale or better;
(b) A resolution of 20 g;
(c) An accuracy of ± 2 per cent of the reading or ± 0.3 per cent of full scale
whichever is better.
10.2.9.deleted
6.4.added
The ECU shall bear a marking with the following data clearly legible and
indelible:
(a) the wording "ICS"; and
(b) the value of 0.4 litre; and
(c) the approval mark according to paragraph 5.4. of this Regulation.
Provisions regarding the approval of gas tube(s) of non-
seamless type, gas tube(s) made of materials other than
copper, stainless steel, and steel with corrosion-resistant
coating, and their couplings
10.2.10.deleted
1.added
Definitions:
Gas tube: gas tube as defined in paragraph 2.21. of this Regulation.
10.2.11.deleted
2.changed
10.2.12.deleted
3.added
Classification pressure:
Parts of Class 0: WP declared
Parts of Class 1: 3,000 kPa
Parts of Class 2: 450 kPa
Parts of Class 2A: 120 kPa
4.changed
10.3.1.deleted
5.added
General design rules:
The couplings shall be compatible with the gas tube.
Specific care shall be taken against galvanic corrosion.
Stainless steel gas tube shall only be used in combination with stainless steel
couplings.
Only straight longitudinal welding (in the direction of the tube itself) is permitted
in gas tubes of non-seamless type.
10.4.deleted
6.changed
6.1.added
For parts of Classes 0 and 1:
Overpressure test Annex 16, para. 4.
External leakage Annex 16, para. 5.
High temperature Annex 16, para. 6.
Low temperature Annex 16, para. 7.
LPG compatibility Annex 16, para. 11.**
Corrosion resistance Annex 16, para. 12.1
Resistance to dry heat Annex 16, para. 13.**
Ozone ageing Annex 16, para. 14.**
6.2.added
For parts of Class 2 or 2A:
Overpressure test Annex 16, para. 4.
1 Only for metallic parts.
External leakage Annex 16, para. 5.
High temperature Annex 16, para. 6.
Low temperature Annex 16, para. 7.
LPG compatibility Annex 16, para. 11.**
Corrosion resistance Annex 16, para. 12.2
6.3.added
Specific requirements on the gas tube and its couplings:
6.3.1.added
The gas tube and its coupling(s) shall be tested for an endurance test consisting
out of 100,000 cycles.
One cycle consist out of pressure ramp from 15 per cent·WP up to WP.
After the endurance test, the gas tube and its coupling(s) need to comply with the
leakage test of Annex 16, paragraphs 5., 6. and 7 and with the overpressure test
according to Annex 16, paragraph 4.
6.3.2.added
Test the gas tube according to the following procedure and acceptance criteria.
(a) Select a mandrel with an external diameter from the below table:
External diameter Mandrel diameter
≤ 8 mm 3 times the external gas tube diameter
> 8 mm 5 times the external gas tube diameter
(b) Bend the gas tube over this mandrel once, forming a "U" shape.
(c) Close the ends of the gas tube and subject it to the overpressure test
according to Annex 16, paragraph 4.
At the completion of the overpressure test, the gas tube shall be tested according
to the leakage test of Annex 16, paragraphs 5., 6. and 7.
6.3.3.added
A coupling designed to be connected directly to threaded fittings shall be capable
of withstanding, without deformation, breakage or leakage, a torque effort of 150
per cent of the rated installation value delivered by the manufacturer, according
to the following test procedure:
(a) Test an unused component, applying the torque adjacent to the fitting.
(b) For a component having a threaded connection or threaded connections,
apply the turning effort for 15 minutes, release the turning effort, then
remove the component and examine it for deformation and breakage.
(c) Perform the leakage test according to Annex 16, paragraphs 5., 6. and 7.
(d) Perform the overpressure test according to Annex 16, paragraph 4.
6.3.4.added
Vibrate the gas tube and its coupling(s) according to the test described in Annex
16, paragraph 10.5.4., procedure A.
After this test the gas tube and its coupling(s) need to comply with the leakage
test of Annex 16, paragraphs 5., 6. and 7. and with the overpressure test according
to Annex 16, paragraph 4.
2 Only for metallic parts.
** Only for non-metallic parts.
6.3.5.added
Test the gas tube and its coupling(s) according to the following procedure and
acceptance criteria.
Secure the subject specimen in an appropriate test fixture, then statically apply a
tensile load along the gas tube axis at a maximum rate of 250 N/min until the gas
tube separates from the coupling(s).
The force (F), in Newton, required to pull apart the gas tube from its coupling(s)
shall be that calculated as:
F = (π∙d2∙P)/10
where
d is the internal diameter, in millimetres;
P is the maximum working pressure, in bar.
6.3.6.added
All gas tubes and its couplings having brass components shall be subjected to the
brass material compatibility test according to Annex 16, paragraph 12.2.
After this test the gas tube and its coupling(s) need to comply with the leakage
test of Annex 16, paragraphs 5., 6. and 7 and with the overpressure test according
to Annex 16, paragraph 4.
1.1.added
LPG components for use in vehicles shall be classified with regard to the
maximum operating pressure and function, according to Chapter 2 of this
Regulation.
1.2 The classification of the components determines the tests which have to be
performed for type approval of the components or parts of the components.
2.added
In Table 1 the applicable test procedures dependent on the classification are
shown.
Annex 17changed
Provisions regarding LPG identification marks for vehicles of categories M2/N2 and M3/N3. (Paragraph 17.1.8. of this Regulation) The sign consists of a sticker which must label shall be weather resistant. The centre zone indicates the first energy source. The upper zone indicates the second energy source. The left zone indicates the gas behaviour due to density. The right zone indicates the state of aggregation of stored gaseous fuel. Layout and symbols shall be in accordance with ISO 17840-4:2018. The colour and dimensions of the sticker must label shall fulfil the following requirements: Colours: Background : red Letters : white or Background: Green, RGB code 0, 176, 80 Border: white reflecting Dimensions Character height : 5 mm Character thickness : 1 Letters and symbols: white reflecting Dimensions: Sticker width: > 110 mm Sticker width : 70 - 90 height: > 80 mm Sticker height : 20 - 30 mm The text "FOR SERVICE PURPOSES ONLY" must be centred in the middle of the sticker.