Skip to content

Compare versions of UN R67

I. Specific equipment of vehicles of category M and N using liquefied petroleum gases in their propulsion system II. Vehicles of category M and N fitted with specific equipment for the use of liquefied petroleum gases in their propulsion system with regard to the installation of such equipment

114 changed · 290 added · 211 deleted
2.changed
LPG components for use in vehicles shall be classified with regard to the maximum operating pressure and function, according to Figure 1. Class 0 High pressure parts including tubes and fittings containing liquid LPG with a pressure > 3,000 kPa. Class 1 High pressure parts including tubes and fittings containing liquid LPG at vapour pressure or increased vapour pressure up to 3,000 kPa. Class 2 Low pressure parts including tubes and fittings containing vaporized LPG with a maximum operating pressure below 450 kPa and over 20 kPa above atmospheric pressure. Class 2A Low pressure parts for a limited pressure range including tubes and fittings containing vaporized LPG with a maximum operating pressure below 120 kPa and over 20 kPa above atmospheric pressure. Class 3 Shut-off valves and pressure relief valves, when operating in the liquid phase. LPG components designed for a maximum operating pressure below 20 kPa above atmospheric pressure are not subjected to this Regulation. A component can consist of several parts, each part classified in his own class with regard to maximum operating pressure and function. 1 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, ECE/TRANS/WP.29/78/Rev.6, para. 2 http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
Figure 1changed
Start Yes Operating pressure > 3 MPa? No Yes Yes Maximum operating Safety pressure Safety > valves? 450kPa? valves? No No Yes Maximum operating pressure < 20kPa? No Not subjected to this regulation. Yes Maximum operation pressure < 120kPa? No Or Class 2 Class 2A Class 1 Class3 Class 0 STOP
2.2.changed
"Specific equipment" means: (a) The container; (b) The accessories fitted to the container; (c) The vaporizer/pressure regulator; (d) The shut-off valve; (e) The gas injection device or injector or gas mixing piece; (f) The gas dosage unit either separate or combined with the gas injection device; (g) Flexible hoses; (h) Filling unit; (i) Non-return valve; (j) Gas-tube pressure relief valve; (k) Filter unit; (l) Pressure or temperature sensor; (m) Fuel pump; (n) Service coupling; (o) Electronic control unit; (p) Fuel rail; (q) Pressure relief device; (r) Multi-component. Multi-component; (s) Non-seamless and seamless gas tubes and their couplings; (t) Gas tubes made of materials other than copper, stainless steel, and steel with corrosion-resistant coating and their couplings.
2.20.changed
"Hose assembly" means an assembly of a flexible hose and couplings. Part I - Approval of specific equipment of vehicles of categories M and N using liquefied petroleum gases in their propulsion system
2.21.added
"LPG-system" means a set of LPG specific equipment intended to be fitted in a vehicle to constitute an integrated and functional whole aimed at enabling the propulsion with LPG;
2.22.added
"Interconnected LPG-system (ICS)" means a LPG-system having hydraulic interconnections with the petrol or diesel fuelling system;
2.23.added
"Multi-component" means any of the above mentioned specific components combined or fitted together as a component.
2.24.added
"Gas tube" means tubing made of metallic material which has been designed not to flex in normal operation and through which LPG flows. Part I - Approval of specific equipment of vehicles of categories M and N using liquefied petroleum gases in their propulsion system
4.2.changed
All equipment shall have a space large enough to accommodate the approval mark including the classification of the component (see Annex 2A) and in case of components of Class 0 also the working pressure (WP); this space shall be shown on the drawings referred to in paragraph 3.2.2. above. In the case of limited space for the approval mark(s), other means of identification that link it to the approval mark shall be provided.
5.4.deleted
There shall be affixed, conspicuously and in the space referred to in paragraph 4.2. above, to all equipment conforming to a type approved under this Regulation, in addition to the mark prescribed in paragraphs 4.1. and 4.3. above, an international approval mark consisting of:
5.2.changed
An approval number shall be assigned to each type of equipment approved. Its first two digits (at present 01 corresponding to the 01 series of amendments which entered into force on 13 November 1999) shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue approved in accordance with Schedule 4 of the approval. The same Contracting Party shall not assign this alphanumeric code to another type of equipment. Agreement (E/ECE/TRANS/505/Rev.3).
4.2.added
above, to all equipment conforming to a type approved under this Regulation, in addition to the mark prescribed in paragraphs 4.1. and 4.3. above, an international approval mark consisting of:
5.4.2.changed
The number of this Regulation, followed by the letter "R", a dash and the 2 The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.6. https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions approval number to the right of the circle prescribed in paragraph 5.4.1. above. This approval number consists of the component type approval number which appears on the certificate completed for this type (see paragraph 5.2. above and Annex 2B) preceded by two figures indicating the sequence of the latest series of amendments to this Regulation.
5.5.changed
The approval mark shall be clearly legible and be indelible. The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3. http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
6.9.changed
Gas injection devices/Gas mixing piece piece3 11 or Injectors
6.15.1.1.deleted
The connection between the float and the closing unit of the 80 per cent stop valve shall not be deformed under normal conditions of use.
6.15.1.2.deleted
If the 80 per cent stop valve of the container comprises a float, the latter shall withstand an outside pressure of 4,500 kPa.
6.14.changed
Either combined or separate Only applicable when the 6.15 Gas tube(s) of non-seamless type, gas dosage actuator is not integrated in the gas injection device. Applicable only when the operating pressure 15 tube(s) made of the gas mixing piece exceeds 20 kPa (Class 2). materials other than copper, stainless steel, and steel with corrosion-resistant coating, and their couplings
6.15.1.3.deleted
The closing unit of the device that limits the filling at 80 per cent +0/-5 per cent of the capacity of the container, for which the 80 per cent stop valve is designed, shall withstand a pressure of 6,750 kPa. At the cut-off position, the filling rate at a differential pressure of 700 kPa shall not exceed 500 cm3/minute. The valve shall be tested with all the containers on which it is intended to be fitted or the manufacturer shall declare by calculation for which container types this valve is suitable.
6.16.added
Multi-component Annexes applicable to the single components 1 Either combined or separate 2 Only applicable when the gas dosage actuator is not integrated in the gas injection device. 3 Applicable only when the operating pressure of the gas mixing piece exceeds 20 kPa (Class 2).
6.15.1.4.deleted
When the 80 per cent stop valve does not comprise any float, it shall not be possible to continue filling, after closing-off, at a rate exceeding 500 cm3/minute.
6.15.1.5.deleted
The device shall bear a permanent marking, indicating the container-type for which it has been designed, diameter and angle, and if applicable mounting indication.
6.15.2.deleted
Electrical operated devices containing LPG shall, in order to prevent in case of fracture of the component electric sparks on the surface of fracture: (a) Be insulated in a manner that no current is lead through LPG containing parts; (b) Have the electrical system of the device isolated: (i) From the body; (ii) From the container for the fuel pump. Isolation resistance shall be > 10 M.
6.17.1.1.added
The connection between the float and the closing unit of the 80 per cent stop valve shall not be deformed under normal conditions of use.
6.15.2.1.deleted
The electrical connections inside the boot and passengers compartment shall comply with protection degree class IP 40 according to IEC Standard 60529- 1989+A1:1999.
6.17.1.2.added
If the 80 per cent stop valve of the container comprises a float, the latter shall withstand an outside pressure of 4,500 kPa.
6.15.2.2.deleted
All other electrical connections shall comply with protection degree class IP 54 according to IEC Standard 60529-1989+A1:1999.
6.17.1.3.added
The closing unit of the device that limits the filling at 80 per cent +0/-5 per cent of the capacity of the container, for which the 80 per cent stop valve is designed, shall withstand a pressure of 6,750 kPa. At the cut-off position, the filling rate at a differential pressure of 700 kPa shall not exceed 500 cm3/minute. The valve shall be tested with all the containers on which it is intended to be fitted or the manufacturer shall declare by calculation for which container types this valve is suitable.
6.15.2.3.deleted
The power supply bushing (fuel pump/actuators/fuel level sensor) to establish an isolated and tight electrical connection shall be of a hermetic sealed type.
6.17.1.4.added
When the 80 per cent stop valve does not comprise any float, it shall not be possible to continue filling, after closing-off, at a rate exceeding 500 cm3/minute.
6.15.3.deleted
Specific provisions on valves activated by an electric/external (hydraulic, pneumatic) power
6.17.1.5.added
The device shall bear a permanent marking, indicating the container-type for which it has been designed, diameter and angle, and if applicable mounting indication.
6.15.3.1.deleted
In the case of valves activated by an electric/external power (e.g. 80 per cent stop valve, service valve, shut-off valves, non-return valves, gas tube pressure relief valve, service coupling), those valves shall be in "closed" position when their power is switched off.
6.17.2.added
Electrical operated devices containing LPG shall, in order to prevent in case of fracture of the component electric sparks on the surface of fracture: (a) Be insulated in a manner that no current is lead through LPG containing parts; (b) Have the electrical system of the device isolated: (i) From the body; (ii) From the container for the fuel pump. Isolation resistance shall be > 10 M.
6.15.3.2.deleted
The power of the fuel pump shall be switched off when the electronic control unit becomes defective or loses power.
6.17.2.1.added
The electrical connections inside the boot and passengers compartment shall comply with protection degree class IP 40 according to IEC Standard 60529- 1989+A1:1999.
6.17.2.2.added
All other electrical connections shall comply with protection degree class IP 54 according to IEC Standard 60529-1989+A1:1999.
6.15.4.1.deleted
The materials constituting a device which are in contact with the heat exchange medium of a device when operating shall be compatible with that fluid and shall be designed to withstand a pressure of 200 kPa of the heat exchange medium. The material shall meet the prescriptions laid down in Annex 15, paragraph 17.
6.17.2.3.added
The power supply bushing (fuel pump/actuators/fuel level sensor) to establish an isolated and tight electrical connection shall be of a hermetic sealed type.
6.15.4.2.deleted
The compartment containing the heat exchange medium of the vaporizer/pressure regulator shall be leak proof at a pressure of 200 kPa.
6.17.3.added
Specific provisions on valves activated by an electric/external (hydraulic, pneumatic) power
6.15.5.deleted
A component consisting of both high pressure and low pressure parts shall be so designed to prevent a pressure build up in the low pressure part above 2.25 times the maximum working pressure for which it has been tested. Components connected directly to the tank pressure shall be designed for the classification pressure of 3,000 kPa. Venting to the motor compartment or outside of the vehicle is not allowed.
6.17.3.1.added
In the case of valves activated by an electric/external power (e.g. 80 per cent stop valve, service valve, shut-off valves, non-return valves, gas tube pressure relief valve, service coupling), those valves shall be in "closed" position when their power is switched off.
6.17.3.2.added
The power of the fuel pump shall be switched off when the electronic control unit becomes defective or loses power.
6.15.6.1.deleted
3,000 kPa, when there is e.g. blocking of the tubing or not opening of a shut-off valve. This can be realized by switching off the pump or by recirculating to the container. Pumps of Class 0 shall be so designed that the outlet pressure never exceeds the WP of the components downstream of the pump, when there is, e.g. blocking of the tubing or not opening of a shut-off valve. This can be realized by switching off the pump or by recirculation to the container.
6.17.3.3.added
Without prejudice to paragraph 1.7. of Annex 7 of this Regulation (commanded stop phases), a remotely controlled shut-off valve (when intended to be fitted as a component of an interconnected LPG-system for the purpose of paragraph 17.13.2.2.) shall be submitted, during approval, to an endurance test according to paragraph 9. of Annex 16 with a number of cycles equal to 20,000. The valve shall bear a marking with the following data clearly legible and indelible: (a) The wording "ICS", and (b) The approval mark according to paragraph 5.4. of this Regulation.
6.15.6.2.deleted
The pressure regulator/vaporizer shall be so designed as to prevent any gas flow when the regulator/vaporizer unit is supplied with LPG at a pressure  4,500 kPa when the regulator is not operating.
6.17.4.1.added
The materials constituting a device which are in contact with the heat exchange medium of a device when operating shall be compatible with that fluid and shall be designed to withstand a pressure of 200 kPa of the heat exchange medium. The material shall meet the prescriptions laid down in Annex 15, paragraph 17.
6.15.7.1.deleted
Gas-tube pressure relief valves of Class 1 shall be so designed as to open at a pressure of 3,200 ± 100 kPa. Gas-tube pressure relief valves of Class 0 shall be so designed as to open at a pressure of 1.07 WP of the pipe ± 100 kPa (if needed).
6.17.4.2.added
The compartment containing the heat exchange medium of the vaporizer/pressure regulator shall be leak proof at a pressure of 200 kPa.
6.15.7.2.deleted
Gas-tube pressure relief valves of Class 1 shall not have internal leakage up to 3,000 kPa. Gas-tube pressure relief valves of Class 0 shall not have internal leakage up to WP of the pipe.
6.17.5.added
A component consisting of both high pressure and low pressure parts shall be so designed to prevent a pressure build up in the low pressure part above 2.25 times the maximum working pressure for which it has been tested. Components connected directly to the tank pressure shall be designed for the classification pressure of 3,000 kPa. Venting to the motor compartment or outside of the vehicle is not allowed.
6.15.8.1.deleted
The pressure relief valve shall be mounted inside the container or on the container, in the area where the fuel is in gaseous state.
6.17.6.1.added
3,000 kPa, when there is e.g. blocking of the tubing or not opening of a shut-off valve. This can be realized by switching off the pump or by recirculating to the container. Pumps of Class 0 shall be so designed that the outlet pressure never exceeds the WP of the components downstream of the pump, when there is, e.g. blocking of the tubing or not opening of a shut-off valve. This can be realized by switching off the pump or by recirculation to the container.
6.15.8.2.deleted
The pressure relief valve shall be so designed as to open at a pressure of 2,700  100 kPa.
6.17.6.2.added
The pressure regulator/vaporizer shall be so designed as to prevent any gas flow when the regulator/vaporizer unit is supplied with LPG at a pressure  4,500 kPa when the regulator is not operating.
6.15.8.3.deleted
The flow capacity of the pressure relief valve, determined with compressed air at a pressure which is 20 per cent higher than the normal operating- pressure shall be at least Q  10.66  A0.82 In which: Q= flow of air in standard m3/min (100 kPa absolute and temperature of 15 °C) A= exterior surface of the container in m2. The flow test results shall be corrected to standard conditions: Air pressure of 100 kPa absolute and temperature of 15 °C. When the pressure relief valve is considered as a pressure relief device, the flow shall be at least 17.7 standard m3/min.
6.15.8.4.deleted
The pressure relief valve shall not have internal leakage up to 2,600 kPa.
6.17.7.1.added
Gas-tube pressure relief valves of Class 1 shall be so designed as to open at a pressure of 3,200 ± 100 kPa. Gas-tube pressure relief valves of Class 0 shall be so designed as to open at a pressure of 1.07 WP of the pipe ± 100 kPa (if needed).
6.15.8.5.deleted
The pressure relief device (fuse) shall be designed to open at a temperature of 120  10 °C.
6.17.7.2.added
Gas-tube pressure relief valves of Class 1 shall not have internal leakage up to 3,000 kPa. Gas-tube pressure relief valves of Class 0 shall not have internal leakage up to WP of the pipe.
6.15.8.6.deleted
The pressure relief device (fuse) shall be designed to have, when opened, a flow capacity of: Q  2.73  A In which: Q= flow of air in standard m3/min (100 kPa absolute and temperature of 15 °C) A= exterior surface of the container in m2. The flow test shall be carried out at an upstream air pressure of 200 kPa absolute, and at temperature of 15 °C. The flow test results shall be corrected to standard conditions: Air pressure of 100 kPa absolute, and temperature of 15 °C.
6.15.8.7.deleted
The pressure relief device shall be mounted on the container in the gaseous zone.
6.17.8.1.added
The pressure relief valve shall be mounted inside the container or on the container, in the area where the fuel is in gaseous state.
6.15.8.8.deleted
The pressure relief device shall be fitted to the container in such a manner that it can discharge into the gas tight housing, when its presence is prescribed.
6.17.8.2.added
The pressure relief valve shall be so designed as to open at a pressure of 2,700  100 kPa.
6.15.8.9.deleted
The pressure relief device (fuse) shall be tested according to the provisions described in Annex 3, paragraph 7.
6.17.8.3.added
The flow capacity of the pressure relief valve, determined with compressed air at a pressure which is 20 per cent higher than the normal operating-pressure shall be at least Q  10.66  A0.82 In which: Q= flow of air in standard m3/min (100 kPa absolute and temperature of 15 °C) A= exterior surface of the container in m2. The flow test results shall be corrected to standard conditions: Air pressure of 100 kPa absolute and temperature of 15 °C. When the pressure relief valve is considered as a pressure relief device, the flow shall be at least 17.7 standard m3/min.
6.15.9.deleted
At minimum fuel level whereby the engine is still operating the heat build-up by the fuel pump(s) should never cause the pressure relief valve to open.
6.17.8.4.added
The pressure relief valve shall not have internal leakage up to 2,600 kPa.
6.17.8.5.added
The pressure relief device (fuse) shall be designed to open at a temperature of 120  10 °C.
6.15.10.1.deleted
The filling unit shall be equipped with at least one soft-seated non-return valve, and it shall not be dismountable by design.
6.17.8.6.added
The pressure relief device (fuse) shall be designed to have, when opened, a flow capacity of: Q  2.73  A In which: Q= flow of air in standard m3/min (100 kPa absolute and temperature of 15 °C) A= exterior surface of the container in m2. The flow test shall be carried out at an upstream air pressure of 200 kPa absolute, and at temperature of 15 °C. The flow test results shall be corrected to standard conditions: Air pressure of 100 kPa absolute, and temperature of 15 °C.
6.15.10.2.deleted
The filling unit shall be protected against contamination.
6.17.8.7.added
The pressure relief device shall be mounted on the container in the gaseous zone.
6.15.10.3.deleted
The design and dimensions of the connecting area of the filling unit shall comply with those in the figures in Annex 9. The filling unit shown in Figure 5 is only applicable for motor vehicles of categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.
6.17.8.8.added
The pressure relief device shall be fitted to the container in such a manner that it can discharge into the gas tight housing, when its presence is prescribed.
6.15.10.4.deleted
The filling unit shown in Figure 4 may also apply for motor vehicles of categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.3
6.17.8.9.added
The pressure relief device (fuse) shall be tested according to the provisions described in Annex 3, paragraph 7.
6.15.10.5.deleted
The outside filling unit is connected to the container by a hose or pipe.
6.17.9.added
At minimum fuel level whereby the engine is still operating the heat build-up by the fuel pump(s) should never cause the pressure relief valve to open.
6.17.10.1.added
The filling unit shall be equipped with at least one soft-seated non-return valve, and it shall not be dismountable by design.
6.15.10.6.1.deleted
The dead volume between the front sealing surface and the front of the non- return valve shall not exceed 0.1 cm3;
6.17.10.2.added
The filling unit shall be protected against contamination.
6.15.10.6.2.deleted
The flow through the connector at a pressure difference of 30 kPa shall be at least 60 litres/min, if tested with water.
6.17.10.3.added
The design and dimensions of the connecting area of the filling unit shall comply with those in the figures in Annex 9. The filling unit shown in Figure 5 is only applicable for motor vehicles of categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.
6.15.10.7.deleted
Specific provisions regarding the heavy-duty vehicle Euro filling unit (Annex 9 – Figure 5):
6.17.10.4.added
The filling unit shown in Figure 4 may also apply for motor vehicles of categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.3 3 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.6, para. 2. https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions
6.15.10.7.1.deleted
The dead volume between the front sealing surface and the front of the non- return valve shall not exceed 0.5 cm3;
6.17.10.5.added
The outside filling unit is connected to the container by a hose or pipe.
6.15.10.7.2.deleted
The flow through the filling unit, with the non-return valve mechanically opened, at a pressure difference of 50 kPa shall be at least 200 litres/min, when tested with water.
6.17.10.6.added
Specific provisions regarding the K15 filling unit (Annex 9 – Figure 3):
6.15.10.7.3.deleted
The Euro filling unit shall comply with the impact test as described in Annex 9, paragraph 7.4.
6.17.10.6.1.added
The dead volume between the front sealing surface and the front of the non- return valve shall not exceed 0.1 cm3;
6.17.10.6.2.added
The flow through the connector at a pressure difference of 30 kPa shall be at least 60 litres/min, if tested with water.
6.15.11.1.deleted
The device to verify the level of liquid in the container shall be of an indirect type (for example magnetic) between the inside and outside of the container. If the device to verify the level of liquid in the container is of a direct type, the electric power connections should meet IP54 specifications according to IEC EN 60529:1997-06.
6.17.10.7.added
Specific provisions regarding the heavy-duty vehicle Euro filling unit (Annex 9 – Figure 5):
6.15.11.2.deleted
If the level indicator of the container comprises a float, the latter shall withstand an outside pressure of 3,000 kPa.
6.17.10.7.1.added
The dead volume between the front sealing surface and the front of the non- return valve shall not exceed 0.5 cm3;
6.15.12.deleted
Provisions regarding the gas tight housing of the container.
6.17.10.7.2.added
The flow through the filling unit, with the non-return valve mechanically opened, at a pressure difference of 50 kPa shall be at least 200 litres/min, when tested with water.
6.15.12.1.deleted
450 mm2.
6.17.10.7.3.added
The Euro filling unit shall comply with the impact test as described in Annex 9, paragraph 7.4.
6.15.12.2.deleted
The gas-tight housing shall be leak-proof at a pressure of 10 kPa with the aperture(s) closed off, maximum allowed leak rate of 100 cm3/h vapour and show no permanent deformation.
6.17.10.8.added
The J15, K15 and heavy-duty vehicle Euro filling units shall comply with the impact test as described in Annex 9, paragraph 7.
6.15.12.3.deleted
The gas-tight housing shall be designed to withstand a pressure of 50 kPa.
6.15.13.deleted
Provisions regarding the remotely controlled service valve with excess flow valve.
6.17.11.1.added
The device to verify the level of liquid in the container shall be of an indirect type (for example magnetic) between the inside and outside of the container. If the device to verify the level of liquid in the container is of a direct type, the electric power connections should meet IP54 specifications according to IEC EN 60529:1997-06.
6.17.11.2.added
If the level indicator of the container comprises a float, the latter shall withstand an outside pressure of 3,000 kPa.
6.15.13.1.1.deleted
In case of the service valve is combined with a LPG fuel supply pump, identification of the pump shall be realised by the marking "PUMP INSIDE" and the identification of the pump either on the marking plate of the LPG As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html container or on the multivalve if present. Electrical connections inside the LPG container shall comply with protection degree class IP 40 according to IEC Standard 60529-1989+A1:1999.
6.17.12.added
Provisions regarding the gas tight housing of the container.
6.15.13.1.2.deleted
Service valves of Class 1 shall withstand a pressure of 6,750 kPa in the open and closed position. Service valves of Class 0 shall withstand a pressure of 2.25 WP in the open and closed position.
6.17.12.1.added
450 mm2.
6.15.13.1.3.deleted
The service valve shall not, at the shut-off position, allow an internal leak rate in the flow direction. There may be leak in the back flow direction.
6.17.12.2.added
The gas-tight housing shall be leak-proof at a pressure of 10 kPa with the aperture(s) closed off, maximum allowed leak rate of 100 cm 3/h vapour and show no permanent deformation.
6.17.12.3.added
The gas-tight housing shall be designed to withstand a pressure of 50 kPa.
6.15.13.2.1.deleted
The excess flow valve shall be mounted inside the container.
6.17.13.added
Provisions regarding the remotely controlled service valve with excess flow valve.
6.15.13.2.2.deleted
The excess flow valve shall be designed with a bypass to allow for equalization of pressures.
6.15.13.2.3.deleted
The excess flow valve shall cut off at a pressure difference over the valve of 90 kPa. At this pressure difference the flow shall not exceed 8,000 cm3/min.
6.17.13.1.1.added
In case of the service valve is combined with a LPG fuel supply pump, identification of the pump shall be realised by the marking "PUMP INSIDE" and the identification of the pump either on the marking plate of the LPG container or on the multivalve if present. Electrical connections inside the LPG container shall comply with protection degree class IP 40 according to IEC Standard 60529-1989+A1:1999.
6.15.13.2.4.deleted
When the excess flow valve is at cut-off position, the flow through the by-pass shall not exceed 500 cm3/min. at a differential pressure of 700 kPa.
6.17.13.1.2.added
Service valves of Class 1 shall withstand a pressure of 6,750 kPa in the open and closed position. Service valves of Class 0 shall withstand a pressure of 2.25 WP in the open and closed position.
6.17.13.1.3.added
The service valve shall not, at the shut-off position, allow an internal leak rate in the flow direction. There may be leak in the back flow direction.
6.17.13.2.1.added
The excess flow valve shall be mounted inside the container.
6.17.13.2.2.added
The excess flow valve shall be designed with a bypass to allow for equalization of pressures.
6.17.13.2.3.added
The excess flow valve shall cut off at a pressure difference over the valve of 90 kPa. At this pressure difference the flow shall not exceed 8,000 cm 3/min.
6.17.13.2.4.added
When the excess flow valve is at cut-off position, the flow through the by-pass shall not exceed 500 cm3/min. at a differential pressure of 700 kPa.
6.17.14.1.added
When a non-return valve is intended to be fitted as a component of an interconnected LPG-system for the purpose of paragraph 17.13.1.1., 17.13.1.2. or 17.13.2.1., it shall be submitted, during approval, to an endurance test according to paragraph 9.7. of Annex 16. The valve shall bear a marking with the following data clearly legible and indelible: (a) The wording "ICS", and (b) The approval mark according to paragraph 5.4. of this Regulation.
6.18.added
When intended to be fitted as components or parts of an interconnected LPG- system, non-metallic, metallic or a mixture of metallic and non-metallic LPG components, including flexible hoses and their elements, and non-metallic, metallic or a mixture of metallic and non-metallic parts of LPG components which may come into contact with petrol shall meet the requirements specified in Annex 19 to this Regulation. Non-metallic, metallic or a mixture of metallic and non-metallic components or components containing non-metallic parts shall bear an approval mark according to Annex A, Appendix 1.
9.3.changed
The minimum requirements for conformity of production control tests set forth in Annexes 8, 10 and 15 16 to this Regulation shall be complied with.
11.6.added
As from 1 September 2022, Contracting Parties applying this Regulation may refuse the sale of a type of component which does not meet the requirements of the 02 series of amendments to this Regulation, unless the component is intended as a replacement for fitting on vehicles in use.
16.2.changed
An approval number shall be assigned to each type of vehicle approved. Its first two digits shall indicate the series of amendments incorporating the most recent major technical amendments made to the Regulation at the time of issue approved in accordance with Schedule 4 of the approval. Agreement (E/ECE/TRANS/505/Rev.3).
16.4.1.changed
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval.4 The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3 http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
16.5.changed
Regulations annexed to the Agreement, in the country which has granted approval under this Regulation, the symbol prescribed in paragraph 16.4.1. above need not be repeated; in such case, the Regulation and approval numbers and the additional symbols of all the Regulations under which approval has 4 The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.6 https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions been granted in the country which has granted approval under this Regulation shall be placed in vertical columns to the right of the symbol prescribed in paragraph 16.4.1. above.
17.1.8.deleted
Identification of LPG-fuelled M2 and M3 category vehicles.
17.1.8.1.deleted
Vehicles of category M2 and M3 shall carry a plate as specified in Annex 16 to this Regulation.
17.1.6.1.added
Notwithstanding the provisions of paragraph 17.1.6., it shall be possible to make an external inspection (e.g. for periodic technical inspection) of the LPG- container and its accessories, when located outside the vehicle, according to the specifications of the manufacturer, without the use of tools to dismantle, but with visual aids, e.g. lamps, mirrors or endoscopes.
17.2.2.deleted
With the exception of the LPG fuel container, in no cross section of the vehicle any component of the LPG system, including any protective material which forms part of such components, may extend beyond the lower edge of the vehicle unless another part of the vehicle, within a radius of 150 mm is situated lower.
17.1.7.2.changed
The heating system referred to in paragraph 17.1.7.1. above shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the heating system is adequately protected and the required operation 5 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.6, para. 2. https://unece.org/transport/standards/transport/vehicle-regulations-wp29/resolutions of the normal LPG system is not affected.
17.1.7.5.changed
Mono-fuel vehicles installed with a service coupling shall carry a sticker near the service coupling as specified in Annex 17 18 to this Regulation.
17.1.8.2.changed
The plate These labels shall be installed placed on the front and rear of the M 2 or M3 category vehicle and on the outside left side as well as on the right side of the doors vehicle; for the side if available in vicinity of a front door. If there is no front door available, the label has to be placed on the left-hand side first third of the vehicle length. In addition, for vehicles of category M 2 and M3, a label shall be fixed to the right hand drive vehicles and on rear of the right-hand side for the left hand drive vehicles. vehicle.
17.2.2.added
With the exception of the LPG fuel container, in no cross section of the vehicle any component of the LPG system, including any protective material which forms part of such components, may extend beyond the lower edge of the vehicle unless another part of the vehicle, within a radius of 150 mm is situated lower.
17.3.1.1.changed
Fuel container; As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
17.3.1.10.changed
Gas-carrying connections between the LPG system components; 6 These components might not be necessary in case of liquid LPG injection.
17.4.1.changed
The fuel container shall be permanently installed in the vehicle and shall not be installed in the engine compartment. These components might not be necessary in case of liquid LPG injection.
17.7.2.deleted
If seamless copper is used the tube shall be protected by a rubber or plastic sleeve.
17.7.3.deleted
The outer diameter of gas tubes made of copper shall not exceed 12 mm with a wall thickness of at least 0.8 mm, gas tubes from steel and stainless steel shall not exceed 25 mm with, for gas services, an appropriate wall thickness.
17.7.4.deleted
The gas tube may be made of a non-metallic material if the tube fulfils the requirements of this Regulation, paragraph 6.7.
17.7.5.deleted
The gas tube may be replaced by a gas hose if this hose fulfils the requirement of this Regulation, paragraph 6.7.
17.7.6.deleted
Gas tubes, other than non-metallic gas tubes, shall be secured such that they shall not be subjected to vibration or stresses.
17.7.7.deleted
Gas hoses and non-metallic gas tubes shall be secured such that they shall not be subjected to stresses.
17.7.8.deleted
At the fixing point the gas tube or hose shall be fitted with a protective material.
17.7.9.deleted
Gas tubes or hoses shall not be located at jacking points.
17.7.10.deleted
At passages the gas tubes or hoses, whether or not fitted with a protective sleeve, shall be fitted with protective material.
17.8.1.deleted
Soldered or welded joints and bite-type compression joints are not permitted. Soldering or welding can be permitted for connecting the individual parts of detachable couplings to the gas tube or component.
17.8.2.deleted
Gas tubes shall only be connected by compatible fittings with regard to corrosion.
17.7.1.changed
Gas tubes shall be of seamless type made of seamless material: either copper or stainless steel or steel with corrosion-resistant coating.
17.8.3.deleted
Stainless steel tubes shall only be joined by stainless steel fittings.
17.7.1.1.added
If seamless copper is used the tube shall be protected by a rubber or plastic sleeve.
17.8.4.deleted
Distributing-blocks shall be made of corrosion-resistant material.
17.7.1.2.added
The outer diameter of Class 1 gas tubes made of copper shall not exceed 12 mm with a wall thickness of at least 0.8 mm, gas tubes of Class 1 from steel and stainless steel shall not exceed 25 mm with, for gas services, an appropriate wall thickness.
17.8.5.deleted
Gas tubes shall be connected by appropriate joints, for example, two-part compression joints in steel tubes and joints with olives tapered on both sides or two flanges in copper tubes. Gas tubes shall be connected with appropriate connections. Under no circumstances couplings may be used whereby the tube will be damaged. The burst pressure of the mounted couplings shall be the same or higher as specified for the tube.
17.8.6.deleted
The number of joints shall be limited to a minimum.
17.7.1.added
shall comply with the applicable tests according to the provisions of
17.8.7.deleted
Any joints shall be made in locations where access is possible for inspection.
17.8.8.deleted
In a passenger compartment or enclosed luggage compartment the gas tube or hose shall be no longer than reasonably required; this provision is fulfilled when the gas tube or hose does not extend further than from the fuel container to the side of vehicle.
17.7.3.added
Gas tubes of non-seamless type shall comply with the applicable tests according to the provisions of Annex 15.
17.8.8.1.deleted
There shall be no gas-conveying connections in the passenger compartment or enclosed luggage compartment with the exception of: (a) The connections on the gas-tight housing; and (b) The connection between the gas tube or hose and the filling unit if this connection is fitted with a sleeve which is resistant against LPG and any leaking gas will be discharged directly into the atmosphere.
17.7.4.added
Gas pipes made of a non-metallic material shall comply with the requirements of this Regulation, paragraph 6.7.
17.8.8.2.deleted
The provisions of paragraph 17.8.8. and paragraph 17.8.8.1. above shall not apply for M2 or M3 category vehicles if the gas tubes or hoses and connections are fitted with a sleeve which is resistant against LPG and which has an open connection to the atmosphere. The open end of the sleeve or ducting shall be situated at the lowest point.
17.7.5.added
The gas tube may be replaced by a gas hose if this hose fulfils the requirement of this Regulation, paragraph 6.7.
17.7.6.added
Gas tubes, other than non-metallic gas tubes, shall be secured such that they shall not be subjected to vibration or stresses.
17.9.1.deleted
A remotely controlled shut-off valve shall be installed in the gas tube from the LPG container to the pressure regulator/vaporizer, as close as possible to the pressure regulator/vaporizer.
17.7.7.added
Gas hoses and non-metallic gas tubes shall be secured such that they shall not be subjected to stresses.
17.9.2.deleted
The remotely controlled shut-off valve may be incorporated into the pressure regulator/vaporizer.
17.7.8.added
At the fixing point the gas tube or hose shall be fitted with a protective material.
17.9.3.deleted
Notwithstanding the provisions of paragraph 17.9.1. above, the remotely controlled shut-off valve may be installed at a location in the engine bay specified by the manufacturer of the LPG system if a fuel return system is provided between the pressure regulator and the LPG container.
17.7.9.added
Gas tubes or hoses shall not be located at jacking points.
17.9.4.deleted
The remotely controlled shut-off valve shall be installed such that the fuel supply is cut off when the engine is not running or, if the vehicle is also equipped with another fuel system, when the other fuel is selected. A delay of 2 seconds is permitted for diagnostic purposes.
17.7.10.added
sleeve, shall be fitted with protective material.
17.9.5.deleted
Notwithstanding the provision of paragraph 17.9.4. above, in case of liquid injection systems, if a fuel recirculation is required to purge the system from gas bubbles (vapour lock), it is allowed to keep the remotely controlled shut- off valve open for a period not longer than 10 seconds before starting the engine in LPG running mode and during the fuel switching-over.
17.9.6.deleted
Notwithstanding the provisions of paragraph 17.9.4. above, the remotely controlled shut-off valve may stay in an open position during the commanded stop phases.
17.8.1.added
Soldered or welded joints and bite-type compression joints are not permitted. Soldering or welding can be permitted for connecting the individual parts of detachable couplings to the gas tube or component.
17.9.7.deleted
If the remotely controlled shut-off valve is closed during commanded stop phases, the valve shall comply with paragraph 1.7. of Annex 7.17.10. Filling unit
17.8.2.added
Gas tubes shall only be connected by compatible fittings with regard to corrosion.
17.10.1.deleted
The filling unit shall be secured against rotation and shall be protected against dirt and water.
17.8.3.added
Stainless steel tubes shall only be joined by stainless steel fittings.
17.10.2.deleted
When the LPG container is installed in the passenger compartment or an enclosed (luggage) compartment, the filling unit shall be located at the outside of the vehicle.
17.8.4.added
Distributing-blocks shall be made of corrosion-resistant material.
17.8.5.added
Gas tubes shall be connected by appropriate joints, for example, two-part compression joints in steel tubes and joints with olives tapered on both sides or two flanges in copper tubes. Gas tubes shall be connected with appropriate connections. Under no circumstances couplings may be used whereby the tube will be damaged. The burst pressure of the mounted couplings shall be the same or higher as specified for the tube.
17.11.1.deleted
The electrical components of the LPG system shall be protected against overloads and at least one separate fuse shall be provided in the supply cable.
17.8.6.added
The number of joints shall be limited to a minimum.
17.11.1.1.deleted
The fuse shall be installed in a known location where it can be reached without the use of tools.
17.8.7.added
Any joints shall be made in locations where access is possible for inspection.
17.11.2.deleted
The electrical power to LPG system components which also carry gas may not be conducted by a gas tube.
17.8.8.added
In a passenger compartment or enclosed luggage compartment the gas tube or hose shall be no longer than reasonably required; this provision is fulfilled when the gas tube or hose does not extend further than from the fuel container to the side of vehicle.
17.11.3.deleted
All electrical components installed in a part of the LPG system where the pressure exceeds 20 kPa shall be connected and insulated in a manner that no current is led through LPG containing parts.
17.8.8.1.added
There shall be no gas-conveying connections in the passenger compartment or enclosed luggage compartment with the exception of: (a) The connections on the gas-tight housing; and (b) The connection between the gas tube or hose and the filling unit if this connection is fitted with a sleeve which is resistant against LPG and any leaking gas will be discharged directly into the atmosphere.
17.11.4.deleted
Electrical cables shall be adequately protected against damage. The electrical connections inside the boot and passengers compartment shall comply with protection degree class IP 40 according to IEC Standard 60529-1989+A1:1999. All other electrical connections shall comply with protection degree class IP 54 according to IEC Standard 60529- 1989+A1:1999.
17.8.8.2.added
The provisions of paragraph 17.8.8. and paragraph 17.8.8.1. above shall not apply for M2 or M3 category vehicles if the gas tubes or hoses and connections are fitted with a sleeve which is resistant against LPG and which has an open connection to the atmosphere. The open end of the sleeve or ducting shall be situated at the lowest point.
17.11.6.deleted
The electrical connections and components in the gas-tight housing shall be constructed such that no sparks are generated.
17.9.1.added
A remotely controlled shut-off valve shall be installed in the gas tube from the LPG container to the pressure regulator/vaporizer, as close as possible to the pressure regulator/vaporizer.
17.9.2.added
The remotely controlled shut-off valve may be incorporated into the pressure regulator/vaporizer.
17.12.1.deleted
The pressure relief device shall be fitted to the fuel container(s) in such a manner that it can discharge into the gas tight housing, when its presence is prescribed, if that gas tight housing fulfils the requirements of paragraph 17.6.5. above.
17.9.3.added
Notwithstanding the provisions of paragraph 17.9.1. above, the remotely controlled shut-off valve may be installed at a location in the engine bay specified by the manufacturer of the LPG system if a fuel return system is provided between the pressure regulator and the LPG container.
18.deleted
The conformity of production procedures shall comply with those set out in the Agreement, Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2) with the following requirements:
17.9.4.added
The remotely controlled shut-off valve shall be installed such that the fuel supply is cut off when the engine is not running or, if the vehicle is also equipped with another fuel system, when the other fuel is selected. A delay of 2 seconds is permitted for diagnostic purposes.
18.1.deleted
All vehicles approved under this Regulation shall be so manufactured as to conform to the type approved by meeting the requirements of paragraph 17. above.
17.9.5.added
Notwithstanding the provision of paragraph 17.9.4. above, in case of liquid injection systems, if a fuel recirculation is required to purge the system from gas bubbles (vapour lock), it is allowed to keep the remotely controlled shut- off valve open for a period not longer than 10 seconds before starting the engine in LPG running mode and during the fuel switching-over.
18.2.deleted
In order to verify that the requirements of paragraph 18.1. above are met, suitable controls of the production shall be carried out.
17.9.6.added
Notwithstanding the provisions of paragraph 17.9.4. above, the remotely controlled shut-off valve may stay in an open position during the commanded stop phases.
18.3.deleted
The Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production facility. The normal frequency of these verifications shall be once every year.
17.9.7.added
If the remotely controlled shut-off valve is closed during commanded stop phases, the valve shall comply with paragraph 1.7. of Annex 7.17.10. Filling unit
17.10.1.added
The filling unit shall be secured against rotation and shall be protected against dirt and water.
19.1.deleted
The approval granted in respect of a type of vehicle pursuant to this Regulation may be withdrawn if the requirements laid down in paragraph 18. above are not complied with.
17.10.2.added
When the LPG container is installed in the passenger compartment or an enclosed (luggage) compartment, the filling unit shall be located at the outside of the vehicle.
19.2.deleted
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation, by means of a communication form conforming to the model in Annex 2D to this Regulation.
20.deleted
Modification and extension of approval of a vehicle type
17.11.1.added
The electrical components of the LPG system shall be protected against overloads and at least one separate fuse shall be provided in the supply cable.
20.1.deleted
Every modification of the installation of the specific equipment for the use of liquefied petroleum gases in the propulsion system of the vehicle shall be notified to the Type Approval Authority which approved the vehicle type. That Type Approval Authority may then either:
17.11.1.1.added
The fuse shall be installed in a known location where it can be reached without the use of tools.
20.1.1.deleted
Consider that the modifications made are unlikely to have an appreciably adverse effect and that in any case the vehicle still complies with the requirements; or
17.11.2.added
The electrical power to LPG system components which also carry gas may not be conducted by a gas tube.
20.1.2.deleted
Require a further test report from the Technical Service responsible for conducting the tests.
17.11.3.added
All electrical components installed in a part of the LPG system where the pressure exceeds 20 kPa shall be connected and insulated in a manner that no current is led through LPG containing parts.
20.2.deleted
Confirmation or refusal of approval, specifying the alteration, shall be communicated by the procedure specified in paragraph 16.3. above to the Parties to the Agreement applying this Regulation.
17.11.4.added
Electrical cables shall be adequately protected against damage. The electrical connections inside the boot and passengers compartment shall comply with protection degree class IP 40 according to IEC Standard 60529- 1989+A1:1999. All other electrical connections shall comply with protection degree class IP 54 according to IEC Standard 60529-1989+A1:1999.
20.3.deleted
The Type Approval Authority issuing the extension of approval shall assign a series number for such an extension and inform thereof the other Contracting Parties to the 1958 Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2D to this Regulation.
21.deleted
If the holder of the approval completely ceases to manufacture a type of vehicle approved in accordance with this Regulation, he shall so inform the Type Approval Authority which granted the approval. Upon receiving the relevant communication, that Authority shall inform thereof the other Contracting Parties to the Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2D to this Regulation.
17.11.6.added
The electrical connections and components in the gas-tight housing shall be constructed such that no sparks are generated.
22.deleted
Transitional provisions regarding the installation of various components of the LPG equipment and the type approval of a vehicle fitted with specific equipment for the use of liquefied petroleum gas in its propulsion system with regard to the installation of such equipment
22.1.deleted
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall refuse to grant approval under this Regulation as amended by the 01 series of amendments.
17.12.1.added
The pressure relief device shall be fitted to the fuel container(s) in such a manner that it can discharge into the gas tight housing, when its presence is prescribed, if that gas tight housing fulfils the requirements of paragraph 17.6.5. above.
22.2.deleted
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall prohibit the fitting on a vehicle and the use as first equipment of a component approved under this Regulation as amended by the 01 series of amendments.
22.3.deleted
During the period of 12 months after the date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation may allow the use of as first equipment of a type of component approved to this Regulation in its original form, when fitted on a vehicle transformed for LPG propulsion.
22.4.deleted
Upon the expiration of a period of 12 months after the date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation shall prohibit the use as first equipment of a component which does not meet the requirements of this Regulation as amended by the 01 series of amendments, when fitted on a vehicle transformed for LPG propulsion.
17.13.1.1.added
Means shall be provided to prevent any flow of LPG into the diesel tank. The installation of two non-return valves along the flow line shall be considered as meeting this requirement if the valves comply with the provisions of paragraph
22.5.deleted
Upon the expiration of a period of 12 months after the date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation may refuse first National Registration (first entry into service) of a vehicle which does not meet the requirements of this Regulation as amended by the 01 series of amendments.
23.deleted
Names and addresses of Technical Services responsible for conducting approval tests, and of Type Approval Authorities The Parties to the Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the Technical Services responsible for conducting approval tests and of the Type Approval Authorities which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval, issued in other countries, are to be sent. Annex 1
17.13.1.2.added
Means shall be provided to prevent any flow of diesel into the LPG container. The installation of two non-return valves along the flow line shall be considered as meeting this requirement if the valves comply with the provisions of paragraph 6.17.14.1.
17.13.2.1.added
Means shall be provided to prevent any flow of LPG into the petrol tank. The installation of two non-return valves along the flow line shall be considered as meeting this requirement if the valves comply with the provisions of paragraph
17.13.2.2.added
In order to prevent that flows of petrol into LPG container, occurring during switch-over operations, could lead to an overfilling of the LPG tank (i.e. above 80 per cent of its capacity which means 80 per cent liquid and 20 per cent gaseous fuel), the LPG-system shall contain an Electronic Control Unit complying also with paragraph 6. of Annex 14. A remotely controlled shut-off valve complying with the provisions of paragraph 6.17.3.3. shall be installed along the flow line.
17.13.2.3.added
Means shall be provided to prevent that flows of petrol into the LPG fuel container could lead to a content of petrol higher than 16 per cent of the actual volume contained in the LPG tank. This measure shall be demonstrated in accordance with the procedures laid down in Annex 20. The present requirement shall be fulfilled also in case of faults by use of a malfunction indication to the driver, and optionally activation of limp home mode.
17.13.2.4.added
Non-metallic, metallic or a mixture of metallic and non-metallic LPG components, including flexible hoses and their elements, and non-metallic, metallic or a mixture of metallic and non-metallic parts of LPG components which may come into contact with petrol shall comply with the requirements set out in paragraph 6.18.
17.13.2.5.added
The ECU complying with the requirements of paragraph 17.13.2.2. shall be installed: (a) In vehicles where the flushed volume is less than or equal to 0.4 litre; and (b) In vehicles equipped with a LPG container having a capacity higher than 20 litres.
18.added
The conformity of production procedures shall comply with those set out in the Agreement, Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2) with the following requirements:
18.1.added
All vehicles approved under this Regulation shall be so manufactured as to conform to the type approved by meeting the requirements of paragraph 17. above.
18.2.added
In order to verify that the requirements of paragraph 18.1. above are met, suitable controls of the production shall be carried out.
18.3.added
The Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production facility. The normal frequency of these verifications shall be once every year.
19.1.added
The approval granted in respect of a type of vehicle pursuant to this Regulation may be withdrawn if the requirements laid down in paragraph 18. above are not complied with.
19.2.added
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation, by means of a communication form conforming to the model in Annex 2D to this Regulation.
20.added
Modification and extension of approval of a vehicle type
20.1.added
Every modification of the installation of the specific equipment for the use of liquefied petroleum gases in the propulsion system of the vehicle shall be notified to the Type Approval Authority which approved the vehicle type. That Type Approval Authority may then either:
20.1.1.added
Consider that the modifications made are unlikely to have an appreciably adverse effect and that in any case the vehicle still complies with the requirements; or
20.1.2.added
Require a further test report from the Technical Service responsible for conducting the tests.
20.2.added
Confirmation or refusal of approval, specifying the alteration, shall be communicated by the procedure specified in paragraph 16.3. above to the Parties to the Agreement applying this Regulation.
20.3.added
The Type Approval Authority issuing the extension of approval shall assign a series number for such an extension and inform thereof the other Contracting Parties to the 1958 Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2D to this Regulation.
21.added
If the holder of the approval completely ceases to manufacture a type of vehicle approved in accordance with this Regulation, he shall so inform the Type Approval Authority which granted the approval. Upon receiving the relevant communication, that Authority shall inform thereof the other Contracting Parties to the Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2D to this Regulation.
22.added
Transitional provisions regarding the installation of various components of the LPG equipment and the type approval of a vehicle fitted with specific equipment for the use of liquefied petroleum gas in its propulsion system with regard to the installation of such equipment
22.1.added
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall refuse to grant approval under this Regulation as amended by the 01 series of amendments.
22.2.added
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall prohibit the fitting on a vehicle and the use as first equipment of a component approved under this Regulation as amended by the 01 series of amendments.
22.3.added
During the period of 12 months after the date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation may allow the use of as first equipment of a type of component approved to this Regulation in its original form, when fitted on a vehicle transformed for LPG propulsion.
22.4.added
Upon the expiration of a period of 12 months after the date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation shall prohibit the use as first equipment of a component which does not meet the requirements of this Regulation as amended by the 01 series of amendments, when fitted on a vehicle transformed for LPG propulsion.
22.5.added
Upon the expiration of a period of 12 months after the date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation may refuse first National Registration (first entry into service) of a vehicle which does not meet the requirements of this Regulation as amended by the 01 series of amendments.
22.6.added
As from the official date of entry into force of the 02 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 02 series of amendments.
22.7.added
As from 1 September 2020, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2020.
22.8.added
Until 1 September 2021, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2020.
22.9.added
As from 1 September 2021, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation.
22.10.added
Notwithstanding paragraph 22.9., Contracting Parties applying the Regulation shall continue to accept type approvals of the equipment/parts issued according to the preceding series of amendments to the Regulation.
1.2.4.5.14.deleted
Annex 1
22.11.added
Notwithstanding paragraph 22.9., Contracting Parties applying this Regulation shall continue to accept type approvals issued according to the preceding series of amendments to this Regulation, for the vehicles/vehicle systems which are not affected by the changes introduced by the 02 series of amendments.
22.12.added
Contracting Parties applying this Regulation shall not refuse to grant type approvals according to any preceding series of amendments to this Regulation or extensions thereof.
22.13.added
As from 1 September 2021, Contracting Parties applying this Regulation may refuse national or regional type-approval and may refuse first registration of a vehicle type, if the vehicle type is affected by the changes introduced by the 02 series of amendments but does not meet the requirements of the 02 series of amendments to this Regulation.
22.14.added
As from the official date of entry into force of the 03 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 03 series of amendments.
22.15.added
As from 1 September 2021, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2021.
1.2.4.5.19.deleted
Further documentation:
22.16.added
Until 1 September 2022, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2021.
1.2.4.5.19.1.deleted
Description of the LPG equipment and the physical safeguarding of the catalyst at switch-over from petrol to LPG or back
22.17.added
As from 1 September 2022, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation.
1.2.4.5.19.2.deleted
System lay-out (electrical connections, vacuum connections compensation hoses, etc.)
22.18.added
Regulation shall continue to accept UN type-approvals issued according to the preceding series of amendments to the UN Regulation, for the vehicles / vehicle systems / vehicle components which are not affected by the changes introduced by the 03 series of amendments.
22.19.added
As from the official date of entry into force of the 04 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 03 series of amendments.
1.2.5.1.deleted
Annex 2A Annex 2A Arrangement of the LPG equipment type approval mark (See paragraph 5.4. of this Regulation) 67 R—012439 CLASS #1 a  5 mm Class 0, 1, 2, 2A or 3 The above approval mark affixed to the LPG equipment shows that this equipment has been approved in the Netherlands (E 4), pursuant to Regulation No. 67 under approval number 012439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 series of amendments. Annex 2B Annex 2B Communication (Maximum format: A4 (210 x 297 mm)) issued by: Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a type of LPG equipment pursuant to Regulation No. 67
22.20.added
As from 1 September 2023, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2023.
22.21.added
Until 1 September 2025, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2023.
22.22.added
As from 1 September 2025, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation.
22.23.added
Regulation shall continue to accept UN type-approvals issued according to the preceding series of amendments to the UN Regulation, for the vehicles / vehicle systems / vehicle components which are not affected by the changes introduced by the 04 series of amendments.
23.added
Names and addresses of Technical Services responsible for conducting approval tests, and of Type Approval Authorities The Parties to the Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the Technical Services responsible for conducting approval tests and of the Type Approval Authorities which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval, issued in other countries, are to be sent.
12.deleted
Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation.) Strike out what does not apply. Annex 2D
1.2.4.5.3.added
1 Specify the tolerance. 2 Strike out what does not apply.
1.2.4.5.7.changed
LPG container: Specify the tolerance. Strike out what does not apply. Annex 1
1.2.4.5.20.added
Seamless gas tubes made of materials other than copper, stainless steel and steel with corrosion-resistant coating and their couplings
1.2.4.5.21.added
Further documentation:
1.2.4.5.21.1.added
Description of the LPG equipment and the physical safeguarding of the catalyst at switch-over from petrol to LPG or back
1.2.4.5.21.2.added
System lay-out (electrical connections, vacuum connections compensation hoses, etc.)
1.2.7.added
Documentation of the provisions for interconnected LPG systems (Annex 20): Annex 2A Arrangement of the LPG equipment type approval mark (See paragraph 5.4. of this Regulation) a  5 mm 1 Class 0, 1, 2, 2A or 3. Indication mark of technical modification to be marked only on multivalve or, when approved separately, on pressure relief valve (discharge valve) and pressure relief device. The above approval mark affixed to the LPG equipment shows that this equipment has been approved in the Netherlands (E 4), pursuant to UN Regulation No. 67 under approval number 032439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of UN Regulation No. 67 as amended by the 03 series of amendments. The indication mark of technical modification (A in the example), preceded by the star symbol, is required only for the approval mark of the accessories of the container (multivalve or, when approved separately, pressure relief valve (discharge valve) and pressure relief device,). Annex 2A - Appendix Arrangement of the type-approval mark of non-metallic, metallic or a mixture of metallic and non-metallic LPG components and LPG components containing non-metallic, metallic or a mixture of metallic and non-metallic parts compatible with petrol. The letter N indicates non- metallic components. The letter M indicates metallic components. The letters NM indicates a combination of metallic…
1.changed
Container including the configuration of accessories fitted to the container, as laid down in Appendix 1 to this annex. 80 per cent stop valve Level indicator Pressure relief valve (discharge valve) Pressure relief device Remotely controlled service valve with excess flow valve Gas-tight housing Power supply bushing (pump/actuators) Fuel pump Vaporizer/pressure regulator Shut-off valve Non-return valve Gas-tube pressure relief valve Service coupling Flexible hose Remote filling unit 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation.) 2 Strike out what does not apply. Annex 2B Gas-tube pressure relief valve Service coupling Flexible hose Remote filling unit Gas injection device or injector Fuel rail Gas dosage unit Gas mixing piece Electronic control unit Pressure/temperature sensor LPG filter unit Non-seamless gas tubes and their couplings Gas tubes made of materials other than copper, stainless steel and steel with corrosion- resistant coating and their couplings Multi-component
14.changed
The documents filed with the application or extension of approval can be obtained upon request. Annex 2B - Appendix Annex 2B - Appendix Containers only
Table 1changed
No. Item Type Approval No. Extension No. Indication mark(s)1 a 80 per cent stop valve b Level indicator c Pressure relief valve d Remotely controlled service valve with excess valve e Fuel pump f Multi-valve g Gas-tight housing h Power supply bushing i Non return valve j Pressure relief device 1 The indication marks of technical modification apply only to Multivalve, or, when approved separately, to Pressure relief valve (discharge valve) and Pressure relief device.
Table 2changed
No. Type Diameter/height [mm] Capacity [L] External Configuration of surface[cm2] accessories [codes]1 Code 00 and, if applicable, same code(s) from Table 3. Annex 2B – Appendix
Table 3changed
No. Accessories Type Approval No. Extension Configuration of No. accessories [code] a b c d Annex 2C Annex 2C Arrangement of approval marks Model A (See paragraph 16.4. of this Regulation) 67 R—012439 R—032439 a  8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of specific equipment for the use of LPG for propulsion, been approved in the Netherlands (E 4), pursuant to Regulation No. 67 under approval number 012439. 032439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 03 series of amendments. Model B (See paragraph 16.4. of this Regulation) 67 012439 032439 83 041628 a  8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of specific equipment for the use of LPG for propulsion, been approved in the Netherlands (E 4), pursuant to Regulation No. 67 under approval number 012439. 032439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 03 series of amendments and that Regulation No. 83 included the 04 series of amendments. Annex 2D Annex 2D Communication (Maximum format: A4 (210 x 297 mm)) issued by : Name of administration: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a vehicle type with regard to the installation of LPG systems pursuant to Regulation No. 67
17.changed
The following documents filed with the application or extension of approval can be obtained upon request. 1 Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see approval provisions in the Regulation.) 2 Strike out what does not apply. Drawings, diagrams and scheme plans regarding the components and the installation of the LPG equipment considered to be of importance for the purpose of this Regulation; Where applicable drawings of the various equipment and their position in the vehicle.
1.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. Operational tests Annex 15, 16, para. 10. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
2.3.changed
Classification pressure: 3,000 kPa. Annex 3
2.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
3.added
Pressure relief valve (discharge valve) and components connecting the pressure relief valve with the gaseous phase inside the LPG container
3.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 200 operation cycles) Operational test Annex 15, 16, para. 10. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 1.6.** 16.** Test on non-metallic material inside a container Annex 16, para. 18.**
4.2.changed
Component classification (according to Figure 1, para.2.): Class 3 or Class 0 if WP declared.
4.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. Operational test Annex 15, 16, para. 10 LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** Annex 3
4.7.changed
If the remotely controlled service valve is closed during commanded stop phases, the valve shall be submitted to the following numbers of operations during the endurance test of paragraph 9. of Annex 15: 16: (a) 200,000 cycles (mark "H1") if the engine shuts off automatically when the vehicle comes to a halt. (b) 500,000 cycles (mark "H2") if, in addition to (a), the engine also shuts off automatically when the vehicle drives with the electric motor only. (c) 1,000,000 cycles (mark "H3") if, in addition to (a) or (b), the engine also shuts off automatically when the accelerator pedal is released. Notwithstanding the above-mentioned provisions, the valve complying with (b) shall be deemed to satisfy (a), and the valve complying with (c) shall be deemed to satisfy (a) and (b).
5.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
6.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. (at 50 kPa) External leakage Annex 15, 16, para. 5. (at 10 kPa) High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7.
7.added
Provisions regarding the approval of the pressure relief device (fuse) and components connecting the pressure relief device with the gaseous phase inside the LPG container.
7.6.changed
Test procedures to be applied: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat (if any) leakage Annex 15, 16, para. 8. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Annex 3 Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycles Annex 15, 16, para. 16.** Test on non-metallic material inside a container Annex 16, para. 18.**
6.1.changed
Fuel pump mounted inside the container: LPG compatibility Annex 15, 16, para. 11.**
6.2.changed
Fuel pump mounted outside the container: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** ____________ * Only for metallic parts. ** Only for non-metallic parts. Annex 5
6.1.changed
For parts of Class 1: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
6.2.changed
For parts of Class 2 and/or 2A: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.** _________________ * Only for metallic parts. ** Only for non-metallic parts.
6.1.changed
For parts of Class 1: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Annex 6 Seat leakage Annex 15, 16, para. 8. Endurance (Number of cycles shall be 50,000 cycles) Annex 15, 16, para. 9. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
6.2.changed
For parts of Class 2 and/or 2A: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Remarks: The shut-off valve can be integrated in the vaporizer, regulator, in this case Annex 7 is also applicable. The parts of the pressure regulator/vaporizer (Class 1, 2 or 2A) shall be leak proof with the outlet(s) of that part closed off. For the overpressure test all the outlets including those of the coolant compartment shall be closed off. __________________ * Only for metallic parts. ** Only for non-metallic parts.
1.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
1.7.changed
If the remotely controlled shut-off valve is closed during commanded stop phases, the valve shall be submitted to the numbers of operations according to paragraph 4.7. of Annex 3 during the endurance test of paragraph 9. of Annex 15.
1.8.added
If a remotely controlled shut-off valve is used in an interconnected LPG- system, the provisions of paragraph 6.17.3.3. shall apply.
2.2.changed
Component classification (according to Figure 1, para. 2.): Class 1. Annex 7
2.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
2.7.added
If a non-return valve is used in accordance with paragraph 6.17.14.1. (interconnected LPG-system), the provisions set out in that paragraph shall apply.
3.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 200 operation cycles) LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
4.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 6,000 operation cycles) LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Annex 7 Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** __________________ * Only for metallic parts. ** Only for non-metallic parts.
1.1.3.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
1.3.1.1.changed
Tensile strength and elongation at break according to ISO 37. Tensile strength not less than 10 MPa and elongation at break not less than 250 per cent. Annex 8
1.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose shall be capable of withstanding the test- pressure test-pressure as mentioned in paragraph 1.5.5.2. below.
Figure 1changed
b mass propulsion mechanism a 1,2m Annex 8 Hose inside diameter Bending radius Distance between centres [mm] [mm] [mm] (Figure 1) (Figure 1) Vertical Horizontal b a up to 13 102 241 102 13 to 16 153 356 153 from 16 to 20 178 419 178
1.7.1.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant corrosion-resistant material.
2.2.2.changed
The reinforcing interlayer(s) has (have) to be protected by a cover against corrosion. If for the reinforcing interlayer(s) corrosion-resistant material is used (i.e. stainless steel) a cover is not required. Annex 8
2.5.3.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose shall be capable of withstanding the test pressure as mentioned in paragraph 2.5.4.2. Annex 8
2.7.2.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant corrosion-resistant material.
2.8.1.2.changed
The year and month of fabrication. Annex 8
3.1.5.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
3.2.1.changed
The synthetic hose shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion- resistant corrosion-resistant material is used (i.e. stainless-steel) a cover is not required.
3.3.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 3.3.2.1. above. Annex 8 Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
3.5.2.3.changed
No cracking or rupture is allowed. Annex 8
Figure 3changed
b mass propulsion mechanism a 1,2m ( (a ((a = 102 mm; b= 241 mm)
3.6.2.changed
The couplings shall be of the crimp-fitting type and made up of a hose- coupling hose-coupling or banjo bolt. The sealing shall be resistant to LPG and comply with paragraph 3.3.1.2. above.
4.1.1.changed
The purpose of this chapter is to determine the provisions regarding the approval of synthetic flexible hoses for use with LPG, having an inside diameter up to 10 mm. Annex 8
4.1.5.changed
The inside diameter shall be in compliance with Table 1 of standard ISO 1307.
4.4.1.1.changed
Tensile strength and elongation at break according to ISO 37. Tensile strength not less than 20 MPa and elongation at break not less than 250 per cent. Annex 8
Figure 1deleted
Annex 9
Figure 4deleted
Annex 9
4.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. Annex 8 After the test the hose shall be capable of withstanding the test pressure as mentioned in paragraph 4.5.5.2. below.
4.6.2.changed
The couplings shall be of the crimp-fitting type and made up of a hose- coupling hose-coupling or banjo bolt. The sealing shall be resistant to LPG and comply with paragraph 4.3.1.2. above.
4.3.1.2.added
above.
4.8.2.changed
Every coupling shall bear the trade name or mark of the assembling manufacturer. Annex 9
6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. Seat leakage test Annex 15, 16, para. 8. Endurance Annex 15, 16, para. 9. (with 6,000 operation cycles) LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13. Ozone ageing Annex 15, 16, para. 14. Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** Impact test paragraph 7. of this annex
7.added
Impact test requirements for the J15, K15 and heavy-duty vehicle Euro filling units
Annex 10changed
The meaning of symbols and terms used in this annex Ph = hydraulic test pressure in kPa; Pr = container bursting pressure measured in the bursting test, in kPa; Re = minimum yield stress in N/mm2 guaranteed by the material standard; Rm = minimum tensile strength in N/mm2 guaranteed by the material standard Rmt = actual tensile strength, in N/mm2; a = calculated minimum thickness of the cylindrical shell wall, in mm; b = calculated minimum thickness of dished ends, in mm; D = nominal outside diameter of the container, in mm; R = inside radius of the dished end of the standard cylindrical container, in mm; r = inside knuckle of the dished end of the standard cylindrical container, in mm; H = outside height of dished part of container end, in mm; h = height of cylindrical part of dished end, in mm; L = length of container's stress-resistant shell, in mm; A = elongation value (per cent) of parent material; V0 = initial volume of the container at the moment when the pressure is increased in the burst test, in dm3; V = final volume of the container on bursting, in dm3; dm 3; g = gravity, in m/s2; c = shape factor; Z = stress reduction factor.
1.2.changed
For all dimensions without indication of tolerances, general tolerances of EN 22768-1 shall apply. Annex 10
1.6.1.1.1.changed
Containers without longitudinal welds: Ph  D Ph  D a  a= = 2000 e + Ph 1500 R e + Ph R 4/3
1.6.1.1.2.changed
Containers with longitudinal welds: Ph  D Ph  D a  a= = 2000 e  z + Ph 1500 R e  z + Ph R 4/3 (a) z = 0.85 where the manufacturer radiographs each weld intersection and 100 m of the adjacent longitudinal weld and 50 mm (25 mm each side of the intersection) of the adjacent circumferential weld. This test has to be performed per machine at the beginning and end of each work shift period from continuous production. (b) z = 1 where each weld intersection and 100 mm of the adjacent longitudinal weld and 50 mm (25 each side of the intersection) of the adjacent circumferential weld is spot radiographed. This test has to be performed at 10 per cent of the container production: the containers to be tested are chosen randomly. Should these radiograph tests reveal unacceptable defects, as defined in paragraph 2.4.1.4. of this annex, all the necessary steps shall be taken to examine the production run in question and eliminate the defects.
2.4.1.4.changed
The following defects are not acceptable: Cracks, inadequate welds or inadequate penetration of this annex, all the weld. necessary steps shall be taken to examine the production run in question and eliminate the defects.
1.6.1.2.1.changed
The container ends shall be in one piece, shall encave to the pressure and shall have either a torispherical or an elliptical form (examples are given in Appendix 5 of this annex). Annex 10
1.6.1.2.3.changed
The thickness of these barrelled ends shall not be in toto less than the figure calculated by means of the following formula: Ph  D b b= C 1500 R e The shape factor C to be used for full ends is given in the table and in the graphs contained in Appendix 4 to this annex. The wall thickness of the cylindrical edge of the ends may not be less or differ more than 15 per cent from the smallest wall thickness of the shell.
1.6.1.3.changed
The nominal wall thickness of the cylindrical part and of the barrelled end may not, under any circumstances; be less than: D + 1 mm with a minimum of 1.5 mm.
1.7.2.3.changed
The manufacturer shall ensure that the welds show continuous penetration without any deviation of the weld seam, and that they are free from defects likely to jeopardize the safe use of the container. For containers in two pieces, a radiographical test has to be performed on the circumferential butt welds over 100 mm, with the exception of the welds in conformity with joggle weld on page 1 of Appendix 1 to this annex. On one container selected at the beginning and end of each shift period from continuous production and, in the event of production being interrupted for a period of more than 12 hours, the first container welded should also be radiographed. Annex 10
Table 2changed
Test to be performed Production Number of containers Test description Batch tests to be tested for type approval Burst test 1 per batch 3 See para. 2.2. Hydraulic test Each container All containers See para. 2.3. Ambient temperature pressure 1 per 5 batches 3 See para. 2.3.6.1. cycling test High temperature pressure 1 See para. 2.3.6.2. cycling test External leak test 1 See para. 2.3.6.3. Permeation test 1 See para. 2.3.6.4. LPG cycling test 1 See para. 2.3.6.5. High temperature creep test 1 See para. 2.3.6.6. Bonfire test 1 See para. 2.6. Impact test 1 See para. 2.7. Drop test 1 See para. 2.8. Boss torque test 1 See para. 2.9. Acid environment test 1 See para. 2.10. Ultra-violet radiation test 1 See para. 2.11. Annex 10
2.1.1.1.1.changed
The frequency of the tests for metal containers shall be: 1 container from each batch during production and for type testing, see Table 1. Test pieces which are not flat shall be flattened by a cold process. In test pieces containing a weld, the weld shall be machined to trim the surplus. Metal containers shall be subjected to the tests as described in Table 1. Test pieces from containers with one circumferential weld only (two sections) shall be taken from the places shown in Appendix 2, Figure 1. Test pieces from containers with longitudinal and circumferential welds (three or more sections) shall be taken from the places shown in Appendix 2, Figure
2.1.2.1.1.changed
Containers with longitudinal and circumferential welds (three sections) on test-pieces test- pieces taken from the places shown in Figure 1 of Appendix 2 to this annex: (a) One tensile test on parent material; the test piece to be taken in the longitudinal direction (if this is not possible, it may be taken in a circumferential direction); (b) One tensile test on parent material of the bottom; (c) One tensile test perpendicular to the longitudinal weld; (d) One tensile test perpendicular to the circumferential weld; (e) One bend test on the longitudinal weld, the inner surface in tension; (f) One bend test on the longitudinal weld, the outer surface in tension; (g) One bend test on the circumferential weld, the inner surface in tension; (h) One bend test on the circumferential weld, the outer surface in tension; and (i) One macroscopic test of a welded section; (ml, m2) A minimum of two macroscopic tests of valve boss/plate sections in case of the sidewall mounted valves referred to in paragraph 2.4.2. below.
2.1.2.2.1.1.changed
The tensile test shall be carried out in accordance with Euronorms EN 876, EN 895 and EN 10002-1.
2.1.2.3.1.changed
The bend test shall be carried out in accordance with standards ISO 7438:2005 and ISO 7799:1985 and ISO 5173:2009 + Amd 1:2011 for welded parts. The bend tests shall be carried out on the inner surface in tension and the outer surface in tension.
2.1.2.3.2.changed
Cracks shall not appear in the test-piece when it is bent round a mandrel as long as the inside edges are separated by a distance not greater than the diameter of the mandrel +3a (see Figure 1 of Appendix 3 to this annex). 2.1.2.3.3 The ratio (n) between the diameter of the mandrel and the thickness of the test piece shall not exceed the values given in the following table: Actual tensile strength Value (n) Rt in (N/mm2) Up to 440 inclusive 2 Above 440 to 520 inclusive 3 Above 520 4 Annex 10
2.2.3.1.changed
The measured bursting pressure (P r) (Pr) shall not under any circumstances be less than 2.25  3,000 = 6,750 kPa.
2.3.6.1.3.changed
Retesting is permitted for the ambient temperature pressure cycling test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. Annex 10 If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected.
Figure 3deleted
Annex 10 – Appendix 1
2.3.6.5.3.changed
Retesting is permitted for the LPG cycling test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected. Annex 10
2.3.6.6.1.changed
This test shall only be performed on all-composite containers with a resin matrix having a glass transition temperature (T G) (TG) below the design temperature +50 °C.
Figure 2deleted
Annex 10 – Appendix 4
2.4.1.4.changed
For The following defects are not acceptable: Cracks, inadequate welds or inadequate penetration of the container wall thickness < 4 mm, the inclusions listed below are regarded as acceptable: Any gas inclusion measuring not more than a/2 mm; Any gas inclusion measuring more than a/2 mm but not more than a/1.5 mm, which is more than 25 mm away from other gas inclusion measuring more than a/2 mm and measuring not more than a/1.5 mm; Any elongated inclusion or any group of rounded inclusions in a row where the length represented (over a weld length of 12a) is not greater than 6 mm; Gas inclusions over any 100 mm weld length, where the total area of all the figures is not greater than 2a mm2. weld.
2.4.1.4.2.added
For the container wall thickness < 4 mm, the inclusions listed below are regarded as acceptable: Any gas inclusion measuring not more than a/2 mm; Any gas inclusion measuring more than a/2 mm but not more than a/1.5 mm, which is more than 25 mm away from other gas inclusion measuring more than a/2 mm and measuring not more than a/1.5 mm; Any elongated inclusion or any group of rounded inclusions in a row where the length represented (over a weld length of 12a) is not greater than 6 mm; Gas inclusions over any 100 mm weld length, where the total area of all the figures is not greater than 2a mm2.
2.5.1.changed
This examination is carried out when the weld has been completed. The welded surface examined shall be well illuminated, and shall be free from grease, dust, scale residue or protective coating of any kind. Annex 10
2.6.2.changed
Container set-up (a) The container shall be placed in the designed position by the manufacturer with the container bottom approximately 100 mm above the fire source. (b) Shielding shall be used to prevent direct flame impingement on the fusible plug (PRD) if present. The shielding shall not be in direct contact with the fusible plug (PRD). (c) Any failure during the test of a valve, fitting or tubing that is not part of the intended protection system for the design shall invalidate the result. (d) Containers with a length of less than 1.65 m. The center of the container shall be positioned over the center of the fire source. 1 Additional accessories, modifications and extensions of the accessories fitted to the container is possible without retesting, if notified to the Type Approval Authority which approved the container, considered to be unlikely to have an appreciable adverse effect. The Type Approval Authority may require a further test report from the Technical Service responsible. The container and its configurations of accessories will be indicated in Appendix 1 the appendix to Annex 2B. Multivalve or, when approved separately, pressure relief valve (discharge valve) and pressure relief device, extended for technical modifications and marked in accordance to Annex 2A need to have a new bonfire test. The container and its configurations of accessories will be indicated in the appendix to Annex 2B. (e) Containers with a length equal to or larger than 1.65 m. If the container is fitted with a pressure relief device at one side, the fire source shall commence at the opposite side of the container. If the container is fitted with pressure relief devices at both sides, or at more than one location along the length of the container, the center of the fire source shall be centered midway between the pressure relief devices that are separated by the greatest horizontal distance.
2.6.5.changed
General test requirements (a) Container shall be filled with 80 per cent in volume of LPG (commercial fuel) and tested in the horizontal position at working pressure; (b) Immediately following the ignition, the fire shall produce flame impingement on the surface of the container, along 1.65 m length of the fire source across the container; (c) Within 5 minutes of ignition at least one thermocouple shall indicate the temperature of fire just below the container of at least 590 °C. This temperature shall be maintained for the remaining duration of the test, namely until when no overpressure is present in the container; (d) The severity of the test conditions shall not be mitigated by ambient conditions (e.g. rain, moderate/high wind etc.). Annex 10
2.8.1.changed
One finished container shall be drop tested at ambient temperature without internal pressurization or attached valves. The surface onto which the containers are dropped shall be a smooth, horizontal concrete pad or flooring. The drop height (Hd) shall be 2 m (measured to the lowest point of the container). The same empty container shall be dropped: (a) In a horizontal position; (b) Vertically on each end; (c) At an angle of 45°. Annex 10 Following the drop test, the containers shall be submitted to an ambient temperature pressure cycling test according the requirements of paragraph 2.3.6.1. of this annex.
2.11.3.changed
Retesting is permitted for the ultra-violet test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected. Annex 10 – Appendix 1
Figure 2achanged
Containers with circumferential welds only and side-mounted valve blocks; location of test-pieces Annex 10 – Appendix 2 (a) or (b) Tensile test on parent material (d) Tensile test on a circumferential weld (g) Bend test on a circumferential weld, the inner surface in tension (h) Bend test on a circumferential weld, the outer surface in tension (m1, m2) Macro sections through valve boss/plate welds (side-mounted valve block)
Annex 10 - Appendix 4changed
Relationship between H/D and shape factor C 1.5 1.4 b/D 0.005 C 0.0075 0.01 0.02 1.3 0.03 0.04 1.2 1.1 0.2 0.21 0.22 0.23 0.24 0.25 H/D Values of shape factor C for H/D between 0.20 and 0.25 Annex 10 – Appendix 4 Relationship between H/D and shape factor C Values of shape factor C for H/D between 0.25 and 0.50
1.1.deleted
LPG components for use in vehicles shall be classified with regard to the maximum operating pressure and function, according to Chapter 2 of this Regulation. 1.2 The classification of the components determines the tests which have to be performed for type approval of the components or parts of the components.
Table 1deleted
Test Class 0 Class 1 Class 2(A) Class 3 Paragraph Overpressure x x x x 4. External leakage x x x x 5. High temperature x x x x 6. Low temperature x x x x 7. Seat leakage x x x 8. Endurance / Functional x x x 9. tests Operational test x x 10. LPG compatibility x x x x 11. Corrosion resistance x x x x 12. Resistance to dry heat x x x 13. Ozone ageing x x x 14. Creep x x x 15. Temperature cycle x x x 16. C…
2.changed
Composite structure (a) Fibres embedded in a matrix Tensile properties: ASTM 3039 Fiber-resin composites ASTM D2343 Glass, Aramid (tens. prop. yarns glass) ASTM D4018.81 Carbon (tens.prop.continuous filament) with special remark for the matrix Shear properties: ASTM D2344 (Interlaminar shearstrength of parallel fibre composite by short beam method) (b) Dry fibres on an isotensoid shape Tensile properties: ASTM D4018.81 Carbon (continuous filament), other fibres. Annex 10 – Appendix 6
3.1.deleted
Leakage tests shall have to be conducted with pressurized gas like air or nitrogen.
3.2.deleted
Water or another fluid may be used to obtain the required pressure for the hydrostatic strength test.
3.3.deleted
All test values shall indicate the type of test medium used, if applicable.
6.changed
The glass transition temperature (Tg) of an elastomer component shall be lower than -40 °C. The glass transition temperature shall be tested according ISO 6721 "Plastics - Determination of dynamic mechanical properties". The Tg-onset Tg- onset is derived from the plotted diagram storage modulus versus temperature by determining the temperature, where the two tangents, which are representing the slopes of the diagram before and after the dramatic loss of stiffness, intersects.
3.4.deleted
The test period for leakage and hydrostatic strength tests shall be not less than 1 minute.
3.5.deleted
All tests shall be performed at a room temperature of 20 °C  5 °C, unless otherwise stated.
Table 2deleted
overpressure test according to the classification: Classification of component Classification pressure Hydraulic test pressure for [kPa] over-pressure test [kPa} Class 0 WP 2.25 WP Class 1 3,000 6,750 Class 3 3,000 or WP 6,750 or 2.25 WP Class 2A 120 270 Class 2 450 1,015
5.1.deleted
A component shall be free from leakage through stem or body seals or other joints, and shall not show evidence of porosity in casting when tested as described in paragraph 5.3. below at any aerostatic pressure between 0 and the pressure shown in Table 3. The above prescriptions are deemed to be satisfied, if the provisions of paragraph 5.4. below are met.
5.2.deleted
The test shall be performed at the following conditions: (a) At room temperature; (b) At the minimum operating temperature; (c) At the maximum operating temperature. The maximum and minimum operating temperatures are given in the annexes.
5.3.deleted
During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure (of 1.5 times the maximum pressure and in the case of a Class 3 component, 2.25 times the maximum classification pressure). A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressures are to be installed Annex 15 in the pressure supply piping. The pressure gauge is to be installed between the positive shut-off valve and the sample under test. While under the applied test pressure, the sample should be submerged in water to detect leakage or any other equivalent test method (flow measurement or pressure drop).
1.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.**
Table 3deleted
Classification pressure Test pressure for leakage test Classification of component [kPa] [kPa] Class 0 WP 1.5 WP Class 1 3,000 4,500 Class 2A 120 180 Class 2 450 675 Class 3 3,000 6,750
5.4.deleted
The external leakage shall be lower than the requirements stated in the annexes or, if no requirements are mentioned, the external leakage shall be lower than 15 cm3/hour with the outlet plugged, when submitted to a gas pressure equal to the leakage test pressure.
2.2.changed
Component classification (according to Figure 1, para. 2.): Class 2: for the part with a maximum regulated pressure during operation of 450 kPa. Annex 11 Class 2A: for the part with a maximum regulated pressure during operation of 120 kPa.
7.deleted
A LPG containing component shall not leak more than 15 cm3/hour with the outlet plugged when submitted to a gas pressure, at the minimum operating temperature (-20 °C), equal to the leakage test pressure (Table 3, paragraph 5.3. above). The component shall be conditioned for at least 8 hours at this temperature.
8.1.deleted
The following tests for seat leakage are to be conducted on samples of service valve or filling unit which have previously been subjected to the external leak test of paragraph 5. above.
8.1.1.deleted
Seat leakage tests are conducted with the inlet of the sample valve connected to a source of aerostatic pressure, the valve in the closed position, and with the outlet open. A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressures are to be installed in the pressure supply piping. The pressure gauge is to be installed between the positive shut-off valve and the sample under test. While under the applied test pressure, observations for leakage are to be made with the open outlet submerged in water unless otherwise indicated.
2.6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.*
8.1.2.deleted
Conformance with paragraphs 8.2. to 8.8. below is to be determined by connecting a length of tubing to the valve outlet. The open end of this outlet tube is to be located within an inverted graduated cylinder which is calibrated in cubic centimetres. The inverted cylinder is to be closed by a water seal. The apparatus is to be adjusted so that: (a) The end of the outlet tube is located approximately 13 mm above the water level within the inverted graduated cylinder, and (b) The water within and exterior to the graduated cylinder is at the same level. With these adjustments made, the water level within the graduated cylinder is to be recorded. With the valve in the closed position assumed as the result of normal operation, air or nitrogen at the specified test pressure is to be applied to the valve inlet for a test period of not less than 2 minutes. During this time, the vertical position of the graduated cylinder is to be adjusted, if necessary, to maintain the same water level within and exterior to it. At the end of the test period and with the water within and exterior to the graduated cylinder at the same level, the level of water within the graduated cylinder is again recorded. From the change of volume within the graduated cylinder, the leakage rate is to be calculated according to the following formula: 60  273 P  V1  Vt     t  T 101.6  Where: V1 = leakage rate, cubic centimetres of air or nitrogen per hour. Vt =…
8.1.3.deleted
Instead of the method described above, leakage may be measured by a flowmeter installed on the inlet side of the valve under test. The flowmeter shall be capable of indicating accurately, for the test fluid employed, the maximum leakage flow rates permitted.
8.2.deleted
The seat of a shut-off valve, when in the closed position, shall be free from leakage at any aerostatic pressure between 0 to 3,000 kPa or from 0 to WP in accordance with the classification pressure of the valve. Annex 15
8.3.deleted
A non-return valve provided with a resilient seat, when in the closed position, shall not leak when subjected to any aerostatic pressure between 50 and 3,000 kPa.
8.4.deleted
A non-return valve provided with a metal-to-metal seat, when in the closed position, shall not leak at a rate exceeding 0.50 dm3/hour when subjected to an inlet pressure up to the test pressure according to Table 3 in paragraph 5.3. above
8.5.deleted
The seat of the upper non-return valve used in the assembly of a filling unit, when in the closed position, shall be free from leakage at any aerostatic pressure between 50 and 3,000 kPa.
8.6.deleted
The seat of a service coupling, when in the closed position, shall be free from leakage at any aerostatic pressure between 0 to 3,000 kPa.
8.7.deleted
The gas-tube pressure relief valve shall not have internal leakage up to 3,000 kPa or up to WP, in accordance with the classification pressure of the valve.
3.6.1.changed
For fuel rails of Class 0 and 1: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11. ** Corrosion resistance Annex 15, 16, para. 12. * Resistance to dry heat Annex 15, 16, para. 13. ** Ozone ageing Annex 15, 16, para. 14. ** Creep Annex 15, 16, para. 15. ** Temperature cycle Annex 15, 16, para. 16. **
8.8.deleted
The pressure relief valve (discharge valve) shall not have internal leakage up to 2,600 kPa.
3.6.2.changed
For fuel rails of Class 2 and/or 2A: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* _________________ * Only for metallic parts. ** Only for non-metallic parts. Annex 12
9.1.deleted
A filling unit or service valve shall be capable of conforming to the applicable leakage test requirements of paragraphs 5. and 8. above, after being subjected to a number of cycles of opening and closing as mentioned in the annexes to this Regulation.
9.2.deleted
A shut-off valve is to be tested with the valve outlet plugged. The valve body filled with n-hexane, and the valve inlet subjected to a pressure of 3,000 kPa or of WP in accordance with the classification pressure of the valve.
9.3.deleted
An endurance test is to be conducted at a rate not faster than 10 times per minute. For a shut-off valve, the closing torque is to be consistent with the size of handwheel, wrench, or other means employed to operate the valve.
9.4.deleted
The appropriate tests for external and seat leakage, as described under external leakage test under paragraph 5. above and seat leakage test under paragraph 8. are to be conducted immediately following the endurance test.
9.5.1.deleted
The 80 per cent stop valve shall be capable to withstand 6,000 complete filling cycles to the maximum filling degree.
6.changed
Applicable test procedures: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Remarks: The parts of the gas dosage unit (Class 2 or 2A) shall be leakproof with the outlet(s) of that part closed. For the overpressure test all the outlets including those of the coolant compartment shall be closed off. * Only for metallic parts. ** Only for non-metallic parts.
9.6.deleted
The regulator shall be able to withstand 50,000 cycles without any failure when tested according to the following procedure: (a) Recycle the regulator for 95 per cent of the total number of cycles at room temperature and at the classification pressure. Each cycle shall consist of flow until stable outlet pressure has been obtained, after which the gas flow shall be shut off by a downstream valve within 1 s, until the downstream lock-up pressure has stabilized. Stabilized outlet pressures are defined as set pressure ±15 per cent for at least 5 s. (b) Cycle the inlet pressure of the regulator for 1 per cent of the total number of cycles at room temperature from 100 per cent to 50 per cent of the classification pressure. The duration of each cycle shall be no less than 10 s. (c) Repeat the cycling procedure listed in sub-paragraph (a) at 120 °C at the classification pressure for 1 per cent of the total number of cycles. (d) Repeat the cycling procedure listed in sub-paragraph (b) at 120 °C at the classification pressure for 1 per cent of the total number of cycles. (e) Repeat the cycling procedure listed in sub-paragraph (a) at -20 °C and 50 per cent of classification pressure for 1 per cent of the total number of cycles. (f) Repeat the cycling procedure listed in sub-paragraph (b) at -20 °C and 50 per cent of classification pressure for 1 per cent of the total number of cycles. …
10.1.1.deleted
In the case of pressure relief valves, three samples of each size, design, and setting are to be used for start-to-discharge and resealing pressure tests. This same set of three valves is to be used for flow capacity tests for other observations indicated in the following paragraphs. Not less than two successive start-to-discharge and resealing pressure observations are to be made on each of the three test valves under test No. 1 and 3 of paragraphs 10.1.2. and 10.1.4. below.
10.1.2.1.deleted
Before being subjected to a flow capacity test, the start-to-discharge pressure of each of three samples of a pressure relief valve of a specific size, design, and setting shall be within +3 per cent of the average of the pressures, but the start-to-discharge pressure of any one of the three valves shall be not less than 95 per cent, not more than 105 per cent, of the set pressure marked on the valve.
10.1.2.2.deleted
The resealing pressure of a pressure relief valve before being subjected to a flow capacity test shall be not less than 50 per cent of the initially observed start-to-discharge pressure.
10.1.2.3.deleted
A pressure relief is to be connected to an air or other aerostatic supply source capable of being maintained at a pressure of at least 500 kPa effective pressure above the marked set pressure of the valve being tested. A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressure are to be installed in the pressure supply piping. The pressure gauge is to be installed in the piping between the valve being tested and the positive shut-off valve. Start-to- discharge and resealing pressure are to be observed through a water seal not over 100 mm in depth. Annex 15
6.1.changed
For parts of Class 0 and 1: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* Resistance to dry heat Annex 15, 16, para. 13.** Ozone ageing Annex 15, 16, para. 14.** Creep Annex 15, 16, para. 15.** Temperature cycle Annex 15, 16, para. 16.** Annex 13
10.1.2.4.deleted
After recording the start-to-discharge pressure of the valve, the pressure is to be increased sufficiently above the start-to-discharge pressure to ensure unseating of the valve. The shut-off valve is then to be closed tightly and the water seal, as well as the pressure gauge, are to be observed closely. The pressure at which bubbles through the water seal cease is to be recorded as the resealing pressure of the valve.
6.2.changed
For parts of Class 2 or 2A: Overpressure test Annex 15, 16, para. 4. External leakage Annex 15, 16, para. 5. High temperature Annex 15, 16, para. 6. Low temperature Annex 15, 16, para. 7. LPG compatibility Annex 15, 16, para. 11.** Corrosion resistance Annex 15, 16, para. 12.* __________________ * Only for metallic parts. ** Only for non-metallic parts.
10.1.3.1.deleted
The flow capacity of each of three samples of a pressure relief valve of a specific size, design, and setting shall fall within a range of 10 per cent of the highest observed capacity.
10.1.3.2.deleted
During flow capacity tests on each valve, there shall be no evidence of chattering or other abnormal operating condition.
10.1.3.3.deleted
The blow-down pressure of each valve shall be not less than 65 per cent of the initially recorded start-to-discharge pressure.
10.1.3.4.deleted
A flow capacity test on a pressure relief valve is to be conducted at a flow rating pressure of 120 per cent of the maximum set pressure.
10.1.3.5.deleted
A flow capacity test on a pressure relief valve is to be conducted by utilizing a properly designed and calibrated orifice flowmeter of the flange type connected to a source of air supply of adequate capacity and pressure. Modifications of the flowmeter from that described herein, and an aerostatic flow medium other than air, may be used provided the end results are the same.
10.1.3.6.deleted
The flowmeter is to be arranged with sufficiently long lengths of pipe both preceding and following the orifice, or other arrangements including straightening vanes, to assure no disturbance at the orifice place for the ratios of orifice to pipe diameters to be employed. Flanges between which the orifice plate is located and clamped are to be provided with pressure take-off lines connected to a manometer. This instrument indicates the pressure differential across the orifice plate and the reading is used in the flow calculation. A calibrated pressure gauge is to be installed in that portion of the meter pipe downstream of the orifice plate. This gauge indicates the flow pressure and the reading is also used in the flow calculation.
5.changed
The output of the electronic control unit shall be inactive when the electric power is switched off or removed. Annex 15
10.1.3.7.deleted
A temperature-indicating instrument is to be connected to the meter pipe downstream of the orifice plate to indicate the temperature of the air flowing to the safety valve. The reading of this instrument is to be integrated in the calculation to correct the temperature of the air flow to a 15 °C base temperature. A barometer is to be available for indicating the prevailing atmospheric pressure. The reading of the barometer is to be added to the indicated air-flow gauge pressure. This absolute pressure is similarly to be integrated in the flow calculation. The air pressure to the flowmeter is to be controlled by a suitable valve installed in the air-supply piping ahead of the flowmeter. The pressure relief valve under test is to be connected to the discharge end of the flowmeter.
6.added
When the Electronic Control Unit (ECU) is intended to be fitted as a component of an interconnected LPG-system, it shall inhibit, by controlling the fuel selection system, the vehicle operation in petrol mode after each switch-over operation to LPG mode until a volume of liquid fuel equivalent to that flown into the LPG tank during such an operation is consumed. Notwithstanding this, the ECU may permit the switch over to petrol mode if a fault in the LPG-system determines the inoperability of the system. Such a fault shall be clearly indicated to the driver. In case of the inoperability of the LPG-system, a remotely controlled shut-off valve complying with the requirements of paragraph 6.17.3.3. shall be installed along the flow line in order to prevent any flow of petrol into the LPG container after switching-over to petrol mode.
10.1.3.8.deleted
After all preparations for flow capacity tests have been made, the valve in the air-supply line is to be opened slowly and the pressure to the valve under test is to be increased to the appropriate flow rating pressure. During this interval, the pressure at which the valve "pops" open is to be recorded as the popping pressure.
6.1.added
The maximum volume of liquid fuel that flows during a switch-over operation shall not exceed 0.4 litre and the minimum volume of the tank shall not be lower than 20 litres.
10.1.3.9.deleted
The predetermined flow rating pressure is to be maintained constant for a brief interval until the readings of the instruments become stabilized. Readings of the flow pressure gauge, pressure differential manometer, and the flowing air temperature indicator are to be recorded simultaneously. The pressure is then to be decreased until there is no further discharge from the valve. The pressure at which this occurs is to be recorded as the blow-down pressure of the valve.
6.2.added
To verify compliance with paragraph 6. of this annex, the ECU shall be tested as follows: (a) Install the LPG-system on a vehicle; (b) Set the fuel selection system in LPG mode; (c) Warm up the engine until all temperatures of cooling and lubrication means and the pressure of lubrication means have reached equilibrium; (d) Let the engine run at the lowest idling speed; (e) Switch over from LPG mode to petrol mode and vice versa; (f) Set the fuel selection system in petrol mode. Test interpretation The criteria adopted for the interpretation of the test is as follows: (i) Petrol mode is disabled until a volume of liquid fuel equal to 0.4 litre is consumed. Such consumption shall be calculated by a test bench measuring device. It may be calculated making use of the fuel flow signals of the LPG ECU read out by means of an appropriate scan tool, if the reliability of such signals has been previously verified. The test shall be repeated also at the highest idling speed.
10.1.3.10.deleted
From the recorded data and the known orifice coefficient of the flowmeter, the air-flow capacity of the pressure relief valve tested is to be calculated using the following formula: Fb  Ft  0.1  h  p Q Where: Q = Flow capacity of pressure relief valve in m3/min. of air at 100 kPa absolute and 15 °C. Fb = Basic orifice factor of flowmeter at 100 kPa absolute and 15 °C. Ft = Flowing air temperature factor to convert recorded temperature to base of 15 °C. h = Differential pressure across orifice of meter in kPa. p = Flowing air pressure to pressure relief valve in kPa absolute (recorded gauge pressure plus recorded barometric pressure). 60 = Denominator to convert equation from m3/hour to m3/min.
6.3.added
To measure the volume of liquid fuel that flows during the switch-over operations, the following test shall be carried out: (a) Install the LPG-system other than the container on a vehicle; (b) Place the container on a weighing system and fill up the LPG tank; (c) After having pressurized the LPG-system up to the normal operating conditions, record the reading of the weighing system (W1); (d) Disable the ECU feature described in paragraph 6. above; (e) Switch-over from LPG to petrol and vice versa for at least 10 times; (f) Record the reading of the weighing system (W2). The volume of petrol flown per switch-over operation shall be calculated as follows: Vsw = (W2-W1) / #SW / Dpetrol where: Dpetrol = 743 kg/m3; #SW = number of switch-over operations from LPG to petrol mode and vice versa during the test. The weighing system shall have the following: (a) A precision of ± 0.02 per cent of full scale or better; (b) A resolution of 20 g; (c) An accuracy of ± 2 per cent of the reading or ± 0.3 per cent of full scale whichever is better.
10.1.3.11.deleted
The average flow capacity of the three pressure relief valves rounded off to the nearest five units is to be taken as the flow capacity of the valve of that specific size, design and setting.
6.4.added
The ECU shall bear a marking with the following data clearly legible and indelible: (a) the wording "ICS"; and (b) the value of 0.4 litre; and (c) the approval mark according to paragraph 5.4. of this Regulation. Provisions regarding the approval of gas tube(s) of non- seamless type, gas tube(s) made of materials other than copper, stainless steel, and steel with corrosion-resistant coating, and their couplings
10.1.4.deleted
Recheck start-to-discharge and resealing pressures of pressure-relief-valves test No. 3
1.added
Definitions: Gas tube: gas tube as defined in paragraph 2.21. of this Regulation.
10.1.4.1.deleted
Subsequent to flow capacity tests, the start-to-discharge pressure of a pressure relief valve shall be not less than 85 per cent, and the resealing pressure shall be not less than 80 per cent of the initial start-to-discharge and resealing pressures recorded under test No. 1 of paragraph 10.1.2. above.
2.changed
In Table 1 the applicable test procedures dependent on the Component classification are shown. (according to paragraph 2., Figure 1): Gas tube and its coupling(s) can be of Class 0, 1, 2 or 2A.
10.1.4.2.deleted
These tests are to be conducted approximately 1 hour after the flow capacity test, and the test procedure is to be the same as described under test No. 1 of paragraph 10.1.2. above.
3.added
Classification pressure: Parts of Class 0: WP declared Parts of Class 1: 3,000 kPa Parts of Class 2: 450 kPa Parts of Class 2A: 120 kPa
4.changed
A LPG containing component shall withstand without any visible evidence of rupture or permanent distortion a hydraulic test pressure which is determined by Table 1 (of 2.25 times Design temperatures: -20 °C to 120 °C For temperatures exceeding the maximum classification pressure) during minimal 1 minute with the outlet of the high pressure part plugged. The samples, previously subjected to the durability test of paragraph 9. of this annex above-mentioned values, special tests conditions are to be connected to a source of hydrostatic pressure. A positive shut-off valve and a pressure gauge, having a pressure range of not less than 1.5 times nor more than 2 times the test pressure, are to be installed in the hydrostatic pressure supply piping. applicable.
10.2.1.deleted
An excess flow valve shall operate at not more than 10 per cent above, nor less than 20 per cent below the rated closing flow capacity specified by the manufacturer, and shall close automatically at a pressure differential across the valve of not more than 100 kPa during the operation tests described below. Annex 15
5.added
General design rules: The couplings shall be compatible with the gas tube. Specific care shall be taken against galvanic corrosion. Stainless steel gas tube shall only be used in combination with stainless steel couplings. Only straight longitudinal welding (in the direction of the tube itself) is permitted in gas tubes of non-seamless type.
10.2.2.deleted
Three samples of each size and style of valve are to be subjected to these tests. A valve intended for use only with liquid is to be tested with water, otherwise the tests are to be made both with air and with water. Except as indicated in paragraph 10.2.3. below, separate tests are to be run with each sample installed in vertical, horizontal and inverted positions. The tests with air to be made without piping or other restriction connected to the outlet of the tests sample.
6.changed
A LPG containing component shall not leak more than 15 cm3/hour with the outlet plugged when submitted to a gas pressure at maximum operating temperature, as indicated in the annexes, equal to the leakage Applicable test pressure (Table 3, paragraph 5.3. above). The component shall be conditioned for at least 8 hours at this temperature. procedures:
10.2.3.deleted
A valve intended for installation in one position only may be tested only in that position.
6.1.added
For parts of Classes 0 and 1: Overpressure test Annex 16, para. 4. External leakage Annex 16, para. 5. High temperature Annex 16, para. 6. Low temperature Annex 16, para. 7. LPG compatibility Annex 16, para. 11.** Corrosion resistance Annex 16, para. 12.1 Resistance to dry heat Annex 16, para. 13.** Ozone ageing Annex 16, para. 14.**
10.2.4.deleted
The test with air is to be conducted by utilizing a properly designed and calibrated orifice flowmeter of the flange type, connected to a source of air supply of adequate capacity and pressure.
6.2.added
For parts of Class 2 or 2A: Overpressure test Annex 16, para. 4. 1 Only for metallic parts. External leakage Annex 16, para. 5. High temperature Annex 16, para. 6. Low temperature Annex 16, para. 7. LPG compatibility Annex 16, para. 11.** Corrosion resistance Annex 16, para. 12.2
10.2.5.deleted
The test sample is to be connected to the outlet of the flowmeter. A manometer or calibrated pressure-gauge reading in increments of not more than 3 kPa is to be installed on the upstream side of the test sample to indicate the closing pressure.
6.3.added
Specific requirements on the gas tube and its couplings:
10.2.6.deleted
The test is conducted by slowly increasing the flow of air through the flowmeter until the check valve closes. At the instant of closing, the pressure differential across the flowmeter orifice and the closing pressure indicated by the gauge are to be recorded. The rate of flow at closing is then to be calculated.
6.3.1.added
The gas tube and its coupling(s) shall be tested for an endurance test consisting out of 100,000 cycles. One cycle consist out of pressure ramp from 15 per cent·WP up to WP. After the endurance test, the gas tube and its coupling(s) need to comply with the leakage test of Annex 16, paragraphs 5., 6. and 7 and with the overpressure test according to Annex 16, paragraph 4.
10.2.7.deleted
Other types of flowmeters and a gas, other than air, may be used.
6.3.2.added
Test the gas tube according to the following procedure and acceptance criteria. (a) Select a mandrel with an external diameter from the below table: External diameter Mandrel diameter ≤ 8 mm 3 times the external gas tube diameter > 8 mm 5 times the external gas tube diameter (b) Bend the gas tube over this mandrel once, forming a "U" shape. (c) Close the ends of the gas tube and subject it to the overpressure test according to Annex 16, paragraph 4. At the completion of the overpressure test, the gas tube shall be tested according to the leakage test of Annex 16, paragraphs 5., 6. and 7.
10.2.8.deleted
The test with water is to be conducted using a liquid flowmeter (or equivalent) installed in a piping system having sufficient pressure to provide the required flow. The system is to include an inlet piezometer or pipe at least one pipe size larger than the valve to be tested, with a flow control valve connected between the flowmeter and piezometer. A hose or hydrostatic relief valve, or both, may be used to reduce the effect of the pressure shock when the excess flow valve closes.
6.3.3.added
A coupling designed to be connected directly to threaded fittings shall be capable of withstanding, without deformation, breakage or leakage, a torque effort of 150 per cent of the rated installation value delivered by the manufacturer, according to the following test procedure: (a) Test an unused component, applying the torque adjacent to the fitting. (b) For a component having a threaded connection or threaded connections, apply the turning effort for 15 minutes, release the turning effort, then remove the component and examine it for deformation and breakage. (c) Perform the leakage test according to Annex 16, paragraphs 5., 6. and 7. (d) Perform the overpressure test according to Annex 16, paragraph 4.
10.2.9.deleted
The test sample is to be connected to the outlet end of the piezometer. A manometer or calibrated pressure gauge of the retard type, which will permit readings in the range of 0 to 1,440 kPa is to be connected to a pressure take- off on the upstream side of the test sample to indicate the closing pressure. The connection is to be made using a length of rubber hose between the pressure gauge and the pressure take-off, with a valve installed at the gauge inlet to permit bleeding air from the system.
6.3.4.added
Vibrate the gas tube and its coupling(s) according to the test described in Annex 16, paragraph 10.5.4., procedure A. After this test the gas tube and its coupling(s) need to comply with the leakage test of Annex 16, paragraphs 5., 6. and 7. and with the overpressure test according to Annex 16, paragraph 4. 2 Only for metallic parts. ** Only for non-metallic parts.
10.2.10.deleted
Prior to the test, the flow control valve is to be opened slightly, with the bleed valve at the pressure gauge open, to eliminate air from the system. The bleed valve is then to be closed and the test is conducted by slowly increasing the flow until the check valve closes. During the test the pressure gauge is to be positioned at the same level as the test sample. At the instant of closing, the rate of flow and closing pressure are to be recorded. When the excess flow valve is at cut-off position, the leakage or by-pass rate of flow is to be recorded.
6.3.5.added
Test the gas tube and its coupling(s) according to the following procedure and acceptance criteria. Secure the subject specimen in an appropriate test fixture, then statically apply a tensile load along the gas tube axis at a maximum rate of 250 N/min until the gas tube separates from the coupling(s). The force (F), in Newton, required to pull apart the gas tube from its coupling(s) shall be that calculated as: F = (π∙d2∙P)/10 where d is the internal diameter, in millimetres; P is the maximum working pressure, in bar.
10.2.11.deleted
An excess flow valve used in the assembly of a filling unit shall close automatically at a pressure differential of not more than 138 kPa when tested as described below.
6.3.6.added
All gas tubes and its couplings having brass components shall be subjected to the brass material compatibility test according to Annex 16, paragraph 12.2. After this test the gas tube and its coupling(s) need to comply with the leakage test of Annex 16, paragraphs 5., 6. and 7 and with the overpressure test according to Annex 16, paragraph 4.
10.2.12.deleted
Three samples of each size of valve are to be subjected to these tests. The tests are to be made with air, and separate tests are to be run with each sample mounted vertically and horizontally. The tests are to be conducted as described in paragraphs 10.2.4. to 10.2.7. above, with a filling unit hose coupling connected to the test sample and with the upper non-return valve held in the open position.
10.3.1.deleted
Testing of the good function of the device limiting the filling degree of the container has to be performed by filling speeds of 20, 50 and 80 l/min or to the maximum flow rate under an upstream pressure of 700 kPa abs.
1.1.added
LPG components for use in vehicles shall be classified with regard to the maximum operating pressure and function, according to Chapter 2 of this Regulation. 1.2 The classification of the components determines the tests which have to be performed for type approval of the components or parts of the components.
10.4.deleted
The device limiting the filling degree of the container shall be capable of withstanding 6,000 complete filling cycles to the maximum filling degree.
2.added
In Table 1 the applicable test procedures dependent on the classification are shown.
10.4.1.deleted
Any device limiting the filling degree of the container and operating by a float, after having been subjected to the tests verifying that: It limits the degree of filling of the container to 80 per cent or less of its capacity; It does not allow - at the cut-off position - any filling of the container at a rate exceeding 0.5 litre/minute, Shall be subjected to one of the test procedures laid down in paragraph 10.5.5. or 10.5.6. below to ensure that the device is constructed to withstand expected dynamic vibrational stresses and to ensure that performance degradations or malfunctions will not be produced by the service vibration environment.
Table 1added
Test Class 0 Class 1 Class 2(A) Class 3 Paragraph Overpressure x x x x 4. External leakage x x x x 5. High temperature x x x x 6. Low temperature x x x x 7. Seat leakage x x x 8. Endurance / Functional x x x 9. tests Operational test x x 10. LPG compatibility x x x x 11. Corrosion resistance x x x x 12. Resistance to dry heat x x x 13. Ozone ageing x x x 14. Creep x x x 15. Temperature cycle x x …
10.5.1.deleted
The test item shall be attached to the vibration equipment by its normal mounting means, either directly to the vibration exciter or transition table, or by means of a rigid fixture capable of transmitting the specified vibration conditions. Equipment used to measure and/or record the acceleration level or amplitude level and the frequency shall have an accuracy of at least 10 per cent of the measured value.
3.1.added
Leakage tests shall have to be conducted with pressurized gas like air or nitrogen.
10.5.2.deleted
At the choice of the Type Approval Authority the tests shall be performed according to either procedure A described in paragraph 10.5.5. or procedure B described in paragraph 10.5.6. below.
3.2.added
Water or another fluid may be used to obtain the required pressure for the hydrostatic strength test.
10.5.3.deleted
The following tests shall be carried out along each of the three orthogonal axes of the test item. Annex 15
3.3.added
All test values shall indicate the type of test medium used, if applicable.
10.5.4.deleted
Procedure A
3.4.added
The test period for leakage and hydrostatic strength tests shall be not less than 1 minute.
10.5.4.1.deleted
Resonant frequencies of the filling limiter shall be determined by varying the frequency of applied vibration slowly through the specified range at reduced test levels but with sufficient amplitude to excite the item. Sinusoidal resonance search may be performed using the test level and cycling time specified for the cycling test, provided the resonance search time is included in the required cycling test time of paragraph 10.5.5.3. below.
3.5.added
All tests shall be performed at a room temperature of 20 °C  5 °C, unless otherwise stated.
10.5.4.2.deleted
The test item shall be vibrated for 30 minutes along each axis at the most severe resonant frequencies determined in paragraph 10.5.5.1. below. The test level shall be 1.5 g (14.7 m/sec2). If more than four significant resonant frequencies are found for any one axis, the four most severe resonant frequencies shall be chosen for this test. If a change in the resonant frequency occurs during the test, its time of occurrence shall be recorded and immediately the frequency shall be adjusted to maintain the peak resonance condition. The final resonant frequency shall be recorded. The total dwell test time shall be included in the required cycling test time of paragraph 10.5.5.3. below.
4.added
A LPG containing component shall withstand without any visible evidence of rupture or permanent distortion a hydraulic test pressure which is determined by Table 1 (of 2.25 times the maximum classification pressure) during minimal 1 minute with the outlet of the high pressure part plugged. The samples, previously subjected to the durability test of paragraph 9. of this annex are to be connected to a source of hydrostatic pressure. A positive shut- off valve and a pressure gauge, having a pressure range of not less than 1.5 times nor more than 2 times the test pressure, are to be installed in the hydrostatic pressure supply piping.
10.5.4.3.deleted
The test item shall be sinusoidally vibrated for three hours along each of its orthogonal axes in accordance with: An acceleration level of 1.5 g. (14.7 m/sec2), A frequency range of 5 to 200 Hz, A sweep time of 12 minutes. The frequency of applied vibration shall be swept over the specified range logarithmically. The specified sweep time is that of an ascending plus a descending sweep.
Table 2added
overpressure test according to the classification: Classification of component Classification pressure Hydraulic test pressure for [kPa] over-pressure test [kPa} Class 0 WP 2.25 WP Class 1 3,000 6,750 Class 3 3,000 or WP 6,750 or 2.25 WP Class 2A 120 270 Class 2 450 1,015
10.5.5.1.deleted
The test shall be performed on a sinusoidal vibrating bench, at a constant acceleration of 1.5 g and at frequencies ranging between 5 and 200 Hz. The test shall last for 5 hours for each of the axes specified in paragraph 10.5.4. above. The frequency band 5-200 Hz shall be covered in each of the two senses in 15 minutes.
5.1.added
A component shall be free from leakage through stem or body seals or other joints, and shall not show evidence of porosity in casting when tested as described in paragraph 5.3. below at any aerostatic pressure between 0 and the pressure shown in Table 3. The above prescriptions are deemed to be satisfied, if the provisions of paragraph 5.4. below are met.
10.5.5.2.deleted
Alternatively, in case of the test is not conducted by utilizing a constant acceleration bench, the frequency band from 5 to 200 Hz has to be subdivided in 11 semi-octave bands, each of them covered by a constant amplitude, so that the theoretical acceleration is included between 1 and 2 g (g = 9.8 m/sec2). Vibration amplitudes for each band are as follows: Amplitude in mm Frequency in Hz Frequency in Hz (crest value) (for acceleration = 1g) (for acceleration = 2g) 10 5 7 5 7 10 2.50 10 14 1.25 14 20 0.60 20 29 0.30 29 41 0.15 41 57 0.08 57 79 0.04 79 111 0.02 111 157 0.01 157 222 Each band shall be covered in both directions in 2 minutes, 30 minutes totally for each band.
5.2.added
The test shall be performed at the following conditions: (a) At room temperature; (b) At the minimum operating temperature; (c) At the maximum operating temperature. The maximum and minimum operating temperatures are given in the annexes.
10.5.6.deleted
After having been subjected to one of the vibration test procedures described above the device shall show no mechanical failures and is deemed to conform to the vibration test requirements only in the case the values of its characteristic parameters: Filling degree at the cut-off position, Filling rate allowed at the cut-off position, Do not exceed the prescribed limits and are not exceeding by more than 10 per cent the values preceding the vibration test procedure.
5.3.added
During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure (of 1.5 times the maximum pressure and in the case of a Class 3 component, 2.25 times the maximum classification pressure). A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressures are to be installed in the pressure supply piping. The pressure gauge is to be installed between the positive shut-off valve and the sample under test. While under the applied test pressure, the sample should be submerged in water to detect leakage or any other equivalent test method (flow measurement or pressure drop).
Table 3added
Classification pressure Test pressure for leakage test Classification of component [kPa] [kPa] Class 0 WP 1.5 WP Class 1 3,000 4,500 Class 2A 120 180 Class 2 450 675 Classification pressure Test pressure for leakage test Classification of component [kPa] [kPa] Class 3 3,000 6,750
11.1.deleted
A synthetic part in contact with LPG-liquid shall not show excessive volume change or loss of weight. Resistance to n-pentane according to ISO 1817 with the following conditions: (a) Medium: n-pentane; (b) Temperature: 23 °C (tolerance acc. to ISO 1817); (c) Immersion period: 72 hours.
5.4.added
The external leakage shall be lower than the requirements stated in the annexes or, if no requirements are mentioned, the external leakage shall be lower than 15 cm3/hour with the outlet plugged, when submitted to a gas pressure equal to the leakage test pressure.
11.2.deleted
Requirements: Maximum change in volume 20 per cent After storage in air with a temperature of 40 °C for a period of 48 hours the mass compared to the original value may not decrease more than 5 per cent.
6.added
A LPG containing component shall not leak more than 15 cm 3/hour with the outlet plugged when submitted to a gas pressure at maximum operating temperature, as indicated in the annexes, equal to the leakage test pressure (Table 3, paragraph 5.3. above). The component shall be conditioned for at least 8 hours at this temperature.
7.added
A LPG containing component shall not leak more than 15 cm 3/hour with the outlet plugged when submitted to a gas pressure, at the minimum operating temperature (-20 °C), equal to the leakage test pressure (Table 3, paragraph 5.3. above). The component shall be conditioned for at least 8 hours at this temperature.
8.1.added
The following tests for seat leakage are to be conducted on samples of service valve or filling unit which have previously been subjected to the external leak test of paragraph 5. above.
8.1.1.added
Seat leakage tests are conducted with the inlet of the sample valve connected to a source of aerostatic pressure, the valve in the closed position, and with the outlet open. A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressures are to be installed in the pressure supply piping. The pressure gauge is to be installed between the positive shut-off valve and the sample under test. While under the applied test pressure, observations for leakage are to be made with the open outlet submerged in water unless otherwise indicated.
8.1.2.added
Conformance with paragraphs 8.2. to 8.8. below is to be determined by connecting a length of tubing to the valve outlet. The open end of this outlet tube is to be located within an inverted graduated cylinder which is calibrated in cubic centimetres. The inverted cylinder is to be closed by a water seal. The apparatus is to be adjusted so that: (a) The end of the outlet tube is located approximately 13 mm above the water level within the inverted graduated cylinder, and (b) The water within and exterior to the graduated cylinder is at the same level. With these adjustments made, the water level within the graduated cylinder is to be recorded. With the valve in the closed position assumed as the result of normal operation, air or nitrogen at the specified test pressure is to be applied to the valve inlet for a test period of not less than 2 minutes. During this time, the vertical position of the graduated cylinder is to be adjusted, if necessary, to maintain the same water level within and exterior to it. At the end of the test period and with the water within and exterior to the graduated cylinder at the same level, the level of water within the graduated cylinder is again recorded. From the change of volume within the graduated cylinder, the leakage rate is to be calculated according to the following formula: 60  273 P  V1 = Vt     t  T 101.6  Where: V1 = leakage rate, cubic centimetres of air or nitrogen…
Annex 17changed
Provisions regarding LPG identification marks for vehicles of categories M2/N2 and M3/N3. (Paragraph 17.1.8. of this Regulation) The sign consists of a sticker which label shall be weather resistant. The centre zone indicates the first energy source. The upper zone indicates the second energy source. The left zone indicates the gas behaviour due to density. The right zone indicates the state of aggregation of stored gaseous fuel. Layout and symbols shall be in accordance with ISO 17840-4:2018. The colour and dimensions of the sticker label shall fulfil the following requirements: Colours: Background : red Letters : white or Background: Green, RGB code 0, 176, 80 Border: white reflecting Dimensions Character height :  5 mm Character thickness :  1 Letters and symbols: white reflecting Dimensions: Sticker width: > 110 mm Sticker width : 70 - 90 height: > 80 mm Sticker height : 20 - 30 mm The text "FOR SERVICE PURPOSES ONLY" shall be centred in the middle of the sticker.