Compare versions of UN R67
I. Specific equipment of vehicles of category M and N using liquefied petroleum gases in their propulsion system II. Vehicles of category M and N fitted with specific equipment for the use of liquefied petroleum gases in their propulsion system with regard to the installation of such equipment
Supplement 10 to the 01 series → latestSupplement 14 to the 01 series → latest02 series of amendments → latest03 series of amendments → latest
1.1.changed
Part I Approval of specific equipment of vehicles of category M and N1 N 1 using liquefied petroleum gases in their propulsion system;
2.changed
LPG components for use in vehicles shall be classified with regard to the maximum operating pressure and function, according to Figure 1. Class 0 High pressure parts including tubes and fittings containing liquid LPG with a pressure > 3,000 kPa. Class 1 High pressure parts including tubes and fittings containing liquid LPG at vapour pressure or increased vapour pressure up to 3,000 kPa. Class 2 Low pressure parts including tubes and fittings containing vaporized LPG with a maximum operating pressure below 450 kPa and over 20 kPa above atmospheric pressure. Class 2A Low pressure parts for a limited pressure range including tubes and fittings containing vaporized LPG with a maximum operating pressure below 120 kPa and over 20 kPa above atmospheric pressure. Class 3 Shut-off valves and pressure relief valves, when operating in the liquid phase. LPG components designed for a maximum operating pressure below 20 kPa above atmospheric pressure are not subjected to this Regulation. A component can consist of several parts, each part classified in his own class with regard to maximum operating pressure and function. As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.2, ECE/TRANS/WP.29/78/Rev.3, para. 2 http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
Figure 1changed
Start Yes Operating pressure >3 > 3 MPa? No Yes Yes Maximum operating pressure Safety >450kPa? > 450kPa? valves? No No Yes Maximum operating pressure <20kPa < 20kPa? No Not subjected to this regulation. Yes Maximum operation pressure <120kPa? < 120kPa? No Or Class 2 Class 2A Class 1 Class3 Class 0 STOP
2.1.3.changed
"Working pressure" pressure (WP)" means the maximum pressure to which the component is designed to be subjected and on the basis of which its strength is determined.
2.2.changed
"Specific equipment" means: (a) The container; (b) The accessories fitted to the container; (c) The vaporizer/pressure regulator; (d) The shut-off valve; (e) The gas injection device or injector or gas mixing piece; (f) The gas dosage unit, unit either separate or combined with the gas injection device; (g) Flexible hoses; (h) Filling unit; (i) Non-return valve; (j) Gas-tube pressure relief valve; (k) Filter unit; (l) Pressure or temperature sensor; (m) Fuel pump; (n) Service coupling; (o) Electronic control unit; (p) Fuel rail; (q) Pressure relief device; (r) Multi-component.
2.4.changed
"Type of container" means containers which do not differ in respect to the following characteristics as specified in Annex 10: (a) The trade name(s) or trade mark(s), mark(s); (b) The shape (cylindrical, special shape), shape); (c) The openings (plate for accessories/metal ring), ring); (d) The material, material; (e) The welding process (in case of metal containers), containers); (f) The heat treatment (in case of metal containers), containers); (g) The production line, line; (h) The nominal wall thickness, thickness; (i) The diameter diameter; (j) The height (in case of special containers).
2.5.1.changed
80 per cent of the capacity of the container; container.
2.5.2.changed
"Level indicator" means a device to verify the level of liquid in the container; container.
2.5.3.changed
"Pressure relief valve (discharge valve)" means a device to limit the pressure build-up in the container; container.
2.5.3.1.changed
"Pressure relief device" means a device aimed to protect the container from burst which can occur in case of fire, by venting the LPG contained; contained.
2.5.4.changed
"Remotely controlled service valve with excess flow valve" means a device which allows the establishment and interruption of LPG supply to the evaporator/pressure regulator; remotely controlled means that the service valve is controlled by the electronic control unit; when the engine of the vehicle is not running the valve is closed; an excess flow valve means a device to limit the flow of LPG; LPG.
2.5.5.changed
"Fuel pump" means a device to establish the supply of liquid LPG to the engine by increasing the pressure of the container with the fuel pump supply pressure; pressure.
2.5.6.changed
"Multivalve" means a device consisting of all or part of the accessories mentioned in paragraphs 2.5.1. to 2.5.3. and 2.5.8.; 2.5.8.
2.5.7.changed
"Gas-tight housing" means a device to protect the accessories and to vent any leakages to the open air; air.
2.5.8.changed
Power supply bushing (fuel pump/actuators/fuel level sensor); sensor).
2.5.9.changed
"Non-return valve" means a device to allow the flow of liquid LPG in one direction and to prevent the flow of liquid LPG in the opposite direction; direction.
2.12.changed
"Electronic control unit" means a device which controls the LPG demand of the engine and cuts off automatically the power to the shut-off valves of the LPG-system LPG system in case of a broken fuel supply pipe caused by an accident, or by stalling of the engine.
2.19.changed
"Liquefied petroleum gas (LPG)" means any product essentially composed of the following hydrocarbons: Propane, propene (propylene), normal butane, isobutane, isobutylene, butene (butylene) and ethane. European Standard EN 589:1993 specifies requirements and methods of test for automotive LPG as marketed and delivered in the countries of the members of CEN (European Committee for Standardization). Part I - Approval of specific equipment of vehicles of category M and N using liquefied petroleum gases in their propulsion system
2.20.added
"Hose assembly" means an assembly of a flexible hose and couplings.
Part I - Approval of specific equipment of vehicles of
categories M and N using liquefied petroleum gases
in their propulsion system
3.2.changed
It shall be accompanied by the undermentioned under mentioned documents in triplicate and by the following particulars:
3.2.3.changed
Verification of compliance with the specifications prescribed in paragraph 6. of this Regulation; Regulation.
4.4.added
In addition to provisions of paragraphs 4.1. and 4.2., one of the following
additional marks shall be used for remotely controlled service valves and
remotely controlled shut-off valves which comply respectively with
paragraph 4.7. of Annex 3 or with paragraph 1.7. of Annex 7:
(a) "H1"
(b) "H2"
(c) "H3"
5.3.changed
Notice of approval or of refusal or of extension of approval of an LPG equipment type/part pursuant to this Regulation shall be communicated to the Parties to the Agreement applying this Regulation, by means of a form conforming to the model in Annex 2B to this Regulation. If it concerns a container, Annex 2B - Appendix 1 shall be added.
5.4.changed
There shall be affixed, conspicuously and in the space referred to in paragraph 4.2. above, to all equipment conforming to a type approved under this Regulation, in addition to the mark prescribed in paragraphs 4.1. and 4.3., 4.3. above, an international approval mark consisting of:
5.4.2.changed
The number of this Regulation, followed by the letter "R", a dash and the approval number to the right of the circle prescribed in paragraph 5.4.1. above. This approval number consists of the component type approval number which appears on the certificate completed for this type (see paragraph 5.2. above and Annex 2B) preceded by two figures indicating the sequence of the latest series of amendments to this Regulation.
5.5.changed
The approval mark shall be clearly legible and be indelible. The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3. http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
5.7.changed
In case of a Class 0 component also the working pressure shall be marked in the vicinity of the approval mark mentioned in paragraph 5.4. above.
6.1.changed
The specific equipment of vehicles using LPG in their propulsion system shall function in a correct and safe way. The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.2/Amend.1. The materials of the equipment which are in contact with LPG shall be compatible with it. Those parts of equipment whose correct and safe functioning is liable to be influenced by LPG, high pressure or vibrations has to be submitted to relevant test procedures described in the annexes to this Regulation. In particular the provisions of paragraphs 6.2. to 6.13. below are to be fulfilled. The installation of LPG-equipment LPG equipment approved by this regulation Regulation shall comply with relevant electromagnetic compatibility (E.M.C) (EMC) requirements according to Regulation No. 10, 02 series of amendments, or equivalent.
6.2.changed
The LPG containers shall be type-approved type approved pursuant to the provisions laid down in Annex 10 to this Regulation.
6.3.1.1.changed
80 per cent stop valve, valve;
6.3.1.2.changed
Level indicator, indicator;
6.3.1.3.changed
Pressure relief valve (discharge valve), valve);
6.3.1.4.changed
Remotely controlled service valve with excess flow valve, valve.
6.3.6.changed
The container shall be equipped with a pressure relief device (PRD). Devices or functions may be approved as PRD being: (a) A fusible plug (temperature triggered) (fuse), or (b) A pressure relief valve provided that it complies to paragraph 6.15.8.3., 6.15.8.3. below, or (c) A combination of the two above devices, or (d) Any other equivalent technical solution, solution provided that it ensures the same degree of performance.
6.3.7.changed
The accessories mentioned in paragraphs 6.3.1. to 6.3.6. above shall be type- type approved pursuant to the provisions laid down in: (a) Annex 3 to this Regulation for accessories mentioned in paragraphs 6.3.1., 6.3.2., 6.3.3. and 6.3.6.; 6.3.6. above; (b) Annex 4 to this Regulation for accessories mentioned in paragraph 6.3.4.; 6.3.4. above; (c) Annex 7 to this Regulation for accessories mentioned in paragraph 6.3.5. above.
6.5.changed
Pressure regulator regulator1
6.9.changed
Gas injection devices/Gas mixing piece3 piece 11 or Injectors
6.15.1.3.changed
The closing unit of the device that limits the filling at 80 per cent +0/-5 per cent of the capacity of the container, for which the 80 per cent stop valve is designed, shall withstand a pressure of 6,750 kPa. At the cut-off position, the filling rate at a differential pressure of 700 kPa shall not exceed 500 cm3/minute. The valve must shall be tested with all the containers on which it is intended to be fitted or the manufacturer must shall declare by calculation for which container types this valve is suitable.
6.15.2.1.changed
The electrical connections inside the boot and passengers compartment shall comply with insulation protection degree class IP 40 according to IEC 529. Standard 60529- 1989+A1:1999.
6.15.2.2.changed
All other electrical connections shall comply with insulation protection degree class IP 54 according to IEC 529. Standard 60529-1989+A1:1999.
6.15.8.3.changed
The flow capacity of the pressure relief valve, determined with compressed air at a pressure which is 20 per cent higher than the normal operating- pressure must shall be at least Q 10.66 A0.82 in In which: Q= flow of air in standard m3/min (100 kPa absolute and temperature of 15 °C) A= exterior surface of the container in m2. The flow test results must shall be corrected to standard conditions: Air pressure of 100 kPa absolute and temperature of 15 °C. When the pressure relief valve is considered as a pressure relief device, the flow shall be at least 17.7 standard m3/min.
6.15.8.6.changed
The pressure relief device (fuse) shall be designed to have, when opened, a flow capacity of: Q 2.73 A in In which: Q= flow of air in standard m3/min (100 kPa absolute and temperature of 15 °C) A= exterior surface of the container in m2. The flow test must shall be carried out at an upstream air pressure of 200 kPa absolute, and at temperature of 15 °C. The flow test results must shall be corrected to standard conditions: Air pressure of 100 kPa absolute, and temperature of 15 °C.
6.15.10.3.changed
The design and dimensions of the connecting area of the filling unit must shall comply with those in the figures in Annex 9. The filling unit shown in Figure 5 is only applicable for motor vehicles of categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg.
6.15.10.4.changed
The filling unit shown in Figure 4 may also apply for motor vehicles of categories M2, M3, N2, N3 and M1 having a maximum total mass > 3,500 kg3. kg.3
6.15.10.6.2.changed
The flow through the connector at a pressure difference of 30 kPa shall be at least 60 litres/min, if tested with water. As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.2, para. 2.
6.15.13.1.1.changed
In case of the service valve is combined with a LPG fuel supply pump, identification of the pump must shall be realised by the marking "PUMP INSIDE" and the identification of the pump either on the marking plate of the LPG As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html container or on the multivalve if present. Electrical connections inside the LPG container shall comply with insulation protection degree class IP 40 according to IEC 529. Standard 60529-1989+A1:1999.
7.3.changed
The competent authority Type Approval Authority issuing the extension of approval shall assign a series number to each communication form drawn up for such an extension.
9.4.changed
The authority Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production facility. The normal frequency of these verifications shall be once every year.
9.6.changed
Every hose assembly which is applied in the high pressure class (Class 1) according to the classification as prescribed in paragraph 2. of this Regulation, shall, during half a minute, be subjected to a test with gas under a pressure of 3,000 kPa. kPa by the approval holder.
9.6.1.changed
Every hose assembly which is applied in the high pressure class (Class 0) according to the classification as prescribed in paragraph 2. of this Regulation, shall, during half a minute, be subjected to a test with gas under a pressure of the declared WP. WP by the approval holder.
11.1.changed
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall refuse to grant ECE approval under this Regulation as amended by the 01 series of amendments.
11.2.changed
As from 3 months after the official date of entry into force of the 01 series of amendments to this Regulation, Contracting Parties applying this Regulation shall grant ECE approvals only if the type of component to be approved meets the requirements of this Regulation as amended by the 01 series of amendments.
12.changed
If the holder of the approval completely ceases to manufacture a type of equipment approved in accordance with this Regulation, he shall so inform the authority Type Approval Authority which granted the approval. Upon receiving the relevant communication, that authority Authority shall inform thereof the other Contracting Parties to the Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2B to this Regulation.
13.changed
Names and addresses of Technical Services responsible for conducting approval tests, and of Type Approval Authorities The Contracting Parties to the Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the Technical Services responsible for conducting approval tests and of the Type Approval Authorities which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval, issued in other countries, are to be sent. Part II - Approval of vehicles of category categories M and N fitted with specific equipment for the use of liquefied petroleum gases in their propulsion system with regard to the installation of such equipment
14.1.3.added
"Commanded stop phase" defines the period of time during which the
combustion engine is switched off automatically for fuel saving and is
allowed to start again automatically.
15.3.changed
A vehicle representative of the vehicle type to be approved, approved shall be submitted to the Technical Service conducting the approval tests.
16.4.1.changed
A circle surrounding the letter "E" followed by the distinguishing number of the country which has granted approval4. approval.4 The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.3 http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
16.4.2.changed
The number of this Regulation, followed by the letter "R", a dash and the approval number to the right of the circle prescribed in paragraph 16.4.1. above.
16.5.changed
Regulations annexed to the Agreement, in the country which has granted approval under this Regulation, the symbol prescribed in paragraph 16.4.1. above need not be repeated; in such case, the Regulation and approval numbers and the additional symbols of all the Regulations under which approval has been granted in the country which has granted approval under this Regulation shall be placed in vertical columns to the right of the symbol prescribed in paragraph 16.4.1. above.
17.1.2.1.added
Notwithstanding the provisions of paragraph 17.1.2. above, if the LPG
electronic control unit is integrated into the engine electronic control unit and
is covered with a vehicle installation type approval according to Part II of this
Regulation and to Regulation No. 10, no separate type approval of the LPG
electronic control unit is necessary. The vehicle type approval shall also be
approved pursuant to the applicable provisions laid down in Annex 14 to this
Regulation.
17.1.5.changed
The LPG-system LPG system shall show no leaks. The distinguish numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev.2/Amend.1.
17.1.6.changed
The LPG-system LPG system shall be installed such that is has the best possible protection against damage, such as damage due to moving vehicle components, collision, grit or due to the loading or unloading of the vehicle or the shifting of those loads.
17.1.7.changed
No appliances shall be connected to the LPG-system LPG system other than those strictly required for the proper operation of the engine of the motor vehicle.
17.1.7.1.changed
Notwithstanding the provisions of paragraph 17.1.7., 17.1.7. above, motor vehicles of categories M2, M3, N2, N3 and M1 having either a maximum total mass > 3500 kg or a body type SA1 5, may be fitted with a heating system to heat the passenger compartment which is connected to the LPG-system. LPG system.
17.1.7.2.changed
The heating system referred to in paragraph 17.1.7.1. above shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the heating system is adequately protected and the required operation of the normal LPG-system LPG system is not affected.
17.1.7.3.changed
Notwithstanding the provisions of paragraph 17.1.7., 17.1.7. above, a mono-fuel vehicle without limp-home system may be equipped with a service coupling in the LPG-system. LPG system.
17.1.7.4.changed
The service coupling referred to in paragraph 17.1.7.3. above shall be permitted if, in the view of the Technical Services responsible for conducting type approval, the service coupling is adequately protected and the required operation of the normal LPG-system LPG system is not affected. The service coupling must shall be combined with a separate gas-tight non-return valve whereby it is only possible to operate the engine.
17.2.1.changed
No component of the LPG-system, LPG system, including any protective materials which form part of such components, shall project beyond the external surface of the vehicle, with the exception of the filling unit if this does not project more than 10 mm beyond the nominal line of the body panel.
17.2.2.changed
With the exception of the LPG fuel container, in no cross section of the vehicle any component of the LPG-system, LPG system, including any protective material which forms part of such components, may extend beyond the lower edge of the vehicle unless another part of the vehicle, within a radius of 150 mm is situated lower. As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.2, para. 2.
17.2.3.changed
No component of the LPG-system LPG system shall be located within 100 mm of the exhaust or similar heat source, unless such components are adequately shielded against heat.
17.3.1.changed
An LPG-system LPG system shall contain at least the following components:
17.3.1.1.changed
Fuel container; As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
17.3.1.6.deleted
17.3.1.10.changed
Gas-carrying connections between the LPG-system LPG system components;
17.3.2.1.changed
17.3.3.changed
The container fittings referred to in paragraphs 17.3.1.2. to 17.3.1.5. above may be combined.
17.3.4.changed
The remotely controlled shut-off valve referred to in paragraph 17.3.1.7. above may be combined with the pressure regulator/vaporizer. These components might not be necessary in case of liquid LPG injection.
17.3.5.changed
Additional components required for the effective operation of the engine may be installed in that part of the LPG-system LPG system where the pressure is less than 20 kPa.
17.4.1.changed
The fuel container shall be permanently installed in the vehicle and shall not be installed in the engine compartment. These components might not be necessary in case of liquid LPG injection.
17.4.5.1.changed
The provisions of paragraph 17.4.5. above shall not apply if the container is adequately protected, at the front and the sides and no part of the container is located lower than this protective structure.
17.4.6.changed
The fuel container(s) must shall be mounted and fixed so that the following accelerations can be absorbed (without damage occurring) when the containers are full: Vehicles of categories M1 and N1: (a) 20 g in the direction of travel; (b) 8 g horizontally perpendicular to the direction of travel. Vehicles of categories M2 and N2: (a) 10 g in the direction of travel; (b) 5 g horizontally perpendicular to the direction of travel. Vehicles of categories M3 and N3: (a) 6.6 g in the direction of travel; (b) 5 g horizontally perpendicular to the direction of travel. A calculation method can be used instead of practical testing if its equivalence can be demonstrated by the applicant for approval to the satisfaction of the Technical Service.
17.6.1.3.changed
Notwithstanding the provision of paragraph 17.6.1.2., 17.6.1.2.above , in case of liquid injection systems, if a fuel recirculation is required to purge the system from gas bubbles (vapour lock), it is allowed to keep the remotely controlled service valve with excess flow valve open for a period not longer than 10 seconds before starting the engine in LPG running mode.
17.6.1.4.added
Notwithstanding the provisions of paragraph 17.6.1.2. above, the remotely
controlled service valve may stay in an open position during the commanded
stop phases.
17.6.1.5.added
If the remotely controlled service valve is closed during commanded stop
phases, the valve shall comply with paragraph 4.7. of Annex 3.
17.6.2.1.changed
The spring-loaded pressure relief valve shall be installed in the fuel container in such a manner that it is connected to the vapour space and can discharge to the surrounding atmosphere. The spring-loaded pressure relief valve may discharge into the gas-tight housing if that gas-tight housing fulfils the requirements of paragraph 17.6.5. below.
17.6.5.1.changed
A gas-tight housing over the container fittings, which fulfils the requirements of paragraphs 17.6.5.2. to 17.6.5.5. below shall be fitted to the fuel container, unless the container is installed outside the vehicle and the container fittings are protected against dirt and water.
17.8.8.2.changed
The provisions of paragraph 17.8.8. and paragraph 17.8.8.1. above shall not apply for M2 or M3 category vehicles if the gas tubes or hoses and connections are fitted with a sleeve which is resistant against LPG and which has an open connection to the atmosphere. The open end of the sleeve or ducting shall be situated at the lowest point.
17.9.3.changed
Notwithstanding the provisions of paragraph 17.9.1., 17.9.1. above, the remotely controlled shut-off valve may be installed at a location in the engine bay specified by the manufacturer of the LPG-system LPG system if a fuel return system is provided between the pressure regulator and the LPG container.
17.9.5.changed
Notwithstanding the provision of paragraph 17.9.4., 17.9.4. above, in case of liquid injection systems, if a fuel recirculation is required to purge the system from gas bubbles (vapour lock), it is allowed to keep the remotely controlled shut-off shut- off valve open for a period not longer than 10 seconds before starting the engine in LPG running mode and during the fuel switching-over.
17.9.6.added
Notwithstanding the provisions of paragraph 17.9.4. above, the remotely
controlled shut-off valve may stay in an open position during the commanded
stop phases.
17.9.7.added
If the remotely controlled shut-off valve is closed during commanded stop
phases, the valve shall comply with paragraph 1.7. of Annex 7.17.10. Filling
unit
17.11.7.deleted
17.11.1.changed
The electrical components of the LPG-system LPG system shall be protected against overloads and at least one separate fuse shall be provided in the supply cable.
17.11.2.changed
The electrical power to LPG-system LPG system components which also carry gas may not be conducted by a gas tube.
17.11.3.changed
All electrical components installed in a part of the LPG-system LPG system where the pressure exceeds 20 kPa shall be connected and insulated in a manner that no current is led through LPG containing parts.
17.11.4.changed
Electrical cables shall be adequately protected against damage. The electrical connections inside the boot and passengers compartment shall comply with insulation protection degree class IP 40 according to IEC 529. Standard 60529-1989+A1:1999. All other electrical connections shall comply with insulation protection degree class IP 54 according to IEC 529. Standard 60529- 1989+A1:1999.
17.11.6.added
The electrical connections and components in the gas-tight housing shall be
constructed such that no sparks are generated.
17.12.1.changed
The pressure relief device shall be fitted to the fuel container(s) in such a manner that it can discharge into the gas tight housing, when its presence is prescribed, if that gas tight housing fulfils the requirements of paragraph 17.6.5. above.
18.2.changed
In order to verify that the requirements of paragraph 18.1. above are met, suitable controls of the production shall be carried out.
18.3.changed
The authority Type Approval Authority which has granted type approval may at any time verify the conformity control methods applied in each production facility. The normal frequency of these verifications shall be once every year.
19.2.changed
If a Contracting Party to the Agreement applying this Regulation withdraws an approval it has previously granted, it shall forthwith so notify the other Contracting Parties applying this Regulation, by means of a communication form conforming to the model in Annex 2D to this Regulation.
20.1.changed
Every modification of the installation of the specific equipment for the use of liquefied petroleum gases in the propulsion system of the vehicle shall be notified to the Type Approval Authority which approved the vehicle type. The department That Type Approval Authority may then either:
20.3.changed
The competent authority Type Approval Authority issuing the extension of approval shall assign a series number for such an extension and inform thereof the other Contracting Parties to the 1958 Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2D to this Regulation.
21.changed
If the holder of the approval completely ceases to manufacture a type of vehicle approved in accordance with this Regulation, he shall so inform the authority Type Approval Authority which granted the approval. Upon receiving the relevant communication, that authority Authority shall inform thereof the other Contracting Parties to the Agreement applying this Regulation by means of a communication form conforming to the model in Annex 2D to this Regulation.
22.1.changed
As from the official date of entry into force of the 01 series of amendments to this Regulation, no Contracting Party applying this Regulation shall refuse to grant ECE approval under this Regulation as amended by the 01 series of amendments.
1.deleted
1.2.4.5.1.deleted
1.1.1.added
Manufacturer's engine code(s) (as marked on the engine or other means of
1.2.changed
1.2.4.5.7.6.deleted
1.2.4.5.7.changed
LPG container: Specify the tolerance. Strike out what does not apply. Annex 1
1.2.4.5.8.1.changed
80 % per cent stop valve:
1.2.4.5.11.deleted
1.2.4.5.13.deleted
1.2.4.5.15.deleted
1.2.4.5.10.changed
Shut-off valve/Non-return valve/Gas tube pressure relief valve: yes/no1 yes/no2
1.2.4.5.16.deleted
1.2.4.5.17.deleted
1.2.4.5.14.changed
1.2.4.5.19.1.changed
Description of the LPG-equipment LPG equipment and the physical safeguarding of the catalyst at switch-over from petrol to LPG or back
1.2.5.1.changed
1.changed
14.changed
The documents filed with the application or extension of approval can be obtained upon request. Annex 2B - Appendix Annex 2B - Appendix (Containers only) Containers only
6.deleted
Table 2changed
No. Type Diameter/height [mm] Capacity [L] External Configuration of surface[cm2] accessories [codes]1 Code 00 and, if applicable, same code(s) from Table 3. Annex 2B - – Appendix
Table 3changed
No. Accessories Type Approval No. Extension Configuration of No. accessories [code] a b c d Annex 2C Annex 2C Arrangement of approval marks Model A (See paragraph 16.4. of this Regulation) 67 R—012439 a 8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of specific equipment for the use of LPG for propulsion, been approved in the Netherlands (E4), (E 4), pursuant to Regulation No. 67 under approval number 012439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 series of amendments. Model B (See paragraph 16.4. of this Regulation) 67 012439 83 041628 a 8 mm The above approval mark affixed to a vehicle shows that the vehicle has, with regard to the installation of specific equipment for the use of LPG for propulsion, been approved in the Netherlands (E4), (E 4), pursuant to Regulation No. 67 under approval number 012439. The first two digits of the approval number indicate that the approval was granted in accordance with the requirements of Regulation No. 67 as amended by the 01 series of amendments and that Regulation No. 83 included the 04 series of amendments. Annex 2D Annex 2D Communication (Maximum format: A4 (210 x 297 mm)) issued by : Name of administration: concerning2: Concerning:2 Approval granted Approval extended Approval refused Approval withdrawn Production definitively discontinued of a vehicle type with regard to the installation of LPG systems pursuant to Regulation No. 67
12.added
Distinguishing number of the country which has granted/extended/refused/withdrawn approval (see
approval provisions in the Regulation.)
Strike out what does not apply.
Annex 2D
1.1.changed
Definition: see See paragraph 2.5.1. of this Regulation.
1.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. Operational test tests Annex 15, para. 10. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
2.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
3.1.changed
Definition: see See paragraph 2.5.3. of this Regulation.
3.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. (with 200 operation cycles) Operational test Annex 15, para. 10. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 1.6.**
4.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. Operational test Annex 15, para. 10 LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.** Annex 3
4.7.added
If the remotely controlled service valve is closed during commanded stop
phases, the valve shall be submitted to the following numbers of operations
during the endurance test of paragraph 9. of Annex 15:
(a) 200,000 cycles (mark "H1") if the engine shuts off automatically when
the vehicle comes to a halt.
(b) 500,000 cycles (mark "H2") if, in addition to (a), the engine also shuts
off automatically when the vehicle drives with the electric motor only.
(c) 1,000,000 cycles (mark "H3") if, in addition to (a) or (b), the engine
also shuts off automatically when the accelerator pedal is released.
Notwithstanding the above-mentioned provisions, the valve complying with
(b) shall be deemed to satisfy (a), and the valve complying with (c) shall be
deemed to satisfy (a) and (b).
5.2.changed
Component classification (according to Figure 1, para. 2.): Class 0 for the part which is in contact with liquid LPG at a pressure > 3,000 kPa; Class 1 or Class 0. for the part which is in contact with liquid LPG at a pressure ≤ 3,000 kPa.
5.4.changed
5.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
6.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. (at 50 kPa) External leakage Annex 15, para. 5. (at 10 kPa) High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7.
7.6.changed
Test procedures to be applied: Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat (if any) leakage Annex 15, para. 8. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Annex 3 Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycles Annex 15, para. 16.**
7.7.changed
Pressure relief device (fuse) specified by the manufacturer shall be shown to be compatible with the service conditions by means of the following tests: (a) One specimen shall be held at a controlled temperature of not less than 90 °C and a pressure not less than test pressure (3,000 kPa) for 24 hours. At the end of this test there shall be no leakage or visible sign of extrusion of any fusible metal used in the design. (b) One specimen shall be fatigue tested at a pressure cycling rate not to exceed 4 cycles per minute as follows: (i) Held at 82 °C while pressured for 10,000 cycles between 300 and 3,000 kPa; Annex 3 (ii) Held at -20 °C while pressured for 10,000 cycles between 300 and 3,000 kPa. At the end of this test there shall be no leakage, or any visible sign of extrusion of any fusible metal used in the design. (c) Exposed brass pressure retaining components of pressure relief device shall withstand, without stress corrosion cracking, a mercurous nitrate test as described in ASTM B154***. The pressure relief device shall be immersed for 30 minutes in an aqueous mercurous nitrate solution containing 10 g of mercurous nitrate and 10 ml of nitric acid per litre of solution. Following the immersion, the pressure relief device shall be leak tested by applying an aerostatic pressure of 3,000 kPa for one minute during which time the component shall be checked for external leakage. Any leakage shall not exceed 200 cm3/h. (d) Exposed stainless steel pressure retaining components of pressure relief device shall be made of an alloy type resistant to chloride induced stress corrosion cracking. ___________ * Only for metallic parts. ** Only for non-metallic parts. *** This procedure, or other equivalent, is allowed until an international standard will be available.
Annex 4changed
1 Definition: see See paragraph 2.5.5. of this Regulation.
6.2.changed
Fuel pump mounted outside the container: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.** ____________ * Only for metallic parts. ** Only for non-metallic parts. Annex 5
1.changed
Definition: see See paragraph 2.14. of this Regulation.
6.1.changed
For parts of Class 1: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
6.2.changed
For parts of Class 2 and/or 2A: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.** _________________ * Only for metallic parts. ** Only for non-metallic parts.
1.changed
Definition: Vaporizer: see See paragraph 2.6. of this Regulation. Pressure regulator: see paragraph 2.7. of this Regulation.
6.1.changed
For parts of Class 1: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Annex 6 Seat leakage Annex 15, para. 8. Endurance (Number of cycles shall be 50,000 cycles) Annex 15, para. 9. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
6.2.changed
For parts of Class 2 and/or 2A: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Remarks: The shut-off valve can be integrated in the vaporizer, regulator, in this case Annex 7 is also applicable. The parts of the pressure regulator/vaporizer (Class 1, 2 or 2A) shall be leakproof leak proof with the outlet(s) of that part closed off. For the overpressure test all the outlets including those of the coolant compartment shall be closed off. __________________ * Only for metallic parts. ** Only for non-metallic parts.
1.1.changed
Definition: see See paragraph 2.8. of this Regulation.
1.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
1.7.added
If the remotely controlled shut-off valve is closed during commanded stop
phases, the valve shall be submitted to the numbers of operations according
to paragraph 4.7. of Annex 3 during the endurance test of paragraph 9. of
Annex 15.
2.1.changed
Definition: see See paragraph 2.5.9. of this Regulation.
2.2.changed
Component classification (according to Figure 1, para. 2.): Class 1. Annex 7
2.3.changed
Classification pressure: 3,000 kPa. Annex 7
2.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
3.1.changed
Definition: see See paragraph 2.9. of this Regulation.
3.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. (with 200 operation cycles) LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
4.1.changed
Definition: see See paragraph 2.17. of this Regulation.
4.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage Annex 15, para. 8. Endurance Annex 15, para. 9. (with 6,000 operation cycles) LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Annex 7 Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.** __________________ * Only for metallic parts. ** Only for non-metallic parts. Annex 8
1.1.2.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +80 °C. For operating temperatures exceeding the above- mentioned above-mentioned values, the test temperatures must shall be adapted.
1.2.1.changed
The hose must shall embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s).
1.2.3.changed
The lining and the cover must shall be smooth and free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
1.3.1.1.changed
Tensile strength and elongation at break according to ISO 37. Tensile strength not less than 10 MPa and elongation at break not less than 250 per cent. Annex 8
1.4.2.1.changed
The test has to be performed in compliance with standard ISO 1431/1. Annex 8
1.5.1.1.changed
A hose at a free length of 1 m has to be connected to a container filled with liquid propane, having a temperature of 23 °C 2 °C.
1.5.2.2.changed
Test-temperature: -25 °C 3 °C.
1.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test- pressure as mentioned in paragraph 1.5.5.2. below.
Figure 1changed
b mass propulsion mechanism a 1,2m Annex 8 Hose inside diameter Bending radius Distance between centres [mm] [mm] [mm] (Figure 1) (Figure 1) Vertical Horizontal b a up to 13 102 241 102 13 to 16 153 356 153 from 16 to 20 178 419 178
1.5.4.3.changed
The testing machine (see Figure 1) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of c.a. 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be as indicated in paragraph 1.5.4.2. above. The longitudinal median planes of both wheels must shall be in the same vertical plane and the distance between the wheel-centres must shall be in accordance with paragraph 1.5.4.2. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
1.5.4.4.changed
The hose shall be S-shape-like installed over the wheels (see Figure 1). The end that runs over the upper wheel shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
1.6.1.changed
The couplings shall be made from steel or brass and the surface must shall be corrosion-resistant.
1.6.2.changed
The couplings must shall be of the crimp-fitting type.
1.6.2.1.changed
The swivel-nut must shall be provided with U.N.F. thread.
1.6.2.2.changed
The sealing cone of swivel-nut type must shall be of the type with a half vertical angle of 45 °. 45°.
1.7.1.changed
The construction of the couplings must shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose consists of corrosion- resistant material.
1.7.2.2.changed
The hose has to be subjected to 150,000 impulses. Annex 8
1.7.2.3.changed
After the impulse test the hose has to withstand the test-pressure as mentioned in paragraph 1.5.5.2. above.
1.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
2.1.2.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +125 °C. For operating temperatures exceeding the above- mentioned values, the test temperatures must shall be adapted.
2.2.1.changed
The hose must shall embody a smooth-bore tube and a cover of suitable synthetic material, reinforced with one or more interlayer(s).
2.2.2.changed
The reinforcing interlayer(s) has (have) to be protected by a cover against corrosion. If for the reinforcing interlayer(s) corrosion-resistant material is used (i.e. stainless steel) a cover is not required. Annex 8
2.2.3.changed
The lining and the cover must shall be smooth and free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
2.4.2.3.changed
No cracking of the test pieces is allowed. Annex 8
2.5.3.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test pressure as mentioned in paragraph 2.5.4.2. 2.5.3.2 Annex 8
2.5.3.3.changed
The testing machine (see Figure 2) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of c.a. 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be as indicated in paragraph 2.5.3.2. above. The longitudinal median planes of both wheels must shall be in the same vertical plane and the distance between the wheel-centres must shall be in accordance with paragraph 2.5.3.2. above. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
2.5.3.4.changed
The hose shall be S-shape-like installed over the wheels (see Figure 2). The end that runs over the upper wheel shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
2.7.2.1.deleted
2.7.2.2.deleted
2.7.2.3.deleted
2.6.3.changed
The couplings must shall be of the crimp-fitting type.
2.7.1.changed
If hose and couplings are not assembled by the approval holder, the approval shall consist of: (a) Hose; (b) Couplings; and (c) Assembly instruction. The construction assembly instruction shall be written in the language of the country to which the type of hose or couplings must will be such, that it is not necessary to peel delivered, or at least in English. It shall include detailed characteristics of equipment used for the cover unless the reinforcement of the hose consists of corrosion- resistant material. assembly operation.
2.7.2.changed
The construction of the couplings shall be such, that it is not necessary to peel the cover unless the reinforcement of the hose assembly has to be subjected to an impulse test in compliance with standard ISO 1436. consists of corrosion- resistant material.
2.7.3.added
The hose assembly has to be subjected to an impulse test in compliance with
standard ISO 1436.
2.7.3.1.changed
The hose assembly (hose with couplings) test has to withstand during five minutes be completed with circulating oil having a gas temperature of 93 °C, and a minimum pressure of 1,015 kPa without any leakage. kPa.
2.7.3.2.added
The hose has to be subjected to 150,000 impulses.
2.7.3.3.added
After the impulse test the hose has to withstand the test-pressure as
mentioned in paragraph 2.5.4.2. above.
2.7.4.1.added
The hose assembly (hose with couplings) has to withstand during five
minutes a gas pressure of 1,015 kPa without any leakage.
2.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
2.8.1.2.changed
The year and month of fabrication. Annex 8
3.1.4.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +125 °C. For operating temperatures exceeding the above-mentioned values, the test temperatures must shall be adapted.
3.2.1.changed
The synthetic hose must shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion- resistant material is used (i.e. stainless-steel) a cover is not required.
3.2.2.changed
The lining and the cover must shall be free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
3.3.2.2.changed
Resistance to n-pentane according to ISO 1817 with the following conditions: (a) Medium: n-pentane; (b) Temperature: 23 °C (tolerance according to ISO 1817); (c) Immersion period: 72 hours. Requirements: (a) Maximum change in volume 2 per cent; (b) Maximum change in tensile strength 10 per cent. Maximum change in elongation at break 10 per cent After storage in air with a temperature of 40 °C for a period of 48 hours the mass compared to the original value may not decrease more than 5 per cent. Annex 8
3.3.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 3.3.2.1. above. Annex 8 Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
3.4.3.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned for at least 21 days before carrying out the tensile test according to paragraph 3.3.1.1. above. Requirements: (a) Maximum change in tensile strength 20 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 50 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
3.5.1.1.changed
A hose at a free length of 1 m has to be connected to a container filled with liquid propane, having a temperature of 23 °C 2 °C.
3.5.1.3.changed
The leakage through the wall of the hose shall not exceed 95 cm3 of vapour per metre of hose per 24 h. Annex 8
3.5.2.2.changed
Test temperature: -25 °C 3 °C.
3.5.2.3.changed
No cracking or rupture is allowed. Annex 8
3.5.3.1.changed
A piece of hose, pressurized at 3,000 kPa, with a minimal length of 0.5 m must shall be put in an oven at a temperature of 125 °C 2 °C during 24 hours.
3.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. After the test the hose must shall be capable of withstanding the test pressure as mentioned in paragraph 3.5.5.2. below.
Figure 3changed
b mass propulsion mechanism a 1,2m ( (a = 102 mm; b= 241 mm)
3.5.4.2.changed
The testing machine (see Figure 3) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of approximately 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be 102 mm. The longitudinal median planes of both wheels must shall be in the same vertical plane. The distance between the wheel-centres must shall be vertical 241 mm and horizontal 102 mm. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
3.5.4.3.changed
The hose shall be S-shape-like installed over the wheels (see Figure 3). The end, that runs over the upper wheel, shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
3.6.1.changed
The couplings shall be made from steel or brass and the surface must shall be corrosion-resistant.
3.6.2.changed
The couplings must shall be of the crimp-fitting type and made up of a hose- coupling or banjo bolt. The sealing shall be resistant to LPG and comply with paragraph 3.3.1.2. above.
3.7.1.3.changed
After the impulse-test the hose has to withstand the test pressure as mentioned in paragraph 3.5.5.2. above.
3.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
3.8.2.changed
Every coupling shall bear the trade name or mark of the assembling manufacturer. Annex 8
4.1.1.changed
The purpose of this chapter is to determine the provisions regarding the approval of synthetic flexible hoses for use with LPG, having an inside diameter up to 10 mm. Annex 8
4.1.4.changed
The hose shall be so designed as to withstand temperatures between -25 °C and +125 °C. For operating temperatures exceeding the above-mentioned values, the test temperatures must shall be adapted.
4.2.1.changed
The synthetic hose must shall embody a thermoplastic tube and a cover of suitable thermoplastic material, oil and weatherproof, reinforced with one or more synthetic interlayer(s). If for the reinforcing interlayer(s) a corrosion-resistant material is used (i.e. stainless-steel) a cover is not required.
4.2.2.changed
The lining and the cover must shall be free from pores, holes and strange elements. An intentionally provided puncture in the cover shall not be considered as an imperfection.
4.4.3.3.1.deleted
4.4.3.3.2.deleted
4.3.2.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned at 23 °C and 50 per cent relative humidity for at least 21 days prior to carrying out the tensile test according to paragraph 4.3.2.1. above. Requirements: (a) Maximum change in tensile strength 35 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 25 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
4.4.3.3.3.deleted
4.4.2.1.added
1:2004/Amd 1:2009.
4.4.2.2.added
The test-pieces, which have to be stretched to an elongation of 20 per cent
shall be exposed to air of 40 °C and a relative humidity of 50 per cent ± 10
per cent with an ozone concentration of 50 parts per hundred million during
120 hours.
4.4.2.3.added
Cracking of the test pieces is not allowed.
4.4.3.3.changed
Resistance to ageing according to ISO 188 with the following conditions: (a) Temperature: 115 °C (test temperature = maximum operating temperature minus 10 °C); (b) Exposure period: 24 and 336 hours. After ageing the specimens have to be conditioned for at least 21 days before carrying out the tensile test according to paragraph 4.3.1.1. above. Requirements: (a) Maximum change in tensile strength 20 per cent after 336 hours ageing compared to the tensile strength of the 24 hours aged material; (b) Maximum change in elongation at break 50 per cent after 336 hours ageing compared to the elongation at break of the 24 hours aged material.
4.5.1.1.changed
A hose at a free length of 1 m has to be connected to a container filled with liquid propane, having a temperature of 23 °C ± 2 °C.
4.5.2.2.changed
Test temperature: -25 °C ± 3 °C.
4.5.3.1.changed
A piece of hose, pressurized at WP, with a minimal length of 0.5 m must shall be put in an oven at a temperature of 125 °C ± 2 °C during 24 hours.
4.5.4.1.changed
3,000 times the hereafter prescribed alternating-bending-test without breaking. Annex 8 After the test the hose must shall be capable of withstanding the test pressure as mentioned in paragraph 4.5.5.2. Annex 8 below.
Figure 4added
(a = 102 mm; b = 241 mm)
4.5.4.2.changed
The testing machine (see Figure 4) shall consist of a steel frame, provided with two wooden wheels, with a rim-width of approximately 130 mm. The circumference of the wheels must shall be grooved for the guidance of the hose. The radius of the wheels, measured to the bottom of the groove, must shall be 102 mm. The longitudinal median planes of both wheels must shall be in the same vertical plane. The distance between the wheel-centres must shall be vertical 241 mm and horizontal 102 mm. Each wheel must shall be able to rotate freely round its pivot-centre. A propulsion mechanism pulls the hose over the wheels at a speed of four complete motions per minute.
4.5.4.3.changed
The hose shall be S-shape-like installed over the wheels (see Figure 4). The end, which runs over the upper wheel, shall be furnished with a sufficient mass as to achieve a complete snuggling of the hose against the wheels. The part that runs over the lower wheel is attached to the propulsion mechanism. The mechanism must shall be so adjusted, that the hose travels a total distance of 1.2 m in both directions.
4.5.5.3.changed
The burst pressure shall not be less than 10,000 kPa and at least 2.25 WP.
4.6.1.changed
The couplings shall be made from steel or brass and the surface must shall be corrosion-resistant.
4.6.2.changed
The couplings must shall be of the crimp-fitting type and made up of a hose- coupling or banjo bolt. The sealing shall be resistant to LPG and comply with paragraph 4.3.1.2. above.
4.8.1.changed
Every hose must shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.
1.changed
Definition: see See paragraph 2.16. of this Regulation.
2.changed
Component classification (according to Figure 1, para. 2.): 2. of this Regulation): Filling unit: Class 3 Non-return valve: Class 3
6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. Seat leakage test Annex 15, para. 8. Endurance Annex 15, para. 9. (with 6,000 operation cycles) LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13. Ozone ageing Annex 15, para. 14. Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.** Impact test paragraph 7. of this annex
Figure 5changed
Dimensions in millimetres Keys: 1 Nozzle sealing surface 2 Minimum valve travel 3 General tolerance ________________ * Only for metallic parts. ** Only for-non metallic for-non-metallic parts.
1.3.1.changed
The material used for the manufacture of the stress-resistant container shells must shall be steel as specified in Euronorm EN 10120 (however, other materials may be used provided that the container has the same safety characteristics, to be certified by the authorities Type Approval Authorities granting type approval).
1.3.3.changed
All components of the container body and all the parts welded thereto must shall be made of mutually compatible materials.
1.3.4.changed
The filler materials must shall be compatible with the parent material so as to form welds with properties equivalent to those specified for the parent material (EN 288-39).
1.3.5.changed
The container manufacturer must shall obtain and provide: (a) For metal containers: chemical cast analysis certificates; (b) For all-composite containers: chemical resistance analysis certificates related to tests performed according to the requirements of Appendix 6; (c) Mechanical properties of the material in respect of the steels or other materials applied for the construction of the parts subject to pressure.
1.3.6.changed
The inspection authority must shall have the opportunity to make independent analyses. These analyses must shall be carried out either on specimens taken from the materials as supplied to the container manufacturer or on the finished containers.
1.3.7.changed
The manufacturer must shall make available to the inspection authority the results of metallurgical and mechanical tests and analyses of parent and filler materials carried out on welds and must shall also provide it with a description of the welding methods and processes which can be regarded as representative of the welds made during production.
1.5.2.changed
Those parts of a container having been deformed by more than 5 per cent must shall be submitted to the following heat treatment: normalize.
1.5.3.changed
Containers with a wall thickness 5 mm must shall be submitted to the following heat treatment:
1.5.4.changed
The manufacturer must shall submit the procedure for the heat treatment used.
1.6.1.1.changed
The wall thickness of the cylindrical shell of the containers must shall not be less than that calculated by the formula:
1.6.1.1.1.changed
Containers without longitudinal welds: Ph D Ph D a 2000 e Ph 1500 R e Ph Re R 4/3
1.6.1.1.2.changed
Containers with longitudinal welds: Ph D Ph D a 2000 e z Ph 1500 R e z Ph Re R 4/3 (a) z = 0.85 where the manufacturer radiographs each weld intersection and 100 m of the adjacent longitudinal weld and 50 mm (25 mm each side of the intersection) of the adjacent circumferential weld. This test has to be performed per machine at the beginning and end of each work shift period from continuous production. (b) z = 1 where each weld intersection and 100 mm of the adjacent longitudinal weld and 50 mm (25 each side of the intersection) of the adjacent circumferential weld is spot radiographed. This test has to be performed at 10 per cent of the container production: the containers to be tested are chosen randomly. Should these radiograph tests reveal unacceptable defects, as defined in paragraph 2.4.1.4., 2.4.1.4. of this annex, all the necessary steps must shall be taken to examine the production run in question and eliminate the defects.
1.6.1.2.1.changed
The container ends shall be in one piece, shall encave to the pressure and shall have either a torispherical or an elliptical form (examples are given in Appendix 5). 5 of this annex). Annex 10
1.6.1.2.2.changed
The container ends must shall fulfil the following conditions: Torispherical ends simultaneous limits: 0.003 D b 0.08 D r 0.1 D RD H 0.18 D r2b h4b h 0.15 D (not applicable for containers as shown in Appendix 2 to this annex, Figure 2a) Elliptical ends simultaneous limits: 0.003 D b 0.08 D H 0.18 D h4b h 0.15 D (not applicable for containers as shown in Appendix 2 to this annex, Figure 2a)
1.6.1.2.3.changed
The thickness of these barrelled ends must shall not be in toto be less than the figure calculated by means of the following formula: Ph D b C 1500 R e The shape factor C to be used for full ends is given in the table and in the graphs contained in Appendix 4 to this annex. The wall thickness of the cylindrical edge of the ends may not be less or differ more than 15 per cent from the smallest wall thickness of the shell.
1.6.1.4.changed
The shell of the container may be made up of one, two or three parts. When the shell is made up from two or three parts, the longitudinal welds must shall be shifted/rotated with a minimum of 10 times the thickness of the container wall (10 a). The ends must shall be in one piece and convex.
1.7.1.2.changed
The manufacturer must shall ensure through adequate supervision that the parent materials and pressed parts used to manufacture the containers are free from defects likely to jeopardize the safe use of the containers.
1.7.2.1.changed
The manufacturer must shall describe the welding methods and processes used and indicate the inspections carried out during production.
1.7.2.2.changed
The butt welds must shall be executed by an automatic welding process. The butt welds on the stress-resistant shell may not be located in any area where there are changes of profile. Angle welds may not be superimposed on butt welds and must shall be at least 10 mm away from them. Welds joining parts making up the shell of the container must shall satisfy the following conditions (see figures given as examples in Appendix 1 of to this annex): Longitudinal weld: this weld is executed in the form of a butt weld on the full section of the material of the wall; Circumferential weld: this weld is executed in the form of a butt weld on the full section of the material of the wall. A joggle weld is considered to be a special type of butt weld; Welds of the studded valve plate or ring shall be carried out according to Appendix 1, Figure 3. A weld fixing the collar or supports to the container shall be either a butt or angle weld. Welded mounting supports shall be welded in the circumferential way. The welds shall be strong enough to withstand vibration, braking actions and outside forces of at least 30 g in all directions. In this case of butt welds, the misalignment of the joint faces may not exceed one-fifth of the thickness of the walls (1/5 a).
1.7.2.3.changed
The manufacturer must shall ensure that the welds show continuous penetration without any deviation of the weld seam, and that they are free from defects likely to jeopardize the safe use of the container. For containers in two pieces, a radiographical test has to be performed on the circumferential butt welds over 100 mm, with the exception of the welds in conformity with joggle weld on page 1 of Appendix 1 of to this annex. On one container selected at the beginning and end of each shift period from continuous production and, in the event of production being interrupted for a period of more than 12 hours, the first container welded should also be radiographed. Annex 10
1.7.2.4.changed
The out-of-roundness of the cylindrical shell of the container must shall be limited so that the difference between the maximum and minimum outside diameter of the same cross-section is not more than 1 per cent of the average of those diameters.
1.7.3.1.changed
The supports must shall be manufactured and attached to the container body in such a way as not to cause dangerous concentrations of stresses or be conducive conductive to the collection of water.
1.7.3.2.changed
The base of the container must shall be sufficiently strong and made of metal compatible with the type of steel used for the container. The form of the base must shall give the container sufficient stability. The top edge of the base must shall be welded to the container in such a way as not to be conducive to the collection of water nor to allow water to penetrate between the base and the container.
1.7.3.4.changed
Where fitted, identification plates must shall be fixed on to the stress resistant shell and shall not be removable. All the necessary corrosion prevention measures must shall be taken.
1.7.4.1.changed
A container representative of the type of container, all accessories fitted on it and any added insulation or protective material, material shall be covered by a bonfire test as specified in paragraph 2.6. of this annex.
2.changed
Tables 1 and 2 below give an overview of the tests to be performed on the LPG containers on prototypes as well as during the production process according to their nature. All tests shall be performed at ambient temperature of 20 °C 5 °C, unless otherwise stated.
Table 1changed
Test to be performed Production Number of containers Test description Batch tests to be tested for type approval Tensile test 1 per batch 2 1/ 21 See para. 2.1.2.2. Bend test 1 per batch 2 1/ 21 See para. 2.1.2.3. Burst test 2 See para. 2.2. Hydraulic test Each container 100 % See para. 2.3. Bonfire test 1 See para. 2.6. Radiographic 1 per batch 100 % See para. 2.4.1. examination Macroscopic examination 1 per batch 2 1/ 21 See para. 2.4.2. Inspection of welds 1 per batch 100 % See para. 1.7.2.3. Visual inspection of the 1 per batch 100 % parts of the container These test pieces can be taken from one container container. Note 1: 6 containers shall be submitted for type approval. Note 2: On one of these prototypes the volume of the container and the wall thickness of each part of the container shall be determined.
2.1.2.1.1.changed
Containers with longitudinal and circumferential welds (three sections) on test-pieces taken from the places shown in Figure 1 of Appendix 2 of to this annex: (a) One tensile test on parent material; the test piece to be taken in the longitudinal direction (if this is not possible, it may be taken in a circumferential direction); (b) One tensile test on parent material of the bottom; (c) One tensile test perpendicular to the longitudinal weld; (d) One tensile test perpendicular to the circumferential weld; (e) One bend test on the longitudinal weld, the inner surface in tension; (f) One bend test on the longitudinal weld, the outer surface in tension; (g) One bend test on the circumferential weld, the inner surface in tension; (h) One bend test on the circumferential weld, the outer surface in tension; and (i) One macroscopic test of a welded section; (ml, m2) A minimum of two macroscopic tests of valve boss/plate sections in case of the sidewall mounted valves referred to in paragraph 2.4.2. below.
2.1.2.1.3.changed
Test-pieces which are not sufficiently flat must shall be flattened by cold pressing.
2.1.2.2.1.2.changed
The values determined for yield stress, tensile strength and elongation after break must shall comply with the characteristics of the metal as required in paragraph 1.3. of this annex.
2.1.2.2.2.1.changed
This tensile test perpendicular to the weld must shall be carried out on a test-piece having a reduced cross-section 25 mm in width for a length extending up to 15 mm beyond the edges of the weld, as shown in Figure 2 of Appendix 3 to this annex. Beyond this central part the width of the test-piece must shall increase progressively.
2.1.2.2.2.2.changed
The tensile strength value obtained must shall meet the minimum levels required by EN 10120.
2.1.2.3.1.changed
2.1.2.3.2.changed
Cracks must shall not appear in the test-piece when it is bent round a mandrel as long as the inside edges are separated by a distance not greater than the diameter of the mandrel + 3a +3a (see Figure 1 in of Appendix 3 of to this annex). 2.1.2.3.3 The ratio (n) between the diameter of the mandrel and the thickness of the test piece must shall not exceed the values given in the following table: Actual tensile strength Value (n) Rt in (N/mm2) up Up to 440 inclusive 2 above Above 440 to 520 inclusive 3 above Above 520 4 Annex 10
2.1.2.4.1.changed
Retesting is permitted for the tensile and bend test. A second test shall consist of two test pieces taken from the same container. Annex 10 If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected.
2.2.1.changed
Containers subjected to this test must shall bear the inscriptions which it is proposed to affix on the section of the container subjected to pressure,
2.2.1.1.changed
The burst test under hydraulic pressure must shall be carried out with equipment which enables the pressure to be increased at an even rate, until the container bursts and the change in pressure over time to be recorded. The maximum flow rate during the test should not exceed 3 per cent of the capacity of the container per minute.
2.2.3.1.changed
The measured bursting pressure (P r) must shall not under any circumstances be less than 2.25 3,000 = 6,750 kPa.
2.2.3.2.changed
The specific change in the volume of the metal container at the time of bursting must shall not be less than: 20 per cent if the length of the metal container is greater than the diameter; 17 per cent if the length of the metal container is equal to or less than the diameter. 8 per cent in the case of a special metal container as shown in Appendix 5, 5 to this annex, page 1, Figures A, B and C.
2.2.3.3.changed
The burst test must shall not cause any fragmentation of the container.
2.2.3.3.1.changed
The main fracture must shall not show any brittleness, i.e. the edges of the fracture must shall not be radial but must shall be at an angle to a diametrical plane and display a reduction of area throughout their thickness.
2.2.3.3.2.changed
For metal containers the fracture must shall not reveal an inherent defect in the metal. The weld must shall be at least as strong as the original metal but preferably stronger. For all-composite containers, the fracture shall not reveal any defects in the structure.
2.3.2.changed
The water pressure in the container must shall increase at an even rate until the test pressure of 3,000 kPa is reached.
2.3.3.changed
The container must shall remain under the test pressure long enough to make it possible to establish that the pressure is not falling off and that the container can be guaranteed leakproof. leak proof.
2.3.4.changed
After the test the container must shall show no signs of permanent deformation.
2.3.5.changed
Any container tested which does not pass the test must shall be rejected.
2.3.6.1.3.changed
Retesting is permitted for the ambient temperature pressure cycling test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. Annex 10 If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected. Annex 10
2.3.6.2.2.changed
The container shall comply with the external leak test requirements as defined in paragraph 2.3.6.3. below. The container shall achieve a minimum burst pressure of 85 per cent of the burst pressure.
2.4.1.1.changed
Welds must shall be radiographed in compliance with ISO specification R 1106, using classification B.
2.4.1.3.changed
Assessment of the weld radiographs must shall be based on the original films in compliance with the practice recommended in standard ISO 2504, paragraph 6.
2.4.2.changed
The macroscopic examination of a full transverse section of the weld must shall show a complete fusion on the surface treated with any acid from the macro- preparation and must shall not show any assembly fault or a significant inclusion or other defects. In case of doubt, a microscopic examination should be made of the suspect area.
2.5.1.changed
This examination is carried out when the weld has been completed. The welded surface examined must shall be well illuminated, and must shall be free from grease, dust, scale residue or protective coating of any kind. Annex 10
2.5.2.changed
The fusion of the welded metal with the parent metal must shall be smooth and free from etching. There must shall be no cracks, notching or porous patches in the welded surface and the surface adjacent to the wall. The welded surface must shall be regular and even. Where a butt weld has been used, the excess thickness must shall not exceed 1/4 of the width of the weld. Annex 10
2.6.1.changed
The bonfire test is designed to demonstrate that a container complete with the fire protection system, specified in the design, will prevent the burst of the container when tested under the specified fire conditions. The manufacturer shall describe the behaviour of the complete fire protection system including the designed drop to atmospheric pressure. The requirements of this test shall be deemed to be fulfilled for any container having the following characteristics in common with the parent container: (a) Same type approval owner, (b) Same shape (cylindrical, special shape), (c) Same material, (d) Same or greater wall thickness, (e) Same or smaller diameter (cylindrical container), (f) Same height or smaller height (special container shape), (g) Same or smaller external surface, (h) Same configuration of accessories fitted to the container 1. container.1
2.6.2.changed
Container set-up (a) The container shall be placed in the designed position by the manufacturer with the container bottom approximately 100 mm above the fire source. (b) Shielding shall be used to prevent direct flame impingement on the fusible plug (PRD) if present. The shielding shall not be in direct contact with the fusible plug (PRD). (c) Any failure during the test of a valve, fitting or tubing that is not part of the intended protection system for the design shall invalidate the result. (d) Containers with a length of less than 1.65 m. The center of the container shall be positioned over the center of the fire source. Additional accessories, modifications and extensions of the accessories fitted to the container is possible without retesting, if notified to the Type Approval Authority which approved the container, considered to be unlikely to have an appreciable adverse effect. The Type Approval Authority may require a further test report from the Technical Service responsible. The container and its configurations of accessories will be indicated in Appendix 1 to Annex 2B. (e) Containers with a length equal to or larger than 1.65 m. If the container is fitted with a pressure relief device at one side, the fire source shall commence at the opposite side of the container. If the container is fitted with pressure relief devices at both sides, or at more than one location along the length of the container, the center of the fire source shall be centered midway between the pressure relief devices that are separated by the greatest horizontal distance. Additional accessories, modifications and extensions of the accessories fitted to the container is possible without retesting, if notified to the Type Approval Authority which approved the container, considered to be unlikely to have an appreciable adverse effect. The Type Approval Authority may require a further test report from the Technical Service responsible. The container and its configurations of accessories will be indicated in Appendix 1 to Annex 2B.
2.6.5.changed
General test requirements (a) Container shall be filled with 80 per cent in volume of LPG (commercial fuel) and tested in the horizontal position at working pressure; (b) Immediately following the ignition, the fire shall produce flame impingement on the surface of the container, along 1.65 m length of the fire source across the container; (c) Within 5 minutes of ignition at least one thermocouple shall indicate the temperature of fire just below the container of at least 590 °C. This temperature shall be maintained for the remaining duration of the test, namely until when no overpressure is present in the container; (d) The severity of the test conditions shall not be mitigated by ambient conditions (e.g. rain, moderate/high wind etc.). Annex 10
2.6.6.changed
Test results: results (a) A burst of the container shall invalidate the test result. (b) A pressure of more than 3,700 kPa, i.e. 136 per cent of the set pressure of the PRV (2,700 kPa), during the test shall invalidate the test result. A pressure between 3,000 and 3,700 kPa shall only invalidate the test result in case visible plastic deformation is observed. Annex 10 (c) In case the behaviour of the protection system does not comply with the specification of the manufacturer and it leads to a mitigating test condition the result shall be invalidated. (d) For a composite container a release of LPG via the surface is accepted in case of a controlled release. A release of gaseous LPG within 2 minutes after the start of the test or a release capacity of more than 30 litres per minute shall invalidate the test result. (e) The results shall be presented in a test summary and shall include the following data for each container as a minimum: (i) Description of the container configuration. (ii) Photo of the container set-up and PRD. (iii) Applied method including time interval between measurements. (iv) The elapsed time from ignition of the fire to the start of venting of LPG and actual pressure. (v) Time to reach atmospheric pressure. (vi) Pressure and temperature diagrams.
2.7.2.changed
For this test, the fluid medium shall be water/glycol mixture or another liquid having a low freezing point which does not change the properties of the container material. A container filled with the fluid medium to the weight that equals the filling with 80 per cent of LPG with a reference mass of 0.568 kg/l, is projected, parallel to the length axle (x-axis in Figure 1) of the vehicle in which it is intended to be fitted at a velocity, V of 50 km/h, against a solid wedge, fixed horizontally, perpendicular to the movement of the container. The wedge shall be installed so that the centre of gravity (c.g.) of the container hits the centre of the wedge. The wedge shall have an angle α of 90 degrees and the point of impact shall be rounded with a maximum radius of 2.5 mm. The length of the wedge L, shall be at least equal to the width of the container in respect to its movement during the test. The height H of the wedge shall be at least 600 millimetres millimetres.
2.8.1.changed
One finished container shall be drop tested at ambient temperature without internal pressurization or attached valves. The surface onto which the containers are dropped shall be a smooth, horizontal concrete pad or flooring. The drop height (Hd) shall be 2 m (measured to the lowest point of the container). The same empty container shall be dropped: (a) In a horizontal position; (b) Vertically on each end; (c) At an angle of 45°. Annex 10 Following the drop test, the containers shall be submitted to an ambient temperature pressure cycling test according the requirements of paragraph 2.3.6.1. of this annex. Annex 10
Figure 1changed
(a) Tensile test on parent material (b) Tensile test on parent material of the bottom (c) Tensile test on a longitudinal weld (d) Tensile test on a circumferential weld (e) Bend test on a longitudinal weld, the inner surface in tension (f) Bend test on a longitudinal weld, the outer surface in tension (g) Bend test on a circumferential weld, the inner surface in tension (h) Bend test on a circumferential weld, the outer surface in tension (m1, m2) Macro sections through valve boss/plate welds (side-mounted valve block) Annex 10 – Appendix 2
Figure 2achanged
Containers with circumferential welds only and side-mounted valve blocks; location of test-pieces Annex 10 – Appendix 2 (a) or (b) Tensile test on parent material (d) Tensile test on a circumferential weld (g) Bend test on a circumferential weld, the inner surface in tension (h) Bend test on a circumferential weld, the outer surface in tension (m1, m2) Macro sections through valve boss/plate welds (side-mounted valve block)
Figure 2bchanged
Containers with circumferential welds only and valve boss/plate fitted to the end. (m1, m2) Macro sections through valve boss/plate welds (Refer to Figure 2a for other locations of test-pieces) Annex 10 – Appendix 3
1.changed
Materials used in an all-composite container must shall be tested according to standard ISO 175 for 72 hours at room temperature. Demonstrating the chemical resistance by using data from literature is also allowed. Compatibility with the following media shall be checked: (a) Brake fluid; (b) Window cleaner; (c) Cooling liquid; (d) Non-leaded petrol; (e) Solution of deionized water, sodium chloride (2.5 % per cent by mass 0.1 %), per cent), (calcium chloride (2.5 % per cent by mass 0.1 %) per cent) and sulphuric acid sufficient to achieve a solution of pH 4.0 0.2. Test acceptance criteria: (a) Elongation: The elongation of a thermoplastic material, after testing, must shall be at least 85 per cent of the initial elongation. The elongation of an elastomer, after testing, must shall be at least larger than 100 per cent. (b) For structural components (e.g., fibres): The residual strength for a structural component after testing must shall be at least 80 per cent of the original tensile strength. (c) Non-structural components (e.g., coating): There are no visual cracks allowed.
2.changed
Composite structure (a) Fibres embedded in a matrix Tensile properties: ASTM 3039 Fiber-resin composites ASTM D2343 Glass, Aramid (tens. prop. yarns glass) ASTM D4018.81 Carbon (tens.prop.continuous filament) with special remark for the matrix Shear properties: ASTM D2344 (Interlaminar shearstrength of parallel fibre composite by short beam method) (b) Dry fibres on an isotensoid shape Tensile properties: ASTM D4018.81 Carbon (continuous filament), other fibres. Annex 10 – Appendix 6
3.changed
4.changed
The Vicat softening temperature of a thermoplastic component must shall be above 70 °C. For structural components, the Vicat softening temperature must shall be at least 75 °C.
5.changed
The Vicat softening temperature of a thermo-set component must shall be above 70 °C.
6.changed
The glass transition temperature (Tg) of an elastomer component must shall be lower than -40 °C. The glass transition temperature shall be tested according ISO 6721 "Plastics - Determination of dynamic mechanical properties". The Tg-onset is derived from the plotted diagram storage modulus versus temperature by determining the temperature, where the two tangents, which are representing the slopes of the diagram before and after the dramatic loss of stiffness, intersects.
1.1.changed
Definition: see See paragraph 2.10. of this Regulation.
1.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.**
2.1.changed
Definition: see See paragraph 2.10. of this Regulation.
2.6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.*
3.1.changed
Definition: see See paragraph 2.18. of this Regulation.
3.6.1.changed
For fuel rails of Class 0 and 1: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11. ** Corrosion resistance Annex 15, para. 12. * Resistance to dry heat Annex 15, para. 13. ** Ozone ageing Annex 15, para. 14. ** Creep Annex 15, para. 15. ** Temperature cycle Annex 15, para. 16. **
3.6.2.changed
For fuel rails of Class 2 and/or 2A: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* _________________ * Only for metallic parts. ** Only for non-metallic parts. Annex 12
1.changed
Definition: see See paragraph 2.11. of this Regulation.
6.changed
Applicable test procedures: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Remarks: The parts of the gas dosage unit (Class 2 or 2A) shall be leakproof with the outlet(s) of that part closed. For the overpressure test all the outlets including those of the coolant compartment shall be closed off. * Only for metallic parts. ** Only for non-metallic parts.
1.changed
Definition: Pressure sensor: see See paragraph 2.13. of this Regulation. Temperature sensor: see See paragraph 2.13. of this Regulation.
6.1.changed
For parts of Class 0 and 1: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* Resistance to dry heat Annex 15, para. 13.** Ozone ageing Annex 15, para. 14.** Creep Annex 15, para. 15.** Temperature cycle Annex 15, para. 16.** Annex 13
6.2.changed
For parts of Class 2 or 2A: Over pressure Overpressure test Annex 15, para. 4. External leakage Annex 15, para. 5. High temperature Annex 15, para. 6. Low temperature Annex 15, para. 7. LPG compatibility Annex 15, para. 11.** Corrosion resistance Annex 15, para. 12.* __________________ * Only for metallic parts. ** Only for non-metallic parts.
1.changed
The electronic control unit can be any device which controls the LPG demand of the engine and establishes the cut-off of the remotely-controlled service valve(s), cut-off valves and fuel pump of the LPG-system LPG system in case of a broken fuel supply pipe or/and in case of stalling of the engine.
2.1.added
Notwithstanding the provisions of paragraphs 1. and 2. above, the remotely
controlled service valve(s) and shut-off valves may stay in an open position
during the commanded stop phases.
3.5.changed
All tests shall be performed at a room temperature of 20 °C 5 °C, unless otherwise stated.
4.changed
A LPG containing component shall withstand without any visible evidence of rupture or permanent distortion a hydraulic test pressure which is determined by Table 1 (of 2.25 times the maximum classification pressure) during minimal 1 minute with the outlet of the high pressure part plugged. The samples, previously subjected to the durability test of paragraph 9. of this annex are to be connected to a source of hydrostatic pressure. A positive shut-off valve and a pressure gauge, having a pressure range of not less than 1.5 times nor more than 2 times the test pressure, are to be installed in the hydrostatic pressure supply piping.
Table 2changed
5.1.changed
A component shall be free from leakage through stem or body seals or other joints, and shall not show evidence of porosity in casting when tested as described in paragraph 5.3. below at any aerostatic pressure between 0 and the pressure shown in Table 3. The above prescriptions are deemed to be satisfied, if the provisions of paragraph 5.4. below are met.
5.3.changed
During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure (of 1.5 times the maximum pressure and in the case of a Class 3 component, 2.25 times the maximum classification pressure). A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressure pressures are to be installed Annex 15 in the pressure supply piping. The pressure gauge is to be installed between Annex 15 the positive shut-off valve and the sample under test. While under the applied test pressure, the sample should be submerged in water to detect leakage or any other equivalent test method (flow measurement or pressure drop).
Table 3changed
5.4.changed
The external leakage must shall be lower than the requirements stated in the annexes or, if no requirements are mentioned, the external leakage shall be lower than 15 cm3/hour with the outlet plugged, when submitted to a gas pressure equal to the leakage test pressure.
6.changed
A LPG containing component shall not leak more than 15 cm3/hour with the outlet plugged when submitted to a gas pressure at maximum operating temperature, as indicated in the annexes, equal to the leakage test pressure (Table 3, paragraph 5.3.). 5.3. above). The component shall be conditioned for at least 8 hours at this temperature.
7.changed
A LPG containing component shall not leak more than 15 cm3/hour with the outlet plugged when submitted to a gas pressure, at the minimum operating temperature (-20 °C), equal to the leakage test pressure (Table 3, paragraph 5.3.). 5.3. above). The component shall be conditioned for at least 8 hours at this temperature.
8.1.1.changed
Seat leakage tests are conducted with the inlet of the sample valve connected to a source of aerostatic pressure, the valve in the closed position, and with the outlet open. A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressure pressures are to be installed in the pressure supply piping. The pressure gauge is to be installed between the positive shut-off valve and the sample under test. While under the applied test pressure, observations for leakage are to be made with the open outlet submerged in water unless otherwise indicated.
8.1.2.changed
Conformance with paragraphs 8.2. to 8.8. below is to be determined by connecting a length of tubing to the valve outlet. The open end of this outlet tube is to be located within an inverted graduated cylinder which is calibrated in cubic centimetres. The inverted cylinder is to be closed by a water seal. The apparatus is to be adjusted so that: (a) The end of the outlet tube is located approximately 13 mm above the water level within the inverted graduated cylinder, and (b) The water within and exterior to the graduated cylinder is at the same level. With these adjustments made, the water level within the graduated cylinder is to be recorded. With the valve in the closed position assumed as the result of normal operation, air or nitrogen at the specified test pressure is to be applied to the valve inlet for a test period of not less than 2 minutes. During this time, the vertical position of the graduated cylinder is to be adjusted, if necessary, to maintain the same water level within and exterior to it. At the end of the test period and with the water within and exterior to the graduated cylinder at the same level, the level of water within the graduated cylinder is again recorded. From the change of volume within the graduated cylinder, the leakage rate is to be calculated according to the following formula: 60 273 P V1 Vt t T 101.6 where: Where: V1 = leakage rate, cubic centimetres of air or nitrogen per hour. Vt = increase in volume within graduated cylinder during test. t = time of test, minutes. P = barometric pressure during test, in kPa. T = ambient temperature during test, in K.
8.2.changed
The seat of a shut-off valve, when in the closed position, shall be free from leakage at any aerostatic pressure between 0 to 3,000 kPa or from 0 to WP in accordance with the classification pressure of the valve. Annex 15
8.4.changed
A non-return valve provided with a metal-to-metal seat, when in the closed position, shall not leak at a rate exceeding 0.50 dm3/hour when subjected to an inlet pressure up to the test pressure according to Table 3 in paragraph 5.3. above
8.7.changed
The gas-tube pressure relief valve shall not have internal leakage up to 3,000 kPa or up to WP, in accordance with the classification pressure of the valve. Annex 15
9.4.changed
The appropriate tests for external and seat leakage, as described under external leakage test under paragraph 5. above and seat leakage test under paragraph 8. are to be conducted immediately following the endurance test.
9.6.changed
The regulator shall be able to withstand 50,000 cycles without any failure when tested according to the following procedure: (a) Recycle the regulator for 95 per cent of the total number of cycles at room temperature and at the classification pressure. Each cycle shall consist of flow until stable outlet pressure has been obtained, after which the gas flow shall be shut off by a downstream valve within 1 s, until the downstream lock-up pressure has stabilized. Stabilized outlet pressures are defined as set pressure ±15 per cent for at least 5 s. (b) Cycle the inlet pressure of the regulator for 1 per cent of the total number of cycles at room temperature from 100 per cent to 50 per cent of the classification pressure. The duration of each cycle shall be no less than 10 s. (c) Repeat the cycling procedure listed in sub-paragraph (a) at 120 °C at the classification pressure for 1 per cent of the total number of cycles. (d) Repeat the cycling procedure listed in sub-paragraph (b) at 120 °C at the classification pressure for 1 per cent of the total number of cycles. (e) Repeat the cycling procedure listed in sub-paragraph (a) at -20 °C and 50 per cent of classification pressure for 1 per cent of the total number of cycles. (f) Repeat the cycling procedure listed in sub-paragraph (b) at -20 °C and 50 per cent of classification pressure for 1 per cent of the total number of cycles. (g) At the completion of all tests indicated in sub-paragraphs (a), (b), (c), (d), (e) and (f), the regulator shall be leak proof as described under external leakage test under paragraph 5., 5. above, at the temperatures of -20 °C, at the room temperature and at the temperature of +120 °C.
10.1.2.3.changed
A pressure relief is to be connected to an air or other aerostatic supply source capable of being maintained at a pressure of at least 500 kPa effective pressure above the marked set pressure of the valve being tested. A positive shut-off valve and a pressure gauge having a pressure range of not less than 1.5 times nor more than 2 times the test pressure are to be installed in the pressure supply piping. The pressure gauge is to be installed in the piping between the valve being tested and the positive shut-off valve. Start-to- discharge and resealing pressure are to be observed through a water seal not over 100 mm in depth. Annex 15
10.1.3.3.changed
The blow-down pressure of each valve shall be not less than 65 per cent of the initially recorded start-to-discharge pressure. Annex 15
10.1.3.10.changed
From the recorded data and the known orifice coefficient of the flowmeter, the air-flow capacity of the pressure relief valve tested is to be calculated using the following formula: Fb Ft 0.1 h p Q where: Where: Q = Flow capacity of pressure relief valve in m3/min. of air at 100 kPa absolute and 15 °C. Fb = Basic orifice factor of flowmeter at 100 kPa absolute and 15 °C. Ft = Flowing air temperature factor to convert recorded temperature to base of 15 °C. h = Differential pressure across orifice of meter in kPa. p = Flowing air pressure to pressure relief valve in kPa absolute (recorded gauge pressure plus recorded barometric pressure). 60 = Denominator to convert equation from m3/hour to m3/min.
10.1.3.11.changed
The average flow capacity of the three pressure relief valves rounded off to the nearest five units is to be taken as the flow capacity of the valve of that specific size, design, design and setting.
10.1.4.1.changed
Subsequent to flow capacity tests, the start-to-discharge pressure of a pressure relief valve shall be not less than 85 per cent, and the resealing pressure shall be not less than 80 per cent of the initial start-to-discharge and resealing pressures recorded under test No. 1 of paragraph 10.1.2. above.
10.1.4.2.changed
These tests are to be conducted approximately 1 hour after the flow capacity test, and the test procedure is to be the same as described under test No. 1 of paragraph 10.1.2. above.
10.2.1.changed
An excess flow valve shall operate at not more than 10 per cent above, nor less than 20 per cent below the rated closing flow capacity specified by the manufacturer, and shall close automatically at a pressure differential across the valve of not more than 100 kPa during the operation tests described below. Annex 15
10.2.2.changed
Three samples of each size and style of valve are to be subjected to these tests. A valve intended for use only with liquid is to be tested with water, otherwise the tests are to be made both with air and with water. Except as indicated in paragraph 10.2.3., 10.2.3. below, separate tests are to be run with each sample installed in vertical, horizontal and inverted positions. The tests with air to be made without piping or other restriction connected to the outlet of the tests sample.
10.2.3.changed
A valve intended for installation in one position only may be tested only in that position. Annex 15
10.2.12.changed
Three samples of each size of valve are to be subjected to these tests. The tests are to be made with air, and separate tests are to be run with each sample mounted vertically and horizontally. The tests are to be conducted as described in paragraphs 10.2.4. to 10.2.7., 10.2.7. above, with a filling unit hose coupling connected to the test sample and with the upper non-return valve held in the open position.
10.5.2.changed
At the choice of the Type Approval Authority the tests shall be performed according to either procedure A described in paragraph 10.5.5. or procedure B described in paragraph 10.5.6. below.
10.5.3.changed
The following tests shall be carried out along each of the three orthogonal axes of the test item. Annex 15
10.5.4.1.changed
Resonant frequencies of the filling limiter shall be determined by varying the frequency of applied vibration slowly through the specified range at reduced test levels but with sufficient amplitude to excite the item. Sinusoidal resonance search may be performed using the test level and cycling time specified for the cycling test, provided the resonance search time is included in the required cycling test time of paragraph 10.5.5.3. below.
10.5.4.2.changed
The test item shall be vibrated for 30 minutes along each axis at the most severe resonant frequencies determined in paragraph 10.5.5.1. below. The test level shall be 1.5 g (14.7 m/sec2). If more than four significant resonant frequencies are found for any one axis, the four most severe resonant frequencies shall be chosen for this test. If a change in the resonant Annex 15 frequency occurs during the test, its time of occurrence shall be recorded and immediately the frequency shall be adjusted to maintain the peak resonance condition. The final resonant frequency shall be recorded. The total dwell test time shall be included in the required cycling test time of paragraph 10.5.5.3. below.
10.5.5.1.changed
The test shall be performed on a sinusoidal vibrating bench, at a constant acceleration of 1.5 g and at frequencies ranging between 5 and 200 Hz. The test shall last for 5 hours for each of the axes specified in paragraph 10.5.4. above. The frequency band 5-200 Hz shall be covered in each of the two senses in 15 minutes.
12.1.changed
A metal LPG containing component shall comply with the leakage tests mentioned in 4, 5, 6 and 7 and after having been submitted to 144 hours salt spray test according to ISO 9227, with all connections closed. Annex 15 Or an optional test:
12.1.1.changed
A metal LPG containing component shall comply with the leakage tests mentioned in paragraphs 4, 5, 6 and 7 and after having been submitted to a salt spray test according to IEC 68-2-52 Kb: Salt Spray Fog Test. Test procedure: Before the test the component shall be cleaned according to the instructions of the manufacturer. All the connections shall be closed off. The component shall not be operated during the test. Subsequently the component shall be submitted during 2 hours to spraying with a solution of salt, containing 5 per cent NaCl (mass per cent) with less than 0.3 per cent contamination and 95 per cent distilled or demineralised water, at a temperature of 20 °C. After the spraying the component is stored at temperature of 40 °C and 90-95 per cent relative humidity for 168 hours. This sequence shall be repeated 4 times. After the test the component shall be cleaned and dried during 1 hour at 55 °C. The component shall now be conditioned to reference conditions during 4 hours, before submitting it to further testing. Annex 15
12.2.changed
A copper or brass LPG containing component shall comply with the leakage tests mentioned in paragraphs 4, 5, 6 and 7 and after having been submitted to 24 hours immersion in Ammonia according to ISO 6957 with all connections closed.
17.2.changed
The test is deemed to be satisfactory if the change in volume is less than 20 per cent, the change in mass is less than 5 per cent, the change in tensile strength is less than –25 per cent and the change in elongation at break is within –30 per cent and +10 per cent. Annex 16
Annex 16changed
category vehicles The sign consists of a sticker which must shall be weather resistant. The colour and dimensions of the sticker must shall fulfil the following requirements: Colours: Background : green Border : white or white reflecting Letters : white or white reflecting Dimensions Border width : 4 - 6 mm Character height : 25 mm Character thickness : 4 mm Sticker width : 110 - 150 mm Sticker height : 80 - 110 mm The word "LPG" must shall be centred in the middle of the sticker. Annex 17
Annex 17changed
The sign consists of a sticker which must shall be weather resistant. The colour and dimensions of the sticker must shall fulfil the following requirements: Colours: Background : red Letters : white or white reflecting Dimensions Character height : 5 mm Character thickness : 1 mm Sticker width : 70 - 90 mm Sticker height : 20 - 30 mm The text "FOR SERVICE PURPOSES ONLY" must shall be centred in the middle of the sticker.